CN223373590U - A tower top construction platform - Google Patents

A tower top construction platform

Info

Publication number
CN223373590U
CN223373590U CN202422168345.XU CN202422168345U CN223373590U CN 223373590 U CN223373590 U CN 223373590U CN 202422168345 U CN202422168345 U CN 202422168345U CN 223373590 U CN223373590 U CN 223373590U
Authority
CN
China
Prior art keywords
embedded
construction platform
cable
embedded part
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202422168345.XU
Other languages
Chinese (zh)
Inventor
曾红亮
陈传磊
邓潜
吴健
张敬弦
李渊涛
李传威
冉富吕
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Road and Bridge International Co Ltd
Road and Bridge South China Engineering Co Ltd
Original Assignee
Road and Bridge International Co Ltd
Road and Bridge South China Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Road and Bridge International Co Ltd, Road and Bridge South China Engineering Co Ltd filed Critical Road and Bridge International Co Ltd
Priority to CN202422168345.XU priority Critical patent/CN223373590U/en
Application granted granted Critical
Publication of CN223373590U publication Critical patent/CN223373590U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cable Accessories (AREA)
  • Bridges Or Land Bridges (AREA)
  • Jib Cranes (AREA)

Abstract

The scheme relates to a tower top construction platform, including set up at the built-in fitting of cable tower top and with built-in fitting fixed connection's prefabricated support, the built-in fitting is including pre-buried first built-in fitting on concave type both sides wing wall top and pre-buried in the second built-in fitting of concave part, prefabricated support include with first built-in fitting and second built-in fitting fixed connection's bottom plate the back of the body cable face direction both sides of bottom plate are equipped with stand and dead lever respectively, the second built-in fitting is the supporting leg, still include the setting in the hoist and mount portal of the face direction both sides of facing the cable of bottom plate, formed stable operation platform to this need not the tower crane can accomplish the suspension cable installation work with the tower top construction platform.

Description

Tower top construction platform
Technical Field
The utility model relates to the field of bridge construction, in particular to the technical field of a tower top construction platform.
Background
In the construction process of a stay cable of a cable-stayed bridge, a traditional operation mode is to hoist cable rods through lifting devices such as a tower crane and the like to carry out shuttle operation of the cable.
The construction of the tower crane is limited, for example, the length of a crane arm is limited, the position needs to be adjusted for multiple times in the actual working condition, and due to the limited space in the tower crane, related materials such as hoisting and transferring anchorage devices and hydraulic jacks in the process of installing the stay cables need to be transferred for multiple times, so that a large amount of manpower and material resources are consumed, and the cost is high.
Meanwhile, during high-altitude operation, the stability of the tower crane is relatively poor and can be influenced by external factors such as wind power, and potential safety hazards to a certain extent are brought to construction safety.
Disclosure of Invention
In summary, the utility model provides a tower top construction platform aiming at the defects of the prior art, and aims to provide a safer, more efficient and stable working environment so as to improve the construction efficiency and safety and reduce the construction cost.
In order to achieve the above purpose, the present utility model adopts the following technical scheme:
The tower top construction platform comprises an embedded part arranged at the top of a cable tower and a prefabricated support fixedly connected with the embedded part, wherein the embedded part comprises a first embedded part embedded at the top ends of wing walls at two sides of a concave part and a second embedded part embedded in the concave part, the prefabricated support comprises a bottom plate fixedly connected with the first embedded part and the second embedded part, upright posts and inclined rods are respectively arranged at two sides of the bottom plate in the direction of the back cable surface, and the second embedded part is a supporting leg;
The hoisting door frame is arranged on two sides of the base plate in the direction of the rope facing surface.
Compared with the prior art, the embedded parts are respectively arranged at the top end and the inside of the concave part of the cable tower back cable surface concave cable tower, and a stable operation platform is formed through the fixed connection of the embedded parts and the bottom plate and the arrangement of the upright posts and the inclined rods. Meanwhile, hoisting door frames are arranged on two sides of the rope facing surface, so that the installation work of the stay ropes can be completed by using a tower top construction platform without a tower crane.
In some embodiments, the embedded parts comprise 2 groups of first embedded parts and 4 groups of second embedded parts on two sides in the direction of the back rope surface.
In a preferred embodiment, among the 4 sets of second embedded parts, at least 1 set of second embedded parts is attached to the inner wall of the cable tower wing wall.
In a preferred embodiment, the embedded part and the bottom plate are connected by welding.
In some embodiments, the base plate is provided with an index lifting region, and the lifting gantry is arranged in the index lifting region.
In some embodiments, the base plate is provided with a hoist layout area inside the index hoist area.
In some embodiments, the floor is provided with a shuttle deployment area lateral to the hoist deployment area.
In some embodiments, a guardrail is also included at the periphery of the floor.
In some embodiments, the device further comprises supporting frames which are arranged on the flanges at two sides of the rope facing surface and are abutted against the prefabricated supports.
Drawings
FIG. 1 is a schematic diagram of the back rope surface of an overhead construction platform;
FIG. 2 is a schematic diagram of a rope facing surface of an overhead construction platform;
FIG. 3 is a layout of embedded parts of a tower top construction platform;
Fig. 4 is a schematic diagram of installation of a cable-facing surface hoisting portal of the tower top construction platform;
FIG. 5 is a schematic diagram of a floor layout of an overhead construction platform;
FIG. 6 is a schematic diagram of a back rope surface of a hoisting operation of a tower top construction platform;
FIG. 7 is a schematic diagram of a tower top construction platform in an installed state;
fig. 8 is a schematic diagram of a cable-facing surface of an installation state of the tower top construction platform.
Detailed Description
The following examples are provided to illustrate the features of the present utility model and other related features in further detail to facilitate understanding by those skilled in the art:
The cable tower construction platform is arranged on the construction platform at the top of the cable tower. Referring to fig. 7 and 8, fig. 8 shows the rope facing surface of the rope tower 1, that is, the rope tower 1 faces the direction in which the stay rope penetrates. Fig. 7 shows the back cable side, i.e. the non-cable-facing side, which in this case is described by the back cable side.
Referring to fig. 1 to 3, the tower top construction platform comprises an embedded part arranged at the top of a tower cable 1, wherein the installation environment of the embedded part is that at least the back cable surface of the top of the cable tower 1 is of a concave structure. At this time, the embedded parts include a first embedded part 110 arranged at the top ends of the wing walls 11 at two sides of the concave part and a second embedded part 120 arranged in the concave part, so that the first embedded part 110 and the second embedded part 120 can be on the same plane, and the second embedded part 120 is of a supporting leg structure.
Specifically, referring to fig. 3, the embedded parts include 2 sets of first embedded parts 110 and 4 sets of second embedded parts 120 on two sides in the direction of the back cable surface. Preferably, 1 group is respectively arranged on two sides, and embedded parts can be added according to the requirement. Preferably, at least 1 group of second embedded parts 120 are attached to the inner wall of the wing wall 11, so that stability can be improved.
After the embedded part is arranged, the manufactured prefabricated support 200 is fixedly connected with the embedded part. Specifically, the prefabricated support 200 includes a base plate 210 fixedly connected to the prefabricated member, and upright posts 220 and diagonal rods 230 respectively provided on two sides of the back cable surface of the base plate 210 form a stable working platform, and actually, the two end surfaces of the back cable surface are respectively provided. Specifically, the base plate 210 and the embedded part may be connected by welding, and the periphery of the base plate 210 may be provided with a guard rail 240 for protection.
Referring to fig. 1 and 4 in combination, after having a stable working platform, the hoisting gantry 300 may be disposed on two sides of the base plate 210 in the direction of the rope facing surface, so that the installation work of the stay cable can be completed by using the tower top construction platform without a tower crane.
As an operation platform, referring to fig. 5 for arrangement of the base plate 210, the base plate is provided with index hoisting areas a and B, and the hoisting gantry 300 is disposed in the index hoisting areas a and B. At this time, the hoist arrangement areas E and F are provided inside the index hoisting areas a and B, and the operating state is now shown in fig. 6, in which the hoist 20 cooperates with the hoisting gantry 300. Further, the rope penetrating machine arrangement areas C and D are provided at the sides of the hoist arrangement area.
Referring to fig. 8, in some embodiments, partial flanges 12 may be formed on two sides of the rope facing surface, that is, relatively recessed portions, where the flanges 12 are provided with a supporting frame 400 abutting the prefabricated support 200. The work platform can be further extended. In this case, the two sides of the rope facing surface are left and right sides as shown in the drawing, and here, left and right sides indicate the direction of drawing.
As described above, the scheme protects a tower top construction platform, and all technical schemes which are the same as or similar to the scheme are shown to fall within the protection scope of the scheme.

Claims (9)

1. The tower top construction platform is characterized by comprising an embedded part arranged at the top of a cable tower (1) and a prefabricated support (200) fixedly connected with the embedded part, wherein the back cable surface at the top of the cable tower (1) is of a concave structure, the embedded part comprises a first embedded part (110) embedded at the top end of each wing wall (11) on two sides of the concave structure and a second embedded part (120) embedded in the concave structure, the prefabricated support (200) comprises a bottom plate (210) fixedly connected with the first embedded part (110) and the second embedded part (120), and upright columns (220) and inclined rods (230) are respectively arranged on two sides of the back cable surface direction of the bottom plate (210), and the second embedded part (120) is a supporting leg;
The hoisting gantry (300) is arranged on two sides of the base plate (210) in the direction of the rope facing surface.
2. The tower top construction platform according to claim 1, wherein the embedded parts comprise 2 groups of first embedded parts (110) and 4 groups of second embedded parts (120) on two sides in the direction of the back rope surface.
3. The tower top construction platform according to claim 2, wherein among the 4 sets of second embedded parts (120), 1 set of second embedded parts (120) is attached to the inner wall of the cable tower wing wall (11).
4. The overhead working platform according to claim 1, wherein the embedded part and the base plate (210) are connected by welding.
5. An overhead construction platform according to claim 1, wherein the base plate (210) is provided with index lifting areas (a, B), and the lifting gantry (300) is arranged in the index lifting areas (a, B).
6. An overhead construction platform according to claim 5, wherein the base plate (210) is provided with a winch arrangement area (E, F) inside the index hoisting area (a, B).
7. An overhead construction platform according to claim 6, wherein the base plate (210) is provided with shuttle placement areas (C, D) lateral to the hoist placement areas (E, F).
8. An overhead construction platform according to claim 1, further comprising a guard rail (240) at the periphery of the base plate (210).
9. An overhead working platform according to any one of claims 1 to 8, further comprising support frames (400) provided on both side flanges (12) of the rope facing surface and abutting the prefabricated support (200).
CN202422168345.XU 2024-09-04 2024-09-04 A tower top construction platform Active CN223373590U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202422168345.XU CN223373590U (en) 2024-09-04 2024-09-04 A tower top construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202422168345.XU CN223373590U (en) 2024-09-04 2024-09-04 A tower top construction platform

Publications (1)

Publication Number Publication Date
CN223373590U true CN223373590U (en) 2025-09-23

Family

ID=97089458

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202422168345.XU Active CN223373590U (en) 2024-09-04 2024-09-04 A tower top construction platform

Country Status (1)

Country Link
CN (1) CN223373590U (en)

Similar Documents

Publication Publication Date Title
CN112575948B (en) A roof truss composed of a string beam and a cantilever truss and a construction method thereof
CN205772984U (en) A kind of hanging apparatus of monolithic steel truss
CN201376848Y (en) Large-scale double-tower automatic-elevation hoisting equipment
CN210177371U (en) A cable-stayed cantilever integrated bridge erecting machine capable of piling
CN103643800A (en) Lifting installation system for buckling restrained supporting member and construction method thereof
CN216339064U (en) Fence mounting platform for bridge pier crane
CN106639106A (en) Steel structure flexible shed frame
CN213836318U (en) Bridge floor wet joint hangs mould structure
CN212954042U (en) Lattice formula cable saddle hoist and mount portal
CN120425727A (en) Suspended wall installation system and construction method suitable for fully prefabricated assembled stations
CN111139742B (en) Method for mounting and dismounting highway bridge girder erection machine
CN219218724U (en) Main girder hanging and paving integrated machine for combined girder cable-stayed bridge
CN219032968U (en) High-altitude suspension splicing system for cable-free large-span steel box girder
CN207244453U (en) A kind of suspension bridge light anchorage mast apparatus
CN217458555U (en) Manned lifting device of tower crane
CN112320630B (en) A support beam for heat absorber hoisting
CN214003866U (en) Supporting beam for hoisting heat absorber
CN222312550U (en) Shaft construction equipment bearing system with automatic lifting function
CN210368664U (en) Wide-body bridge girder erection machine
CN209922694U (en) Lifting appliance
CN223032878U (en) A high-altitude operation and transportation device for chimney
CN221000620U (en) A bracket device used for lifting large-segment steel beams at sea
CN220078407U (en) Double-column type railway-crossing light portal frame
CN212101684U (en) Movable hanging basket suitable for highway high-altitude construction operation
CN218434470U (en) Device for quickly hoisting bridge deck by cable crane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant