CN223153729U - Integrated duct system - Google Patents
Integrated duct systemInfo
- Publication number
- CN223153729U CN223153729U CN202422272928.7U CN202422272928U CN223153729U CN 223153729 U CN223153729 U CN 223153729U CN 202422272928 U CN202422272928 U CN 202422272928U CN 223153729 U CN223153729 U CN 223153729U
- Authority
- CN
- China
- Prior art keywords
- threaded rods
- fixedly arranged
- mounting
- integrated
- bodies
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Duct Arrangements (AREA)
Abstract
The application relates to the technical field of air pipes and discloses an integrated air pipe system, which comprises a wall body, two pipe bodies and four installation pieces, wherein two fixing frames are fixedly arranged at the bottom end of the wall body, first threaded rods are fixedly arranged at the two sides of the bottom end of each fixing frame, first adjusting cavities are formed in one side of the upper ends of the four installation pieces in a penetrating mode, connecting columns are fixedly arranged at the upper ends of the two pipe bodies, connecting plates are fixedly arranged at the upper ends of the two connecting columns, second threaded rods are fixedly arranged at the two sides of the bottom end of each connecting plate, second adjusting cavities are formed in the bottom ends of the four installation pieces in a penetrating mode, and the four second threaded rods are arranged in the corresponding second adjusting cavities. The integrated air duct system has the advantages that the angle of the duct body is adjusted, and the duct bodies can be stably and rapidly connected.
Description
Technical Field
The utility model belongs to the technical field of air pipes, and particularly relates to an integrated air pipe system.
Background
With the development of comprehensive national force and building technology in China, more and more super high-rise buildings and large-scale comprehensive business bodies in various cities are in planning, designing and constructing periods, and in the buildings, special vertical pipe shafts for air conditioner air pipes are generally arranged and used for installing air pipes with different numbers, different using functions or different specifications.
The prior patent (bulletin number: CN 207196844U) discloses an integrated air pipe system, which comprises a plurality of integrated air pipe modules, wherein each integrated air pipe module comprises a shared bracket and a plurality of air pipe units, air pipe fixing devices and bracket fixing devices are arranged on the shared brackets at intervals, the air pipe units are fixed on the shared brackets side by side through the air pipe fixing devices, connecting devices are arranged at two ends of the air pipe units, the shared brackets are fixed on a building structure through the bracket fixing devices, and adjacent integrated air pipe modules are connected through the connecting devices of the corresponding air pipe units.
It is pointed out in the above-mentioned comparison document that the integrated tuber pipe module can connect various tuber pipe units as required in the mill, form customizable standard module, finally transport to the job site, carry out integral hoisting and installation, form integrated tuber pipe system, but the device uses shared support as the intermediate structure of connecting wall body and tuber pipe, use this kind of intermediate structure although increased the convenience of installation, but also need guarantee the regularity when shared support installs simultaneously, if the angular deviation appears, can influence the connection between the tuber pipes, still can cause the damage to the wall when need reinstallation, and follow-up restoration problem, so propose integrated tuber pipe system and solve above-mentioned problem.
Disclosure of utility model
Aiming at the defects of the prior art, the application provides an integrated air duct system, which has the advantages of adjusting the angles of the duct bodies, ensuring stable and quick connection between the duct bodies and the like, and solves the problems that the common support is used as an intermediate structure for connecting a wall body and an air duct, the intermediate structure is convenient to install, the uniformity of the common support during installation is ensured, if the angle deviation occurs, the wall is damaged when the installation is required to be reinstalled, and the problem of subsequent repair is solved.
In order to achieve the purpose, the integrated air duct system comprises a wall body, two duct bodies and four installation pieces, wherein two fixing frames are fixedly arranged at the bottom end of the wall body, first threaded rods are fixedly arranged on two sides of the bottom end of each fixing frame, first adjusting cavities are respectively formed in one side of the upper end of each installation piece in a penetrating mode, and the four first adjusting cavities penetrate through the corresponding first threaded rods.
Two the body upper end is all fixed and is provided with the spliced pole, two the spliced pole upper end is all fixed and is provided with the connecting plate, two the connecting plate bottom both sides are all fixed and are provided with the second threaded rod, four the installed part bottom is all run through and is provided with the second adjustment chamber, four the second threaded rod all sets up in the second adjustment intracavity that corresponds.
Through above-mentioned scheme, the device is through setting up mount, mounting, first threaded rod, first adjustment chamber, the second adjustment chamber, the body, spliced pole and connecting plate isotructure, when accomplishing the mount with wall body fixed mounting to the body, can remove the fore-and-aft position of body through the front and back position of removal mounting, the body is when the installation, the adjacent hookup location of two bodies needs to be pressed close to, but when two bodies are aligned, adjacent face friction is great like this, it is comparatively inconvenient when splice installation, through seting up first adjustment chamber on the mounting, when two bodies are used for the concatenation, can promote the body from one side and press close to, avoided the friction of body both sides, splice more laborsaving, simultaneously, through setting up the angle adjustment, even the deviation on the angle appears in the mount at the installation, also need not to dismantle the adjustment to the mount, rotate the body, make the connecting plate rotate in the cavity of mounting, the angle that can adjust the body is used for correcting the problem of angle skew when the mount installation, reduce the repeated construction of mount, increase work efficiency.
Further, the outer walls of one ends of the four first threaded rods extending out of the first adjusting cavity are all in threaded connection with first nuts.
Through above-mentioned scheme, carry out threaded connection through setting up first nut and first screw rod, in order to fix its position after the adjustment finishes.
Further, the outer walls of one ends of the four second threaded rods extending out of the second adjusting cavity are sleeved and connected with gaskets and second nuts in a threaded mode.
Through above-mentioned scheme, through setting up gasket and second nut in order to fix its position after the angular adjustment is accomplished.
Further, one ends of the two pipe bodies, which are close to each other, are fastened and connected through the cooperation of the fastening bolt and the third nut.
Through above-mentioned scheme, carry out fastening connection through fastening bolt and third nut cooperation between the body.
Further, cavities are formed in the four mounting pieces.
Through above-mentioned scheme, the setting of cavity is in order to hold the connecting plate.
Compared with the prior art, the technical scheme of the application has the following beneficial effects:
The device is through setting up mount, the installed part, first threaded rod, first adjustment chamber, the second adjustment chamber, the body, spliced pole and connecting plate isotructure, when installing the body with mount and wall body fixed mounting completion back, can remove the fore-and-aft position of body through removing the front-and-back position of installed part, the body is when installing, the adjacent hookup location of two bodies needs to press close, but when two bodies are aligned, adjacent face friction is great like this, it is comparatively inconvenient when splice installation, through seting up first adjustment chamber on the installed part, when two bodies are used for the concatenation, can follow the promotion body from one side and press close to, avoided the friction of body both sides, splice more laborsaving, simultaneously, through setting up the angle adjustment, even the deviation on the angle appears in the mount at the installation, also need not to dismantle the adjustment to the mount, rotate the body, make the connecting plate rotate in the cavity of installed part, the angle of adjustable body is used for correcting the problem of angle skew during the installation, reduce the repeated construction to the mount, increase work efficiency.
Drawings
FIG. 1 is a schematic view of the overall structure of an integrated ductwork system of the present utility model;
FIG. 2 is a front view of the integrated ductwork system of the present utility model;
FIG. 3 is a schematic diagram of a front-to-back tuning architecture of the integrated ductwork system of the present utility model;
Fig. 4 is a schematic view of an angle adjusting structure of the integrated duct system of the present utility model.
The figure shows that the concrete is 1, a wall body, 2, a pipe body, 3, a fixing frame, 4, a first threaded rod, 5, a mounting piece, 6, a first adjusting cavity, 7, a first nut, 8, a second adjusting cavity, 9, a connecting column, 10, a connecting plate, 11, a second threaded rod, 12, a gasket, 13, a second nut, 14, a fastening bolt, 15 and a third nut.
Detailed Description
The following description of the embodiments of the present application will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present application, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the application without making any inventive effort, are intended to be within the scope of the application.
Referring to fig. 1 and 3, the integrated air duct system in this embodiment includes a wall 1, two pipes 2 and four mounting members 5, two fixing frames 3 are fixedly disposed at the bottom end of the wall 1, first threaded rods 4 are fixedly disposed at two sides of the bottom ends of the two fixing frames 3, first adjusting cavities 6 are respectively and respectively provided at one side of the upper ends of the four mounting members 5, and the four first adjusting cavities 6 respectively pass through the corresponding first threaded rods 4.
Referring to fig. 2 and 4, connecting posts 9 are fixedly arranged at the upper ends of the two pipe bodies 2, connecting plates 10 are fixedly arranged at the upper ends of the two connecting posts 9, second threaded rods 11 are fixedly arranged at two sides of the bottom ends of the two connecting plates 10, second adjusting cavities 8 are arranged at the bottom ends of the four mounting pieces 5 in a penetrating mode, and the four second threaded rods 11 are arranged in the corresponding second adjusting cavities 8.
Referring to fig. 2, 3 and 4, the outer walls of one ends of the four first threaded rods 4 extending out of the first adjusting cavity 6 are all in threaded connection with a first nut 7, the outer walls of one ends of the four second threaded rods 11 extending out of the second adjusting cavity 8 are all sleeved and in threaded connection with a gasket 12 and a second nut 13, one ends of the two pipe bodies 2, which are close to each other, are in fastening connection through the cooperation of a fastening bolt 14 and a third nut 15, and cavities are formed in the four mounting pieces 5.
In this embodiment, through setting up structure such as mount 3, mounting 5, first threaded rod 4, first adjustment chamber 6, second adjustment chamber 8, body 2, spliced pole 9 and connecting plate 10, when the mount 3 is installed to body 2 with wall body 1 fixed mounting completion back, can remove the front and back position of body 2 through removing the front and back position of mounting 5, body 2 is when the installation, but when two bodies 2 are aligned, adjacent face friction is great like this, it is comparatively inconvenient when the concatenation is installed, through seting up first adjustment chamber 6 on mounting 5, can follow one side and promote body 2 and press close when two bodies 2 are used for the concatenation, the friction of body 2 both sides has been avoided, the concatenation is more laborsaving, simultaneously, through setting up the angle modulation, even mount 3 has appeared the deviation in the angle and also need not to dismantle the adjustment to mount 3, rotate body 2, make connecting plate 10 rotate in the cavity in mounting 5, the angle of adjustable body 2 is used for the 3 when the installation of the repeated work offset of mount, the work efficiency of 3 is improved when the repeated construction.
The pipe body 2, the connecting post 9, the connecting plate 10 and the second threaded rod 11 are integrally formed, and when the pipe body 2 is rotated to adjust the angle, the connecting plate 10 is rotated in the cavity inside the mounting member 5, so that the angle adjustment and the position adjustment are independent and do not interfere with each other
The working principle of the embodiment is as follows:
When the device is used, the first adjusting cavity 6 on the two mounting pieces 5 corresponds to the first threaded rod 4, the first nut 7 is screwed, the subsequent adjustment is convenient to be carried out by screwing the first nut 7, the pipe body 2 is pre-mounted by means of an external tool, one of the second threaded rods 11 arranged at the bottom end of the connecting plate 10 penetrates into the second adjusting cavity 8, one of the mounting pieces 5 is moved to be close to the other mounting piece 5 and wrap the connecting plate 10, afterwards, the pipe body 2 is moved and the two mounting pieces 5 are driven to move along the first adjusting cavity 6, the pipe body 2 is contacted with the other pipe body 2, then the pipe body 2 is rotated to enable the connecting plate 10 to rotate, the second threaded rod 11 is further rotated in the second adjusting cavity 8, after adjustment is finished, the gasket 12 and the second threaded rod 13 are respectively pre-mounted with the second threaded rod 11, the fastening bolts 14 penetrate through the two adjacent pipe bodies 2, the third threaded rods 15 are screwed at one ends of the fastening bolts 14, the pipe body 2 is fixed, after the fixation is finished, the pre-mounted first threaded rod 7 and the second threaded rod 13 are screwed, and the pipe body 2 is screwed.
It is noted that relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising one does not exclude the presence of other like elements in a process, method, article, or apparatus that comprises an element.
Although embodiments of the present application have been shown and described, it will be understood by those skilled in the art that various changes, modifications, substitutions and alterations can be made hereto without departing from the spirit and principles of the present application.
Claims (5)
1. The integrated air duct system comprises a wall body (1), two pipe bodies (2) and four mounting pieces (5) and is characterized in that two fixing frames (3) are fixedly arranged at the bottom end of the wall body (1), first threaded rods (4) are fixedly arranged at two sides of the bottom end of each fixing frame (3), first adjusting cavities (6) are respectively formed in one side of the upper end of each mounting piece (5) in a penetrating mode, and the four first adjusting cavities (6) penetrate through the corresponding first threaded rods (4);
Two all fixed spliced pole (9) that are provided with in body (2) upper end, two spliced pole (9) upper end is all fixed be provided with connecting plate (10), two connecting plate (10) bottom both sides are all fixed be provided with second threaded rod (11), four mounting (5) bottom all runs through and is provided with second adjustment chamber (8), four second threaded rod (11) all set up in corresponding second adjustment chamber (8).
2. An integrated air duct system according to claim 1, characterized in that the outer walls of the ends of the four first threaded rods (4) extending out of the first adjusting cavity (6) are all in threaded connection with first nuts (7).
3. An integrated air duct system according to claim 1, characterized in that the outer walls of the ends of the four second threaded rods (11) extending out of the second adjusting chamber (8) are respectively sleeved and screwed with a gasket (12) and a second nut (13).
4. An integrated ductwork system according to claim 1, characterized in that the ends of the two tubular bodies (2) which are close to each other are fastened by means of a fastening bolt (14) and a third nut (15) which cooperate.
5. An integrated ductwork system according to claim 1, characterized in that four of said mounting members (5) are each provided with a cavity inside.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202422272928.7U CN223153729U (en) | 2024-09-18 | 2024-09-18 | Integrated duct system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202422272928.7U CN223153729U (en) | 2024-09-18 | 2024-09-18 | Integrated duct system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN223153729U true CN223153729U (en) | 2025-07-25 |
Family
ID=96466119
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202422272928.7U Active CN223153729U (en) | 2024-09-18 | 2024-09-18 | Integrated duct system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN223153729U (en) |
-
2024
- 2024-09-18 CN CN202422272928.7U patent/CN223153729U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106592775B (en) | A high-precision embedded parts reinforcement installation device, method and application | |
| CN212154215U (en) | Take prefabricated wallboard bearing structure to one side of entrance to a cave | |
| CN221878546U (en) | Detachable steel construction building crossbeam of split type | |
| CN220319204U (en) | Bottom adjustable supporting device for assembly type bay window construction | |
| CN220504183U (en) | Connecting device for steel beam and special-shaped column of assembled steel structure house | |
| CN111058653A (en) | Combined component supporting tool system and construction method thereof | |
| CN204947971U (en) | modular photovoltaic bracket | |
| CN217824810U (en) | BIPV anchor clamps formula photovoltaic support | |
| CN221193879U (en) | Bearing device for building curtain wall engineering components | |
| CN223274030U (en) | A solar panel bracket that is easy to assemble for a building construction team | |
| CN209129226U (en) | A kind of novel corner fastener structure | |
| CN220851060U (en) | Support structure for building pipeline erection | |
| CN218161569U (en) | Tunnel cable installing support cross arm mounting structure | |
| CN220167141U (en) | Assembled building steel construction | |
| CN222186055U (en) | Pipe gallery fixing frame for hydropower installation project | |
| CN217734539U (en) | Adjustable assembled suspended ceiling reverse supporting device | |
| CN220521576U (en) | Light steel structural member | |
| CN219863380U (en) | Steel structure module | |
| CN216690323U (en) | Novel wall connecting piece device | |
| CN223088710U (en) | Adjustable photovoltaic curtain wall | |
| CN219569282U (en) | Assembled curtain wall | |
| CN223708827U (en) | Adjustable pipeline bracket for assembly type machine room | |
| CN220814220U (en) | Reinforcing connecting frame with adjusting function | |
| CN222894778U (en) | A pipe load-bearing support structure for prisms | |
| CN222009613U (en) | Aluminum alloy formwork connection bracket for construction engineering |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |