CN222809876U - A pier construction platform - Google Patents

A pier construction platform Download PDF

Info

Publication number
CN222809876U
CN222809876U CN202421410300.2U CN202421410300U CN222809876U CN 222809876 U CN222809876 U CN 222809876U CN 202421410300 U CN202421410300 U CN 202421410300U CN 222809876 U CN222809876 U CN 222809876U
Authority
CN
China
Prior art keywords
embedded
support base
construction platform
pier
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202421410300.2U
Other languages
Chinese (zh)
Inventor
都恩伯
吴芳
杨继成
王伟宏
王雅明
陆梁广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Major Bridge Engineering Group Co Ltd
Wuhan Bridge Special Technology Co Ltd of MBEC
Original Assignee
China Railway Major Bridge Engineering Group Co Ltd
Wuhan Bridge Special Technology Co Ltd of MBEC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Major Bridge Engineering Group Co Ltd, Wuhan Bridge Special Technology Co Ltd of MBEC filed Critical China Railway Major Bridge Engineering Group Co Ltd
Priority to CN202421410300.2U priority Critical patent/CN222809876U/en
Application granted granted Critical
Publication of CN222809876U publication Critical patent/CN222809876U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本实用新型公开了一种墩身施工平台,涉及桥梁工程施工领域,包括多个支撑底座、与支撑底座数量对应并用于埋设在桥梁承台内的多个支撑底座预埋件、一个或多个回形框架以及多个连接件,单个支撑底座设置在单个支撑底座预埋件上,每个支撑底座上均设置有一个连接件,回形框架通过连接件固定在支撑底座上,多个回形框架沿竖直方向连接,且相邻回形框架同样通过连接件连接。通过支撑底座预埋件在桥梁承台上进行支撑底座的定点,再将使用连接件将支撑底座与回形框架连接,使支撑底座在桥梁承台上更加稳固,且回形框架通过连接件与支撑底座连接,使整体结构一体化程度更高,解决了墩身施工平台整体稳定性控制难度较大、安全隐患多,存在较大安全风险的问题。

The utility model discloses a pier body construction platform, which relates to the field of bridge engineering construction, including multiple support bases, multiple support base embedded parts corresponding to the number of support bases and used to be buried in the bridge pedestal, one or more round-shaped frames and multiple connecting parts, a single support base is arranged on a single support base embedded part, each support base is provided with a connecting part, the round-shaped frame is fixed on the support base through the connecting part, multiple round-shaped frames are connected in the vertical direction, and adjacent round-shaped frames are also connected through the connecting part. The support base is fixed on the bridge pedestal through the support base embedded part, and then the support base is connected to the round-shaped frame by the connecting part, so that the support base is more stable on the bridge pedestal, and the round-shaped frame is connected to the support base through the connecting part, so that the overall structure is more integrated, which solves the problem that the overall stability control of the pier body construction platform is difficult, there are many safety hazards, and there are large safety risks.

Description

Pier construction platform
Technical Field
The utility model relates to the field of bridge engineering construction, in particular to a pier body construction platform.
Background
In the field of bridge engineering construction, bridge pier construction refers to a work of constructing and building a bridge pier (such as a column, a bridge column, a pier, etc.) in the bridge engineering construction process. The bridge pier body construction plays roles of supporting, bearing and fixing structures in bridge building engineering, and is an important component of building stability and safety, wherein the high pier construction is a common technology in building construction, can greatly improve the bearing capacity of a building, can save building materials, and is widely applied to the construction of high-rise buildings and large bridges.
In the construction of the high pier, because the span, load and height of the pier are larger than those of a common road bridge, in order to ensure the safety and construction quality of constructors, a pier body construction platform is usually built on a bridge bearing platform around the periphery of a bridge pier body before construction is carried out, so as to assist the constructors in high pier construction. When the pier body construction platform is built, a bracket method is adopted for construction, namely a bracket is built around the pier body above the bridge bearing platform by using a rod piece or a steel pipe. The main function of this platform is to support all temporary facility weights of the capping beam construction and the capping beam weights, ensuring that these weights can be transferred directly to the ground.
In the actual pier body construction platform erecting process, along with the increase of the construction height, as the support rod pieces are more, and the support rod pieces are mostly connected by adopting simple bolts, the overall stability of the pier body construction platform is difficult to control, the potential safety hazards are more, and the greater safety risk exists.
Disclosure of utility model
The application provides a pier body construction platform, which can solve the technical problems of large overall stability control difficulty, multiple potential safety hazards and large safety risk of the pier body construction platform in the prior art.
The embodiment of the application provides a pier body construction platform which comprises a plurality of support bases, a plurality of support base embedded parts, one or more square frames and a plurality of connecting pieces, wherein the support base embedded parts correspond to the support bases in number and are used for being embedded in a bridge bearing platform, the support bases are arranged on the support base embedded parts, each support base is provided with one connecting piece, the square frames are fixed on the support bases through the connecting pieces, the square frames are connected in the vertical direction, and the adjacent square frames are connected through the connecting pieces.
In one embodiment, the rectangular frame comprises a protective screen frame and a framework structure, the protective screen frame is arranged on the framework structure, the framework structure is formed by splicing a plurality of vertical uprights and a plurality of horizontal cross bars, and the vertical uprights and the horizontal cross bars are connected through connecting pieces.
In one embodiment, the connecting piece is set to be a connecting angle steel and a connecting bolt, and connecting holes adapted to the connecting bolt are formed in the connecting angle steel, the vertical upright rod and the two ends of the horizontal cross rod.
In an implementation mode, the support base embedded part comprises an embedded steel plate, a plurality of embedded bolts and a plurality of embedded bars, wherein the embedded bolts and the embedded bars are arranged on the embedded steel plate, bolt holes matched with the embedded bolts are formed in the support base, and the embedded bars are used for being buried in the bridge bearing platform.
In one embodiment, a plurality of the embedded bars are welded and fixed with the embedded steel plate.
In one embodiment, the bridge pier further comprises a balance pull rod, one end of the balance pull rod is used for being buried in the bridge pier body, and the other end of the balance pull rod is connected with the framework structure.
In one embodiment, the protective screen frame comprises a reinforcing mesh and a section steel skeleton arranged on the reinforcing mesh.
In one embodiment, the support base is provided with a plurality of stiffening steel plates.
In one embodiment, a ladder path is provided between adjacent ones of the loop frames.
In one embodiment, the support base is welded to the connector.
The technical scheme provided by the embodiment of the application has the beneficial effects that:
The fixed point of supporting the base is carried out on the bridge bearing platform through the supporting base embedded part, the supporting base is connected with the shape-returning frame through the connecting part, and the supporting base embedded part is buried in the bridge bearing platform in advance, so that the supporting base is more stable on the bridge bearing platform, and the shape-returning frame is connected with the supporting base through the connecting part, so that the integral structure integration degree is higher, the problems of large control difficulty, many potential safety hazards and large safety risks of the overall stability of the pier body construction platform are solved.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present application, the drawings required for the description of the embodiments will be briefly described below, and it is apparent that the drawings in the following description are only some embodiments of the present application, and other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
FIG. 1 is a schematic diagram of a pier construction platform mounted on a bridge bearing platform;
FIG. 2 is a top view of the pier construction platform of the present application mounted on a bridge deck;
fig. 3 is a schematic diagram of the overall structure of the embedded part of the support base in the application.
FIG. 4 is a top view of the support base and the connector of the present application;
In the figure, 1, a supporting base, 11, a supporting base embedded part, 111, an embedded steel plate, 112, an embedded bolt, 113, an embedded steel bar, 12 and a stiffening steel plate;
2. The device comprises a rectangular frame, a 21, a protective net frame, 211, a reinforcing steel mesh, 212, a profile steel framework, 22, a vertical upright rod, 23, a horizontal cross rod, 24 and a ladder path;
3. Connecting angle steel, 4 balancing pull rods, 5 bridge bearing platforms and 6 bridge pier bodies.
Detailed Description
In order that those skilled in the art will better understand the present application, a technical solution in the embodiments of the present application will be clearly and completely described below with reference to the accompanying drawings in which it is apparent that the described embodiments are only some embodiments of the present application, not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the application without making any inventive effort, are intended to be within the scope of the application.
The embodiment of the application provides a pier body construction platform, which can solve the problems of large control difficulty and more potential safety hazards of the overall stability of the pier body construction platform and large safety risks.
The present embodiment is described in a state that the pier construction platform disclosed by the present application has been constructed, referring to a schematic structural diagram of the pier construction platform mounted on a bridge deck of fig. 1 and a top view of the pier construction platform mounted on the bridge deck of fig. 2, the pier construction platform comprises a plurality of support bases 1, a plurality of support base embedded parts 1 corresponding to the number of support bases 1 and used for being embedded in the bridge deck 5, one or a plurality of loop-shaped frames 2, and a plurality of connecting parts.
In this embodiment, the support base 1 is specifically provided with four, support base built-in fitting 1 is also provided with four relatively, the shape frame 2 that returns is provided with two, support base built-in fitting 1 buries in advance on four angles of bridge cushion cap 5, all be fixed with a support base 1 on every support base built-in fitting 1, all be provided with a connecting piece on four support base 1, four support base 1 pass through the connecting piece and are connected with four angles of shape frame 2, after fixing the shape frame 2 that returns that is connected with support base 1, set up second shape frame 2 that returns along bridge pier shaft vertical direction again, connect four angles through four connecting pieces equally between two shape frames 2 in order to accomplish the connection fixedly. Because support base built-in fitting 1 buries in advance in bridge cushion cap 5 to make support base 1 more firm on bridge cushion cap 5, and return shape frame 2 is connected with support base 1 through the connecting piece, makes overall structure degree of integration higher, and then promotes pier shaft construction platform overall stability.
Referring to fig. 3, which is a schematic diagram of the overall structure of the support base embedded part, the support base embedded part 1 includes an embedded steel plate 111, a plurality of embedded bolts 112 and a plurality of embedded bars 113, in this embodiment, three embedded bars 113 are specifically welded on the embedded steel plate 111 and four embedded bolts 112 are fixed, and four bolt holes corresponding to the embedded bolts 112 are formed in the support base 1, so that the support base 1 is more stably fixed on the embedded steel plate 111. When the pier body construction platform is installed, the embedded steel bars 113 are embedded into the bridge bearing platform 5, so that the embedded steel plates 111 are fixed on the surface of the bridge bearing platform 5, the embedded bolts 112 penetrate through the bolt holes in the support base 1, the embedded bolts 112 are screwed, the embedded work of the support base embedded part 1 and the connection and fixation between the support base 1 and the support base embedded part 1 can be completed, and the pier body construction platform is simple in structure and convenient to install.
In order to further strengthen the bearing capacity of the support base 1, four stiffening steel plates 12 are welded on the support base 1, so that the support base 1 can more stably support the rectangular frame 2, and the stability of the pier body construction platform is improved.
Referring to fig. 4 for supporting the top view of the base and the connecting piece, in this embodiment, the connecting piece is specifically set to be a connecting angle 3 and a connecting bolt, a plurality of connecting holes for penetrating the connecting bolt are formed in the connecting angle 3, and the connecting angle 3 is welded and fixed with the upper end of the support, so that the rigid connection between the connecting angle 3 and the support is completed, and the connection between the connecting angle 3 and the support is more stable.
Referring to the schematic structural diagram of the pier construction platform installed on the bridge bearing platform of fig. 1 and the top view of the pier construction platform installed on the bridge bearing platform of fig. 2, the rectangular frame 2 comprises a protective screen frame 21 and a framework structure, in this embodiment, the framework structure is formed by splicing a plurality of vertical uprights 22 and a plurality of horizontal cross bars 23, and the vertical uprights 22 and the horizontal cross bars 23 are also connected with connecting bolts through connecting angle steel 3, connecting holes matched with the connecting bolts are formed at two ends of the vertical uprights 22 and the horizontal cross bars 23, so that the vertical uprights 22 and the horizontal cross bars 23 are connected and fixed through the connecting bolts, the connecting mode is simple, and the connecting angle steel 3 can promote the stability of connection between the vertical uprights 22 and the horizontal cross bars 23, so that the framework structure is firmer, the protective screen frame 21 comprises a reinforcing mesh 211 and a steel framework 212, the reinforcing mesh 211 is paved on the bottom plane of the framework structure and the plane parallel to the bridge pier, and the steel mesh 212 is obliquely welded on the reinforcing mesh 211 so as to further promote the strength of the reinforcing mesh, and further promote the construction capacity of the pier construction platform, so that construction personnel can carry out personal safety operation on the pier construction platform.
In the construction of the high pier, as the span, the load and the height of the bridge pier body are larger than those of a common road bridge, for some bridge pier bodies with higher heights, construction staff can construct at the bottom of the bridge pier body at first, and then the second layer of the square frame 2 is connected, so that the bridge pier body is poured by gradually rising in layers. In order to further promote multilayer pier shaft construction platform's stability, still be provided with balanced pull rod 4 in this thing example, balanced pull rod 4 one end buries in bridge pier shaft inside, and balanced pull rod 4 other end stretches out from the bridge pier shaft and is connected with skeleton structure, referring to fig. 2, in this embodiment, balanced pull rod 4 specifically is provided with four, and balanced pull rod 4 stretches out from the bridge pier shaft and with the horizontal pole 23 welded fastening of lower floor's returning frame 2 upper portion to make the pier shaft construction platform that has multilayer returning frame 2 can be more stable, reduce the existence of potential safety hazard.
In order to facilitate high pier construction of constructors, referring to a structural schematic diagram of the pier body construction platform installed on a bridge bearing platform in fig. 1, a ladder passage 24 is further erected between adjacent rectangular frames 2, a hollow portion is reserved at the corner of each rectangular frame 2 in the protective screen frame 21 on the bottom surface of each rectangular frame 2, so that the ladder passage 24 is erected, in the embodiment, iron wires are used for fixedly connecting the ladder passage 24 with the protective screen frames 21, in other embodiments, the ladder passage and the protective screen frames 21 can be fixed by using connecting bolts, so that the ladder passage 24 can be erected between adjacent rectangular frames 2 more firmly, and then constructors can freely move between rectangular frames 2 on different floors, and facilities such as a climbing frame and a lifting platform are additionally required to be provided for the pier body construction platform in high pier construction so as to improve the construction efficiency of high pier construction.
The construction method of the pier body construction platform comprises the following steps of firstly burying embedded steel bars 113 inside a bridge bearing platform 5 when the pier body construction platform is erected, enabling an embedded steel plate 111 to be fixed on the surface of the bridge bearing platform 5, enabling embedded bolts 112 to penetrate through bolt holes in a supporting base 1, welding connecting angle steel 3 at the upper end of the supporting base 1 after tightening the embedded bolts 112, splicing a plurality of upright posts and a plurality of horizontal cross bars 23 by using the connecting bolts and the connecting angle steel 3 to form a framework structure, paving reinforcing steel meshes 211 which are obliquely welded with a steel skeleton 212 on the bottom plane of the framework structure and the plane parallel to the bridge pier body on the plane parallel to the framework structure, and for the bridge pier body with higher height, splicing a plurality of layers of rectangular frames 2 by using the connecting angle steel 3 and the connecting bolts, burying balance pull rods 4 in the bridge pier body, enabling the extending ends of the balance pull rods 4 to be fixedly welded with the upper horizontal cross bars 23 in the lower layer rectangular frames 2, and finally erecting a ladder-climbing channel 24 between adjacent rectangular frames 2, thus completing the installation of the pier body construction platform.
In the description of the present application, it should be noted that the azimuth or positional relationship indicated by the terms "upper", "lower", etc. are based on the azimuth or positional relationship shown in the drawings, and are merely for convenience of describing the present application and simplifying the description, and are not indicative or implying that the apparatus or element in question must have a specific azimuth, be constructed and operated in a specific azimuth, and thus should not be construed as limiting the present application. Unless specifically stated or limited otherwise, the terms "mounted," "connected," "coupled," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected, mechanically connected, electrically connected, directly connected, or indirectly connected via an intervening medium, or may be in communication between two elements. The specific meaning of the above terms in the present application can be understood by those of ordinary skill in the art according to the specific circumstances.
It should be noted that in the present application, relational terms such as "first" and "second" and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising one does not exclude the presence of other like elements in a process, method, article, or apparatus that comprises an element.
The foregoing is only a specific embodiment of the application to enable those skilled in the art to understand or practice the application. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be applied to other embodiments without departing from the spirit or scope of the application. Thus, the present application is not intended to be limited to the embodiments shown herein but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (10)

1. The pier shaft construction platform, its characterized in that, it includes:
The bridge comprises a plurality of support bases (1), a plurality of support base embedded parts, one or more square frames (2) and a plurality of connecting pieces, wherein the support bases are corresponding to the support bases (1) in number and are used for being embedded in a bridge bearing platform (5);
The single support base (1) is arranged on a single support base embedded part (11), one connecting part is arranged on each support base (1), and the rectangular frame (2) is fixed on the support base (1) through the connecting parts;
the plurality of the square frames (2) are connected in the vertical direction, and the adjacent square frames (2) are also connected through the connecting pieces.
2. The pier construction platform according to claim 1, wherein the rectangular frame (2) comprises a protective screen frame (21) and a framework structure, the protective screen frame (21) is arranged on the framework structure, the framework structure is formed by splicing a plurality of vertical uprights (22) and a plurality of horizontal cross bars (23), and the vertical uprights (22) are connected with the horizontal cross bars (23) through connecting pieces.
3. The pier body construction platform of claim 2, wherein the connecting piece is a connecting angle steel (3) and a connecting bolt, and connecting holes matched with the connecting bolt are formed in two ends of the connecting angle steel (3), the vertical upright rod (22) and the horizontal cross rod (23).
4. The pier body construction platform of claim 1, wherein the support base embedded part (11) comprises an embedded steel plate (111), a plurality of embedded bolts (112) and a plurality of embedded bars (113) which are arranged on the embedded steel plate (111), bolt holes which are matched with the embedded bolts (112) are formed in the support base (1), and the embedded bars (113) are used for being embedded in the bridge bearing platform (5).
5. The pier construction platform according to claim 4, wherein the plurality of embedded bars (113) are welded and fixed with the embedded steel plate (111).
6. The pier body construction platform of claim 2, further comprising a balance pull rod (4), wherein one end of the balance pull rod (4) is used for being buried in the pier body of the bridge, and the other end of the balance pull rod is connected with the framework structure.
7. The pier construction platform according to claim 2, wherein the protective screen frame (21) comprises a reinforcing mesh (211) and a profile steel skeleton (212) arranged on the reinforcing mesh (211).
8. The pier construction platform according to claim 1, wherein the supporting base (1) is provided with a plurality of stiffening steel plates (12).
9. The pier construction platform according to claim 1, wherein a ladder path (24) is provided between adjacent ones of the rectangular frames (2).
10. The pier construction platform according to claim 1, wherein the supporting base (1) is welded and fixed with the connecting piece.
CN202421410300.2U 2024-06-19 2024-06-19 A pier construction platform Active CN222809876U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202421410300.2U CN222809876U (en) 2024-06-19 2024-06-19 A pier construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202421410300.2U CN222809876U (en) 2024-06-19 2024-06-19 A pier construction platform

Publications (1)

Publication Number Publication Date
CN222809876U true CN222809876U (en) 2025-04-29

Family

ID=95460777

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202421410300.2U Active CN222809876U (en) 2024-06-19 2024-06-19 A pier construction platform

Country Status (1)

Country Link
CN (1) CN222809876U (en)

Similar Documents

Publication Publication Date Title
CN113401815B (en) High-altitude conversion system of core tube tower crane of super high-rise building and construction method thereof
CN103132766B (en) Truss for lifting power transmission line tower connecting leg and erection method
CN105442839A (en) Erecting method of cantilever structure formwork bent
CN109184061A (en) It cornices outside space structure ceiling system structure and construction method
CN111663457A (en) Assembled module, modular construction platform and method, bridge pier construction method
CN107762161B (en) A kind of energy-saving assembled system of steel residential structure and installation method
CN212897502U (en) Assembled lifting scaffold
CN111119222A (en) An assembly device for towers of UHVDC transmission lines in alpine regions
CN212582721U (en) Bearing platform of tower crane for vertical tower of top plate of foundation garage
CN111851978A (en) A kind of prefabricated lifting scaffold and its construction method
CN212897667U (en) Temporary supporting device for swing column
CN213390842U (en) Local bearing and supporting structure of steel truss
KR200187693Y1 (en) Prefabricating erection bent
CN211815605U (en) Construction device for pile column type pier tie beam and capping beam
CN219863968U (en) Construction platform of prestressing force structure
CN220451395U (en) Structural climbing frame attaching supporting device
CN116657875B (en) Cantilever steel structure construction platform with formwork system and construction method
CN216920677U (en) First-layer supporting structure of large rockery outer package
CN210766497U (en) Left and right truss middle flange connection two-side double-column portal frame
CN217508096U (en) Easily install electric power circuit modularization crossing structure
CN210002826U (en) detachable welding platform for steel column construction
CN210685313U (en) Safe convenient house steel connection structure
CN115370115A (en) Construction method of support-free cantilever platform
CN111962850A (en) Construction method of overhanging scaffold
CN219887489U (en) Height-adjustable integral folding scaffold

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant