CN223215892U - Water conservancy pipeline installation auxiliary stay device - Google Patents

Water conservancy pipeline installation auxiliary stay device

Info

Publication number
CN223215892U
CN223215892U CN202422765632.9U CN202422765632U CN223215892U CN 223215892 U CN223215892 U CN 223215892U CN 202422765632 U CN202422765632 U CN 202422765632U CN 223215892 U CN223215892 U CN 223215892U
Authority
CN
China
Prior art keywords
supporting
clamping
connecting beam
water conservancy
lifting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202422765632.9U
Other languages
Chinese (zh)
Inventor
吴泽
薛涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiying River Water Conservancy Management Office Liangzhou District
Original Assignee
Xiying River Water Conservancy Management Office Liangzhou District
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiying River Water Conservancy Management Office Liangzhou District filed Critical Xiying River Water Conservancy Management Office Liangzhou District
Priority to CN202422765632.9U priority Critical patent/CN223215892U/en
Application granted granted Critical
Publication of CN223215892U publication Critical patent/CN223215892U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

The utility model discloses an auxiliary supporting device for installing a water conservancy pipeline, which belongs to the technical field of related equipment of water conservancy projects and comprises a connecting beam, a lifting frame and a supporting unit, wherein the connecting beam is provided with corresponding bearing capacity and supporting capacity, two ends of the connecting beam are respectively provided with a moving unit, two ends of the connecting beam are respectively connected with the moving unit through lifting columns, the lifting frame is provided with corresponding bearing capacity and supporting capacity, the lifting frame is arranged at the bottom of the lifting direction of the connecting beam and forms a circumferentially closed space with the connecting beam in the lifting direction, the supporting unit is arranged on a cross beam of the lifting frame, corresponding supporting operation is carried out below the lifting frame, the supporting height and the supporting position of the pipeline can be adjusted when the pipeline is lowered, and the two clamping pieces are driven to relatively move through a driving unit to clamp and support the pipelines with different outer diameters.

Description

Water conservancy pipeline installation auxiliary stay device
Technical Field
The utility model belongs to the technical field of related equipment of hydraulic engineering, and particularly relates to an auxiliary supporting device for hydraulic pipeline installation.
Background
The hydraulic pipeline laying is an important component in hydraulic engineering, and relates to a plurality of links such as pipeline construction, installation and maintenance. The purpose is to realize the functions of water transportation, water discharge, sewage treatment and the like, and ensure the safety and the quality of hydraulic engineering.
The water conservancy pipeline is required to be excavated when being paved, the pipeline is lifted to the upper part of the trench by utilizing the lifting device, the pipeline is lowered according to the paving direction, and the pipeline is supported at the bottom of the trench through the concrete pouring base. But to the longer pipeline of length, need the manual work to support at the interlude and the tail end of pipeline when the below to follow the decline of pipeline and follow adjustment supporting height, this kind of mode is easy the accidental injury constructor and inefficiency.
Disclosure of utility model
Aiming at the situation, the utility model provides an auxiliary supporting device for installing a water conservancy pipeline in order to overcome the defects of the prior art.
The technical scheme includes that the water conservancy pipeline installation auxiliary supporting device comprises a connecting beam, a lifting frame and supporting units, wherein the connecting beam is provided with corresponding bearing capacity and supporting force, two ends of the connecting beam are respectively provided with a moving unit, two ends of the connecting beam are respectively connected with the moving unit through lifting columns, the lifting frame is provided with corresponding bearing capacity and supporting force, the lifting frame is arranged at the bottom of the connecting beam in the lifting direction and forms a circumferentially closed space with the connecting beam in the lifting direction, and the supporting units are arranged on cross beams of the lifting frame and perform corresponding supporting operation below the lifting frame.
Further, the supporting unit comprises two opposite clamping pieces, the tops of the clamping pieces are respectively connected with the cross beam of the lifting frame in a sliding mode, the tops of the clamping pieces are respectively connected with the driving unit, the driving unit provides driving force for the clamping pieces to slide along the cross beam, the bottoms of the clamping pieces are bent in the preset direction to form supporting portions, and the supporting portions are provided with corresponding supporting forces.
Further, the clamping piece comprises a clamping inner piece and a clamping outer piece, a clamping working face of the clamping inner piece is provided with a preset bending radian, a corresponding gap is formed between the clamping outer piece and the clamping inner piece, and elastic filler is filled in the gap.
Further, a traction hook is arranged on the moving front side of the connecting beam, and the traction hook can be provided with a traction rope.
Further, the plug board and the plug slot are respectively configured at one end of the support part, which is close to each other, and the plug board is matched with the plug slot.
After the structure is adopted, the water conservancy pipeline installation auxiliary supporting device has the beneficial effects that the connecting beam is supported by the lifting upright post and moves along the excavated groove through the moving unit, the supporting height and the supporting position of the pipeline can be adjusted when the pipeline is lowered, the driving unit drives the two clamping pieces to move relatively, the pipelines with different outer diameter sizes are clamped and supported, and the practicability of the device is improved.
Drawings
The accompanying drawings are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this specification, illustrate the utility model and together with the embodiments of the utility model, serve to explain the utility model.
FIG. 1 is a schematic diagram of the whole structure of an auxiliary supporting device for installing a water conservancy pipeline;
Fig. 2 is a schematic structural view of a supporting unit of the auxiliary supporting device for installing water conservancy pipelines.
FIG. 3 is a partial cross-sectional view of an auxiliary support device for installing a water conservancy pipeline according to the present utility model;
In the drawing, 1, a connecting beam, 2, a lifting frame, 3, a supporting bottom plate, 4, a movable wheel, 5, a clamping piece, 6, a clamping inner piece, 7, a clamping outer piece, 8, a traction hook, 9, a plugboard, 10, a plugboard slot, 11, a lifting upright post, 12 and a telescopic push rod.
Detailed Description
The technical solutions of the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present utility model, and it is apparent that the described embodiments are only some embodiments of the present utility model, but not all embodiments, and all other embodiments obtained by those skilled in the art without making any inventive effort based on the embodiments of the present utility model are within the scope of protection of the present utility model.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
As shown in fig. 1-3, an auxiliary supporting device for installing a water conservancy pipeline comprises a connecting beam 1, wherein the connecting beam 1 is provided with corresponding bearing capacity and supporting force, two ends of the connecting beam 1 are respectively connected with a moving unit through lifting columns 11, the connecting beam 1 is used for crossing between two sides of a trench to be excavated, the moving unit can comprise a supporting bottom plate 3 and a moving wheel 4 arranged at the bottom of the supporting bottom plate 3, the connecting beam 1 is erected on the two supporting bottom plates 3 through the lifting columns 11, the lifting columns 11 can adjust the height of the connecting beam 1 during lifting operation, the lifting columns 11 can be connected with a hydraulic working system, the hydraulic working system provides driving force for the lifting columns 11, the moving unit is displaced along the length direction of the trench to adjust the operation position of the connecting beam 1, wherein a traction hook 8 is arranged at the moving front side of the connecting beam 1, a traction rope can be arranged, the traction rope can be connected with a tractor, and the whole pulling device moves along the length direction of the trench.
In some preferred embodiments, the lifting frame 2 has corresponding bearing capacity and supporting force and is arranged at the bottom of the lifting direction of the connecting beam 1, can be a U-shaped frame, and comprises two vertical beams connected with the connecting beam 1 and a cross beam fixed between the vertical beams, wherein the extending directions of two ends of the cross beam are consistent with those of the connecting beam 1, and the supporting unit is arranged on the cross beam of the lifting frame 2 in a sliding manner and is used for clamping and supporting under the cross beam. Specifically, the two vertical beams are respectively provided with a driving unit, the driving supporting unit slides along the cross beam, the driving unit can be a telescopic push rod 12, the telescopic push rod 12 slides along the cross beam direction, the telescopic push rod 12 can be connected with a hydraulic working system, and the hydraulic working system provides driving force for the telescopic push rod 12.
In some preferred embodiments, the supporting unit includes two opposite clamping members 5, the top parts of the clamping members 5 are respectively connected with the cross beam of the lifting frame 2 in a sliding manner, the top parts of the clamping members 5 are respectively connected with a driving unit, the driving unit provides driving force for the clamping members 5 to slide along the cross beam, the bottom parts of the clamping members 5 are bent along a predetermined direction to form supporting parts, and the supporting parts have corresponding supporting forces. When the lifting column 11 works, the lifting frame 2 and the supporting unit lift along with the connecting beam 1 to adjust the supporting and clamping working positions, wherein, preferably, the plug board 9 and the plug slot 10 are respectively arranged at one ends of the supporting parts, which are close to each other, and the plug board 9 is matched with the plug slot 10.
The clamping piece 5 comprises a clamping inner piece 6 and a clamping outer piece 7, the clamping working surface of the clamping inner piece 6 is provided with a preset bending radian, a corresponding gap is formed between the clamping outer piece 7 and the clamping inner piece 6, elastic fillers are filled in the gap, the clamping part and the supporting part of the clamping outer piece 7 correspond to the clamping part and the supporting part of the clamping inner piece 6, the clamping outer piece 7 can be of an L-shaped structure and provided with corresponding supporting force, the clamping inner piece 6 is correspondingly supported, the clamping inner piece 6 is provided with a preset bending radian, the gap between the clamping outer piece 7 and the clamping outer piece 7 is filled with the elastic fillers (for example, rubber materials with a certain elastic deformation force), and excessive clamping is avoided when the pipe is supported.
The support device is used for cleaning the ground on two sides of the top end of a cut groove, so that the connecting beam 1 can move along the length direction of the groove through the moving unit, the connecting beam 1 spans the corresponding height of the groove, when a long pipeline is lifted by the lifting device, the support device is moved to a proper working position from the tail end of the pipeline to the front end (the tail end of the pipeline passes through the clamping piece 5), and when the support device is used, the number of the support devices can be determined according to the length of the pipeline. After the supporting device moves to a proper operation position, the horizontal position of the clamping piece 5 is adjusted through the telescopic push rod 12, the supporting operation height is adjusted through the lifting upright post 11, pipelines with different outer diameter sizes are clamped and supported, when the supporting device is arranged below the pipelines, the lifting upright post 11 is lowered along with the pipelines to adjust the supporting height of the supporting part, after the lifting part is lowered to a foundation stone poured in the groove, the front end part (lifted part) of the pipelines is supported by the base table at the moment, the base table can be continuously poured along the laying direction of the pipelines, the telescopic push rod 12 is controlled, the clamping pieces 5 are separated from each other and are moved along the laying direction through the traction rope to adjust the supporting position until the pouring is completed, the supporting devices are separated from the pipelines (a plurality of supporting devices can be matched with each other, one supporting device can continuously support, one supporting device can adjust the supporting height, the clamping piece 5 is convenient to separate from the pipelines and move along the pipelines to change the supporting position or separate from the pipelines), and the device is convenient to dismantle the pipelines, and can be repeatedly used.
Although embodiments of the present utility model have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made therein without departing from the principles and spirit of the utility model, the scope of which is defined in the appended claims and their equivalents. In summary, if one of ordinary skill in the art is informed by this disclosure, a structural manner and an embodiment similar to the technical solution should not be creatively devised without departing from the gist of the present utility model. All parts of the utility model can be driven by corresponding external motors, which is not described in detail in the prior art.

Claims (5)

1. Water conservancy pipeline installs auxiliary stay device, a serial communication port includes:
The connecting beam is provided with corresponding bearing capacity and supporting force, the two ends of the connecting beam are respectively provided with a moving unit, and the two ends of the connecting beam are respectively connected with the moving unit through lifting upright posts;
the lifting frame is provided with corresponding bearing capacity and supporting force, is arranged at the bottom of the lifting direction of the connecting beam, and forms a circumferentially closed space with the connecting beam in the lifting direction;
And the supporting unit is arranged on the cross beam of the lifting frame and is used for carrying out corresponding supporting operation below the lifting frame.
2. The auxiliary supporting device for water conservancy pipeline installation according to claim 1, wherein the supporting unit comprises two opposite clamping pieces, the tops of the clamping pieces are respectively connected with the cross beam of the lifting frame in a sliding mode, the tops of the clamping pieces are respectively connected with the driving unit, the driving unit provides driving force for the clamping pieces to slide along the cross beam, the bottoms of the clamping pieces are bent along a preset direction to form supporting portions, and the supporting portions have corresponding supporting force.
3. The auxiliary supporting device for water conservancy pipeline installation according to claim 2, wherein the clamping piece comprises a clamping inner piece and a clamping outer piece, the clamping working face of the clamping inner piece is provided with a preset bending radian, a corresponding gap is formed between the clamping outer piece and the clamping inner piece, and elastic filler is filled in the gap.
4. The auxiliary supporting device for water conservancy pipeline installation according to claim 1, wherein the movable front side of the connecting beam is provided with a traction hook, and the traction hook can be provided with a traction rope.
5. The auxiliary supporting device for water conservancy pipeline installation according to claim 2, wherein the plug board and the plug groove are respectively arranged at one ends of the supporting parts, which are close to each other, and the plug board is matched with the plug groove.
CN202422765632.9U 2024-11-13 2024-11-13 Water conservancy pipeline installation auxiliary stay device Active CN223215892U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202422765632.9U CN223215892U (en) 2024-11-13 2024-11-13 Water conservancy pipeline installation auxiliary stay device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202422765632.9U CN223215892U (en) 2024-11-13 2024-11-13 Water conservancy pipeline installation auxiliary stay device

Publications (1)

Publication Number Publication Date
CN223215892U true CN223215892U (en) 2025-08-12

Family

ID=96654869

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202422765632.9U Active CN223215892U (en) 2024-11-13 2024-11-13 Water conservancy pipeline installation auxiliary stay device

Country Status (1)

Country Link
CN (1) CN223215892U (en)

Similar Documents

Publication Publication Date Title
KR101243775B1 (en) Apparatus of Constructing Bridge and Method of Constructing Bridge by Using the Same
CN109210274B (en) Pipe jacking pipeline butt joint device and method
CN114412203B (en) Auxiliary device for hoisting and positioning prefabricated wall components
CN208329596U (en) A kind of semi-machine rail type subway station side wall template construction equipment
CN114687292A (en) A universal support that slides for land area bridge construction
CN211772954U (en) Simple sliding device vehicle for replacing high-speed railway continuous beam support
CN107447668B (en) Automatic lifting positioning variable-cross-section bridge pier template
CN214946926U (en) Municipal construction drainage pipe bearing structure
CN112942110B (en) Convenient and fast movable type bridge centralized drainage pipeline installation operation platform
CN113982257A (en) Template structure and template system
CN209957301U (en) Lifting device for cutting concrete support beam
CN218226739U (en) Clamping vertical lifting mechanism of mobile robot
CN118600878A (en) Self-climbing support structure for bridge jacking and jacking method thereof
CN217325034U (en) A universal stand that slides for land area bridge construction
CN216075091U (en) Peripheral structure of underground building engineering construction inversion construction structures
CN212917120U (en) Green building section bar numerical control equipment of bending
CN211395897U (en) Underdrain external mold lining trolley
CN116374722A (en) An intelligent cable pay-off rack
CN110258629A (en) The assembled equipment and its assembling method of prefabricated components
CN209603180U (en) A kind of flexible internal model with connect frame carriage
CN218818574U (en) Pipeline laying equipment
CN210917648U (en) Inner mold lining trolley for underdrain
CN207129856U (en) Platform crane and motor platform
CN222138576U (en) Jacking device for building structure reinforcement
CN215756040U (en) Mechanical lifting type engineering machinery transfer device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant