A dust suppression device for construction engineeringInfo
- Publication number
- CN223416969U CN223416969U CN202422936659.XU CN202422936659U CN223416969U CN 223416969 U CN223416969 U CN 223416969U CN 202422936659 U CN202422936659 U CN 202422936659U CN 223416969 U CN223416969 U CN 223416969U
- Authority
- CN
- China
- Prior art keywords
- fixedly connected
- construction engineering
- dust
- mounting shell
- atomizer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)
Abstract
The utility model relates to a construction engineering construction technical field, and disclose a construction engineering construction is with dust device, including removing the base, the top of removing the base includes: the dust fall subassembly, the dust fall subassembly includes the installation shell, the inside of installation shell is provided with a plurality of atomizer, the equal fixedly connected with installation axle in two sides of a plurality of atomizer, the inside of installation shell is provided with a plurality of adjusting part, the utility model discloses a set up the dust fall subassembly, after the atomizer carries out the angle deviation for the spray angle of atomizer changes, consequently the spray range of atomizer changes, thereby the scope of its dust fall of control, through setting up conveying component, under conveying hose's effect, be convenient for carry in all atomizer with water, make all atomizer all can spray, under annular pipeline's effect, be convenient for connect all conveying hose, carry water.
Description
Technical Field
The utility model relates to the technical field of construction engineering construction, in particular to a dust fall device for construction engineering construction.
Background
The building construction refers to the production activity of engineering construction implementation stage, which is the construction process of various buildings, also can be said to be the process of changing various lines on a design drawing into real objects at a designated place, and comprises the steps of foundation engineering construction, main structure construction, roof engineering construction, decoration engineering construction and the like, wherein the place of construction operation is called a building construction site or a construction site, and is also called a construction site.
In the process of building engineering construction, a large amount of dust can be generated, the dust can bring harm to the bodies of construction site workers, and meanwhile, the environment is polluted, so that dust is required to be subjected to dust fall treatment, when the existing dust fall device is used, dust fall can only be carried out on a designated range, the dust fall range is limited, the dust fall working efficiency is reduced, and therefore the dust fall device for building engineering construction is provided.
Disclosure of utility model
(One) solving the technical problems
Aiming at the defects of the prior art, the utility model provides a dust settling device for construction engineering construction, which has the advantages that after an atomization nozzle is subjected to angle deviation, the spraying angle of the atomization nozzle is changed, so that the spraying range of the atomization nozzle is changed, the dust settling range is controlled, by arranging a conveying component, water is conveniently conveyed to all the atomization nozzles under the action of a conveying hose, all the atomization nozzles can be sprayed, all the conveying hose is conveniently connected under the action of an annular pipeline, water is conveniently conveyed, and the like, so that the problems that a large amount of dust is generated in the construction process of construction engineering, the dust can bring harm to the body of workers on the construction site, and the environment is polluted at the same time, therefore, dust settling treatment is required to be carried out on the dust, the dust settling range is limited only when the existing dust settling device is used, and the dust settling efficiency is reduced.
(II) technical scheme
In order to realize the purposes that after the angle deviation of the atomizing spray heads is carried out, the spraying angle of the atomizing spray heads is changed, so that the spraying range of the atomizing spray heads is changed, and the dust falling range of the atomizing spray heads is controlled, the conveying assembly is arranged, water is conveniently conveyed to all the atomizing spray heads under the action of the conveying hoses, all the atomizing spray heads can spray, all the conveying hoses are conveniently connected under the action of the annular pipeline, and the water is conveniently conveyed.
The dust settling assembly comprises a mounting shell, a plurality of atomizing nozzles are arranged in the mounting shell, mounting shafts are fixedly connected to two sides of each of the atomizing nozzles, and a plurality of adjusting assemblies are arranged in the mounting shell;
The conveying assembly comprises an annular pipeline, a plurality of conveying hoses are fixedly connected to the periphery of the annular pipeline, an output pipe is fixedly connected to the left side below the annular pipeline, the dust settling assembly is arranged, after the angle of the atomizing nozzle is shifted, the spraying angle of the atomizing nozzle is changed, the spraying range of the atomizing nozzle is changed, the dust settling range of the atomizing nozzle is controlled, the conveying assembly is arranged, water is conveniently conveyed to all the atomizing nozzles under the action of the conveying hoses, all the atomizing nozzles can be sprayed, and all the conveying hoses are conveniently connected under the action of the annular pipeline to convey the water.
As a preferable technical scheme of the utility model, one end of the installation shaft is rotatably connected with one side of the inner wall of the installation shell, the upper end of the conveying hose is fixedly connected with the lower surface of the atomizing nozzle, and the upper surface of the annular pipeline is fixedly connected with the lower surface of the installation shell, so that water can be conveniently conveyed into the atomizing nozzle by arranging the conveying hose.
As a preferable technical scheme of the utility model, the right side above the movable base is fixedly connected with an electric cylinder, the upper end of the electric cylinder is fixedly connected with the lower surface of the installation shell, and the electric cylinder is arranged to facilitate the adjustment of the height of the installation shell.
As a preferable technical scheme of the utility model, the adjusting component comprises an adjusting connecting rod, the upper end of the adjusting connecting rod is rotationally connected with a first connecting piece, the lower end of the adjusting connecting rod is rotationally connected with a second connecting piece, and the angle of the atomizing nozzle can be conveniently adjusted by arranging the adjusting component.
As a preferable technical scheme of the utility model, a moving assembly is arranged in the installation shell and comprises a threaded rod, a moving block is connected to the wall of the threaded rod in a threaded manner, a motor is fixedly connected to the upper end of the threaded rod, and all second connecting pieces are conveniently driven to move by arranging an electric cylinder.
As a preferable technical scheme of the utility model, one surface of the first connecting piece is fixedly connected with one end of the atomizing nozzle, the upper end and the lower end of the threaded rod are respectively and rotatably connected with the upper side and the lower side of the inner wall of the installation shell, the surface of the moving block is fixedly connected with the opposite surface of the second connecting piece, the lower surface of the motor is fixedly connected with the upper surface of the installation shell, and the second connecting piece is conveniently driven to move when the motor moves.
As a preferable technical scheme of the utility model, the left side above the movable base is fixedly connected with the water storage tank, the upper side of the water storage tank is fixedly connected with the water pump, the output end of the water pump is fixedly connected with the lower end of the output pipe, the water storage tank is convenient for storing water, and under the action of the water pump, the water in the water storage tank is convenient to be conveyed into the output pipe and conveyed into the annular pipeline through the output pipe.
(III) beneficial effects
Compared with the prior art, the utility model provides a dust falling device for construction engineering construction, which has the following beneficial effects:
1. This dust device through setting up the dust fall subassembly, after the atomizer carries out the angular displacement for the spray angle of atomizer changes, consequently the spray range of atomizer changes, thereby the scope of its dust fall of control, through setting up conveying assembly, in the effect of conveying hose, be convenient for carry water to all atomizer, make all atomizer all can spray, under annular pipeline's effect, be convenient for connect all conveying hose, carry water.
2. This dust device through setting up the water storage tank, is convenient for store water, under the effect of water pump, is convenient for carry the water in the water storage tank to the output tube in, carries to annular pipeline through the output tube in.
Drawings
Fig. 1 is a schematic perspective view of the whole structure of the present utility model.
FIG. 2 is a schematic diagram of a front cross-sectional structure of a dust suppression assembly according to the present utility model.
FIG. 3 is a schematic perspective view of a dust suppression assembly according to the present utility model.
In the figure, 1, a base is moved; 2, a dust falling component, 21, a mounting shell, 22, an atomization spray head, 23, a mounting shaft, 24, an adjusting component, 241, an adjusting connecting rod, 242, a first connecting piece, 243, a second connecting piece, 25, an electric cylinder, 26, a moving component, 261, a threaded rod, 262, a moving block, 263, a motor, 3, a conveying component, 31, an annular pipeline, 32, a conveying hose, 33, an output pipe, 34, a water storage tank, 35 and a water pump.
Detailed Description
In order that the above-recited objects, features and advantages of the present utility model will become more readily apparent, a more particular description of the utility model will be rendered by reference to specific embodiments thereof which are illustrated in the appended drawings.
Example 1
Referring to fig. 1-3, for a first embodiment of the present utility model, there is provided a dust settling device for construction engineering, including a movable base 1, wherein four corners below the movable base 1 are fixedly connected with movable wheels, and the upper part of the movable base 1 includes:
the dust settling assembly 2, the dust settling assembly 2 comprises a mounting shell 21, the mounting shell 21 is polygonal, a plurality of atomizing nozzles 22 are arranged in the mounting shell 21, mounting shafts 23 are fixedly connected to two sides of the atomizing nozzles 22, and a plurality of adjusting assemblies 24 are arranged in the mounting shell 21;
The conveying assembly 3, the conveying assembly 3 includes annular pipeline 31, all fixedly connected with a plurality of conveying hoses 32 around the annular pipeline 31, left side fixedly connected with output tube 33 below the annular pipeline 31.
One end of the installation shaft 23 is rotatably connected with one side of the inner wall of the installation shell 21, the upper end of the conveying hose 32 is fixedly connected with the lower surface of the atomizing nozzle 22, and the upper surface of the annular pipeline 31 is fixedly connected with the lower surface of the installation shell 21.
The right side on the upper surface of the movable base 1 is fixedly connected with an electric cylinder 25, and the upper end of the electric cylinder 25 is fixedly connected with the lower surface of the mounting shell 21.
The adjusting assembly 24 includes an adjusting link 241, a first connecting piece 242 is rotatably connected to an upper end of the adjusting link 241, and a second connecting piece 243 is rotatably connected to a lower end of the adjusting link 241.
The inside of installation shell 21 is provided with movable assembly 26, and movable assembly 26 includes threaded rod 261, and the pole wall threaded connection of threaded rod 261 has movable block 262, and the face number of movable block 262 sets up to the polygon of the same quantity with atomizer 22, and the upper end fixedly connected with motor 263 of threaded rod 261, motor 263 set up on installation shell 21, and the upside of the inner wall of installation shell 21 is run through to above it to the upper end of threaded rod 261.
One surface of the first connecting piece 242 is fixedly connected with one end of the atomizing nozzle 22, the upper end and the lower end of the threaded rod 261 are respectively and rotatably connected with the upper side and the lower side of the inner wall of the installation shell 21, the surface of the moving block 262 is fixedly connected with the opposite surface of the second connecting piece 243, and the lower surface of the motor 263 is fixedly connected with the upper surface of the installation shell 21.
During the use process, the dust settling device is moved to a use position through the movable base 1, and when the device is used, the electric cylinder 25 drives the installation shell 21 to move, and the installation shell 21 is moved to a designated height for operation;
At this time, water is conveyed into the annular pipeline 31 through the output pipe 33, and then conveyed into the atomizing nozzle 22 through the plurality of conveying hoses 32 on the annular pipeline 31 for spraying, so as to carry out dust fall treatment on site;
When the dust fall range needs to be increased, the motor 263 is started, the motor 263 can drive the threaded rod 261 to rotate, the threaded rod 261 drives the moving block 262 to move at the moment, the moving block 262 can drive the second connecting piece 243 to move, the second connecting piece 243 drives the lower end of the adjusting connecting rod 241 to move after moving, the adjusting connecting rod 241 at the moment generates offset, the adjusting connecting rod 241 drives one end of the atomizing spray head 22 to rotate through the first connecting piece 242, the atomizing spray head 22 rotates in the mounting shell 21 through the mounting shaft 23, at the moment, the spraying angle of the atomizing spray head 22 changes, and therefore the spraying range of the atomizing spray head 22 changes, and the spraying range of the atomizing spray head 22 is controlled.
Example 2
Referring to fig. 1 to 3, in a second embodiment of the present utility model, a water storage tank 34 is fixedly connected to the left side of the upper surface of the mobile base 1, a water pump 35 is fixedly connected to the upper surface of the water storage tank 34, and an output end of the water pump 35 is fixedly connected to a lower end of the output pipe 33.
In the use process, the water pump 35 is started to convey the water in the water storage tank 34 into the output pipe 33, the water enters the annular pipeline 31 through the output pipe 33, and then flows into the conveying hose 32 through the annular pipeline 31 to enter the atomizing nozzle 22 respectively, and is sprayed out through the atomizing nozzle 22.
The rest of the structure is the same as that of embodiment 1.
It should be noted that the above embodiments are only for illustrating the technical solution of the present utility model and not for limiting the same, and although the present utility model has been described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that the technical solution of the present utility model may be modified or substituted without departing from the spirit and scope of the technical solution of the present utility model, which is intended to be covered in the scope of the claims of the present utility model.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202422936659.XU CN223416969U (en) | 2024-11-29 | 2024-11-29 | A dust suppression device for construction engineering |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202422936659.XU CN223416969U (en) | 2024-11-29 | 2024-11-29 | A dust suppression device for construction engineering |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN223416969U true CN223416969U (en) | 2025-10-10 |
Family
ID=97250903
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202422936659.XU Active CN223416969U (en) | 2024-11-29 | 2024-11-29 | A dust suppression device for construction engineering |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN223416969U (en) |
-
2024
- 2024-11-29 CN CN202422936659.XU patent/CN223416969U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2020077660A1 (en) | Operating system and method for surface coating robot | |
| CN208066583U (en) | A kind of swing type atomizing de-dusting apparatus of constructing tunnel | |
| CN211587129U (en) | A support frame for easy angle adjustment for atomizing nozzles | |
| CN107487251A (en) | A kind of adjustable efficiently watering device for building | |
| CN223416969U (en) | A dust suppression device for construction engineering | |
| CN112516714A (en) | Watering dust fall structure for building engineering | |
| CN112221787A (en) | Paint spraying device for inner surface of wind power tower cylinder | |
| CN205217229U (en) | Outer surface paint sandblast composite set of steel pipe | |
| CN212523493U (en) | A dust device for construction engineering | |
| CN221889481U (en) | A dust removal device for building construction protection | |
| CN214552082U (en) | Tower crane environmental protection sprays dust device for building engineering | |
| CN215654449U (en) | Dustproof device for constructional engineering | |
| CN212739933U (en) | Dust settling system for storage yard of mixing station | |
| CN205217218U (en) | Steel pipe internal and external surface sandblast composite set that sprays paint | |
| CN216948043U (en) | Heatstroke prevention dust removal watering device for construction | |
| CN221964806U (en) | A height-adjustable fog cannon for construction sites | |
| CN214130893U (en) | Highway bridge construction is with on-spot dust removal spray set | |
| CN221536094U (en) | Dust fall equipment with spray range adjustable structure | |
| CN221941217U (en) | A construction sprinkler device | |
| CN216170916U (en) | Spray dust removal device for construction site | |
| CN221288360U (en) | Robot paint spraying apparatus | |
| CN220677242U (en) | Building engineering dust device | |
| CN221933476U (en) | A dust suppression device for garden engineering construction | |
| CN218221668U (en) | Indoor automatic dust removal spraying mechanism of green building construction | |
| CN219290963U (en) | Rotary water-spraying dust-settling device for building engineering management |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |