CN222524007U - Casting well equipment installation protector - Google Patents

Casting well equipment installation protector Download PDF

Info

Publication number
CN222524007U
CN222524007U CN202420855001.3U CN202420855001U CN222524007U CN 222524007 U CN222524007 U CN 222524007U CN 202420855001 U CN202420855001 U CN 202420855001U CN 222524007 U CN222524007 U CN 222524007U
Authority
CN
China
Prior art keywords
plate
end frame
support rod
casting well
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202420855001.3U
Other languages
Chinese (zh)
Inventor
狄英杰
申晨辉
张恒
蔡明洲
巴超峰
候贤宝
王永力
宋超
赵杰
吕浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangyuan Zhongfu Technology Co ltd
Original Assignee
Guangyuan Zhongfu Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangyuan Zhongfu Technology Co ltd filed Critical Guangyuan Zhongfu Technology Co ltd
Priority to CN202420855001.3U priority Critical patent/CN222524007U/en
Application granted granted Critical
Publication of CN222524007U publication Critical patent/CN222524007U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Jib Cranes (AREA)

Abstract

本实用新型公开了一种铸造井设备安装防护装置,包括底板、斜架和端架,底板为两个,在每个底板上设置有两个斜架,并在两个斜架之间设置有梯板,在斜架的顶部设置有端架,在端架与底板之间设置有第一支杆,在端架顶部的一侧设置有第二支杆,在第二支杆下方的端架上套设有位移板,在位移板的中部设置有U型轨道,在第二支杆和U型轨道之间设置有吊架组件,吊架组件的左侧通过拉绳连接有卷扬机,吊架组件的右侧通过拉绳连接有导线轮。本实用新型通过在第二支杆和U型轨道上滑动连接有吊架组件,配合卷扬机和导线轮的使用,便于工作人员对不同位置的设置进行安装,提高了工作效率,保证了施工的安全性和稳定性。

The utility model discloses a casting well equipment installation protection device, including a base plate, an inclined frame and an end frame, two base plates, two inclined frames are arranged on each base plate, a ladder plate is arranged between the two inclined frames, an end frame is arranged on the top of the inclined frame, a first support rod is arranged between the end frame and the base plate, a second support rod is arranged on one side of the top of the end frame, a displacement plate is sleeved on the end frame below the second support rod, a U-shaped track is arranged in the middle of the displacement plate, a hanger assembly is arranged between the second support rod and the U-shaped track, a winch is connected to the left side of the hanger assembly through a pull rope, and a guide wheel is connected to the right side of the hanger assembly through a pull rope. The utility model is convenient for workers to install settings at different positions by slidingly connecting the hanger assembly on the second support rod and the U-shaped track, in conjunction with the use of the winch and the guide wheel, thereby improving work efficiency and ensuring construction safety and stability.

Description

Casting well equipment installation protector
Technical Field
The utility model relates to a movable protective hanging bracket, in particular to a cast well equipment installation protective device, and belongs to the technical field of deep well casting.
Background
The deep well casting requires to replace different equipment when casting different types of alloys, and personnel are required to install dummy ingot heads and install crystallizer pipelines on the platform, and because the gap between the platform and the inner wall of the casting well is large, the personnel have potential safety hazards of falling when installing the dummy ingot heads and the crystallizer, and the original safety facility requires the personnel to hang in the casting well by using a lifting rope for construction, and the hanging points are replaced according to different construction points.
Disclosure of utility model
The technical problem to be solved by the utility model is to overcome the defects of the prior art, provide the casting well equipment installation protection device, facilitate the movement of workers in the casting well, and facilitate the rapid equipment installation of the workers.
The technical scheme adopted by the utility model for solving the technical problems is as follows:
The utility model provides a casting well equipment installation protector, includes bottom plate, oblique frame and end frame, the bottom plate is two, is the symmetry form and distributes in the both sides of casting well, every be provided with two oblique frames on the bottom plate to be provided with the ladder board between two oblique frames, the top of oblique frame is provided with the end frame, be provided with first branch between end frame and the bottom plate, one side at end frame top is provided with second branch, the cover is equipped with the displacement board on the end frame of second branch below, the middle part of displacement board is provided with U type track, be provided with the gallows subassembly between second branch and the U type track, the left side of gallows subassembly is connected with the hoist engine through the stay cord, the right side of gallows subassembly is connected with the wire wheel through the stay cord.
The end frame is L-shaped, a limiting plate is arranged at the right end of the end frame, and the displacement plate is sleeved above the limiting plate and is fixedly connected with the end frame through bolts.
The U-shaped track penetrates through the middle of the displacement plate, and matched nuts are screwed above and below the displacement plate.
The hanger assembly comprises a hook plate, a support plate and a fence, wherein the support plate is connected with the U-shaped track in a sliding mode, two hook plates are arranged on one side of the support plate, the hook plates are hung on the second supporting rod, safety bolts are arranged on the hook plates below the second supporting rod, and the fence is arranged on the upper portion of the support plate.
And a guide wheel is arranged at the hook plate above the second supporting rod.
The winch is arranged on the left end frame, the wire guide wheel is arranged on the right end frame, and a support column is arranged on the upper portion of the right inclined frame.
The bottom of the bottom plate is provided with rollers.
The utility model has the positive beneficial effects that:
1. according to the utility model, the hanging bracket component is connected on the second support rod and the U-shaped track in a sliding manner, and can be horizontally moved according to different construction points by matching with the use of the winch and the wire guide wheel, so that a worker can install equipment on the hanging bracket, and the hanging bracket is convenient to use and simple to operate.
2. According to the utility model, the rollers are arranged at the bottom of the bottom plate, so that the device can be conveniently moved horizontally integrally, workers can conveniently install the devices at different positions, the working efficiency is improved, and the safety and stability of construction are ensured.
Drawings
FIG. 1 is a schematic diagram of the structure of the present utility model;
FIG. 2 is a construction site layout of the present utility model;
FIG. 3 is a schematic view of the hanger assembly of the present utility model;
The device comprises a 1-bottom plate, a 2-inclined frame, a 3-end frame, a 4-first supporting rod, a 5-displacement plate, a 6-U-shaped track, a 7-second supporting rod, an 8-hook plate, a 9-supporting plate, a 10-fence, an 11-winch, a 12-wire guide wheel, a 13-supporting column, a 14-safety bolt, a 15-ladder plate, a 16-guiding wheel, an A-casting well and a B-construction platform.
Detailed Description
The utility model is further explained and illustrated below with reference to the drawings:
Referring to fig. 1-3, a protection device for installing casting well equipment comprises two bottom plates 1, inclined frames 2 and end frames 3, wherein the two bottom plates 1 are symmetrically distributed on two sides of a casting well, two inclined frames 2 are arranged on each bottom plate 1, a ladder plate 15 is arranged between the two inclined frames 2, the end frames 3 are arranged at the top of each inclined frame 2, a first supporting rod 4 is arranged between each end frame 3 and the bottom plate 1, a second supporting rod 7 is arranged on one side of the top of each end frame 3, a displacement plate 5 is sleeved on each end frame 3 below each second supporting rod 7, a U-shaped track 6 is arranged in the middle of each displacement plate 5, a hanging bracket assembly is arranged between each second supporting rod 7 and each U-shaped track 6, a winch 11 is connected to the left side of each hanging bracket assembly through a pull rope, and a wire guide wheel 12 is connected to the right side of each hanging bracket assembly through a pull rope.
The end frame 3 is L-shaped, a limiting plate is arranged at the right end of the end frame 3, and a displacement plate 5 is sleeved above the limiting plate and is fixedly connected with the end frame 3 through bolts.
The U-shaped track 6 penetrates through the middle of the displacement plate 5, and matched nuts are screwed above and below the displacement plate 5.
The hanger assembly comprises a hook plate 8, a support plate 9 and a fence 10, wherein the support plate 9 is connected with the U-shaped track 6 in a sliding way, two hook plates 8 are arranged on one side of the support plate 9, the hook plates 8 are hung on the second supporting rod 7, safety bolts 14 are arranged on the hook plates 8 below the second supporting rod 7, and the fence 10 is arranged on the upper portion of the support plate 9.
A guide wheel 16 is arranged at the hook plate 8 above the second strut 7.
The winding engine 11 is arranged on the left end frame 3, the wire guide wheel 12 is arranged on the right end frame 3, and the upper part of the inclined frame 2 is provided with a support column 13.
Rollers are arranged at the bottom of the bottom plate 1.
In the above description, the construction platform is arranged above the casting well, the staff needs to install equipment such as a crystallizer on the construction platform, the bottom plate is positioned at the two sides of the construction platform and the casting well, the inner end of the end frame is positioned at the upper position of the casting well, and the hanger component horizontally moves above the casting well.
In the above description, the end frame, the bottom frame and the first supporting rod are of an integrated structure, and the end frame is distributed in an L shape, and the front end of the end frame is positioned at the upper position of the casting well.
In the above description, the second supporting rod is arranged between the end frames at two sides, the upper end of the hook plate is hung on the second supporting rod, the bottom of the hook plate is fixedly connected with the supporting plate, the hook plate is connected with the second supporting rod in a sliding way, and the supporting plate is connected with the U-shaped track in a sliding way.
In the description, when the lifting frame assembly is used, the lifting frame assembly is positioned at the right end of the second supporting rod, workers enter the lifting frame assembly through the ladder frame and pull the lifting frame assembly to move along the transverse horizontal direction of the second supporting rod through the winch, after construction is finished, the lifting frame assembly is reset by the aid of the pull ropes on the guide wheels, and meanwhile the pull ropes are wound on the supporting rods to be fixed.
In the above description, the device can be moved along the horizontal transverse direction of the casting well by moving the bottom plate, so that the installation of multi-azimuth equipment is convenient for the staff.
In the above description, when the construction is completed, the worker comes out from the hanger while removing the safety bolts at the upper portion of the hook plate, then the hanger assembly is taken out, while taking out the U-shaped rail, and then the bottom plate is removed.
In the above description, the reinforcing rod is provided between the end frame and the first strut.
According to the utility model, the hanger component is connected on the second support rod and the U-shaped track in a sliding manner, and is matched with the use of the winch and the wire guide wheel, so that the installation of workers on different positions is facilitated, the use is convenient, the operation is simple, the working efficiency is improved, and the safety and the stability of construction are ensured.

Claims (7)

1.一种铸造井设备安装防护装置,包括底板(1)、斜架(2)和端架(3),其特征在于:所述底板(1)为两个,呈对称状分布在铸造井的两侧,在每个所述底板(1)上设置有两个斜架(2),并在两个斜架(2)之间设置有梯板(15),所述斜架(2)的顶部设置有端架(3),所述端架(3)与底板(1)之间设置有第一支杆(4),所述端架(3)顶部的一侧设置有第二支杆(7),所述第二支杆(7)下方的端架(3)上套设有位移板(5),所述位移板(5)的中部设置有U型轨道(6),所述第二支杆(7)和U型轨道(6)之间设置有吊架组件,所述吊架组件的左侧通过拉绳连接有卷扬机(11),所述吊架组件的右侧通过拉绳连接有导线轮(12)。1. A casting well equipment installation protection device, comprising a base plate (1), an inclined frame (2) and an end frame (3), characterized in that: the base plates (1) are two and symmetrically distributed on both sides of the casting well, two inclined frames (2) are arranged on each base plate (1), and a ladder plate (15) is arranged between the two inclined frames (2), an end frame (3) is arranged on the top of the inclined frame (2), a first support rod (4) is arranged between the end frame (3) and the base plate (1), a second support rod (7) is arranged on one side of the top of the end frame (3), a displacement plate (5) is sleeved on the end frame (3) below the second support rod (7), a U-shaped track (6) is arranged in the middle of the displacement plate (5), a hanger assembly is arranged between the second support rod (7) and the U-shaped track (6), the left side of the hanger assembly is connected to a winch (11) through a pulley, and the right side of the hanger assembly is connected to a guide wheel (12) through a pulley. 2.根据权利要求1所述的一种铸造井设备安装防护装置,其特征在于:所述端架(3)呈L状分布,所述端架(3)右端设置有限位板,所述位移板(5)套设在限位板的上方,并通过螺栓与端架(3)固定连接在一起。2. A casting well equipment installation protection device according to claim 1, characterized in that: the end frame (3) is distributed in an L shape, a limit plate is arranged at the right end of the end frame (3), the displacement plate (5) is sleeved above the limit plate, and is fixedly connected to the end frame (3) by bolts. 3.根据权利要求1所述的一种铸造井设备安装防护装置,其特征在于:所述U型轨道(6)贯穿位移板(5)的中部,并在位移板(5)的上方和下方拧有相匹配的螺母。3. A casting well equipment installation protection device according to claim 1, characterized in that: the U-shaped track (6) passes through the middle of the displacement plate (5), and matching nuts are screwed on the top and bottom of the displacement plate (5). 4.根据权利要求1所述的一种铸造井设备安装防护装置,其特征在于:所述吊架组件由钩板(8)、支撑板(9)和围栏(10)组成,所述支撑板(9)与U型轨道(6)滑动连接在一起,所述支撑板(9)的一侧设置有两个钩板(8),所述钩板(8)挂设在第二支杆(7)上,并在第二支杆(7)下方的钩板(8)上设置有安全螺栓(14),所述支撑板(9)的上部设置有围栏(10)。4. A casting well equipment installation protection device according to claim 1, characterized in that: the hanger assembly consists of a hook plate (8), a support plate (9) and a fence (10), the support plate (9) is slidably connected to the U-shaped track (6), two hook plates (8) are arranged on one side of the support plate (9), the hook plate (8) is hung on the second support rod (7), and a safety bolt (14) is arranged on the hook plate (8) below the second support rod (7), and a fence (10) is arranged on the upper part of the support plate (9). 5.根据权利要求1所述的一种铸造井设备安装防护装置,其特征在于:所述第二支杆(7)上方的钩板(8)处设置有导向轮(16)。5. A casting well equipment installation protection device according to claim 1, characterized in that a guide wheel (16) is provided at the hook plate (8) above the second support rod (7). 6.根据权利要求1所述的一种铸造井设备安装防护装置,其特征在于:所述卷扬机(11)设置在左侧的端架(3)上,所述导线轮(12)设置在右侧的端架(3)上,并在右侧所述的斜架(2)的上部设置有支柱(13)。6. A casting well equipment installation protection device according to claim 1, characterized in that: the winch (11) is arranged on the end frame (3) on the left side, the guide wheel (12) is arranged on the end frame (3) on the right side, and a support (13) is arranged on the upper part of the inclined frame (2) on the right side. 7.根据权利要求1所述的一种铸造井设备安装防护装置,其特征在于:所述底板(1)的底部设置有滚轮。7. A casting well equipment installation protection device according to claim 1, characterized in that: a roller is provided at the bottom of the base plate (1).
CN202420855001.3U 2024-04-24 2024-04-24 Casting well equipment installation protector Active CN222524007U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202420855001.3U CN222524007U (en) 2024-04-24 2024-04-24 Casting well equipment installation protector

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202420855001.3U CN222524007U (en) 2024-04-24 2024-04-24 Casting well equipment installation protector

Publications (1)

Publication Number Publication Date
CN222524007U true CN222524007U (en) 2025-02-25

Family

ID=94671094

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202420855001.3U Active CN222524007U (en) 2024-04-24 2024-04-24 Casting well equipment installation protector

Country Status (1)

Country Link
CN (1) CN222524007U (en)

Similar Documents

Publication Publication Date Title
CN207748760U (en) A kind of bridge crane of hoisting large-size drainpipe
CN110004834A (en) A kind of automatic climbing platform for hanging cable construction
CN211899163U (en) Construction structure of roof steel structure platform slope glass curtain wall
CN206971764U (en) The purlin crane system of Steel Structure Installation
CN108035530B (en) Oil tank inner wall construction hanging basket
CN222524007U (en) Casting well equipment installation protector
CN208249734U (en) One kind is built the road gantry crane
CN207829430U (en) Lifting type operation platform for suspension operation
CN204324787U (en) A trolley type cable well cover opener
CN213596814U (en) Movable three-dimensional spanning multi-purpose suspension bridge construction platform
CN110748140A (en) Track beam hanging basket special for stepped curtain wall
CN205369033U (en) Gallows formula bridge tool car
CN207004137U (en) A kind of power tower
CN105152052A (en) Glass curtain wall component lifting device and glass curtain wall component installing method
CN211665594U (en) Bridge bottom die integral dismantling device
CN211596364U (en) A multifunctional anti-collision wall construction trolley
CN210341680U (en) Door type corrugated steel web plate installation and overhanging type hanging bracket structure
CN209799334U (en) Lifting scaffold hanging device
CN112591636A (en) High-strength hanger platform based on steel grating
CN207844973U (en) Simple taiwan area hoisting bracket
CN216194118U (en) Hanging basket structure for bridge construction
CN223016341U (en) Overhead hoist of steel construction roof beam
CN204441805U (en) A kind of Height Adjustable wire-unfolding rack
CN220954726U (en) Suspension construction work tool
CN221319208U (en) Liftable bracket platform device for dismounting and mounting electric hoist of bridge crane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant