CN222588564U - Boiler water wall ground assembly device - Google Patents

Boiler water wall ground assembly device Download PDF

Info

Publication number
CN222588564U
CN222588564U CN202420851144.7U CN202420851144U CN222588564U CN 222588564 U CN222588564 U CN 222588564U CN 202420851144 U CN202420851144 U CN 202420851144U CN 222588564 U CN222588564 U CN 222588564U
Authority
CN
China
Prior art keywords
support
supports
boiler water
assembly device
clamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202420851144.7U
Other languages
Chinese (zh)
Inventor
刘晓
卫阿朋
刘晓红
高峰
韩云鹏
刘红军
郝晓亮
冯海涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Chemical Engineering Second Construction Corp
Original Assignee
China Chemical Engineering Second Construction Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Chemical Engineering Second Construction Corp filed Critical China Chemical Engineering Second Construction Corp
Priority to CN202420851144.7U priority Critical patent/CN222588564U/en
Application granted granted Critical
Publication of CN222588564U publication Critical patent/CN222588564U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a boiler water-cooled wall ground assembly device which comprises two supports, clamps, hooking pieces, a stress beam, an upper jack and connecting rods, wherein the two supports are placed in parallel, each support comprises a plurality of supporting legs which are placed longitudinally, the tops of the supporting legs are connected through support beams, the clamps used for clamping the end parts of a tube screen are arranged above the support beams, the plurality of connecting rods are connected between the two supports transversely, the hooking pieces which are arranged longitudinally are in a group, the inner sides of the two supports are respectively provided with one group of hooking pieces, the bottoms of the hooking pieces are hooked on the connecting rods, the tops of the two hooking pieces in the group are connected with the stress beam, and the upper jack is arranged at the lower part of the stress beam and the upper part of the tube screen. The pipe screen is fastened through the clamp and the support, the hooking piece, the stress beam and the connecting rod form a stress frame of the upper jack, and the dislocation of the pipe orifice is corrected through the jack and the wedge, so that the structure is simple.

Description

Boiler water-cooled wall ground assembling device
Technical Field
The utility model relates to the technical field of boiler water wall installation, in particular to a boiler water wall ground assembling device.
Background
The water-cooled wall ground pairing can effectively reduce overhead work and ensure welding quality. When the water-cooled wall is assembled on the ground, the tube panels are connected in rows, so that the deviation exists mostly when the fine alignment is performed after the preliminary alignment of the gate, and the method mainly comprises transverse deviation and longitudinal deviation.
Therefore, in order to ensure the quality of water-cooled wall assembly and improve the speed of pipe screen alignment, it is necessary to provide a boiler water-cooled wall ground assembly platform, which is adopted in water-cooled wall ground assembly alignment.
Disclosure of utility model
The utility model aims to solve the technical problem of providing a boiler water wall ground assembling device, so that the alignment, assembling and welding of the pipe orifice of the boiler water wall pipe screen can be rapidly completed on the ground.
In order to solve the technical problems, the utility model adopts the following technical scheme:
The boiler water wall ground assembling device comprises a support, a clamp, a hooking piece, a stress beam, an upper jack and a connecting rod;
The support is arranged in parallel, each support comprises a plurality of support legs which are longitudinally arranged, the top parts of the support legs in the same support are connected through support beam, and a clamp for clamping the end part of the tube panel is arranged above the support beam;
A group of hooking pieces are arranged between two supports at two sides of the butt welding seam of the tube panel, the bottom of each hooking piece is hooked on the connecting rod, and the top of each hooking piece is connected with the stress beam;
The upper jack is arranged at the lower part of the stress beam and the upper part of the tube panel.
Further, the clamp is a bar-shaped clamping plate, and the bar-shaped clamping plate is fastened with the base cross beam through a locking bolt.
Further, the hooking piece comprises a plate body, the bottom of the plate body is L-shaped, and a square hole for fixing the end part of the stress beam is formed in the top of the plate body.
Further, the device also comprises a lower jack arranged on the ground between the two supports.
Further, the pipe screen comprises a wedge which can be inserted into a gap between adjacent pipe screens.
Compared with the prior art, the boiler water wall ground pairing device provided by the utility model has the advantages that the tube screen is fastened through the clamp and the support, the hooking piece, the stress beam and the connecting rod form the stress frame of the upper jack, and the dislocation of the tube orifice is corrected through the jack and the wedge, so that the structure is simple.
The utility model reduces the labor and mechanical consumption during the alignment of the tube panels, improves the construction efficiency, is simple to operate, and can adapt to the alignment correction requirements of water-cooled walls with various lengths by arranging the number of the supports.
Drawings
The accompanying drawings, which are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this specification, illustrate embodiments of the utility model and together with the description serve to explain the utility model.
FIG. 1 is a schematic diagram of the front structure of a boiler water wall ground pairing device provided by the utility model, wherein a part A is a tube panel welded junction;
FIG. 2 is a schematic view of the structure of the stand, clamp and lower jack;
FIG. 3 is a schematic illustration of the use of an upper jack and wedge;
Fig. 4 is a schematic structural view of the hooking member, wherein (a) is a front view and (b) is a side view.
In the figure, 1-support, 2-clamp, 3-hook, 4-stress beam, 5-upper jack, 6-connecting rod, 7-lower jack, 8-support leg, 9-support beam, 10-tube panel, 11-locking bolt and 12-wedge.
Detailed Description
For a better understanding of the present utility model, reference will be made to the following description of the utility model taken in conjunction with the accompanying drawings and examples. The features of the embodiments and examples of the present utility model may be combined with each other without any conflict.
The utility model provides a boiler water wall ground assembly device, which comprises a support 1, a clamp 2, a hooking piece 3, a stress beam 4, an upper jack 5 and a connecting rod 6.
Two supports 1 are placed in parallel, and each support 1 comprises a plurality of supporting legs 8 placed longitudinally, and the tops of the supporting legs 8 are connected through a support beam 9, and a clamp 2 for clamping the end part of a tube panel 10 is arranged above the support beam 9. A plurality of connecting rods 6 are transversely connected between the two supports 1.
Every two longitudinally arranged hooking pieces 3 are in a group, and the inner sides of the two supports 1 are respectively provided with a group of hooking pieces. The bottom of the hooking piece 3 is hooked on the connecting rod 6, and the tops of the two hooking pieces 3 in one group are connected with the stress beam 4.
The support frames 1 are placed in parallel, each support frame 1 comprises a plurality of support legs 9 placed longitudinally, the tops of the support legs 8 in the same support frame 1 are connected through support frame beams 9, a clamp 2 used for clamping the end part of a tube panel 10 is arranged above the support frame beams 9, and a connecting rod 6 is connected between the support legs 8 of the two support frames 1 on two sides of a butt welding line of the tube panel 10 in a transverse mode.
A group of hooking pieces 3 are arranged between the two supports 1 at two sides of the butt welding seam of the pipe screen 10, the two hooking pieces 3 are in a group, the bottom of each hooking piece 3 is hooked on the connecting rod 6, the top of each hooking piece 3 is connected with the stress beam 4, and the upper jack 5 is arranged at the lower part of the stress beam 4 and at the upper part of the pipe screen 10.
In this embodiment, the support 1 is a steel support, and the upper surface of the support 1 is provided with a horizontal support beam 9. As shown in fig. 1, the supports 1 are all placed longitudinally, the tube panels 10 to be assembled are placed on two or more supports 1, the ends of the tube panels 10 are clamped and fixed by the clamps 2 and the support cross beams 9, and the welded junctions of one group of tube panels 10 are near the middle parts of the two supports 1.
The supporting legs 8 of the two supports 1 on the two sides of the butt welding line of the pipe screen 10 are fixedly connected through 6 connecting rods so as to bear the tensile force of the hooking piece 3. The lower part of the hooking piece 3 is hooked on the connecting rod 6, and the stress beam 4 traverses two hooking pieces 3 in one group to form a stable stress frame. As shown in fig. 3, the top end of the upper jack 5 is propped against the bottom of the stress beam 4, the lower end of the upper jack 5 is arranged on the tube panel 10, the upper jack 5 acts on the tube panel 10 of the water-cooled wall reversely through the stress frame, and the upper jack 5 is lifted to provide the pressure correction tube panel forward longitudinal deviation. The boiler water wall ground assembling device provided by the embodiment can quickly finish the alignment, assembling and welding of the pipe orifice of the boiler water wall pipe screen on the ground.
In a relatively specific embodiment, the clamp 2 is a bar-shaped clamping plate, and channel steel can be used as the bar-shaped clamping plate, as shown in fig. 1 and 2, and the bar-shaped clamping plate and the base beam 9 are fastened by a locking bolt 11 to fix the tube panel 10.
As shown in fig. 4, the hooking member 3 includes a plate body, the bottom of the plate body is L-shaped, and a square hole for fixing the end of the stress beam is formed at the top of the plate body.
In a preferred embodiment, it also comprises a lower jack 7 arranged on the ground between the two supports 1. The top end of the lower jack 7 props against the bottom of the tube panel 10, and the lower jack 5 is matched with the upper jack to correct the positive longitudinal deviation of the tube panel.
In another preferred embodiment, a wedge 12 (fig. 3) is also included that is insertable into the gap between adjacent tube panels 10. The wedge 12, when inserted into the slit, provides the motive force for the correction orifice to adjust for the lateral deflection of the tube panel.
The scope of the present utility model is not limited to the above embodiments, but various modifications and alterations of the present utility model will become apparent to those skilled in the art, and any modifications, improvements and equivalents within the spirit and principle of the present utility model are intended to be included in the scope of the present utility model.

Claims (5)

1.一种锅炉水冷壁地面组对装置,其特征在于:包括支座、夹具、勾连件、受力梁、上部千斤顶和连杆;1. A boiler water wall ground assembly device, characterized in that it includes a support, a clamp, a hook, a load-bearing beam, an upper jack and a connecting rod; 多个支座平行放置,每个支座包括多个纵向放置的支脚,同一支座内的支脚顶部通过支座横梁连接,支座横梁上方设置有用于夹紧管屏端部的夹具;管屏对接焊缝两侧两个支座的支腿之间横向连接有连杆;Multiple supports are placed in parallel, each support includes multiple longitudinally placed legs, the tops of the legs in the same support are connected by a support crossbeam, and a clamp for clamping the end of the tube panel is arranged above the support crossbeam; a connecting rod is transversely connected between the legs of the two supports on both sides of the tube panel butt weld; 管屏对接焊缝两侧两个支座之间设置一组勾连件;勾连件底部勾连于连杆,勾连件顶部连接受力梁;所述上部千斤顶设置在受力梁下部、管屏上部。A set of hooking pieces is arranged between two supports on both sides of the tube panel butt weld; the bottom of the hooking piece is hooked to the connecting rod, and the top of the hooking piece is connected to the load-bearing beam; the upper jack is arranged at the lower part of the load-bearing beam and the upper part of the tube panel. 2.根据权利要求1所述的锅炉水冷壁地面组对装置,其特征在于:所述夹具为条形夹板,条形夹板与底座横梁通过锁紧螺栓紧固。2. The boiler water-cooled wall ground assembly device according to claim 1 is characterized in that the clamp is a strip clamp, and the strip clamp and the base beam are fastened by locking bolts. 3.根据权利要求1或2所述的锅炉水冷壁地面组对装置,其特征在于:所述勾连件包括板体,板体底部为L型,板体顶部开有用于受力梁端部固定的方孔。3. The boiler water-cooled wall ground assembly device according to claim 1 or 2 is characterized in that the hooking member includes a plate body, the bottom of the plate body is L-shaped, and a square hole is opened on the top of the plate body for fixing the end of the load-bearing beam. 4.根据权利要求3所述的锅炉水冷壁地面组对装置,其特征在于:还包括设置于两个支座之间的地面的下部千斤顶。4. The boiler water-cooled wall ground assembly device according to claim 3 is characterized in that it also includes a lower jack arranged on the ground between the two supports. 5.根据权利要求1或4所述的锅炉水冷壁地面组对装置,其特征在于:还包括可插入相邻管屏之间缝隙的楔子。5. The boiler water-cooled wall ground assembly device according to claim 1 or 4, characterized in that it also includes a wedge that can be inserted into the gap between adjacent tube panels.
CN202420851144.7U 2024-04-23 2024-04-23 Boiler water wall ground assembly device Active CN222588564U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202420851144.7U CN222588564U (en) 2024-04-23 2024-04-23 Boiler water wall ground assembly device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202420851144.7U CN222588564U (en) 2024-04-23 2024-04-23 Boiler water wall ground assembly device

Publications (1)

Publication Number Publication Date
CN222588564U true CN222588564U (en) 2025-03-11

Family

ID=94853259

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202420851144.7U Active CN222588564U (en) 2024-04-23 2024-04-23 Boiler water wall ground assembly device

Country Status (1)

Country Link
CN (1) CN222588564U (en)

Similar Documents

Publication Publication Date Title
CN113062474A (en) H-shaped steel and square pipe assembled joint and construction method
CN110409806B (en) Early-dismantling head and template supporting system
CN223223616U (en) T beam web stirrup installation bed-jig
CN217631274U (en) Bracket template system that supports is exempted from to piece together soon
CN120587862B (en) Offshore wind power full-rotation multi-angle pile driver fork frame preparation process
CN218758782U (en) Beam mold supports reinforcing apparatus
CN216687220U (en) Support frame convenient to fix quickly for tower crane
CN218362893U (en) Welding tool for cross beam of carrier roller set of belt conveyor
CN216184761U (en) Adjustable transportation bed-jig of steel case roof beam
CN212153747U (en) Connecting node structure of box type support and box type cross beam
CN211735104U (en) Prefabricated rain-proof sunshade shed frame of festival section case roof beam
CN215055557U (en) A steel structure safety rope fixing device
CN115012652A (en) Assembly type support-free bracket template assembling system and construction method thereof
CN210648912U (en) Special brazing clamp for flow-concentrating liquid cooling plate
CN222936448U (en) Butt joint device for hoisting side beams of steel skeleton
CN223447065U (en) An auxiliary device for facilitating the connection and positioning of steel arch frames
CN219978195U (en) Flaw detection frame of ultra-large bearing ring
CN219632970U (en) Auxiliary structure for machining and assembling of steel pipe arch rib end support device
CN215519928U (en) Building engineering strutting arrangement
CN215594401U (en) Pre-embedded anchoring mechanism for heavy bracket
CN217782797U (en) High-altitude construction operation platform suitable for lattice column
CN221502664U (en) Scaffold for construction
CN222295685U (en) Adjustable support frame for building template
CN218148874U (en) Assembly type building connection structure
CN222083601U (en) A support device for installing steel bars of a cap

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant