CN222562220U - Engineering progress display device for construction management construction - Google Patents

Engineering progress display device for construction management construction Download PDF

Info

Publication number
CN222562220U
CN222562220U CN202420347005.0U CN202420347005U CN222562220U CN 222562220 U CN222562220 U CN 222562220U CN 202420347005 U CN202420347005 U CN 202420347005U CN 222562220 U CN222562220 U CN 222562220U
Authority
CN
China
Prior art keywords
construction
sliding plate
display device
plate
display
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202420347005.0U
Other languages
Chinese (zh)
Inventor
程涌城
郑晓玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiande City Transportation Bureau
Original Assignee
Jiande City Transportation Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiande City Transportation Bureau filed Critical Jiande City Transportation Bureau
Priority to CN202420347005.0U priority Critical patent/CN222562220U/en
Application granted granted Critical
Publication of CN222562220U publication Critical patent/CN222562220U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices For Indicating Variable Information By Combining Individual Elements (AREA)

Abstract

本实用新型属于施工展示装置技术领域,具体的说是一种建设管理施工用工程进度展示装置,包括框体,所述框体的内部开设有单侧开口的收纳槽,所述收纳槽的一侧嵌入连接有玻璃层,所述收纳槽的内部滑动连接有滑动板,所述滑动板设为U形,所述滑动板的内部安装有展示组件;本实用新型通过展示板可以水平放置,便于放置工程进度展示图,而转动螺纹柱抵紧工程进度展示图进行固定,将滑动板推入收纳槽的内部进行展示,通过框架和玻璃层的配合,实现户外施工场地展示时展示图的防水防尘功能。

The utility model belongs to the technical field of construction display devices, and specifically is a project progress display device for construction management, comprising a frame, a storage groove with a single-side opening is opened inside the frame, a glass layer is embedded and connected to one side of the storage groove, a sliding plate is slidably connected to the inside of the storage groove, the sliding plate is set to be U-shaped, and a display component is installed inside the sliding plate; the utility model can be placed horizontally through the display plate, which is convenient for placing a project progress display chart, and the rotating threaded column is pressed against the project progress display chart to fix it, and the sliding plate is pushed into the interior of the storage groove for display, and the cooperation of the frame and the glass layer realizes the waterproof and dustproof function of the display chart when displaying it in an outdoor construction site.

Description

Engineering progress display device for construction management construction
Technical Field
The utility model relates to the technical field of construction display devices, in particular to an engineering progress display device for construction management and construction.
Background
The engineering construction is a special accounting subject for collecting and accounting engineering cost of a building installation enterprise, and is an activity of carrying out new construction, extension and reconstruction on the construction engineering according to the requirements of construction engineering design files, and four details of labor cost, material cost, mechanical cost and other direct cost are set under the engineering construction, and the construction process is usually displayed through a display board.
The current chinese patent with bulletin number CN211044968U discloses a progress management display device for construction engineering construction, which comprises a supporting column, the bottom fixedly connected with universal wheel of support column, and the inside of support column has cup jointed flexible interior pole, the preceding terminal surface welded connection of flexible interior pole has two spouts, and the inside of spout cup joints and has inserted the slider, the opposite side fixedly connected with show board of slider, and fixed establishment is installed to the both sides of show board, fixed establishment's inside is including two L template.
The inventor considers that the prior art has the defects that the device has no waterproof and dustproof functions when being used outdoors, the position of the fixing mechanism is fixed, debugging cannot be carried out according to the size of the display diagram, the display diagram with various sizes is inconvenient to fix, improvement is needed, and therefore the construction progress display device for construction management and construction is provided for solving the problems.
Disclosure of utility model
In order to overcome the defects of the prior art and solve the technical problems, the utility model provides an engineering progress display device for construction management and construction.
The technical scheme includes that the engineering progress display device for construction management and construction comprises a frame body, a storage groove with a single-side opening is formed in the frame body, a glass layer is embedded and connected to one side of the storage groove, a sliding plate is connected to the inside of the storage groove in a sliding mode, the sliding plate is U-shaped, a display assembly is mounted in the sliding plate, the display assembly comprises a display plate supported by transparent materials, the display plate is hinged to the sliding plate, a sliding opening is formed in one side of the frame body, a locking assembly is mounted in the sliding opening, the locking assembly comprises a clamping plate, the clamping plate is L-shaped and is connected with the sliding opening in a sliding mode, when the engineering progress display device is used, the sliding plate is pulled out of the storage groove, the display plate is enabled to abut against the sliding plate to be horizontally convenient to place the engineering progress display view, a threaded column is rotated to abut against the engineering progress display view to be fixed, then the sliding plate is enabled to slide to the inside of the storage groove after the sliding plate is rotated to be vertical, the engineering progress display view is enabled to be in the inside of the frame, and meanwhile, the dustproof progress display function is achieved through the outdoor display of the glass progress display view through the glass layer in the matching mode.
Preferably, the surface of the display board is outwards protruded to form a limiting convex layer, the sliding board is slid to the inside of the storage groove, and the glass layer is propped against the limiting convex layer, so that the display board is kept vertically for display.
Preferably, the regulating plate of L shape is installed respectively to the both sides of show board, the surface threaded connection of regulating plate has a plurality of screw thread post, screw thread cylinder is to the one end fixedly connected with rubber pad of regulating plate, and the rubber pad increases the frictional force with the engineering progress show diagram.
Preferably, one end of each of the two adjusting plates is slidably connected with a guide rod, and two ends of each guide rod are fixedly connected with the display plate.
Preferably, two the other end threaded connection of regulating plate has two-way lead screw, two ends and the show board rotation of two-way lead screw are connected, drive the regulating plate through rotating two-way lead screw and slide, and then according to the width of show diagram, adjust the position of screw thread post to the cooperation transversely sets up many screw thread posts, compare in prior art, can satisfy to fix the show diagram of multisize.
Preferably, the locking assembly further comprises an L-shaped clamping groove, and the clamping groove is formed in one side of the sliding plate.
Preferably, the bottom fixedly connected with spacing spring of cardboard, and the bottom fixed mounting of spacing spring is in the bottom of sliding port, and when the sliding plate inserts and accomodates inslot portion, the cardboard slides along the draw-in groove through spacing spring's tension and inserts the inside of draw-in groove, and then carries out automatic fixation to the sliding plate, unexpected roll-off accomodates the groove when avoiding the display diagram to show, when needing to change the display diagram, pushes down the cardboard to promote the sliding plate through the push rod, and then can take out the sliding plate and change the display diagram.
Preferably, the side wall of the sliding plate is fixedly connected with a push rod, and the push rod penetrates through the frame body and extends to the outside.
Preferably, the bottom symmetry fixedly connected with landing leg of framework, the bottom symmetry fixedly connected with of landing leg removes the wheel, is convenient for remove display device.
The utility model has the advantages that:
1. According to the utility model, the display board can be horizontally placed, so that the engineering progress display diagram is conveniently placed, the rotating threaded column is abutted against the engineering progress display diagram to be fixed, the sliding board is pushed into the storage groove to be displayed, and the waterproof and dustproof functions of the display diagram during outdoor construction site display are realized through the cooperation of the frame and the glass layer.
2. According to the utility model, the bidirectional screw rod is rotated to drive the adjusting plate to slide, so that the positions of the threaded columns are adjusted according to the width of the display diagram, and the threaded columns are matched with a plurality of transversely arranged threaded columns.
Drawings
In order to more clearly illustrate the embodiments of the utility model or the technical solutions of the prior art, the drawings which are used in the description of the embodiments or the prior art will be briefly described, it being obvious that the drawings in the description below are only some embodiments of the utility model, and that other drawings can be obtained from these drawings without inventive faculty for a person skilled in the art.
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a schematic view of the expanded structure of FIG. 1 according to the present utility model;
FIG. 3 is a schematic view showing the structure of the assembly according to the present utility model;
FIG. 4 is a schematic view of the structure A of FIG. 3 according to the present utility model;
fig. 5 is an exploded view of the locking assembly of the present utility model.
The device comprises a frame body 1, a containing groove 2, a glass layer 3, a sliding plate 4, a display assembly 5, a display plate 51, a display plate 52, a limiting convex layer 53, an adjusting plate 54, a threaded column 55, a rubber pad 56, a guide rod 57, a bidirectional screw rod 6, a sliding port 7, a locking assembly 71, a clamping plate 72, a clamping groove 73, a limiting spring 8 and a push rod.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-5, an engineering progress display device for construction management and construction comprises a frame body 1, a storage groove 2 with a single side opening is formed in the frame body 1, a glass layer 3 is embedded and connected to one side of the storage groove 2, a sliding plate 4 is slidably connected to the inside of the storage groove 2, the sliding plate 4 is in a U shape, a display assembly 5 is mounted in the sliding plate 4, the display assembly 5 comprises a display plate 51 supported by transparent materials, the display plate 51 is hinged with the sliding plate 4, a sliding opening 6 is formed in one side of the frame body 1, a locking assembly 7 is mounted in the sliding opening 6, the locking assembly 7 comprises a clamping plate 71, the clamping plate 71 is in an L shape, the clamping plate 71 is slidably connected with the sliding opening 6, when in use, the sliding plate 4 is pulled out of the storage groove 2, the sliding plate 51 is rotated downwards, the sliding plate 4 is kept horizontally for conveniently placing an engineering progress display, a threaded column 54 is tightly fixed against the engineering progress display, then the sliding plate 4 is slid into the inside of the storage groove 2 after the sliding plate 51 is rotated to be vertical, and the engineering progress display view is simultaneously displayed in the frame, and the dustproof function is realized through the outdoor display of the glass layer 3 when the frame is matched with the outdoor display frame.
The surface of the display plate 51 is outwards protruded to form a limiting convex layer 52, the sliding plate 4 is slid into the storage groove 2, and the glass layer 3 is propped against the limiting convex layer 52, so that the display plate 51 is kept vertically displayed.
L-shaped adjusting plates 53 are respectively arranged on two sides of the display plate 51, a plurality of threaded columns 54 are connected to the surfaces of the adjusting plates 53 in a threaded mode, rubber pads 55 are fixedly connected to one ends of the threaded columns 54, which face the adjusting plates 53, of the adjusting plates, and friction force between the rubber pads 55 and an engineering progress display chart is increased.
One end of the two adjusting plates 53 is slidably connected with a guide rod 56, and two ends of the guide rod 56 are fixedly connected with the display plate 51.
The other end threaded connection of two regulating plates 53 has two-way lead screw 57, and two ends and the show board 51 rotation of two-way lead screw 57 are connected, drive regulating plate 53 through rotating two-way lead screw 57 and slide, and then according to the width of show diagram, adjust the position of screw thread post 54 to a plurality of screw thread posts 54 that the cooperation transversely set up, compare in prior art, can satisfy and fix the show diagram of multisize.
The locking assembly 7 further comprises an L-shaped clamping groove 72, the clamping groove 72 being provided on one side of the slide plate 4.
The bottom fixedly connected with spacing spring 73 of cardboard 71, and the bottom fixed mounting of spacing spring 73 is in the bottom of sliding port 6, and when the sliding plate 4 inserts and accomodates inslot 2, the cardboard 71 slides along draw-in groove 72 through the tension of spacing spring 73 and inserts the inside of draw-in groove 72, and then carries out automatic fixation to sliding plate 4, unexpected roll-off accomodates inslot 2 when avoiding showing the diagram show, when needing to change the showing diagram, pushes down cardboard 71 to promote sliding plate 4 through push rod 8, and then can take out sliding plate 4 and change the showing diagram.
The side wall of the sliding plate 4 is fixedly connected with a push rod 8, and the push rod 8 penetrates through the frame body 1 and extends to the outside.
The bottom symmetry fixedly connected with landing leg of framework 1, the bottom symmetry fixedly connected with of landing leg removes the wheel, is convenient for remove display device.
None of the parts of the device are the same as or can be implemented using prior art.
The working principle is that when the display device is used, the sliding plate 4 is pulled out of the storage groove 2, the display plate 51 is rotated downwards, the display plate 51 is propped against the sliding plate 4 to keep a horizontal engineering progress display diagram convenient to place, the rotating threaded column 54 is propped against the engineering progress display diagram to fix, then after the display plate 51 is rotated to be vertical, the sliding plate 4 is slid into the storage groove 2, the engineering progress display diagram is displayed in the frame, and meanwhile, the waterproof and dustproof functions of the display diagram during outdoor construction site display are realized through the cooperation of the frame and the glass layer 3;
The bidirectional screw rod 57 is rotated to drive the adjusting plate 53 to slide, so that the position of the threaded column 54 is adjusted according to the width of the display diagram, and the threaded column 54 is matched with a plurality of transversely arranged threaded columns 54, so that the display diagram with multiple sizes can be fixed compared with the prior art;
When the sliding plate 4 is inserted into the storage groove 2, the clamping plate 71 slides along the clamping groove 72 through the tension of the limiting spring 73 and is inserted into the clamping groove 72, so that the sliding plate 4 is automatically fixed, the sliding plate is prevented from accidentally sliding out of the storage groove 2 when the display diagram is displayed, the clamping plate 71 is pressed downwards when the display diagram needs to be replaced, the sliding plate 4 is pushed by the push rod 8, and the display diagram can be replaced by the sliding plate 4.
In the description of the present specification, the descriptions of the terms "one embodiment," "example," "specific example," and the like, mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the present utility model. In this specification, schematic representations of the above terms do not necessarily refer to the same embodiments or examples. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The foregoing has shown and described the basic principles, principal features and advantages of the utility model. It will be understood by those skilled in the art that the present utility model is not limited to the embodiments described above, and that the above embodiments and descriptions are merely illustrative of the principles of the present utility model, and various changes and modifications may be made without departing from the spirit and scope of the utility model, which is defined in the appended claims.

Claims (8)

1. The utility model provides an engineering progress display device for construction management construction, includes framework (1), its characterized in that, unilateral open-ended accomodates groove (2) have been seted up to the inside of framework (1), the one side embedding of accomodating groove (2) is connected with glass layer (3), the inside sliding connection of accomodating groove (2) has sliding plate (4), sliding plate (4) are established to the U-shaped, the internally mounted of sliding plate (4) has show subassembly (5), show subassembly (5) include show board (51) that transparent material supported, show board (51) are articulated with sliding plate (4), sliding mouth (6) have been seted up to one side of framework (1), the internally mounted of sliding mouth (6) has locking component (7), locking component (7) are including cardboard (71), cardboard (71) are established to L shape, cardboard (71) and sliding mouth (6) sliding connection.
2. The construction management construction engineering progress display device according to claim 1, wherein a limiting convex layer (52) is formed on the surface of the display plate (51) in an outward protruding mode.
3. The construction management construction engineering progress display device according to claim 1, wherein L-shaped adjusting plates (53) are respectively arranged on two sides of the display plate (51), a plurality of threaded columns (54) are connected to the surfaces of the adjusting plates (53) in a threaded mode, and rubber pads (55) are fixedly connected to one ends of the threaded columns (54) facing the adjusting plates (53).
4. The construction management construction engineering progress display device according to claim 3, wherein one end of each of the two adjusting plates (53) is slidably connected with a guide rod (56), and two ends of each guide rod (56) are fixedly connected with the display plate (51).
5. The construction management construction engineering progress display device according to claim 3, wherein two ends of the two adjusting plates (53) are connected with two-way screw rods (57) in a threaded mode, and two ends of the two-way screw rods (57) are connected with the display plates (51) in a rotating mode.
6. The construction management work progress display device according to claim 1, wherein the locking assembly (7) further comprises an L-shaped clamping groove (72), and the clamping groove (72) is formed on one side of the sliding plate (4).
7. The construction management construction engineering progress display device according to claim 1, wherein the bottom of the clamping plate (71) is fixedly connected with a limiting spring (73), and the bottom end of the limiting spring (73) is fixedly arranged at the bottom of the sliding opening (6).
8. The construction management construction engineering progress display device according to claim 1, wherein the side wall of the sliding plate (4) is fixedly connected with a push rod (8), and the push rod (8) penetrates through the frame body (1) and extends to the outside.
CN202420347005.0U 2024-02-26 2024-02-26 Engineering progress display device for construction management construction Active CN222562220U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202420347005.0U CN222562220U (en) 2024-02-26 2024-02-26 Engineering progress display device for construction management construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202420347005.0U CN222562220U (en) 2024-02-26 2024-02-26 Engineering progress display device for construction management construction

Publications (1)

Publication Number Publication Date
CN222562220U true CN222562220U (en) 2025-03-04

Family

ID=94762785

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202420347005.0U Active CN222562220U (en) 2024-02-26 2024-02-26 Engineering progress display device for construction management construction

Country Status (1)

Country Link
CN (1) CN222562220U (en)

Similar Documents

Publication Publication Date Title
CN222562220U (en) Engineering progress display device for construction management construction
CN210804955U (en) An urban planning layout display agency
CN218845643U (en) A multi-screen support frame for software debugging
CN216239433U (en) A crystalline silicon photovoltaic sunshade device combined with glass curtain wall
CN215950848U (en) Display screen for behavior management
CN212322447U (en) Novel english teaching device
CN212233892U (en) A rotating teaching device for strategic management
CN219725067U (en) A long support frame welding device
CN211667492U (en) Electronic commerce teaching device
CN210860461U (en) Portable column switch for automatic control field test
CN210027264U (en) A GPS-based Geographic Information Collection Device
CN218149830U (en) A formwork fixture
CN206133072U (en) An optical module assembly jig
CN208239749U (en) A kind of liquid crystal display frame size detection device
CN221048228U (en) Equipment fixing device for intelligent electric installation and debugging of building
CN218914432U (en) Computer display screen mounting frame
CN221054586U (en) LED display screen fixing device convenient to installation
CN221551410U (en) Double-upright-column multi-line station rod convenient for replacing circuit board
CN214368766U (en) Display fixing device for teaching demonstration
CN221121685U (en) LED display installation component
CN221323859U (en) A large screen for emergency command and display of power grid power protection
CN219353817U (en) Detachable and portable mop
CN220008962U (en) Flattening device with arrangement function
CN216803369U (en) Building design model splicing apparatus
CN213276476U (en) Combined hard disk mounting rack

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant