CN222435834U - Electric hanging basket rear bracket heightening construction device - Google Patents

Electric hanging basket rear bracket heightening construction device Download PDF

Info

Publication number
CN222435834U
CN222435834U CN202421206077.XU CN202421206077U CN222435834U CN 222435834 U CN222435834 U CN 222435834U CN 202421206077 U CN202421206077 U CN 202421206077U CN 222435834 U CN222435834 U CN 222435834U
Authority
CN
China
Prior art keywords
top surface
heightening
front beam
rod
hanging basket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202421206077.XU
Other languages
Chinese (zh)
Inventor
杨志明
丁文飞
李海军
樊利霞
陈浩
刘凯
荆权
彭丑霞
成泽
郝海东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Construction Investment Group Co Ltd
Original Assignee
Shanxi Construction Investment Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Construction Investment Group Co Ltd filed Critical Shanxi Construction Investment Group Co Ltd
Priority to CN202421206077.XU priority Critical patent/CN222435834U/en
Application granted granted Critical
Publication of CN222435834U publication Critical patent/CN222435834U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model belongs to the technical field of building construction, and particularly relates to an electric hanging basket rear support heightening construction device which comprises a base plate, wherein the top surface of the base plate is connected with a balancing weight, the top surface of the base plate is connected with a base rod, the top surface of the base rod is connected with a heightening rod, the top surface of the heightening rod is connected with a push rod, the top surface of the push rod is connected with one end of a rear beam, the other end surface of the rear beam is connected with a middle beam, the other end surface of the middle beam is connected with a cantilever front beam, the other end bottom surface of the cantilever front beam is connected with a parapet wall top surface, and the top surface of the cantilever front beam is connected with an upper support. The utility model has the advantages of simple structure, reasonable design, convenient installation, reliable and stable structure, high safety, adjustable length of the girder and adjustable height of the rear bracket, is made of a steel structure, and is suitable for the installation and construction of hanging baskets under the working conditions of ultrahigh parapet walls with various heights.

Description

Electric hanging basket rear bracket heightening construction device
Technical Field
The utility model belongs to the technical field of building construction, and particularly relates to a rear bracket heightening construction device of an electric hanging basket.
Background
The electric hanging basket is high-altitude operation equipment adopting an electric lifting system, has the advantages of high efficiency, safety, convenience, stability and the like, and is widely applied to the fields of construction, decoration, maintenance and the like.
In the projects of building and public building, an insulating layer is designed on an outer wall for energy saving, an electric hanging basket is needed for construction of the insulating layer, along with the development of society, people have certain requirements on the attractiveness of the building, various models can be designed for heightening the parapet of the roof, the conventional hanging basket is not high enough and cannot be installed, so that construction operations such as the insulation of the outer vertical surface of the building and curtain walls cannot be carried out, and under the condition, the hanging basket heightening construction device capable of being installed for the parapet of the super high degree is urgently needed.
Therefore, the utility model provides a rear bracket heightening construction device of an electric hanging basket, which solves the problems.
Disclosure of utility model
The utility model aims to provide a rear bracket heightening construction device of an electric hanging basket, and aims to solve the problem that the hanging basket provided in the prior art cannot be adapted to an ultrahigh parapet wall.
The technical scheme is that the electric hanging basket rear support heightening construction device comprises a base plate, wherein the top surface of the base plate is connected with a balancing weight, the top surface of the base plate is connected with a base rod, the top surface of the base rod is connected with a heightening rod, the top surface of the heightening rod is connected with a push rod, the top surface of the push rod is connected with one end of a rear beam, the other end surface of the rear beam is connected with a middle beam, the other end surface of the middle beam is connected with a cantilever front beam, the other end bottom surface of the cantilever front beam is connected with a parapet top surface, the top surface of the cantilever front beam is connected with an upper strut, a pulley arranged on the top surface of the upper strut is connected with a reinforcing steel wire rope, one end of the reinforcing steel wire rope is connected with a rear beam, the other end of the reinforcing steel wire rope is connected with a hanging basket, and the top surface of one end of the cantilever front beam is connected with a rectangular fixing piece.
In order to realize the position of a fixed backing plate, the back support heightening construction device of the electric hanging basket is preferable, and the backing plate is fixed on the top surface of a roof by two M16 expansion bolts.
In order to realize the connection of the base rod, the heightening rod and the ejector rod, the utility model is used as a preferable heightening construction device for the rear bracket of the electric hanging basket, and the base rod, the heightening rod and the ejector rod are connected through M16 bolts.
In order to realize that the rear beam, the middle beam and the overhanging front beam are connected and the upper support is connected with the overhanging front beam, the rear beam, the middle beam and the overhanging front beam are also connected through M16 bolts, and the upper support is connected with the overhanging front beam through bolts.
In order to realize the installation of the reinforced steel wire rope, the front end and the rear end of the reinforced steel wire rope are respectively fixed at the end heads of the rear beam and the overhanging front beam through the steel wire rope clamps.
In order to fix the overhanging front beam to prevent sideslip, the electric hanging basket rear bracket heightening construction device is preferable, and the U-shaped fixing piece is connected with the parapet through a M16 expansion bolt in a threaded mode.
Compared with the prior art, the utility model has the beneficial effects that:
The utility model has the advantages of simple structure, reasonable design, convenient installation, reliable and stable structure, high safety, adjustable length of the girder and adjustable height of the rear bracket, is made of a steel structure, and is suitable for the installation and construction of hanging baskets under the working conditions of ultrahigh parapet walls with various heights.
Drawings
The accompanying drawings are included to provide a further understanding of the utility model and are incorporated in and constitute a part of this specification, illustrate the utility model and together with the embodiments of the utility model, serve to explain the utility model. In the drawings:
FIG. 1 is a schematic diagram of a front view structure of the present utility model;
FIG. 2 is a schematic view of the rear bracket structure of the present utility model;
FIG. 3 is a schematic view showing the front end fixing structure of the utility model on the parapet wall;
FIG. 4 is a figure of a Chinese character 'ji' the structure of the fixing piece is schematically shown.
In the figure, 1, a backing plate, 2, a balancing weight, 3, a base rod, 4, a heightening rod, 5, an ejector rod, 6, a rear beam, 7, a middle beam, 8, a cantilever front beam, 9, a reinforced steel wire rope, 10, an upper support, 11, a U-shaped fixing piece, 12, a hanging basket, 13 and a parapet wall.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-4, the utility model provides a rear support heightening construction device of an electric hanging basket, which comprises a base plate 1, wherein the top surface of the base plate 1 is connected with a balancing weight 2, the top surface of the base plate 1 is connected with a base rod 3, the top surface of the base rod 3 is connected with a heightening rod 4, the top surface of the heightening rod 4 is connected with a push rod 5, the top surface of the push rod 5 is connected with one end of a rear beam 6, the other end surface of the rear beam 6 is connected with a middle beam 7, the other end surface of the middle beam 7 is connected with a cantilever front beam 8, the bottom surface of the other end of the cantilever front beam 8 is connected with the top surface of a parapet wall 13, the top surface of the cantilever front beam 8 is connected with an upper strut 10, a pulley arranged on the top surface of the upper strut 10 is connected with a reinforced steel wire rope 9, one end of the reinforced steel wire rope 9 is connected with a rear beam 6, the other end of the reinforced steel wire rope 9 is connected with a hanging basket 12, and the top surface of the cantilever front beam 8 is connected with a U-shaped fixing piece 11.
Preferably, the backing plate 1 is fixed on the roof top surface by two M16 expansion bolts.
When the base plate 1 is particularly used, the base plate 1 is fixedly arranged on a roof by using the two M16 expansion bolts, so that the base plate 1 is fixed, and the balancing weight 2 is placed on the base plate 1, so that the balancing weight of the base plate 1 can be increased, and the stability of the base plate 1 during use is improved.
Preferably, the base rod 3, the heightening rod 4 and the ejector rod 5 are connected through M16 bolts.
When the rear bracket of the heightening tool is particularly used, the rear bracket of the heightening tool consists of the ejector rod 5, the heightening rod 4 and the base rod 3, meanwhile, the ejector rod 5 and the base rod 3 are manufactured by using square tubes with the size of 70 multiplied by 4mm, the heightening rod 4 is manufactured by using square tubes with the size of 80 multiplied by 4mm, and the base rod 3, the heightening rod 4 and the ejector rod 5 are connected through M16 bolts, so that the mounting positions among the base rod 3, the heightening rod 4 and the ejector rod 5 can be freely adjusted, and the purpose of freely adjusting the height of the rear bracket is achieved.
Preferably, the rear beam 6, the middle beam 7 and the overhanging front beam 8 are also connected through M16 bolts, and the upper support column 10 and the overhanging front beam 8 are connected through bolts.
When the girder of the heightening tool is particularly used, the girder consists of the rear girder 6, the middle girder 7 and the overhanging front girder 8, the rear girder 6 and the overhanging front girder 8 are inserted into the middle girder 7, so that the rear girder 6, the middle girder 7 and the overhanging front girder 8 can be freely stretched by adopting M16 bolt connection, the purpose of regulating the girder length is achieved, and the front height and the rear height are ensured.
Preferably, the front and rear ends of the reinforcing steel wire rope 9 are respectively fixed at the ends of the rear beam 6 and the overhanging front beam 8 through steel wire rope clamps.
When the steel wire rope is specifically used, the reinforced steel wire rope 9 is manufactured by using steel wire ropes with the diameter of 8.3mm, the front end and the rear end of the reinforced steel wire rope 9 are respectively fixed at the end heads of the rear beam 6 and the overhanging front beam 8 through steel wire rope clamps, the reinforced steel wire rope 9 is fixedly provided with four steel wire rope clamps, and meanwhile, the space between the steel wire rope clamps is 6-7 d.
Preferably, the U-shaped fixing piece 11 is connected with the parapet 13 through screw threads by using M16 expansion bolts.
When the cantilever front beam 8 is particularly used, the cantilever front beam 8 is placed on the top surface of the parapet 13, the U-shaped fixing piece 11 is placed at the upper end of the cantilever front beam 8, the M16 expansion bolts penetrate through the U-shaped fixing piece 11 and are screwed into the parapet 13, the position of the U-shaped fixing piece 11 can be fixed on the parapet 13, and meanwhile, the position of the cantilever front beam 8 is fixed, so that the sideslip phenomenon is prevented from being found when the cantilever front beam 8 is used.
Working implementation principle: when the electric hanging basket rear bracket heightening construction device is used, the backing plate 1 is fixed at a designated position of a roof by using two M16 expansion bolts, the balancing weight 2 is placed on the backing plate 1, the balancing weight of the backing plate 1 can be increased, the stability of the backing plate 1 in use is improved, at the moment, the rear bracket can be installed by using the M16 bolts, the ejector rod 5 and the base rod 3 can slide on the heightening rod 4, the ejector rod 5 and the base rod 3 can be adjusted at a proper position, then the M16 bolts are used for fixedly connecting, thereby achieving the purpose of freely adjusting the height of the rear bracket, at the moment, a girder can be installed, the ejector rod 5 is connected with the rear beam 6 by using bolts according to the distance between the rear bracket and the parapet wall 13, the positions of the rear beam 6, the middle beam 7 and the cantilever front beam 8 are adjusted, the rear beam 6 and the cantilever front beam 8 can slide in a telescopic manner in the middle beam 7, after the back beam 6 and the overhanging front beam 8 are adjusted to proper positions, the upper support column 10 can be connected with the overhanging front beam 8 through the M16 bolts, the overhanging front beam 8 is fixed by the U-shaped fixing piece 11, the reinforced steel wire rope 9 can be installed, the front end and the rear end of the reinforced steel wire rope 9 are respectively fixed at the end heads of the back beam 6 and the overhanging front beam 8 through the steel wire rope clamps, one end of the reinforced steel wire rope 9 is connected with pulleys arranged at the top ends of the upper support column 10, larger abrasion is prevented when the reinforced steel wire rope 9 is used, the overhanging front beam 8, the upper support column 10 and the back support frame are connected by adopting the reinforced steel wire rope 9 in a pulling way, one end of the reinforced steel wire rope 9 is connected with the hanging basket 12, the electric hanging basket rear support heightening construction device can be assembled, operators can work normally, and therefore the operators can adjust the height of the rear support and the length of the girder according to the height of the parapet 13, and the electric hanging basket rear support heightening construction device can be suitable for hanging basket 12 installation construction under the working condition of the ultrahigh parapet 13 with various heights.
It should be noted that the above-mentioned embodiments are merely preferred embodiments of the present utility model, and the present utility model is not limited thereto, but may be modified or substituted for some of the technical features thereof by those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present utility model should be included in the protection scope of the present utility model.

Claims (6)

1. The utility model provides an electronic hanging flower basket rear bracket heightens construction equipment, includes backing plate (1), its characterized in that backing plate (1) top surface is connected with balancing weight (2), and backing plate (1) top surface is connected with base pole (3), base pole (3) top surface is connected with heightening pole (4), heightening pole (4) top surface is connected with ejector pin (5), ejector pin (5) top surface is connected with the one end of back beam (6), the other end surface of back beam (6) is connected with well roof beam (7), the other end surface of well roof beam (7) is connected with cantilever front beam (8), the other end bottom surface of cantilever front beam (8) is connected with parapet (13) top surface, and cantilever front beam (8) top surface is connected with pillar (10), the pulley that upper pillar (10) top surface set up is connected with reinforcing wire rope (9), the one end of reinforcing wire rope (9) is connected with back beam (6), and the other end department of reinforcing wire rope (9) is connected with back beam (8), the one end of cantilever front beam (12) is connected with the top of cantilever front beam (8), the one end of cantilever front beam (12).
2. The electric hanging basket rear bracket heightening construction device according to claim 1 is characterized in that the backing plate (1) is fixed on the top surface of a roof through two M16 expansion bolts.
3. The electric hanging basket rear bracket heightening construction device according to claim 1 is characterized in that the base rod (3), the heightening rod (4) and the ejector rod (5) are connected through M16 bolts.
4. The electric hanging basket rear bracket heightening construction device according to claim 1 is characterized in that the rear beam (6), the middle beam (7) and the overhanging front beam (8) are connected through M16 bolts, and the upper support column (10) is connected with the overhanging front beam (8) through bolts.
5. The electric hanging basket rear bracket heightening construction device according to claim 1 is characterized in that the front end and the rear end of the reinforced steel wire rope (9) are respectively fixed at the end heads of the rear beam (6) and the overhanging front beam (8) through steel wire rope clamps.
6. An electric hanging basket rear bracket heightening construction device according to claim 1, characterized in that the rectangular fixing piece (11) is connected with the parapet (13) by using an M16 expansion bolt in a threaded manner.
CN202421206077.XU 2024-05-30 2024-05-30 Electric hanging basket rear bracket heightening construction device Active CN222435834U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202421206077.XU CN222435834U (en) 2024-05-30 2024-05-30 Electric hanging basket rear bracket heightening construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202421206077.XU CN222435834U (en) 2024-05-30 2024-05-30 Electric hanging basket rear bracket heightening construction device

Publications (1)

Publication Number Publication Date
CN222435834U true CN222435834U (en) 2025-02-07

Family

ID=94406513

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202421206077.XU Active CN222435834U (en) 2024-05-30 2024-05-30 Electric hanging basket rear bracket heightening construction device

Country Status (1)

Country Link
CN (1) CN222435834U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN120331453A (en) * 2025-05-26 2025-07-18 中建一局集团装饰工程有限公司 A split double pulley double wire rope tensioning hanging basket construction method for old renovation projects

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN120331453A (en) * 2025-05-26 2025-07-18 中建一局集团装饰工程有限公司 A split double pulley double wire rope tensioning hanging basket construction method for old renovation projects

Similar Documents

Publication Publication Date Title
CN222435834U (en) Electric hanging basket rear bracket heightening construction device
CN215484886U (en) Adjustable strutting arrangement for building
CN217680416U (en) Adjustable hanging basket supporting device with high stability
CN214462398U (en) Bolt-fixed type cable-stayed cantilever scaffold
CN212153855U (en) Building curtain wall structure
CN220556714U (en) But reuse's roofing photovoltaic mounting bracket
CN216840514U (en) Hanging basket suspension device
CN214576138U (en) High-strength galvanized iron tower convenient to install
CN217784388U (en) Suspended ceiling installation fixing frame for building pipeline
CN217268754U (en) Operation hanging basket supporting device
CN216076215U (en) Adjustable elevator shaft operating platform
CN113309339B (en) Frame beam lower scaffold structure with complex structure
CN215442631U (en) Office building steel construction suspended ceiling conversion layer
CN111009862B (en) Extrusion-molded bracket arm and production method thereof
CN211569905U (en) Net rack short column embedded part hoisting device
CN211313053U (en) Fast-assembling stand for interior decoration
CN218843699U (en) Box type adjustable wall-attached support for climbing frame
CN223661326U (en) Be suitable for different slope sloping roof hanging flower basket installing support
CN220848643U (en) Back-pull type anchoring wall-riding hanging basket support frame
CN222501002U (en) Safety rope protection device for hanging basket
CN218881263U (en) Steel construction curtain bearing structure
CN220811661U (en) Building engineering lifting device
CN218263597U (en) Single-column double-arm multifunctional high-speed sign post
CN212866811U (en) Flower basket bolt scaffold frame of encorbelmenting
CN219060847U (en) Wall-attached support with multiple attachment forms for climbing frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant