Indoor overhanging mobile operation platform frame for repairing high-rise window outer wall
Technical Field
The utility model relates to the technical field of building construction, in particular to an indoor overhanging mobile operation platform frame for repairing an outer wall of a high-rise window.
Background
At present, a new high-rise building or an external wall of an existing high-rise building is decorated, reformed, repaired and the like to work aloft, a more standard external scaffold or hanging basket scaffold is generally adopted as a construction operation frame in large-area construction, but when a project to be checked is completed or the external wall of an existing high-rise building window is partially required to be reformed or repaired, such as glass replacement, wall surface repair, water-proof plugging and the like, the external scaffold or hanging basket scaffold is not required to be newly erected on site in consideration of construction cost and construction period, the operation stand is not required to be changed by self-manufacturing a simple cantilever steel pipe frame, the simple cantilever steel pipe frame is manufactured by self-manufacturing, and the manufacturing personnel lacks related structural stress knowledge and experience, and the external wall hanging repair operation is carried out by only using a personal cognition local temporary drawing, or a frame body without safety protection, so that the accident of falling at high places is more easily caused.
Therefore, an indoor overhanging mobile operation platform frame for repairing an outer wall of a high-rise window is provided, and the indoor overhanging mobile operation platform frame is used for solving the problems in the prior art.
Disclosure of utility model
Aiming at the problems, the utility model provides an indoor overhanging mobile operation platform frame for repairing an outer wall of a high-rise window, which comprises a prefabricated support, an overhanging platform, overhanging rails, a base component and two bearing components, wherein the independent components are assembled on site in sequence according to two different practical application conditions, and the mobile operation platform frame is assembled in a final assembly mode, so that a shaping operation platform frame which is safe, economical and capable of being used in a turnover mode is formed, the convenience and the safety are improved, and the technical scheme adopted by the utility model is as follows in order to realize the purposes of the utility model:
According to one aspect of the utility model, an indoor overhanging mobile operation platform frame for repairing an outer wall of a high-rise window is provided, and comprises a support, an overhanging platform and overhanging railings, wherein the overhanging platform and the overhanging railings are arranged in the middle of the support, the overhanging railings are located above the overhanging platform, the support comprises four upright posts, the four upright posts enclose a rectangle, the upper end and the lower end between two adjacent upright posts are connected through connecting rods, each upright post is provided with a plurality of bolt holes, the overhanging platform comprises two support cross bars connected to the support through bolts, a plurality of reinforcing rods are arranged between the two support cross bars, a bearing plate is arranged at one end of each support cross bar far away from the support, the bearing plate is U-shaped, the overhanging railings comprise two limiting rods connected to the support through bolts, two interception rods are arranged between the two limiting rods, and a component is arranged on the support.
Preferably, the bearing assembly comprises a support frame arranged at the bottom of the support frame, the support frame is U-shaped, the support frame is far away from the support frame and is provided with a counterweight plate at one end, the counterweight plate is provided with a counterweight box, the support frame is far away from one end of the support frame and is symmetrically provided with two casters, the support frame is provided with a first connecting piece, the support frame is provided with a second connecting piece, the first connecting piece is connected with the second connecting piece through a connecting pipe, and the lower end of the support frame is provided with a base assembly matched with the bearing assembly.
Preferably, the base assembly comprises vertical sleeves sleeved outside four stand columns of the support, two adjacent vertical sleeves are all provided with cross braces, four vertical sleeve lower ends are provided with two transverse sleeves, the support frame is matched with the two transverse sleeves, an auxiliary rod is arranged between the vertical sleeve and the transverse sleeve, the auxiliary rod is 7-shaped, and universal wheels are arranged on the two vertical sleeves far away from one side of the auxiliary rod.
Preferably, the cross section of the weight plate is I-shaped.
Preferably, the bearing assembly comprises an adjustable jacking and an adjustable jacking which are respectively arranged at the top and the bottom of the bracket, wood backing plates are arranged at the end parts of the adjustable jacking and the adjustable jacking, the upright posts are square through, and the adjustable jacking are matched with the corresponding upright posts.
In summary, due to the adoption of the technical scheme, the beneficial effects of the utility model are as follows:
According to the indoor overhanging mobile operation platform frame for repairing the high-rise window outer wall, the plurality of independent components are assembled on site in sequence according to two different practical application working conditions on site through the prefabricated support, the overhanging platform, the overhanging railing, the base component and the two bearing components, and the mobile operation platform frame is assembled in a final way, so that the shaping operation platform frame which is safe, economical and capable of being used in a turnover mode is formed, and convenience and safety are improved.
Drawings
FIG. 1 is a schematic view of a first embodiment of the present utility model;
FIG. 2 is a schematic diagram of a second embodiment of the present utility model;
FIG. 3 is a schematic structural view of an H-shaped balance steel pipe according to an embodiment of the present utility model;
FIG. 4 is a schematic view of a supporting frame according to an embodiment of the present utility model;
FIG. 5 is a schematic view of the structure of the overhanging platform of the present utility model;
In the attached drawings, 1, a bracket, 101, a column, 102, a connecting rod, 103, a bolt hole, 104 and a first connecting piece;
2. the cantilever platform comprises a cantilever platform, a supporting cross bar, a 202, a reinforcing rod, a 203 and a bearing plate;
3. cantilever railing 301, limiting rod 302, interception rod;
4. a support frame; 5, a counterweight plate, 6, a counterweight box, 7, casters, 8, a second connecting piece, 9, a connecting pipe, 10, a vertical sleeve, 11, a transverse support, 12, a transverse sleeve, 13, an auxiliary rod, 14, universal wheels, 15, an adjustable jacking, 16, an adjustable jacking, 17, a wood base plate and 18, H-shaped balance steel pipes.
Detailed Description
In order to make the objects, technical solutions and advantages of the present utility model more apparent, the present utility model will be further described in detail below by referring to the accompanying drawings and by illustrating preferred embodiments. It should be noted, however, that many of the details set forth in the description are merely provided to provide a thorough understanding of one or more aspects of the utility model, and that these aspects of the utility model may be practiced without these specific details.
Referring to fig. 1 to 3, the present utility model provides an indoor overhanging mobile operation platform frame for repairing an outer wall of a high-rise window, which has the following technical scheme:
The cantilever type steel column support comprises a support 1, a cantilever platform 2 and a cantilever railing 3, wherein the cantilever platform 2 and the cantilever railing 3 are arranged in the middle of the support 1, the cantilever railing 3 is positioned above the cantilever platform 2, the support 1 comprises four columns 101, the four columns 101 are steel square through columns 101 with the cross sections of 80x80x4mm and the lengths of 2300mm, the four columns 101 are enclosed into a rectangle, the upper ends and the lower ends between two adjacent columns 101 are connected through connecting rods 102, each connecting rod 102 is angle steel with the cross sections of 50x50x5mm and the lengths of 860mm, and each column 101 is provided with a plurality of bolt holes 103 to form an independent column 101 framework; the cantilever platform 2 comprises two support cross rods 201 which are connected to the support 1 through bolts, each support cross rod 201 is a steel square tube with the cross section of 100x50x4mm and the length of 2340mm, a plurality of reinforcing rods 202 are arranged between the two support cross rods 201, each reinforcing rod 202 is a steel square tube with the cross section of 50x50x3mm and the length of 610mm, the plurality of reinforcing rods 202 are respectively welded between the two support cross rods 201 according to a certain interval, the top surfaces of the support cross rods 201 and the reinforcing rods 202 are flush, a bearing plate 203 is arranged at one end, far away from the support 1, of each support cross rod 201, the bearing plate 203 is U-shaped, the bearing plate 203 is a patterned steel plate, and the periphery of the bearing plate is folded upwards to be used as a flange, the cantilever railing 3 comprises two limiting rods 301 which are connected to the support 1 through bolts, two blocking rods 302 are arranged between the two limiting rods 301, each blocking rod 302 is a steel square tube with the cross section of 100x50x4 and the length of 2340mm, each blocking rod 302 is 50x50x3mm, the top surfaces of the steel square tube is provided with a transverse supporting component and the bearing component is provided with the blocking component 610 mm.
The bearing assembly comprises a support frame 4 arranged at the bottom of a support frame 1, the support frame 4 is U-shaped, the support frame 4 is formed by bending and drilling steel plates with the cross section of 90x90x4mm and the length of 2000mm, a counterweight plate 5 is arranged at one end, far away from the support frame 1, of the support frame 4, a counterweight box 6 is arranged on the counterweight plate 5, two casters 7 are symmetrically arranged at one end, far away from the support frame 1, of the support frame 4, each caster 7 is a polyurethane caster 7, a first connecting piece 104 is arranged on the support frame 1, a second connecting piece 8 is arranged on the support frame 4, both the first connecting piece 104 and the second connecting piece 8 are formed by bending and drilling steel plates with the cross section of 100x260x3mm, the first connecting piece 104 and the second connecting piece 8 are connected through a connecting pipe 9, and the connecting pipe 9 isThe steel pipe bracing, support 1 lower extreme is equipped with bearing assembly complex base subassembly.
The base assembly comprises vertical sleeves 10 sleeved outside four upright posts 101 of a support 1, each vertical sleeve is a steel square tube with the cross section of 100x100x4mm and the length of 1050mm, two adjacent vertical sleeves 10 are all provided with cross braces 11, each cross brace 11 is an angle steel with the cross section of 50x50x5mm and the length of 710mm, four lower ends of the vertical sleeves 10 are provided with two transverse sleeves 12, the support frame 4 is matched with the two transverse sleeves 12, an auxiliary rod 13 is arranged between the vertical sleeves 10 and the transverse sleeves 12, the auxiliary rod 13 is 7-shaped, and universal wheels 14 are arranged on the two vertical sleeves 10 far away from one side of the auxiliary rod 13.
The cross section of the weight plate 5 is I-shaped, grooves are formed in the upper end and the lower end of the weight plate 5 and matched with the width of the support frame 4, namely the weight plate 5 is clamped with the support frame 4, so that the stability of the weight plate 5 is improved, the stability of a weight box 6 placed on the weight plate 5 is further guaranteed, and the effect of limiting the weight box 6 to move left and right can be achieved through the grooves formed in the upper end of the weight plate 5, and the stability of the weight box 6 is further improved.
The bearing component comprises an adjustable jacking 15 and an adjustable jacking 16 which are respectively arranged at the top and the bottom of the bracket 1, H-shaped balance steel pipes 18 are respectively arranged between the two adjustable jacking 15 and the adjustable jacking 16 in each row, and each H-shaped balance steel pipe 18 is of a sectionA horizontal steel pipe with the length of 2048mm is provided, threaded rods are arranged in each adjustable jacking 15 and each adjustable jacking 16, wood base plates 20 are arranged at the ends of the threaded rods, the upright posts 101 are square through, and each threaded rod is inserted into the corresponding upright post 101.
Embodiment one:
the condition is that suspended ceilings or floors in the room are more than or equal to 4m;
In the room where a high-rise window is needed, a base component and a supporting frame 4 are respectively moved to the center of the room where the window is located through universal wheels 14 and casters 7, then four upright posts 101 of a bracket 1 are respectively inserted into corresponding vertical sleeves 10, the four upright posts are fixed through bolts, a plurality of connecting rods 102 are sequentially installed on the four upright posts 101 through bolts, stability of the bracket 1 is ensured, an overhanging platform 2 and an overhanging railing 3 are sequentially installed on the bracket 1 through bolts according to the height of a windowsill, two right trapezoid steel plates are welded on each supporting cross rod 201 and a limiting rod 301, then the right trapezoid steel plates are connected with the corresponding upright posts 101, two bolt connections are realized at the same stress point, so that stress is more uniform, stability is better, positions of the supporting frame and the window are adjusted through a plurality of bolt holes 103, workers can conveniently enter and exit, the supporting frame 4 is inserted into corresponding transverse steel pipes, the counterweight plate 5 is fixedly clamped with the supporting frame 4 through bolts, the counterweight box 6 is placed on the counterweight plate 5, finally a connecting piece I104 and a connecting piece II 8 are connected through a counterweight 9, and a connecting piece II is connected through a connecting pipe 18, and the whole side-turning device is prevented from being installed on the base, and the side-turning device is completely installed; a nylon safety rope with the diameter not smaller than 16mm is thrown below an upper wall window of an installation floor of an indoor overhanging mobile operation platform frame, the upper end of the safety rope is firmly bound at an indoor firm fixed point of the upper layer, the lower section of the safety rope is bound on a safety belt of a worker who is going out to the overhanging platform 2, the worker who is going out to the high altitude can work along the overhanging platform 2 after binding the safety belt and the safety rope and wearing a safety helmet, only 1 person is allowed to operate on the indoor overhanging mobile operation platform, other personnel can only be located in the room for matching, and the disassembly process is the reverse of the above process.
Embodiment two:
the indoor suspended ceiling is not needed and the layer height is less than 4m;
The method comprises the steps of measuring the height of a windowsill, the height of the windowsill and the overhanging length of an overhanging platform 2 in a room where a high-rise window is needed, initially determining the position of the corresponding adjustable bottom support 16 in the room, then placing four adjustable bottom supports 16 at preset positions, sequentially installing the overhanging platform 2 and an overhanging railing 3 on a bracket 1 through bolts according to the windowsill height, welding two right-angle trapezoidal steel plates on each supporting cross rod 201 and each limiting rod 301, connecting the right-angle trapezoidal steel plates with corresponding upright posts 101, then adjusting the positions of the windows through a plurality of bolt holes 103, facilitating the ingress and egress of workers, inserting the four adjustable top supports 15 or the four adjustable bottom supports 16 at the tops of the corresponding upright posts 101 respectively through adjusting threaded rods, completing the installation of the whole supporting base at the moment, binding the upper ends of the safety ropes at the indoor firm points of the upper layer under the window of the upper layer of the mounting floor of an overhanging mobile operation platform frame, binding the lower sections of the safety ropes on the upper layer of the nylon belts of the overhanging operation platform 2, and moving the safety ropes on the upper layer of the safety belts of the overhanging platform in the room only can be matched with the safety belts of the overhanging platform 1 in a process of working mode after the personnel are disassembled, and the workers can only work in a process of the safety platform is carried out in the room.
The foregoing is merely a preferred embodiment of the present utility model and it should be noted that modifications and adaptations to those skilled in the art may be made without departing from the principles of the present utility model, which are intended to be comprehended within the scope of the present utility model.