CN222879230U CN202421915162.3U CN202421915162U CN222879230U CN 222879230 U CN222879230 U CN 222879230U CN 202421915162 U CN202421915162 U CN 202421915162U CN 222879230 U CN222879230 U CN 222879230U
Authority
CN
China
Prior art keywords
water stop
steel bar
stop plate
cooling oil
wind power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202421915162.3U
Other languages
Chinese (zh)
Inventor
梅世忠
段忠志
吴中伟
乾瑞
宋富豪
曾晓春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Guizhou Engineering Co Ltd
Original Assignee
PowerChina Guizhou Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Guizhou Engineering Co Ltd filed Critical PowerChina Guizhou Engineering Co Ltd
Priority to CN202421915162.3U priority Critical patent/CN222879230U/en
Application granted granted Critical
Publication of CN222879230U publication Critical patent/CN222879230U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Wind Motors (AREA)

Abstract

The application discloses a steel bar installation structure of a wind power cooling oil well, which comprises a steel bar body and a water stop plate arranged in the steel bar body, wherein the water stop plate is arranged in the steel bar body through an adjustable position of a water stop plate installer. The lower parts of the hook body A and the hook body B are separated to generate gaps, so that the water stop plate can be adjusted up and down, the water stop plate is installed in the reinforcing steel bar body through the adjustable position of the water stop plate installer, and the problem that the water stop plate is not convenient to adjust up and down in the construction process due to the fact that the water stop plate is welded and fixed with the reinforcing steel bar body through the tie bars is solved.

Description

Reinforcing steel bar mounting structure of wind power cooling oil well
Technical Field
The utility model relates to a reinforcing steel bar installation structure of a wind power cooling oil well, and belongs to the technical field of wind power construction.
Background
The wind power generation booster station needs to be equipped with cooling oil for cooling the oil well containment booster. And the cooling oil well needs to be bound with reinforcing steel bars and poured in layers during construction.
In order to ensure the waterproofness of the layered pouring joint surface, a water stop plate is required to be installed in the reinforcement body. When the water stop plate is installed in the reinforcement body, the position of the water stop plate needs to be ensured. The prior art is that the water stop plate is welded and fixed with the steel bar body through the tie bars (see Chinese patent publication No. CN 216586661U), and although the position of the water stop plate in the steel bar body can be stabilized, the water stop plate is inconvenient to adjust up and down in the construction process.
Disclosure of utility model
In order to solve the technical problems, the utility model provides a steel bar installation structure of a wind power cooling oil well.
The utility model is realized by the following technical scheme.
The utility model provides a steel bar installation structure of a wind power cooling oil well, which comprises the following components:
The steel bar body is provided with a water stop plate in the steel bar body, and the water stop plate is arranged in the steel bar body through an adjustable position of a water stop plate installer.
The steel bar body is composed of vertical bars and vertical bars surrounding the vertical bars.
The longitudinal ribs and the vertical ribs are tied and fixed.
The water stop plate installer comprises a hook body A which is hooked on a longitudinal rib, a hook body B which is fixed on the hook body A in an adjustable screwing mode through a bolt, wherein the upper part of the hook body A is hooked on the longitudinal rib, the upper part of the hook body B is screwed on through the bolt, and the lower part of the hook body A and the lower part of the hook body B are tightly pressed to lift the water stop plate.
The utility model has the beneficial effects that the water stop plate can be adjusted up and down when the lower parts of the hook body A and the hook body B are separated to generate a gap, so that the water stop plate can be installed in the steel bar body through the adjustable position of the water stop plate installer, and the problem that the water stop plate is inconvenient to adjust up and down in the construction process due to the fact that the water stop plate is welded and fixed with the steel bar body through the tie bars is solved.
Drawings
Fig. 1 is a schematic view of the structure of the reinforcement of the present utility model in a foundation pit foundation;
Fig. 2 is a schematic view of the structure of the reinforcement body of the present utility model when the reinforcement body is in contact with the diagonal brace support;
FIG. 3 is a schematic distribution view of the water stop plate, the water stop plate installer and the reinforcement body according to the present utility model;
FIG. 4 is a schematic distribution diagram of a water stop plate, a wind power cooling oil underground layer and a wind power cooling oil underground layer;
In the figure, a foundation pit foundation, 2-reinforcement, 21-vertical ribs, 22-longitudinal ribs and 3-water stop plates are arranged;
4-water stop plate mounting device, 41-hook body A, 42-hook body B and 43-bolt;
5-inclined support rods, 51-sleeves, 52-threaded rods, 53-adjusting plates and 54-stressed rotating lugs;
61-a stress plate, 62-a pin, 63-a component force rod, 71-a wind power cooling oil well lower layer and 72-a wind power cooling oil well upper layer.
Detailed Description
The technical solution of the present utility model is further described below, but the scope of the claimed utility model is not limited to the above.
As shown in fig. 1 to 4.
The application relates to a molding construction method of a wind power cooling oil well, which comprises the following steps:
foundation pit foundation 1 is excavated downwards to the ground, through construction vertical bar 21 and indulging the muscle 22 in the foundation pit foundation 1, indulge the muscle 22 and tie up fixedly and enclose and close and constitute reinforcing bar body 2 on vertical bar 21, install stagnant water board 3 in the reinforcing bar body 2, stagnant water board 3 passes through stagnant water board installer 4 adjustable position and installs in reinforcing bar body 2, constitutes the reinforcing bar mounting structure of a wind-powered electricity generation cooling oil well.
The side of the reinforcement body 2 provided with the water stop plate 3 is provided with a telescopic adjustable inclined support rod 5, the inclined support rod 5 contacts with the side surface of the foundation pit foundation 1 to be stressed, the top of the inclined support rod 5 is fixedly welded with a stressed plate 61, the stressed plate 61 is fixedly welded with a pin 62, the pin 62 is inserted between the longitudinal ribs 22 to limit, and the stressed plate 61 contacts with the vertical ribs 21 and the longitudinal ribs 22 at multiple points to form a stressed system for supporting the reinforcement body of the wind power cooling oil well. The diagonal bracing bar 5 is provided with a component force bar 63, and the component force bar 63 is supported upwards in a diagonal manner by the contact force of the bottom surface of the foundation pit foundation 1.
After the reinforcing steel bar body 2 is stably supported by the diagonal support rods 5, a template is erected, the wind power cooling oil underground layer 71 and the wind power cooling oil well upper layer 72 are subjected to layered pouring, the reinforcing steel bar body 2 and the water stop plate 3 can be subjected to limiting support when the wind power cooling oil underground layer 71 is formed, the water stop plate installer 4, the diagonal support rods 5 and the like are removed at the moment, then the wind power cooling oil well upper layer 72 is poured, the water stop plate 3 is positioned between the joint surfaces of the wind power cooling oil underground layer 71 and the wind power cooling oil well upper layer 72 to stop water, and the wind power cooling oil underground layer 71 and the wind power cooling oil well upper layer 72 are connected through the reinforcing steel bar body 2.
The application relates to a reinforcing steel bar installation structure of a wind power cooling oil well, which comprises the following components:
The vertical bars 21 and the steel bar body 2 formed by surrounding the vertical bars 22 of the vertical bars 21 are arranged in the foundation pit foundation 1, and the vertical bars 22 and the vertical bars 21 are bundled and fixed.
And a water stop plate 3 arranged in the steel bar body 2, wherein the water stop plate 3 is arranged in the steel bar body 2 through an adjustable position of a water stop plate installer 4.
The water stop plate installer 4 comprises a hook body A41 hooked on the longitudinal rib 22, a hook body B42 which is fixed on the hook body A41 in an adjustable screwing mode through a bolt 43, wherein the upper portion of the hook body A41 is hooked on the longitudinal rib 22, the upper portion of the hook body B42 is screwed through the bolt 43, the lower portion of the hook body A41 and the lower portion of the hook body B42 are tightly pressed to hang the water stop plate 3, the water stop plate 3 can be adjusted up and down when gaps are formed between the lower portions of the hook body A41 and the hook body B42, the water stop plate 3 is installed in the steel bar body 2 through the adjustable position of the water stop plate installer 4, and the problem that the water stop plate is inconvenient to adjust up and down in the construction process due to the fact that the water stop plate is welded and fixed with the steel bar body through a tie rib is solved.
The application discloses a stress system for supporting a wind power cooling oil well reinforcing steel bar body, which comprises the following components:
The steel bar body 2 in the foundation pit foundation 1 is composed of vertical bars 21 and longitudinal bars 22 surrounding the vertical bars 21, and the longitudinal bars 22 are tied and fixed with the vertical bars 21.
The top of the telescopic inclined support rod 5 is fixed with a stress plate 61, and the stress plate 61 is in multipoint contact with the vertical bars 21 and the longitudinal bars 22 of the steel bar body 2.
The bottom of the inclined support rod 5 is contacted with the side surface of the foundation pit foundation 1 by stretching, the top of the inclined support rod 5 is in multipoint contact with the vertical ribs 21 and the vertical ribs 22 of the steel bar body 2 through the stress plate 61, and the problem that single steel bars at the contact points are easy to deform due to direct single-point contact support at the top of the inclined support rod 5 is avoided.
The force bearing plate 61 is fixedly welded with pins 62, the pins 62 are a plurality of pins 62 which are fixedly distributed on the force bearing plate 61 at intervals, the pins 62 are inserted between the longitudinal ribs 22, and the bottom edges of the longitudinal ribs 22 and the side edges of the vertical ribs 21 are in contact with the pins 62 for limiting.
The bottom surface of the foundation pit foundation 1 is provided with a component force rod 63 which is obliquely upwards, the top of the component force rod 63 is fixedly connected with the inclined support rod 5 in a binding way, and the component force rod 63 supports the weight load component force of the inclined support rod 5.
The inclined support rod 5 comprises a hollow sleeve 51, a threaded rod 52 sleeved in the sleeve 51, the threaded rod 52 stretches into the sleeve 51, an adjusting plate 53 is screwed on the threaded rod 52 through a thread pair, and the adjusting plate 53 is screwed on the threaded rod 52 to abut against the sleeve 51. After the distance between the sleeve 51 and the threaded rod 52 is adjusted, the sleeve 51 is screwed on the threaded rod 52 through the adjusting plate 53, so that the sleeve 51 props against the adjusting plate 53, and the scalability of the diagonal support rod 5 is realized.
The side of the adjusting plate 53 is provided with symmetrically distributed stressed rotating lugs 54, so that the adjusting plate 53 can be rotated by the stress of the rotating lugs 54.

Claims (4)

1. The utility model provides a reinforcing bar mounting structure of wind-powered electricity generation cooling oil well which characterized in that includes:
The water stop device comprises a reinforcing steel bar body (2) and a water stop plate (3) arranged in the reinforcing steel bar body (2), wherein the water stop plate (3) is arranged in the reinforcing steel bar body (2) through an adjustable position of a water stop plate installer (4).
2. The steel bar installation structure of a wind power cooling oil well according to claim 1, wherein the steel bar body (2) is composed of a vertical bar (21) and a vertical bar (22) surrounding the vertical bar (21).
3. A reinforcing steel bar installation structure of a wind power cooling oil well according to claim 2, wherein the longitudinal ribs (22) are bundled and fixed with the vertical ribs (21).
4. The reinforcing steel bar installation structure of a wind power cooling oil well according to claim 1, wherein the water stop plate installer (4) comprises a hook body A (41) hooked on the longitudinal rib (22), a hook body B (42) which is fixed on the hook body A (41) in an adjustable screwing mode through a bolt (43), the upper portion of the hook body A (41) is hooked on the longitudinal rib (22) and then the upper portion of the hook body B (42) is screwed through the bolt (43), and the lower portion of the hook body A (41) and the lower portion of the hook body B (42) are tightly pressed and hung to form the water stop plate (3).
CN202421915162.3U 2024-08-08 2024-08-08 Reinforcing steel bar mounting structure of wind power cooling oil well Active CN222879230U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202421915162.3U CN222879230U (en) 2024-08-08 2024-08-08 Reinforcing steel bar mounting structure of wind power cooling oil well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202421915162.3U CN222879230U (en) 2024-08-08 2024-08-08 Reinforcing steel bar mounting structure of wind power cooling oil well

Publications (1)

Publication Number Publication Date
CN222879230U true CN222879230U (en) 2025-05-16

Family

ID=95684697

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202421915162.3U Active CN222879230U (en) 2024-08-08 2024-08-08 Reinforcing steel bar mounting structure of wind power cooling oil well

Country Status (1)

Country Link
CN (1) CN222879230U (en)

Similar Documents

Publication Publication Date Title
CN207847228U (en) A kind of overturning-preventing concrete wire pole
CN207048318U (en) A kind of aluminum alloy pattern plate bracing device
CN206458903U (en) A kind of limiting shock resistant support for being easy to adjust
CN112195957B (en) Reinforced connecting structure of fan tower and foundation and construction method
CN222879230U (en) Reinforcing steel bar mounting structure of wind power cooling oil well
CN107351228A (en) A kind of prefabricated wind power tower mould equipment and its construction technology
CN222894053U (en) Stress system for supporting wind power cooling oil well reinforcement
CN114775676A (en) Reconstruction method and application suitable for built old wind power plant fan foundation
CN205985998U (en) But regulation cable mount
CN206070404U (en) Oblique formwork support structure at the section haunch of box culvert top
CN209958387U (en) Reinforcing apparatus of land-based wind-powered electricity generation field fan pylon basis
CN217378587U (en) Supporting device for square pier capping beam
CN119062113A (en) A forming construction method for wind power cooling oil well
CN210530459U (en) Consolidation cable system of mixed structure wind tower
CN210563435U (en) Slope supporting device for top rising of inclined heavy-load steel net rack
CN205932928U (en) Generator rag bolt anchor board mounting tool
CN202007527U (en) Cast-in-place steel reinforcing bar concrete column template fixing device
CN215631143U (en) Pulley inhaul cable device for concrete inclined roof of combined formwork supporting system
CN212376397U (en) Anti-overturning high-voltage line power transmission iron tower
CN221118262U (en) Climbing cone type composite steel corbel device
CN222295879U (en) An articulated pole mounting system
CN219344881U (en) Swift fixed base
CN222164751U (en) A steel structure installation base for a power station boiler
CN223074777U (en) Iron tower foundation convenient to installation
CN214784720U (en) Support structure of green building center pillar

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant