CN222390926U - A steel structure installation scaffold - Google Patents
A steel structure installation scaffold Download PDFInfo
- Publication number
- CN222390926U CN222390926U CN202420527343.2U CN202420527343U CN222390926U CN 222390926 U CN222390926 U CN 222390926U CN 202420527343 U CN202420527343 U CN 202420527343U CN 222390926 U CN222390926 U CN 222390926U
- Authority
- CN
- China
- Prior art keywords
- peripheral frame
- steel
- steel structure
- frame
- sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 74
- 239000010959 steel Substances 0.000 title claims abstract description 74
- 238000009434 installation Methods 0.000 title claims abstract description 34
- 230000002093 peripheral effect Effects 0.000 claims abstract description 39
- 230000003014 reinforcing effect Effects 0.000 claims abstract description 29
- 230000007246 mechanism Effects 0.000 claims abstract description 25
- 230000002787 reinforcement Effects 0.000 claims abstract description 9
- 238000003780 insertion Methods 0.000 claims description 10
- 230000037431 insertion Effects 0.000 claims description 10
- 238000010276 construction Methods 0.000 abstract description 5
- 238000000034 method Methods 0.000 abstract description 5
- 230000008878 coupling Effects 0.000 abstract description 4
- 238000010168 coupling process Methods 0.000 abstract description 4
- 238000005859 coupling reaction Methods 0.000 abstract description 4
- 238000009435 building construction Methods 0.000 abstract description 2
- 230000006872 improvement Effects 0.000 abstract description 2
- 230000008569 process Effects 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
Landscapes
- Ladders (AREA)
Abstract
The application relates to the technical field of building construction, in particular to a steel structure installation scaffold which comprises a peripheral frame, wherein four corners of the lower surface of the peripheral frame are provided with installation mechanisms, bearing mechanisms are arranged between the inner walls of the front side and the rear side of the peripheral frame, and each installation mechanism comprises four support columns, a reinforcing sleeve, four plugboards and four connecting steel pipes. This steel construction installation scaffold frame has through setting up installation mechanism, through the support column, picture peg and connect between steel pipe and the slot etc. mutually support, through inserting the support column in the steel pipe of connection, drive the picture peg along the slot inserts at the support column downshifting in-process, it is inside at coupling sleeve's outside to put into the coupling sleeve with the reinforcement sleeve, and place the coupling steel pipe outside in the utilization reinforcement sleeve, the cross-under board consolidates between the two, further pack the combination department with scaffold frame and consolidate, screw up locking bolt to in the locking screw after inserting, in order to form the installation stability of whole improvement scaffold frame.
Description
Technical Field
The application relates to the technical field of building construction, in particular to a steel structure installation scaffold.
Background
Scaffolding is a system of pipe connections, plates, ladders and other items that can be connected together to form a framework around, for example, a building, and can be used in a variety of ways, such as to provide access to elevated pedestrians around the building or to the exterior of the building, for example, to enable workers to trim or construct the building, temporarily or independently supported structures or portions thereof, for example, to support a display screen of a field event, and to provide temporary structural support for the building during repair work.
A steel structure installation scaffold disclosed in China patent publication No. (CN 213477576U) comprises two side frames, a carrying plate, an adjusting mechanism, a first supporting rod and a second supporting rod, wherein the side frames are rectangular frames formed by connecting two upright posts and two cross bars, the bottoms of the upright posts are connected with the adjusting mechanism, connecting pieces I are arranged between the upright posts and the upright posts, the carrying plate is rectangular, fixing pieces are arranged between the front end face and the rear end face of the carrying plate, arc hooks are arranged on the left end face and the right end face of the carrying plate, through holes I are formed in one end of the first supporting rod and one end of the second supporting rod, the first supporting rod and the second supporting rod are connected onto the connecting pieces I through one rotation of the holes, through holes II are formed in the other end of the first supporting rod, the first supporting rods on the left side frame and the right side frames are fixedly connected onto the fixing pieces II through the holes, quick connectors are arranged at the other ends of the second supporting rods, and the second supporting rods on the left side frames and the right side frames are horizontally connected together through the quick connectors.
The problem that the installation stability of the scaffold is poor is solved, the support rods on the two side frames are fixedly connected to the second fixing piece through the second through holes, the other end of the second support rod is provided with a quick connector, the two support rods on the left side frame and the right side frame are horizontally connected together through the quick connector, the upper rod body and the lower rod body are connected through the connector in the mode, the connector of the scaffold is required to bear down force and transverse stress after the scaffold is lifted and assembled, and the fracture phenomenon is easy to occur when the scaffold is repeatedly used, so that the overall stability of the scaffold is affected.
Disclosure of utility model
Aiming at the defects of the prior art, the application provides the steel structure installation scaffold which has the advantages of high installation stability and the like, and solves the problem of poor stability of the scaffold in the prior art.
In order to achieve the aim, the technical scheme is that the steel structure installation scaffold comprises a peripheral frame, wherein four corners of the lower surface of the peripheral frame are provided with installation mechanisms, and bearing mechanisms are arranged between the inner walls of the front side and the rear side of the peripheral frame;
The installation mechanism comprises four support columns, a reinforcing sleeve, four plugboards and four connecting steel pipes, wherein four support columns are respectively fixed at four corners of the lower surface of the peripheral frame, four reinforcing sleeves are respectively fixed at the outer sides of the four support columns, four plugboards are respectively connected with the inner walls of the fixing sleeves, four connecting steel pipes are respectively fixed at four corners of the upper surface of the peripheral frame, and slots corresponding to the positions of the four plugboards are formed in the outer surfaces of the connecting steel pipes.
Through adopting this technical scheme, put into inside connecting steel pipe through the support column, and utilize the reinforcement sleeve to arrange in the connecting steel pipe outside, the cross-under board consolidates between the two, can further pack the reinforcing with the combination department of scaffold frame.
Further, the inner diameter of the connecting steel pipe is equal to the outer diameter of the supporting column.
By adopting the technical scheme, the support columns and the connecting steel pipes are utilized to facilitate the mutual assembly of a plurality of peripheral frames.
Further, the reinforcing sleeve is in the shape of a cylinder with a hollow inside and a missing bottom.
By adopting the technical scheme, the support column is inserted into the connecting steel pipe, so that the reinforcing sleeve is sleeved on the outer side of the connecting sleeve.
Further, the length of the inserting plate is equal to the depth of the inner cavity of the inserting groove.
By adopting the technical scheme, the inserting plate is driven to be inserted along the inserting groove in the downward moving process of the supporting column, and the reinforcing sleeve is sleeved on the outer side of the connecting sleeve.
Further, locking screw holes are formed in one side, opposite to the connecting steel pipe, of the reinforcing sleeve, and locking bolts are connected with the inner peripheral wall of the locking screw holes in a threaded mode.
By adopting the technical scheme, the locking bolt is screwed into the locking screw hole after the locking bolt is inserted, so that the installation stability of the scaffold is integrally improved.
Further, the bottom ends of the four support columns are all fixed with a support chassis.
By adopting the technical scheme, the bearing stability of the scaffold can be improved through the supporting chassis.
Further, the bearing mechanism comprises a working table plate, a cross bar, a plurality of fixing sleeves and a steel frame step ladder, wherein the working table plate is fixed between the inner walls of the front side and the rear side of the peripheral frame, the cross bar is fixed between the opposite sides of the support columns on the front side and the rear side, the plurality of fixing sleeves are respectively connected with the outer surfaces of the peripheral frame and the cross bar, and the steel frame step ladder is fixed between the opposite sides of the fixing sleeves on the left side and the right side.
By adopting the technical scheme, the working layer on which a worker stands is formed by connecting the working table plate with the peripheral frame, and the steel frame step ladder can be obliquely fixed by the transverse bar, so that the worker can conveniently go up and down, and the safety is improved relative to the vertical ladder.
Further, a reinforcing rib plate is fixed between one side of the peripheral frame opposite to the support column, and the reinforcing rib plate is triangular in shape.
By adopting the technical scheme, the joint of the scaffold can be supported by the reinforcing rib plate, and the bearing capacity can be increased by utilizing the shape characteristics.
Compared with the prior art, the technical scheme of the application has the following beneficial effects:
1. This steel construction installation scaffold frame has through setting up installation mechanism, through the support column, picture peg and connect between steel pipe and the slot etc. mutually support in can inserting the connection steel pipe through the support column, drive the picture peg simultaneously at the support column downshifting in-process and insert along the slot, in order to put into the outside at adapter sleeve with the reinforcement sleeve cover, it is inside to connect the steel pipe to put into through the support column, and utilize the reinforcement sleeve to arrange the connection steel pipe outside in, the cross-under board consolidates between the two, further pack the combination department with scaffold frame and consolidate, screw up locking bolt to in the locking screw after inserting, in order to form the installation stability of whole improvement scaffold frame.
2. This steel construction installation scaffold frame has through having set up bearing mechanism, mutually supporting between work platen, the whipstock, fixed cover and steelframe step ladder and deep floor etc. can utilize work platen and peripheral frame to link to each other and form the working layer that supplies the workman to stand, and erect whipstock tiltable fixed steelframe step ladder to make things convenient for the workman from top to bottom, relative vertical ladder has improved the security, but simultaneously through deep floor supporting scaffold frame junction, utilize shape characteristic ability to increase the bearing capacity, this mode is whole to be steel construction constitution, can effectively ensure the security of scaffold frame.
Drawings
FIG. 1 is a schematic diagram of the structure of the present application;
FIG. 2 is a schematic view of a peripheral frame of the present application;
FIG. 3 is a schematic view of the mounting mechanism of the present application;
FIG. 4 is a schematic view of a mounting mechanism coupling sleeve of the present application;
Fig. 5 is a schematic view of a carrying mechanism according to the present application.
The steel frame comprises a peripheral frame 1, a mounting mechanism 2, a supporting column 201, a reinforcing sleeve 202, a 203, a plugboard 204, a connecting steel pipe 205, a slot 206, a locking bolt 207, a supporting chassis 3, a bearing mechanism 301, a working table plate 302, a cross bar 303, a fixing sleeve 304, a steel frame step 305 and a reinforcing rib plate.
Detailed Description
The following description of the embodiments of the present application will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present application, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the application without making any inventive effort, are intended to be within the scope of the application.
Referring to fig. 1-2, a scaffold for installing a steel structure in the present embodiment includes a peripheral frame 1, installing mechanisms 2 are disposed at four corners of the lower surface of the peripheral frame 1, and bearing mechanisms 3 are disposed between inner walls of front and rear sides of the peripheral frame 1.
Referring to fig. 3-4, in order to improve the installation stability of the scaffold, the installation mechanism 2 in this embodiment includes four support columns 201, reinforcing sleeves 202, four insertion plates 203 and four connecting steel pipes 204, the four support columns 201 are respectively fixed at four corners of the lower surface of the peripheral frame 1, the four reinforcing sleeves 202 are respectively fixed at the outer sides of the four support columns 201, the four insertion plates 203 are respectively connected with the inner walls of the fixing sleeves 202, the four connecting steel pipes 204 are respectively fixed at four corners of the upper surface of the peripheral frame 1, slots 205 corresponding to the positions of the four insertion plates 203 are formed on the outer surfaces of the connecting steel pipes 204, the support columns 201 and the connecting steel pipes 204 are utilized to facilitate the mutual assembly between the plurality of peripheral frames 1, the insertion of the support columns 201 into the connecting steel pipes 204 is performed, and the insertion plates 203 are driven to be inserted along the slots 205 in the downward movement process of the support columns 201, so that the reinforcing sleeves 202 are sleeved on the outer sides of the connecting steel pipes 204.
In this embodiment, the inner diameter of the connection steel pipe 204 is equal to the outer diameter of the support column 201, the shape of the reinforcement sleeve 202 is a cylinder with hollow inside and missing bottom, the length of the insertion plate 203 is equal to the depth of the inner cavity of the insertion slot 205, the connection steel pipe 204 is placed inside the connection steel pipe through the support column 201, the reinforcement sleeve 202 is utilized to be placed outside the connection steel pipe 204, the joint plate 203 is penetrated between the connection steel pipe 204 and the connection steel pipe, the combined part of the scaffold can be further filled and reinforced, locking screw holes are formed in one side, opposite to the connection steel pipe 204, of the reinforcement sleeve 202, locking bolts 206 are connected with the inner peripheral wall threads of the locking screw holes, after the locking bolts 206 are screwed into the locking screw holes after the insertion, so that the installation stability of the scaffold is integrally improved, and the bottom ends of the four support columns 201 are all fixed with a support chassis 207.
Referring to fig. 5, in order to improve the bearing safety of the scaffold, the bearing mechanism 3 in this embodiment includes a working platform 301, a bar 302, a plurality of fixing sleeves 303 and a steel frame step 304, the working platform 301 is connected with the peripheral frame 1 to form a working layer for a worker to stand, the working platform 301 is fixed between the inner walls of the front and rear sides of the peripheral frame 1, the bar 302 is fixed between the opposite sides of the front and rear sides of the supporting columns 201, the fixing sleeves 303 are respectively connected with the outer surfaces of the peripheral frame 1 and the bar 302, the steel frame step 304 is fixed between the opposite sides of the left and right sides of the fixing sleeves 303, and the steel frame step 304 can be obliquely fixed by the erecting bar 302, so that the safety is improved relative to the vertical steps. In this embodiment, a reinforcing rib plate 305 is fixed between the opposite sides of the peripheral frame 1 and the support column 201, the reinforcing rib plate 305 is triangular, the joint of the scaffold can be supported by the reinforcing rib plate 305, the bearing capacity can be increased by utilizing the shape characteristics, and the whole structure is composed of a steel structure, so that the safety of the scaffold can be effectively ensured.
The working principle of the embodiment is as follows:
(1) When the scaffold is used for improving the installation stability, the support columns 201 and the connecting steel pipes 204 are utilized to facilitate the mutual assembly of a plurality of peripheral frames 1, the support columns 201 are inserted into the connecting steel pipes 204, meanwhile, the inserting plates 203 are driven to be inserted along the inserting grooves 205 in the downward moving process of the support columns 201, so that the reinforcing sleeve 202 is sleeved on the outer side of the connecting steel pipes 204, the reinforcing sleeve 202 is placed into the connecting steel pipes 204 through the support columns 201, the reinforcing sleeve 202 is arranged on the outer side of the connecting steel pipes 204, the joint plates 203 are used for reinforcing, the joint positions of the scaffold can be further filled and reinforced, and the locking bolts 206 are screwed into the locking screw holes after the joint plates are inserted, so that the installation stability of the scaffold is integrally improved.
(2) When the scaffold is used for improving bearing safety, a working layer for a worker to stand is formed by connecting the working table plate 301 with the peripheral frame 1, and the erection transverse bars 302 can be used for obliquely fixing the steel frame step 304, so that the worker can conveniently go up and down, the safety is improved relative to a vertical ladder, meanwhile, the joint of the scaffold can be supported by the reinforcing rib plates 305, the bearing capacity can be increased by utilizing the shape characteristics, and the whole scaffold is formed by a steel structure, so that the safety of the scaffold can be effectively ensured.
Claims (8)
1. The steel structure installation scaffold comprises a peripheral frame (1) and is characterized in that four corners of the lower surface of the peripheral frame (1) are provided with installation mechanisms (2), and bearing mechanisms (3) are arranged between the inner walls of the front side and the rear side of the peripheral frame (1);
The mounting mechanism (2) comprises four supporting columns (201), a reinforcing sleeve (202), four inserting plates (203) and four connecting steel pipes (204), wherein the four supporting columns (201) are respectively fixed at four corners of the lower surface of the peripheral frame (1), the four reinforcing sleeve (202) are respectively fixed at the outer sides of the four supporting columns (201), the four inserting plates (203) are respectively connected with the inner walls of the fixing sleeve (202), the four connecting steel pipes (204) are respectively fixed at four corners of the upper surface of the peripheral frame (1), and slots (205) corresponding to the positions of the four inserting plates (203) are formed in the outer surface of the connecting steel pipes (204).
2. A steel structure installation scaffold according to claim 1, wherein the inner diameter of the connecting steel pipe (204) is equal to the outer diameter of the support column (201).
3. A steel structure installation scaffold according to claim 1, characterized in that the reinforcement sleeve (202) is in the shape of a cylinder with hollow inside and missing bottom.
4. The steel structure installation scaffold according to claim 1, wherein the length of the insertion plate (203) is equal to the depth of the inner cavity of the insertion groove (205).
5. The scaffold for installing the steel structure according to claim 1, wherein locking screw holes are formed in the side, opposite to the connecting steel pipe (204), of the reinforcing sleeve (202), and locking bolts (206) are connected to the inner peripheral wall of the locking screw holes in a threaded manner.
6. A steel structure installation scaffold according to claim 1, characterized in that the bottom ends of the four support columns (201) are each fixed with a support chassis (207).
7. The steel structure installation scaffold according to claim 1, wherein the bearing mechanism (3) comprises a working table plate (301), a transverse bar (302), a plurality of fixing sleeves (303) and a steel frame step ladder (304), the working table plate (301) is fixed between the inner walls of the front side and the rear side of the peripheral frame (1), the transverse bar (302) is fixed between the opposite sides of the front side and the rear side of the supporting column (201), the fixing sleeves (303) are respectively connected with the outer surfaces of the peripheral frame (1) and the transverse bar (302), and the steel frame step ladder (304) is fixed between the opposite sides of the left side and the right side fixing sleeves (303).
8. The steel structure installation scaffold according to claim 7, wherein a reinforcing rib plate (305) is fixed between one side of the peripheral frame (1) opposite to the support column (201), and the reinforcing rib plate (305) is triangular in shape.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202420527343.2U CN222390926U (en) | 2024-03-19 | 2024-03-19 | A steel structure installation scaffold |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202420527343.2U CN222390926U (en) | 2024-03-19 | 2024-03-19 | A steel structure installation scaffold |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN222390926U true CN222390926U (en) | 2025-01-24 |
Family
ID=94292513
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202420527343.2U Active CN222390926U (en) | 2024-03-19 | 2024-03-19 | A steel structure installation scaffold |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN222390926U (en) |
-
2024
- 2024-03-19 CN CN202420527343.2U patent/CN222390926U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101597955B (en) | Safety scaffold | |
| CN201521101U (en) | Safety scaffold | |
| CN114411970A (en) | Beam column node structure of steel construction assembly type structure | |
| CN114704096A (en) | Climbing formula quick detach concrete spreader in pit shaft | |
| CN116657870A (en) | Supporting structure of assembled laminated plate and construction method thereof | |
| CN112360009A (en) | Wall and floor connecting node and method for prefabricated building | |
| CN213389720U (en) | Assembled support segment | |
| CN222390926U (en) | A steel structure installation scaffold | |
| CN215594830U (en) | Platform structure is built to girder steel | |
| CN116397864B (en) | Scaffold device for open caisson construction | |
| CN216130567U (en) | Frame type template | |
| CN211949029U (en) | Steel structure shear wall module with T-shaped special-shaped column structure | |
| CN111677112A (en) | Stable assembly type bearing support standard section assembling structure | |
| CN219887568U (en) | High-altitude adjustable formwork support | |
| CN220889415U (en) | Scaffold skeleton member capable of being quickly built | |
| CN219471224U (en) | Building steelframe connection mounting structure | |
| CN221143380U (en) | A stone unit plate installation structure of a steel truss | |
| CN220058310U (en) | Assembled steel structure frame | |
| CN220645154U (en) | Socket type disc buckle type shaping tripod outer protection frame | |
| CN219220954U (en) | Reinforced steel structure of steel structure joint | |
| CN218234259U (en) | Combined folding scaffold | |
| CN216920363U (en) | Easy dismouting formula excavation supporting | |
| CN215715446U (en) | Civil construction engineering base construction | |
| CN218581153U (en) | Detachable girder steel bracket support | |
| CN220117448U (en) | Quick detach formula steel structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |