CN223018162U - A sunken wading arc-shaped hanging formwork reinforcement structure - Google Patents

A sunken wading arc-shaped hanging formwork reinforcement structure Download PDF

Info

Publication number
CN223018162U
CN223018162U CN202422250881.4U CN202422250881U CN223018162U CN 223018162 U CN223018162 U CN 223018162U CN 202422250881 U CN202422250881 U CN 202422250881U CN 223018162 U CN223018162 U CN 223018162U
Authority
CN
China
Prior art keywords
arc
shaped
aluminum
die
shaped aluminum
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202422250881.4U
Other languages
Chinese (zh)
Inventor
李海涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baoding Tongheng Construction Engineering Co ltd
Original Assignee
Baoding Tongheng Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoding Tongheng Construction Engineering Co ltd filed Critical Baoding Tongheng Construction Engineering Co ltd
Priority to CN202422250881.4U priority Critical patent/CN223018162U/en
Application granted granted Critical
Publication of CN223018162U publication Critical patent/CN223018162U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a submerged wading arc-shaped hanging die reinforcing structure, which relates to the technical field of hanging die reinforcing and comprises a plurality of corner arc-shaped aluminum dies, wherein an arc-shaped aluminum die is fixedly connected between two adjacent corner arc-shaped aluminum dies, angle steel is arranged on the top surfaces of two opposite arc-shaped aluminum dies, one end of the angle steel is detachably connected with an outer aluminum die, the bottom surfaces of the two opposite arc-shaped aluminum dies are detachably connected with a structural descending plate, a top plate aluminum die is arranged at one end of the structural descending plate, which is away from the arc-shaped aluminum die, and one end of the angle steel, which is away from the outer aluminum die, is detachably connected with the top plate aluminum die. The utility model is connected with the arc aluminum mould through the angle steel, is arranged at the high-low span part to form the blocking mould, can be formed at one time after concrete is poured, avoids the working procedures of manual painting and the like at the later stage, can effectively avoid the problems of mould running, mould removing, angle falling and the like, effectively improves the engineering quality and the engineering progress, and reduces the comprehensive cost.

Description

Sinking type wading arc-shaped hanging die reinforcing structure
Technical Field
The utility model relates to the technical field of hanging die reinforcement, in particular to a sinking wading arc-shaped hanging die reinforcement structure.
Background
The wading room in the building comprises parts such as a bathroom, a balcony and the like, is generally designed to be sunken, the ground height of the wading room is lower than that of other rooms, in the traditional construction, a square timber hanging die is generally adopted, the problems of die expansion and difficult die disassembly are easy to occur due to the material of square timber, and meanwhile, the working procedures such as manual octagonal smearing and the like are needed in the later stage after concrete pouring, so that time and labor are wasted, square steel is adopted to replace the wading room in the prior art, and the problems of die running and die disassembly and corner falling exist.
Therefore, a submerged wading arc-shaped hanging die reinforcing structure is needed, not only can be formed at one time, the working procedures such as manual painting at a later stage are avoided, but also the problems of die running, die removal, corner falling and the like can be effectively avoided, the engineering quality and the engineering progress are effectively improved, and the comprehensive cost is reduced.
Disclosure of utility model
The utility model aims to provide a submerged wading arc-shaped hanging die reinforcing structure, which aims to solve the problems in the prior art.
In order to achieve the purpose, the utility model provides a submerged wading arc-shaped hanging die reinforcing structure, which comprises a plurality of corner arc-shaped aluminum dies, wherein arc-shaped aluminum dies are fixedly connected between two adjacent corner arc-shaped aluminum dies, angle steel is arranged on the top surfaces of the two opposite arc-shaped aluminum dies, an outer aluminum die is detachably connected to one end of the angle steel, a structural descending plate is detachably connected to the bottom surfaces of the two opposite arc-shaped aluminum dies, a top plate aluminum die is mounted at one end of the structural descending plate, which is away from the arc-shaped aluminum dies, and one end of the angle steel, which is away from the outer aluminum die, is detachably connected with the top plate aluminum die.
Preferably, a plurality of corner arc aluminum dies and a plurality of arc aluminum dies are spliced into a rectangle.
Preferably, the angle steel is provided with a plurality of angle steel.
Preferably, two ends of the angle steel are detachably connected with the outer aluminum die and the top plate aluminum die through opposite-penetrating bolts respectively.
Preferably, the arc aluminum die and the side surface of the corner arc aluminum die, which is abutted against the structural descending plate, are arc-shaped.
Preferably, the arc aluminum die is detachably connected with the angle steel through a plurality of connecting pieces.
Preferably, the arc-shaped aluminum die and the corner arc-shaped aluminum die are arranged in a hollow mode.
Preferably, the top surface of the arc-shaped aluminum die is provided with a cavity, and the connecting piece is arranged in the cavity in advance.
The utility model discloses the following technical effects:
The utility model is connected with the arc aluminum mould through the angle steel, is arranged at the high-low span part to form the blocking mould, can be formed at one time after concrete is poured, avoids the working procedures of manual painting and the like at the later stage, can effectively avoid the problems of mould running, mould removing, angle falling and the like, effectively improves the engineering quality and the engineering progress, and reduces the comprehensive cost.
Drawings
In order to more clearly illustrate the embodiments of the present utility model or the technical solutions in the prior art, the drawings that are needed in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present utility model, and other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic plan view of the present utility model;
FIG. 2 is a schematic cross-sectional view of the structure of FIG. 1 at A-A in accordance with the present utility model;
FIG. 3 is an enlarged schematic view of the structure of FIG. 2A according to the present utility model;
FIG. 4 is an enlarged schematic view of the structure of FIG. 2B according to the present utility model;
FIG. 5 is an enlarged schematic view of the structure of FIG. 2 at C according to the present utility model;
FIG. 6 is a schematic view of the structure of the arc aluminum die and the bolt of the utility model;
Wherein, 1, arc aluminum mould; 2, corner arc aluminum mould, 3, angle steel, 4, structural descending plate, 5, beam or shear wall, 6, guide wall or turning edge, 7, connecting piece, 8, opposite through bolt, 9, outer aluminum mould, 10, top plate aluminum mould.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
In order that the above-recited objects, features and advantages of the present utility model will become more readily apparent, a more particular description of the utility model will be rendered by reference to the appended drawings and appended detailed description.
Referring to fig. 1-6, the utility model discloses a submerged wading arc-shaped hanging die reinforcing structure, which comprises a plurality of corner arc-shaped aluminum dies 2, wherein an arc-shaped aluminum die 1 is fixedly connected between two adjacent corner arc-shaped aluminum dies 2, the top surfaces of two opposite arc-shaped aluminum dies 1 are provided with angle steels 3, one ends of the angle steels 3 are detachably connected with outer aluminum dies 9, the bottom surfaces of the two opposite arc-shaped aluminum dies 1 are detachably connected with structural descending plates 4, one ends of the structural descending plates 4, which are far away from the arc-shaped aluminum dies 1, are provided with top plate aluminum dies 10, and one ends of the angle steels 3, which are far away from the outer aluminum dies 9, are detachably connected with the top plate aluminum dies 10.
The utility model is connected with the arc-shaped aluminum mould 1 through the angle steel 3, is arranged at the high-low span part to form the blocking mould, can be formed at one time after concrete is poured, avoids the working procedures of manual painting and the like at the later stage, can effectively avoid the problems of mould running, mould removing, angle falling and the like, effectively improves the engineering quality and the engineering progress, and reduces the comprehensive cost.
Further optimizing scheme, a plurality of corner arc aluminum mould 2 splice into the rectangle with a plurality of arc aluminum mould 1.
Further optimizing scheme, angle steel 3 is provided with a plurality of.
According to the further optimization scheme, two ends of the angle steel 3 are detachably connected with the outer aluminum die 9 and the top plate aluminum die 10 through the opposite-penetrating bolts 8 respectively. The opposite-penetrating bolt 8 adopts a water-stopping screw or a sleeve opposite-penetrating screw, the water-stopping screw needs to be cut off smoothly, and the sleeve opposite-penetrating screw needs to be plugged in the later period.
Further optimizing scheme, arc aluminum mould 1, corner arc aluminum mould 2 are the arc with the side of structure descending board 4 butt. The later leveling layer is omitted, and the molding can be performed once.
Further optimizing scheme, arc aluminum mould 1 can dismantle with angle steel 3 through a plurality of connecting piece 7 and be connected.
Further optimizing scheme, arc aluminum mould 1, corner arc aluminum mould 2 are interior cavity setting. The weight of the arc-shaped aluminum die 1 and the corner arc-shaped aluminum die 2 can be reduced.
Further optimizing scheme, the cavity is offered to the top surface of arc aluminium mould 1, and connecting piece 7 sets up in the cavity in advance. The connection 7 may be a bolt or a pin.
The working process comprises the following steps:
1. the arc template is manufactured by firstly carrying out die matching according to the size of each side of a sinking space, wherein each side is generally a whole arc aluminum die 1 connected with a corner arc aluminum die 2, each side arc aluminum die 1 can be divided into a plurality of sections for assembly in a longer time, a corner part is required to be manufactured into a finished corner arc aluminum die 2, 45-degree grooves are needed to be cut on sectional materials, then two sectional materials are welded at a vertical angle of 90 degrees relative to each other through the grooves to form the corner arc aluminum die 2, and the corner arc aluminum die 2 is connected with each side straight edge arc aluminum die 1 to form the whole arc template.
2. And 4, binding the plate steel bars, namely cleaning sundries on the arc templates, bouncing steel bar spacing lines, starting binding the plate steel bars from the 1/2 spacing of the edges of the beams or the shear walls 5, binding plate bottom steel bars firstly, and binding plate upper layer steel bars after the pipelines are installed.
3. And (3) installing an arc-shaped hanging die, namely fixing one end of angle steel 3 penetrating through a beam or a shear wall 5 at the upper opening of an outer aluminum die 9 through a through bolt 8, connecting one end of angle steel 3 penetrating through a guide wall or a turning edge 6 through a through bolt 8 penetrating through a top plate aluminum die 10 of a structural descending plate 4 to form a bridge system, effectively connecting the arc-shaped hanging die according to position positioning and elevation, and installing corners at high and low span positions through corner arc-shaped aluminum dies 2 (the size is determined according to design) to form a blocking die.
4. The concrete pouring method comprises the steps of pouring concrete, wherein the virtual paving thickness of the concrete of a pouring plate is larger than 20mm, the vibrating distance is less than or equal to 500mm, quincuncial vibration is compact, scraping by a scraping rule, leveling the root position of a hanging die, controlling the flatness, carrying out secondary surface collecting and calendaring, avoiding a later leveling layer and carrying out one-step forming.
5. The formwork is removed and the forming effect is that firstly, angle steel 3 is removed from one side to the other side in sequence, then the arc-shaped hanging die is removed, so that the concrete arc is smooth and compact without being pried and smashed.
6. And (3) processing the penetrating bolt 8, namely cutting and flattening the water stopping screw rod by a cutting machine, and plugging and compacting the hole of the penetrating screw rod by micro-expansion cement mortar by the sleeve.
7. And (3) curing, namely carrying out sprinkling curing on the floor slab at regular time, and avoiding the problems of sand generation, cracks, insufficient strength and the like caused by water loss.
According to the utility model, the arc-shaped aluminum mould 1 and the corner arc-shaped aluminum mould 2 are made of aluminum alloy sections, arc-shaped hanging moulds are manufactured according to the size of each opening, a bridge frame reinforcing system is made of angle steel 3 and connected with the arc-shaped hanging moulds, the arc-shaped hanging moulds are arranged at the high-low span parts to form a blocking mould, and after concrete is poured, an octagonal shape is formed once, so that the working procedures of manually smearing the octagonal shape in the later period are omitted.
The arc-shaped aluminum die 1 and the corner arc-shaped aluminum die 2 adopt the shaping die, the size and the position of the sinking floor slab are fixed accurately and firmly, the root arc is formed at one time, the later painting cost is avoided, and the technical defects of traditional die running and die removal and corner falling are overcome.
The utility model effectively improves the engineering quality and the engineering progress and reduces the comprehensive cost.
In the description of the present utility model, it should be understood that the terms "longitudinal," "transverse," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like indicate or are based on the orientation or positional relationship shown in the drawings, merely to facilitate description of the present utility model, and do not indicate or imply that the devices or elements referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus should not be construed as limiting the present utility model.
The above embodiments are only illustrative of the preferred embodiments of the present utility model and are not intended to limit the scope of the present utility model, and various modifications and improvements made by those skilled in the art to the technical solutions of the present utility model should fall within the protection scope defined by the claims of the present utility model without departing from the design spirit of the present utility model.

Claims (8)

1.一种下沉式涉水间弧型吊模加固结构,其特征在于:包括若干个转角弧形铝模(2),相邻的两个所述转角弧形铝模(2)之间固定连接有弧形铝模(1),两个相对的所述弧形铝模(1)的顶面设置有角钢(3),所述角钢(3)的一端可拆卸连接有外铝模(9),两个相对的所述弧形铝模(1)的底面可拆卸连接有结构降板(4),所述结构降板(4)背离所述弧形铝模(1)的一端安装有顶板铝模(10),所述角钢(3)远离所述外铝模(9)的一端与所述顶板铝模(10)可拆卸连接。1. A sunken wading room arc-shaped hanging form reinforcement structure, characterized in that it comprises a plurality of corner arc-shaped aluminum molds (2), an arc-shaped aluminum mold (1) is fixedly connected between two adjacent corner arc-shaped aluminum molds (2), an angle steel (3) is arranged on the top surface of two opposite arc-shaped aluminum molds (1), one end of the angle steel (3) is detachably connected to an outer aluminum mold (9), and the bottom surfaces of the two opposite arc-shaped aluminum molds (1) are detachably connected to a structural drop plate (4), and a top plate aluminum mold (10) is installed at one end of the structural drop plate (4) away from the arc-shaped aluminum mold (1), and the end of the angle steel (3) away from the outer aluminum mold (9) is detachably connected to the top plate aluminum mold (10). 2.根据权利要求1所述的下沉式涉水间弧型吊模加固结构,其特征在于:若干个所述转角弧形铝模(2)与若干个弧形铝模(1)拼接成矩形。2. The sunken wading room arc-shaped hanging formwork reinforcement structure according to claim 1 is characterized in that: a plurality of said corner arc-shaped aluminum molds (2) and a plurality of arc-shaped aluminum molds (1) are spliced into a rectangle. 3.根据权利要求1所述的下沉式涉水间弧型吊模加固结构,其特征在于:所述角钢(3)设置有若干个。3. The sunken wading arc-shaped hanging formwork reinforcement structure according to claim 1 is characterized in that: a plurality of angle steels (3) are provided. 4.根据权利要求1所述的下沉式涉水间弧型吊模加固结构,其特征在于:所述角钢(3)的两端分别通过对穿螺栓(8)与所述外铝模(9)、所述顶板铝模(10)可拆卸连接。4. The sunken wading arc-shaped hanging formwork reinforcement structure according to claim 1 is characterized in that the two ends of the angle steel (3) are detachably connected to the outer aluminum formwork (9) and the top plate aluminum formwork (10) through through bolts (8). 5.根据权利要求1所述的下沉式涉水间弧型吊模加固结构,其特征在于:所述弧形铝模(1)、所述转角弧形铝模(2)与所述结构降板(4)抵接的侧面呈弧形。5. The sunken wading room arc-shaped hanging formwork reinforcement structure according to claim 1 is characterized in that the side surfaces where the arc-shaped aluminum formwork (1), the corner arc-shaped aluminum formwork (2) abut against the structural drop plate (4) are arc-shaped. 6.根据权利要求1所述的下沉式涉水间弧型吊模加固结构,其特征在于:所述弧形铝模(1)通过若干个连接件(7)与所述角钢(3)可拆卸连接。6. The sunken wading room arc-shaped hanging formwork reinforcement structure according to claim 1 is characterized in that the arc-shaped aluminum formwork (1) is detachably connected to the angle steel (3) through a plurality of connecting pieces (7). 7.根据权利要求1所述的下沉式涉水间弧型吊模加固结构,其特征在于:所述弧形铝模(1)、所述转角弧形铝模(2)内中空设置。7. The sunken wading room arc-shaped hanging formwork reinforcement structure according to claim 1 is characterized in that the arc-shaped aluminum formwork (1) and the corner arc-shaped aluminum formwork (2) are hollow inside. 8.根据权利要求6所述的下沉式涉水间弧型吊模加固结构,其特征在于:所述弧形铝模(1)的顶面开设有空腔,所述连接件(7)预先设置在所述空腔内。8. The sunken wading arc-shaped hanging formwork reinforcement structure according to claim 6 is characterized in that a cavity is opened on the top surface of the arc-shaped aluminum formwork (1), and the connecting piece (7) is pre-arranged in the cavity.
CN202422250881.4U 2024-09-13 2024-09-13 A sunken wading arc-shaped hanging formwork reinforcement structure Active CN223018162U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202422250881.4U CN223018162U (en) 2024-09-13 2024-09-13 A sunken wading arc-shaped hanging formwork reinforcement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202422250881.4U CN223018162U (en) 2024-09-13 2024-09-13 A sunken wading arc-shaped hanging formwork reinforcement structure

Publications (1)

Publication Number Publication Date
CN223018162U true CN223018162U (en) 2025-06-24

Family

ID=96086830

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202422250881.4U Active CN223018162U (en) 2024-09-13 2024-09-13 A sunken wading arc-shaped hanging formwork reinforcement structure

Country Status (1)

Country Link
CN (1) CN223018162U (en)

Similar Documents

Publication Publication Date Title
CN112726878A (en) Formwork-erecting-free construction method for masonry filler wall constructional column, prefabricated module and mould
CN112681162A (en) Construction method for movable split mounting type light formwork cast-in-situ box culvert
CN113700157A (en) Concrete constructional column supporting method for roof post-cast strip
CN115324343B (en) Construction method of pre-embedded large radiation-proof steel plate in shear wall
CN107035045A (en) A kind of precast concrete bidirectional hollow plate and preparation method thereof
CN210216896U (en) Prefabricated plate skeleton and prefabricated plate
CN114837404A (en) Sunken type falling plate pouring mold and pouring method
CN120384637A (en) Standardized anti-slope formwork and integrated pouring construction method for sunken toilets
CN204728698U (en) The closed formwork structure of a kind of concrete suspension bridging piece
CN114193611A (en) Construction forming method of assembly type bridge deck prefabricated member
CN119238720A (en) Forming technology and forming mold of prefabricated concrete box house
CN219365408U (en) Pouring forming positioning device for counter sill and constructional column base of caisson
CN207643373U (en) A kind of prefabricated anchor block adjustable composite steel form
CN110185254A (en) A kind of Combined aluminum alloy template system and its application method
CN109208799B (en) Construction method for early formwork removal in structure hole of waffle slab
CN207140033U (en) Assembly concrete exterior wall board mold
CN213412368U (en) Horizontal adjustable prefabricated building body mould
CN115781880A (en) Bench formwork device for vertical casting stairs
CN219241312U (en) Support prefabricated mould of concrete wall body negative and positive angle
CN211114819U (en) A kind of turnover stereotype mold used in the construction of the sinking room
CN113174843B (en) Customized openable bridge expansion joint template and construction method
CN217268355U (en) Constructional column non-disassembly pouring mold
CN219241317U (en) Precast support mould of concrete high-low span floor
CN215549566U (en) But side forms of quick assembly disassembly component production with magnetism box
CN206319587U (en) The making mould of concrete floor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant