CN223003708U CN202422209645.8U CN202422209645U CN223003708U CN 223003708 U CN223003708 U CN 223003708U CN 202422209645 U CN202422209645 U CN 202422209645U CN 223003708 U CN223003708 U CN 223003708U
Authority
CN
China
Prior art keywords
frame
baffle
wall surface
reinforced concrete
sliding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202422209645.8U
Other languages
Chinese (zh)
Inventor
贾功勋
贾功磊
李丽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Endurance Technology Group Co ltd
Original Assignee
Endurance Technology Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Endurance Technology Group Co ltd filed Critical Endurance Technology Group Co ltd
Priority to CN202422209645.8U priority Critical patent/CN223003708U/en
Application granted granted Critical
Publication of CN223003708U publication Critical patent/CN223003708U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开了厂房机电安装工程用钢筋混凝土架设装置,包括第一挡板,所述第一挡板右侧壁面均匀贯穿螺纹连接有固定销,所述固定销右侧分别贯穿螺纹连接有一个第二挡板,所述第一挡板下方设置有框架,所述框架的内部前壁面开设有一个滑槽,该厂房机电安装工程用钢筋混凝土架设装置固定板通过连接螺栓固定安装于墙体上,随后通过转动传动丝杆带动滑块移动,通过连接块对固定板进行固定,通过转动升降丝杆转动带动连接杆向上移动,对第一支撑板和第二支撑板的高度进行调节,同时根据框架的大小拉动第二支撑板进行调节面积,便于根据框架的不同尺寸对设备的高度和面积进行调节,设备连接稳定,操作便捷,使用较为灵活,满足了使用者的日常需求。

The utility model discloses a reinforced concrete erection device for electromechanical installation engineering of a factory building, comprising a first baffle, a right wall surface of the first baffle being evenly penetrated with a fixing pin connected with a thread, a second baffle being respectively penetrated with a thread connected with the right side of the fixing pin, a frame being arranged below the first baffle, a slide groove being arranged on the inner front wall surface of the frame, the fixing plate of the reinforced concrete erection device for electromechanical installation engineering of a factory building being fixedly installed on the wall by connecting bolts, and then the sliding block is driven to move by rotating the transmission screw rod, the fixing plate is fixed by the connecting block, the connecting rod is driven to move upward by rotating the lifting screw rod, the height of the first support plate and the second support plate is adjusted, and the second support plate is pulled to adjust the area according to the size of the frame, so that the height and area of the equipment can be adjusted according to the different sizes of the frame, the equipment connection is stable, the operation is convenient, the use is relatively flexible, and the daily needs of the user are met.

Description

Reinforced concrete erection device for electromechanical installation engineering of factory building
Technical Field
The utility model relates to the technical field of concrete erection devices, in particular to a reinforced concrete erection device for a factory building electromechanical installation project.
Background
A reinforced concrete (for short, reinforced concrete) erection device is equipment for constructing and erecting a reinforced concrete structure in a building engineering. The reinforced concrete is a composite material formed by combining reinforced bars and concrete, has the advantages of high strength, durability, compression resistance and the like, is widely applied to building structures, plays an important role in projects such as buildings, bridges, tunnels and the like, promotes the development and progress of modern building projects, but the traditional reinforced concrete erection device for the electromechanical installation project of a factory still has certain defects, such as:
The utility model provides a "reinforced concrete erects device for factory building electromechanical installation engineering" that is CN202210881352.7, including four backplate that are used for square concrete to finalize the design, adopt four backplate head to meet and enclose into a square frame, then set up C type and link plate in the head of backplate, when adjacent backplate is connected, the link plate is located C type and colludes, set up the dial in C type colludes, rotate the dial and can stir the link plate, and can stir the link plate to collude in the C type, set up the pinch bar in the one end of dial, the pinch bar one end cover is established the pinch bar, fix the locating lever on the outer wall that the C type colluded, can four backplate enclose into a fastening connection's square frame when docking with the pinch bar, and then improved the efficiency that concrete placement erect greatly, reverse operation just can break away from four self-protection boards and hardened base lateral walls, according to the above-mentioned, this reinforced concrete erects device, but when higher wall is concrete placement, stability of equipment is relatively poor, result in pouring equipment is very good to the position and can't be used to the equipment is very high to the flexible condition, the equipment is very high to the user is very poor and is very flexible at the user.
Disclosure of utility model
The utility model aims to provide a reinforced concrete erection device for a factory building electromechanical installation project, which aims to solve the problems that in the background art, when a higher wall surface is used for concrete pouring, equipment stability is poor, so that when a floating position is poured, the equipment cannot be well fixed and adjusted in height, the equipment is inflexible to use, the structure is too single, and a user is often bothered.
In order to achieve the purpose, the reinforced concrete erection device for the mechanical and electrical installation engineering of the factory building comprises a first baffle, wherein a fixing pin is uniformly connected with the right side wall surface of the first baffle in a penetrating threaded manner, a second baffle is respectively connected with the right side of the fixing pin in a penetrating threaded manner, a frame is arranged below the first baffle, a sliding groove is formed in the inner front wall surface of the frame, a longitudinal screw rod is connected in the sliding groove in a sliding manner, a first clamping block is connected with the lower end of the longitudinal screw rod in a penetrating threaded manner, a transverse screw rod is connected with the right wall surface of the first clamping block in a penetrating threaded manner, the first clamping block is in sliding connection with the frame, and a second clamping block is connected with the right side of the transverse screw rod in a penetrating threaded manner.
As a preferable technical scheme of the utility model, the four sliding grooves are arranged on the circular array of the frame, the first clamping blocks, the transverse screw rods and the second clamping blocks are symmetrically arranged on the longitudinal center of the frame, the longitudinal screw rods are symmetrically arranged on the transverse center of the frame, and the first baffle is positioned between the two first clamping blocks.
As a preferable technical scheme of the utility model, the second baffle is positioned between the first clamping block and the second clamping block, the lower bottom surface of the left side of the frame is contacted with the first supporting plate, the second supporting plate is connected inside the first supporting plate in a sliding way, and the front wall surface of the first supporting plate is connected with the first fixing rod in a sliding way.
As the preferable technical scheme of the utility model, the front wall surface of the second supporting plate is slidably connected with a second fixing rod, the lower ends of the first fixing rod and the second fixing rod are fixedly arranged on a connecting rod, a lower bottom surface bearing of the connecting rod is connected with a lifting screw rod, and the lower end of the lifting screw rod is in threaded connection with a base.
As the preferable technical scheme of the utility model, the right wall surface of the connecting rod is slidably connected with the left wall surface of the upper end of the base, the right part of the base is in threaded connection with a transmission screw rod, the right end bearing of the transmission screw rod is connected with a sliding block, the lower end of the sliding block is slidably connected with a connecting block, and the upper top surface of the right side of the connecting block is in threaded sliding connection with a sliding rod.
As the preferable technical scheme of the utility model, the upper top surface of the sliding rod is fixedly arranged on the upper right side of the base, a fixed plate is arranged below the connecting block, the lower bottom surface of the connecting block penetrates through and is connected to the left side of the fixed plate in a sliding manner, and a plurality of connecting bolts uniformly penetrate through and are connected to the left wall surface of the fixed plate in a threaded manner.
Compared with the prior art, the utility model has the beneficial effects that the reinforced concrete erection device for the electromechanical installation engineering of the factory building,
The fixed plate passes through connecting bolt fixed mounting on the wall body, drives the slider through rotating the transmission lead screw and removes afterwards, fixes the fixed plate through the connecting block, rotates through the rotation lift lead screw and drives the connecting rod and upwards move, adjusts the height of first backup pad and second backup pad, and the area is adjusted to the second backup pad according to the size pulling of frame simultaneously, is convenient for adjust the height and the area of equipment according to the different sizes of frame, and equipment connection is stable, and the simple operation uses comparatively in a flexible way, has satisfied user's daily demand.
The first baffle and the second baffle are replaced according to the required size, then the first baffle and the second baffle are fixed through the fixing pins, then the positions of the first clamping block and the second clamping block are adjusted through rotating the transverse screw rod and the longitudinal screw rod, the first baffle and the second baffle are fixed through the first clamping block and the second clamping block, equipment can be adjusted according to different requirements of a user, the use is flexible, the fixing is stable, and the labor burden of the user is reduced.
Drawings
FIG. 1 is a schematic view of a front view in cross section;
FIG. 2 is a schematic top view of a frame according to the present utility model;
FIG. 3 is a schematic top view of a first baffle and a second baffle according to the present utility model;
FIG. 4 is a schematic view of a front cross-sectional structure of a base of the present utility model;
FIG. 5 is an enlarged schematic view of the structure of FIG. 2A according to the present utility model;
Fig. 6 is an enlarged schematic view of the structure of fig. 1 at B according to the present utility model.
The device comprises a first baffle plate, a second baffle plate, a frame, a longitudinal screw rod, a first clamping block, a transverse screw rod, a second clamping block, a first supporting plate, a second supporting plate, a first fixing rod, a second fixing rod, a lifting screw rod, a second supporting plate, a base, a transmission screw rod, a first sliding block, a second sliding block, a connecting rod, a second sliding block, a connecting rod, a sliding groove, a sliding rod and a sliding rod.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-6, the utility model provides a technical scheme, the reinforced concrete erection device for the electromechanical installation engineering of a factory building comprises a first baffle plate 1, wherein a fixed pin 2 is uniformly connected with the right side wall surface of the first baffle plate 1 in a penetrating threaded manner, a second baffle plate 3 is respectively connected with the right side of the fixed pin 2 in a penetrating threaded manner, a frame 4 is arranged below the first baffle plate 1, a sliding groove 21 is formed in the inner front wall surface of the frame 4, a longitudinal screw rod 5 is connected with the sliding groove 21 in a sliding manner, a first clamping block 6 is connected with the lower end of the longitudinal screw rod 5 in a penetrating threaded manner, a transverse screw rod 7 is connected with the right wall surface of the first clamping block 6 in a penetrating threaded manner, and the first clamping block 6 is in sliding connection with the frame 4, and a second clamping block 8 is connected with the right side of the transverse screw rod 7 in a penetrating threaded manner.
The sliding grooves 21 are formed in a circular array with respect to the frame 4, the first clamping blocks 6, the transverse screw rods 7 and the second clamping blocks 8 are symmetrically arranged with respect to the longitudinal center of the frame 4, the longitudinal screw rods 5 are symmetrically arranged with respect to the transverse center of the frame 4, and the first baffle plate 1 is positioned between the two first clamping blocks 6.
The second baffle 3 is located between the first clamp splice 6 and the second clamp splice 8, and the bottom surface contact has first backup pad 9 under the left side of frame 4, and the inside sliding connection of first backup pad 9 has second backup pad 10, and the preceding wall sliding connection of first backup pad 9 has first dead lever 11.
The front wall surface of the second supporting plate 10 is slidably connected with a second fixing rod 12, the lower ends of the first fixing rod 11 and the second fixing rod 12 are fixedly installed on a connecting rod 20, a lifting screw rod 13 is connected with a lower bottom surface bearing of the connecting rod 20, and a base 14 is connected with the lower end of the lifting screw rod 13 in a threaded mode.
The right wall surface sliding connection of connecting rod 20 is in the upper end left wall surface of base 14, and the right part of base 14 runs through threaded connection has transmission lead screw 15, and the right-hand member bearing of transmission lead screw 15 is connected with slider 16, and the lower extreme sliding connection of slider 16 has connecting block 17, and the upper top surface of the right side of connecting block 17 runs through sliding connection has slide bar 22.
The upper top surface of slide bar 22 fixed mounting is in the right side upper portion of base 14, and the below of connecting block 17 is provided with fixed plate 18, and the lower bottom surface of connecting block 17 runs through sliding connection in the left side of fixed plate 18, and the left wall of fixed plate 18 evenly runs through threaded connection has a plurality of connecting bolts 19.
When the reinforced concrete erection device for the factory building electromechanical installation engineering is used, firstly, a user fixedly installs a fixed plate 18 on a wall body through a connecting bolt 19, then drives a sliding block 16 to move through a rotary transmission screw 15, fixes the fixed plate 18 through a connecting block 17, drives a connecting rod 20 to move upwards through rotation of a rotary lifting screw 13, adjusts the heights of a first supporting plate 9 and a second supporting plate 10, simultaneously pulls the second supporting plate 10 according to the size of a frame 4 to adjust the area, then replaces the first baffle plate 1 and the second baffle plate 3 according to the required size, then fixes the first baffle plate 1 and the second baffle plate 3 through a fixing pin 2, then adjusts the positions of a first clamping block 6 and a second clamping block 8 through rotation of a transverse screw 7 and a longitudinal screw 5, fixes the first baffle plate 1 and the second baffle plate 3 through the first clamping block 6 and the second clamping block 8, and then places the frame 4 in the upper direction of the first supporting plate 9 and the second supporting plate 10 to the inside equipment for pouring.
To complete a series of work, and what is not described in detail in this specification is prior art that is well known to those skilled in the art.
It will be evident to those skilled in the art that the utility model is not limited to the details of the foregoing illustrative embodiments, and that the present utility model may be embodied in other specific forms without departing from the spirit or essential characteristics thereof. The present embodiments are, therefore, to be considered in all respects as illustrative and not restrictive, the scope of the utility model being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The reinforced concrete erection device for the electromechanical installation engineering of the factory building comprises a first baffle (1);
The method is characterized in that:
The right side wall surface of first baffle (1) evenly runs through threaded connection and has fixed pin (2), the right side of fixed pin (2) runs through threaded connection respectively and has a second baffle (3), the below of first baffle (1) is provided with frame (4), spout (21) have been seted up to the inside front wall surface of frame (4), the inside sliding connection of spout (21) has vertical lead screw (5), the lower extreme of vertical lead screw (5) runs through threaded connection and has first clamp splice (6), the right side wall surface of first clamp splice (6) runs through threaded connection and has horizontal lead screw (7), and first clamp splice (6) are sliding connection with frame (4), the right side of horizontal lead screw (7) runs through threaded connection and has second clamp splice (8).
2. The reinforced concrete erection device for the electromechanical installation engineering of the factory building according to claim 1, wherein the sliding grooves (21) are four in a circular array relative to the frame (4), the first clamping blocks (6), the transverse screw rods (7) and the second clamping blocks (8) are symmetrically arranged relative to the longitudinal center of the frame (4), the longitudinal screw rods (5) are symmetrically arranged relative to the transverse center of the frame (4), and the first baffle plate (1) is positioned between the two first clamping blocks (6).
3. The reinforced concrete erection device for the plant electromechanical installation engineering according to claim 2, wherein the second baffle (3) is located between the first clamping block (6) and the second clamping block (8), a first supporting plate (9) is contacted with the left lower bottom surface of the frame (4), a second supporting plate (10) is connected with the inside of the first supporting plate (9) in a sliding manner, and a first fixing rod (11) is connected with the front wall surface of the first supporting plate (9) in a sliding manner.
4. A reinforced concrete erection device for factory building electromechanical installation engineering according to claim 3, characterized in that the front wall surface of the second supporting plate (10) is slidably connected with a second fixing rod (12), the lower ends of the first fixing rod (11) and the second fixing rod (12) are fixedly installed on a connecting rod (20), a lifting screw rod (13) is connected with a lower bottom surface bearing of the connecting rod (20), and a base (14) is connected with the lower end of the lifting screw rod (13) in a threaded manner.
5. The reinforced concrete erection device for factory building electromechanical installation engineering according to claim 4, wherein the right wall surface of the connecting rod (20) is slidably connected to the left wall surface of the upper end of the base (14), a transmission screw (15) is connected to the right portion of the base (14) through a threaded connection, a sliding block (16) is connected to the right end bearing of the transmission screw (15), a connecting block (17) is slidably connected to the lower end of the sliding block (16), and a sliding rod (22) is connected to the upper top surface of the right side of the connecting block (17) through a sliding connection.
6. The reinforced concrete erection device for the plant electromechanical installation engineering according to claim 5, wherein the upper top surface of the sliding rod (22) is fixedly installed on the upper right side of the base (14), a fixed plate (18) is arranged below the connecting block (17), the lower bottom surface of the connecting block (17) penetrates through and is connected to the left side of the fixed plate (18) in a sliding manner, and a plurality of connecting bolts (19) uniformly penetrate through and are connected to the left wall surface of the fixed plate (18) in a threaded manner.
CN202422209645.8U 2024-09-09 2024-09-09 Reinforced concrete erection device for plant mechanical and electrical installation engineering Active CN223003708U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202422209645.8U CN223003708U (en) 2024-09-09 2024-09-09 Reinforced concrete erection device for plant mechanical and electrical installation engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202422209645.8U CN223003708U (en) 2024-09-09 2024-09-09 Reinforced concrete erection device for plant mechanical and electrical installation engineering

Publications (1)

Publication Number Publication Date
CN223003708U true CN223003708U (en) 2025-06-20

Family

ID=96050335

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202422209645.8U Active CN223003708U (en) 2024-09-09 2024-09-09 Reinforced concrete erection device for plant mechanical and electrical installation engineering

Country Status (1)

Country Link
CN (1) CN223003708U (en)

Similar Documents

Publication Publication Date Title
CN112609826A (en) Guide beam column structure is connected to steel construction
CN221955713U (en) An adjustable tower crane conversion section
CN116607833B (en) Construction device for energy dissipation and vibration reduction connection nodes of prefabricated shear walls
CN216340964U (en) Building engineering template fixing device
CN119754621A (en) Power transmission line tower foundation height adjusting device
CN116838079A (en) Steel template convenient to install and use method thereof
CN115126271A (en) A prefabricated concrete structure
CN222294732U (en) Suspension device for tension and compression rod of steel sleeve box of bridge underwater bearing platform
CN222140768U (en) A pre-embedded part fixing device for foundation construction
CN223240845U (en) Positioning device for foundation embedded bolt of tower crane
CN224103905U (en) Modular mounting frame for cluster charging piles
CN224046844U (en) An auxiliary device for the renovation of existing buildings
CN220686125U (en) Pile foundation beam slab connecting device for water construction
CN116905381B (en) Box girder internal mold top plate supporting truss and construction process thereof
CN222270014U (en) Clamping device of concrete baffle for hydraulic engineering
CN221421688U (en) Efficient formwork erecting and removing construction device for bridge guardrail
CN218265125U (en) Assembly type structure fixing device for building engineering
CN219033239U (en) House building supporting device
CN222390997U (en) Cable-stayed cantilever formwork structure
CN223423245U (en) Anti-floating anchor rod standard height control auxiliary device
CN224016120U (en) Ultra-high performance concrete prefabricated assembled bridge joint structure
CN222648849U (en) A prefabricated support structure for power well construction
CN222333259U (en) Welding-spot-free steel bar truss floor support plate
CN220117833U (en) Quick detachable building templates link
CN220768094U (en) Novel multifunctional steel support hanging plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant