CN222477457U - Construction equipment of pile is irritated to vibration immersed tube rock-socketed - Google Patents

Construction equipment of pile is irritated to vibration immersed tube rock-socketed Download PDF

Info

Publication number
CN222477457U
CN222477457U CN202421284817.1U CN202421284817U CN222477457U CN 222477457 U CN222477457 U CN 222477457U CN 202421284817 U CN202421284817 U CN 202421284817U CN 222477457 U CN222477457 U CN 222477457U
Authority
CN
China
Prior art keywords
base
immersed tube
construction equipment
cleaning
parts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202421284817.1U
Other languages
Chinese (zh)
Inventor
孙忠深
高凤怀
王园园
侯秀娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Senjian Foundation Engineering Co ltd
Original Assignee
Qingdao Senjian Foundation Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Senjian Foundation Engineering Co ltd filed Critical Qingdao Senjian Foundation Engineering Co ltd
Priority to CN202421284817.1U priority Critical patent/CN222477457U/en
Application granted granted Critical
Publication of CN222477457U publication Critical patent/CN222477457U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cleaning In General (AREA)

Abstract

The utility model discloses construction equipment for a vibrating immersed tube rock-socketed pile, which relates to the technical field of constructional engineering and comprises a base, a limiting part, a motor, a threaded sleeve, a guide part and a cleaning component, wherein a component installation space is formed in the upper part of the base, the limiting part is arranged on one side of the base in the construction direction, the motor is arranged on the surface of the base on the same side as the limiting part, a bidirectional screw rod penetrating the base and extending into the limiting part is connected to the output end of the motor, the threaded sleeve is arranged on two sides of the surface of the bidirectional screw rod and is matched with the limiting part, the guide part is arranged on the surface of the bidirectional screw rod, and the cleaning component is arranged on the surface of the guide part.

Description

Construction equipment of pile is irritated to vibration immersed tube rock-socketed
Technical Field
The utility model relates to the technical field of constructional engineering, in particular to construction equipment for a vibrating immersed tube rock-socketed pile.
Background
Immersed tube cast-in-place piles are one of many types of pile foundations in civil construction engineering. The method comprises the steps of adopting a steel pipe (namely a sleeve) which is matched with the design size of a pile, sleeving a pile tip at the end part, sinking the pile tip into the soil, hanging a steel reinforcement framework in the sleeve, pouring concrete, vibrating or hammering the pile, and tamping the concrete by utilizing vibration during pile pulling to form the required cast-in-place pile.
According to the construction method, pile holes are punched through a pile sinking pipe compaction machine and steel pipes are embedded into a strong weathering or medium-pressure rock formation layer, drill rods of a down-the-hole hammer drill are inserted into the steel pipes, crushing and drilling are conducted on the bottoms of the pile holes through alloy drill bits, rock sand and small particle broken stone at the bottoms of the pile holes are blown out of the steel pipes through high-pressure air in the crushing and drilling process, the problems of expanding diameter of slurry protection walls and sediment are solved through adopting steel pipe protection walls, slurry is not generated through adopting a dry pore-forming mode, and rock stratum tunneling and pore-forming speed are accelerated through the alloy drill bits.
However, in the actual use process of the construction equipment of the existing vibrating immersed tube rock-socketed pile, due to the fact that certain guiding positioning is lacked in the traction process when the pile is socketed, personnel are required to continuously adjust to a proper position, the process is complicated, the consumed time is long, the construction efficiency is low, a certain impurity and the like are inevitably attached to the surface of the sleeve in the use process, the sleeve is required to be cleaned further by the personnel, and the labor capacity is increased.
Disclosure of utility model
The utility model aims to solve the defects in the prior art and provides construction equipment for a vibrating immersed tube rock-socketed pile. According to the utility model, the guide part can limit and guide the movement of the sleeve to a certain extent, so that the movement range of the sleeve is reduced, the stability is improved, the guide operation is convenient, the surface of the sleeve can be cleaned by the cleaning assembly in the movement process of the sleeve, the labor amount of staff is reduced, the use effect is improved, and the sleeve is convenient and fast.
In order to achieve the above purpose, the present utility model adopts the following technical scheme:
A construction equipment of a vibratory immersed tube rock-socketed pile, comprising:
a base, the upper part of which is provided with a component mounting space;
A limit part arranged at one side of the base in the construction direction;
The motor is arranged on the surface of the base at the same side as the limiting part, and the output end of the motor is connected with a bidirectional screw rod penetrating through the base and extending into the limiting part;
the thread sleeves are arranged on two sides of the surface of the bidirectional screw rod and are matched with the limiting parts, and guide parts are arranged on the surfaces of the thread sleeves;
The surface of the guide part is provided with a cleaning component through a connecting component.
The utility model further provides that the cleaning component comprises a mounting part and a cleaning part;
The installation department all connects the surface in the relative one side of guiding part, clearance portion all sets up the inboard relative at the installation department, and clearance portion is the arc setting.
The utility model further provides that the connecting component comprises a first connecting piece and a second connecting piece;
The second connecting pieces are arranged on the opposite sides of the guide parts, and the second connecting pieces are arranged between the mounting parts and the second connecting pieces.
The utility model is further characterized in that a first winch and a second winch are respectively arranged on the upper portion of the base, a stand column is arranged on one side of the upper portion of the base, and the output end of the first winch is connected with the stand column.
The utility model is further characterized in that a top plate is arranged at one end of the upright post far away from the base, pulleys are arranged on the inner side of the top plate and the surface of the upright post, and a traction rope penetrating around the surfaces of the pulleys is connected to the output end of the second winch.
The utility model is further arranged that one end of the haulage rope is provided with a vibrator, and the lower part of the vibrator is provided with a sleeve above the cleaning component.
The utility model is further provided that supporting legs are arranged around the surface of the base, and a moving assembly for driving equipment to move is arranged at the lower part of the base.
The sleeve has the beneficial effects that the guide part can limit and guide the movement of the sleeve to a certain extent, so that the movement range of the sleeve is reduced, the stability is improved, the guide operation is convenient, the surface of the sleeve can be cleaned by the cleaning assembly in the movement process, the labor capacity of staff is reduced, the use effect is improved, and the sleeve is convenient and fast to use.
1. This construction equipment of stake is irritated to vibration immersed tube inlays rock through being provided with motor, guide part, spacing portion, two-way lead screw and thread bush cooperate, when constructing, because guiding mechanism is located sheathed tube under for staff's accessible start motor, make the motor drive two-way lead screw and rotate, two-way lead screw rotates the back with drive thread bush at spacing portion internal movement, the thread bush can drive guide part and be close to each other or keep away from each other, with carry out certain guide and restriction to the sleeve pipe of different specifications, with the movable range of reduction sleeve pipe, improve stability, and the position that the guide part is located is the position of sleeve pipe work, thereby reduced the time that the in-process consumed that aligns, improve efficiency of construction.
2. This construction equipment of stake is irritated to vibration immersed tube inlays rock through being provided with cleaning component and coupling assembling and cooperatees, and cleaning component can be through first and second of coupling assembling and the dismouting of guiding part mutually for the sleeve pipe is when moving, and under the condition that the direction was prescribe a limit to mutually to guiding part, cleaning part can contact with the sleeve pipe, thereby carries out certain cleaning in order to clean its surface to activity sleeve pipe surface attached silt impurity etc. avoids influencing subsequent use and has reduced staff's clearance amount of labour, improves the result of use.
Drawings
Fig. 1 is a schematic diagram of a first overall structure of a construction device for vibrating immersed tube rock-socketed pile grouting according to the present utility model;
Fig. 2 is a schematic diagram of a second overall structure of a construction device for vibrating immersed tube rock-socketed pile according to the present utility model;
FIG. 3 is a schematic structural view of a guiding mechanism of a construction device for vibrating immersed tube rock-socketed pile according to the present utility model;
fig. 4 is a schematic diagram of a cleaning assembly connection structure of a construction device for vibrating immersed tube rock-socketed grouting piles.
In the figure, 1, a base; 2, a first winch, 3, a second winch, 4, a top plate, 5, a stand column, 6, a vibrator, 7, a pulley, 8, a sleeve, 9, a traction rope, 10, a supporting leg, 11, a guiding part, 12, a limiting part, 13, a motor, 14, an installation part, 15, a threaded sleeve, 16, a bidirectional screw rod, 17, a cleaning part, 18, a first connecting piece, 19 and a second connecting piece.
Detailed Description
The technical scheme of the patent is further described in detail below with reference to the specific embodiments.
Embodiments of the present patent are described in detail below, examples of which are illustrated in the accompanying drawings, wherein the same or similar reference numerals refer to the same or similar elements or elements having the same or similar functions throughout. The embodiments described below by referring to the drawings are exemplary only for explaining the present patent and are not to be construed as limiting the present patent.
In the description of this patent, it should be understood that the terms "center," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like indicate orientations or positional relationships based on the orientation or positional relationships shown in the drawings, merely to facilitate describing the patent and simplify the description, and do not indicate or imply that the devices or elements being referred to must have a particular orientation, be configured and operated in a particular orientation, and are therefore not to be construed as limiting the patent.
In the description of this patent, it should be noted that, unless explicitly stated and limited otherwise, the terms "mounted," "connected," and "disposed" are to be construed broadly, and may be fixedly connected, disposed, detachably connected, disposed, or integrally connected, disposed, for example. The specific meaning of the terms in this patent will be understood by those of ordinary skill in the art as the case may be.
Referring to fig. 1 to 4, a construction apparatus of a vibrating immersed tube rock-socketed pile includes a base 1, a limiting part 12 having a component installation space formed at an upper portion thereof, a motor 13 installed at a surface of the base 1 at the same side as the limiting part 12, and having a bidirectional screw rod 16 connected at an output end thereof, penetrating the base 1 and extending into the limiting part 12, a thread bushing 15 installed at both sides of the surface of the bidirectional screw rod 16 and adapted to the limiting part 12, and having a guide part 11 installed at a surface thereof, wherein a cleaning assembly is installed at a surface of the guide part 11, and the cleaning assembly is capable of automatically cleaning a sleeve 8 in a moving process through the cleaning assembly, thereby reducing labor intensity of a worker without additionally operating the cleaning assembly, and the connecting assembly enables the cleaning assembly to be detached from the guide part 11, thereby maintaining or replacing the cleaning assembly, etc.
Specifically, referring to fig. 2-4, the cleaning assembly comprises a mounting part 14 and a cleaning part 17, wherein the mounting part 14 is connected to the surface of one side opposite to the guide part 11, the cleaning parts 17 are arranged on the inner sides opposite to the mounting part 14, and the cleaning parts 17 are arc-shaped, so that when the sleeve 8 moves, the cleaning part 17 can be contacted with the sleeve 8 under the condition that the guide part 11 limits the guide during the movement, thereby cleaning the surface of the movable sleeve 8 to a certain extent due to the mud impurities and the like attached to the surface of the movable sleeve 8, avoiding influencing the subsequent use, reducing the cleaning labor amount of workers, improving the use effect, and ensuring the normal operation and long-term reliability of the construction equipment.
Specifically, referring to fig. 4, the connection assembly includes a first connection member 18 and a second connection member 19, wherein the first connection member 19 is mounted on the opposite side of the guide portion 11, the second connection member 19 is mounted between the mounting portion 14 and the second connection member 19, and by this embodiment, the guide portion 11 and the mounting portion 14 are firmly connected, and then the cleaning assembly can be detached from the guide portion 11 through the first connection member 18 and the second connection member 19, so as to perform maintenance or replacement, etc., further, the first connection member 18 and the second connection member 19 can be mounted on the mounting portion 14 by connecting in the form of a screw and a threaded hole, and as another embodiment of this embodiment, the first connection member 18 and the second connection member 19 can also be in the form of a bolt and a nut penetrating through the guide portion 11 so as to fix the mounting portion 14.
Specifically, referring to fig. 1-2, a first winch 2 and a second winch 3 are respectively installed on the upper portion of the base 1, a column 5 is installed on one side of the upper portion of the base 1, and an output end of the first winch 2 is connected with the column 5.
Specifically, referring to fig. 1-2, the top plate 4 is installed at one end of the upright 5 far away from the base 1, the pulleys 7 are installed on the inner side of the top plate 4 and the surface of the upright 5, the output end of the second winch 3 is connected with the traction rope 9 wound on the surface of the pulleys 7, through the implementation mode, the second winch 3 can drive the traction rope 9 to move when operating, and the traction rope 9 is wound on the surface of the pulleys 7 at the moment so that the traction rope 9 can move better, and related interference such as friction resistance is reduced, so that the output force of the second winch can be effectively transmitted to a required position.
Specifically, referring to fig. 1-2, a vibrator 6 is installed at one end of a hauling rope 9, a sleeve 8 above a cleaning assembly is installed at the lower part of the vibrator 6, and by this embodiment, a reinforcement cage is suspended in the sleeve 8, and then a concrete is poured while vibrating or hammering a tube is performed, and the concrete is tamped by vibration during tube drawing to form a desired cast-in-place pile.
Specifically, referring to fig. 1-2, support legs 10 are installed around the surface of the base 1, and a moving assembly for driving equipment to move is installed at the lower part of the base 1, so that the equipment can be moved to a construction position by the embodiment, and is supported and stabilized by the support legs 10.
The working principle is that when the device is used, equipment is moved to a construction position and is supported and stabilized through the supporting legs 10, then when construction is carried out, as the guide mechanism is positioned under the sleeve 8, a worker can start the motor 13 to drive the bidirectional screw rod 16 to rotate, the bidirectional screw rod 16 rotates to drive the threaded sleeve 15 to move in the limiting part 12, the threaded sleeve 15 can drive the guide parts 11 to be mutually close to or mutually far away from each other, so that the sleeve 8 with different specifications is guided and limited to a certain extent, the moving range of the sleeve 8 is reduced, the stability is improved, and as the position of the guide parts 11 is the working position of the sleeve 8, the time consumed in the alignment process is reduced, the construction efficiency is improved, the cleaning assembly can be detached from the guide parts 11 through the first connecting piece 18 and the second connecting piece 19, when the sleeve 8 moves, the cleaning assembly can contact the sleeve 8 under the condition that the guide parts 11 limit the guide, so that the cleaning assembly can clean the surface of the sleeve 8 with certain impurities and the like attached to the surface of the movable sleeve 8, the cleaning assembly is used for cleaning the surface of the sleeve 8, and the cleaning assembly is prevented from being used by the subsequent cleaning assembly, and the cleaning assembly is improved.
The foregoing is only a preferred embodiment of the present utility model, but the scope of the present utility model is not limited thereto, and any person skilled in the art, who is within the scope of the present utility model, should make equivalent substitutions or modifications according to the technical scheme of the present utility model and the inventive concept thereof, and should be covered by the scope of the present utility model.

Claims (7)

1. The utility model provides a construction equipment of stake is irritated to vibration immersed tube rock-socketed which characterized in that includes:
A base (1) with a component mounting space formed at the upper part thereof;
A limit part (12) arranged at one side of the base (1) in the construction direction;
The motor (13) is arranged on the surface of the base (1) at the same side as the limit part (12), and the output end of the motor is connected with a bidirectional screw rod (16) penetrating the base (1) and extending into the limit part (12);
the thread sleeves (15) are arranged on two sides of the surface of the bidirectional screw rod (16) and are matched with the limiting parts (12), and guide parts (11) are arranged on the surfaces of the thread sleeves;
The surface of the guide part (11) is provided with a cleaning component through a connecting component.
2. A construction equipment of a vibrating immersed tube rock-socketed pile according to claim 1, characterized in that the cleaning assembly comprises a mounting part (14) and a cleaning part (17);
the installation parts (14) are all connected to the opposite side surfaces of the guide parts (11), the cleaning parts (17) are all arranged on the opposite inner sides of the installation parts (14), and the cleaning parts (17) are arranged in an arc shape.
3. The construction equipment for the vibrating immersed tube rock-socketed pile according to claim 1, wherein the connecting assembly comprises a first connecting piece (18) and a second connecting piece (19);
the second connecting pieces (19) are arranged on the opposite sides of the guide parts (11), and the second connecting pieces (19) are respectively arranged between the mounting parts (14) and the second connecting pieces (19).
4. The construction equipment for the vibrating immersed tube rock-socketed pile according to claim 1, wherein a first winch (2) and a second winch (3) are respectively installed on the upper portion of the base (1), a stand column (5) is installed on one side of the upper portion of the base (1), and the output end of the first winch (2) is connected with the stand column (5).
5. The construction equipment for the vibrating immersed tube rock-socketed pile according to claim 4, wherein a top plate (4) is installed at one end, far away from the base (1), of the upright (5), pulleys (7) are installed on the inner side of the top plate (4) and the surface of the upright (5), and a traction rope (9) penetrating and winding the surface of the pulleys (7) is connected to the output end of the second winch (3).
6. A construction equipment of a vibrating immersed tube rock-socketed pile according to claim 5, characterized in that a vibrator (6) is mounted at one end of the haulage rope (9), and a sleeve (8) above the cleaning assembly is mounted at the lower part of the vibrator (6).
7. The construction equipment for the vibrating immersed tube rock-socketed pile according to claim 1, wherein supporting legs (10) are arranged around the surface of the base (1), and a moving assembly for driving the equipment to move is arranged at the lower part of the base (1).
CN202421284817.1U 2024-06-06 2024-06-06 Construction equipment of pile is irritated to vibration immersed tube rock-socketed Active CN222477457U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202421284817.1U CN222477457U (en) 2024-06-06 2024-06-06 Construction equipment of pile is irritated to vibration immersed tube rock-socketed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202421284817.1U CN222477457U (en) 2024-06-06 2024-06-06 Construction equipment of pile is irritated to vibration immersed tube rock-socketed

Publications (1)

Publication Number Publication Date
CN222477457U true CN222477457U (en) 2025-02-14

Family

ID=94503022

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202421284817.1U Active CN222477457U (en) 2024-06-06 2024-06-06 Construction equipment of pile is irritated to vibration immersed tube rock-socketed

Country Status (1)

Country Link
CN (1) CN222477457U (en)

Similar Documents

Publication Publication Date Title
CN102852457B (en) Follow-up drilling machine for down-hole hammer casing pipe
CN109083591B (en) Drilling bored concrete pile body and pile cap integrated drilling pore-forming method
CN110952554B (en) Walking lifting disc type pile head cutting mechanism
CN111021355B (en) Hoisting type cast-in-place pile head cutting device
CN211922618U (en) Walking lifting disc type pile head cutting mechanism
CN110344414A (en) A kind of pilot hole plant stake piling all-in-one machine
JP2012031680A (en) Device for foundation construction
CN222477457U (en) Construction equipment of pile is irritated to vibration immersed tube rock-socketed
CN117780254B (en) Application method of spinning torsion type composite pile construction comprehensive device under ultra-low clearance
CN212612466U (en) Special geological pile foundation construction equipment
CN211898379U (en) Pile head rotary cutting mechanism of cast-in-place pile
CN210289617U (en) Ultra-large aperture pore-forming working device suitable for complex geological conditions
RU2392384C1 (en) Vibration drill for fabrication of drilled concrete piles in soil
CN116289928A (en) Hole guiding construction equipment and technology for ultra-long static pressure pipe pile
JP2002327434A (en) Concrete pile and its manufacturing method and leader device
CN210341918U (en) A new type of vibratory pile driving device
CN112144519B (en) Drilling tool, cement-soil mixing pile sinking all-in-one machine and construction method of composite pile
CN219653713U (en) Heavy pile foundation steel reinforcement cage positioner
CN214940114U (en) Piling and hole guiding device for bridge erecting pile driver
CN105840109A (en) Multifunctional rotary drilling machine movable assembling mechanism assembly
CN219710260U (en) Construction device for sampling rock and soil at pile end of ultra-deep bored concrete pile
CN117052293B (en) Improved construction equipment and construction method for square bored pile
CN219622651U (en) Pile driving device for civil engineering construction
CN214463935U (en) Raise boring machine with hoisting function
CN219547809U (en) Filling pile positioning grouting frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant