CN222375834U CN202420999919.5U CN202420999919U CN222375834U CN 222375834 U CN222375834 U CN 222375834U CN 202420999919 U CN202420999919 U CN 202420999919U CN 222375834 U CN222375834 U CN 222375834U
Authority
CN
China
Prior art keywords
mounting
lifting
frame
bracket
connecting piece
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202420999919.5U
Other languages
Chinese (zh)
Inventor
张长庆
王敏
宋健
李航程
李梦楠
刘士萌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yasha Decoration Co Ltd
Original Assignee
Zhejiang Yasha Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yasha Decoration Co Ltd filed Critical Zhejiang Yasha Decoration Co Ltd
Priority to CN202420999919.5U priority Critical patent/CN222375834U/en
Application granted granted Critical
Publication of CN222375834U publication Critical patent/CN222375834U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00—Energy generation through renewable energy sources
    • Y02E10/50—Photovoltaic [PV] energy

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model provides an assembled bracket mounting device, and belongs to the technical field of bracket mounting. The assembly type bucket arch installation device comprises an bucket arch assembly, a supporting piece, a first lifting connecting piece, a second lifting connecting piece and a third lifting connecting piece. According to the utility model, two ends of the first lifting connecting piece are respectively provided with the supporting piece and the wellhead square, one end of the second lifting connecting piece is connected with the supporting piece, the other end of the second lifting connecting piece passes through the drawing square and is connected with the Shan Caimo arch, one end of the third lifting connecting piece is connected with the supporting piece, the other end of the third lifting connecting piece passes through the wellhead square and is connected with the compartment arch, the structure is simple, the installation is rapid, the installation time is saved, and the bucket arch hanging stability is higher.

Description

Assembled bucket arch installation device
Technical Field
The utility model relates to the technical field of bucket arch installation, in particular to an assembled bucket arch installation device.
Background
The bucket arch is the most characteristic building component in ancient of China, and has unique image in the world building. The bucket arch is a representative language symbol of the ancient Chinese architecture, has very long history of generation and development, gradually becomes a building culture symbol of grade and identity, represents the national style of the building in China, and is now becoming an attractive image sign of the traditional building. In the modern architecture, the wood frame structure is endowed with new meaning, and the wood frame structure is integrated into the modern architecture as a decorative structure capable of representing Chinese elements, so that new vitality is regenerated. The national wind and Chinese wind are getting hot at present. No matter the Chinese style clothing is worn by people in the clothing industry or the Chinese style decoration in the decoration industry, the arousal of Chinese culture and the traceability and regression of the aesthetic of contemporary Chinese people are not displayed. The classical Chinese style is integrated with a large number of Chinese traditional elements, so that the stable and inwardly-converged beauty is highlighted with heavy and complex design. The design style of the ancient and elegant Chinese hotel decoration is popular with people in China, and a plurality of classical modeling elements and garden decoration forms are reserved in the Chinese style hotel decoration, for example, the bracket exists in the hotel environment in the decoration form. Scene restoration is a very common display form in museum exhibition, and through scene restoration, audiences can be brought into life scenes of historical events or specific periods, so that immersion of the audiences is enhanced, and viewing experience is improved. Through scene restoration, precious historical cultural heritage can be better protected and inherited, and more people can know and recognize historical culture through in-person experience. The scene restoration relates to restoration of a space environment, and restoration of the shape of a Chinese ancient building bracket is a frequently encountered problem.
The bucket arch is formed by stacking a plurality of small-size constructions such as bucket, arch, warp, lift and the like from bottom to top layer by layer. The structure of the bucket arch is very complex, the bucket arch is connected by a mortise and tenon structure, the size of each component is strictly calculated after the whole size of the manufacture is determined, and then timber is strictly processed according to the calculated size. Repeated scribing and calculation are needed on the timber during processing, so that the size of each component is more accurate. Where the joints in the mortise and tenon joint are to be manually punched out, each stroke must be performed exactly according to the previously drawn line for better fixation. The traditional bucket arch manufacturing process is complex and complicated, the manufacturing period is long, the traditional bucket arch hanging installation requires workers to have rich technical experience and high operation level, and the quality requirements on the workers are extremely high.
Disclosure of utility model
The utility model aims to overcome the defects of the prior art and provide an assembled bracket mounting device.
The utility model provides an assembled type bucket arch mounting device which comprises an bucket arch assembly, a supporting piece, a first lifting connecting piece, a second lifting connecting piece and a third lifting connecting piece, wherein the bucket arch assembly comprises a well head square column, a dragging square column, a single material square column and a box arch, two ends of the first lifting connecting piece are respectively connected with the supporting piece and the well head square column, one end of the second lifting connecting piece is connected with the supporting piece, the other end of the second lifting connecting piece penetrates through the dragging square column and is connected with Shan Caimo square column, one end of the third lifting connecting piece is connected with the supporting piece, and the other end of the third lifting connecting piece penetrates through the well head square column and is connected with the box arch.
Further, the support piece includes horizontal support frame, vertical support frame, first connection structure, a plurality of first mounting bracket, first connection structure connects respectively in horizontal support frame and vertical support frame, and is a plurality of first mounting bracket connects respectively in horizontal support frame, run through on the first mounting bracket and be equipped with first installation through-hole, the top of first lifting connecting piece, the top of second lifting connecting piece, the top of third lifting connecting piece are connected respectively in the first installation through-hole of corresponding first mounting bracket.
Further, the bucket arch assembly further comprises a head and a head, the supporting piece further comprises a second connecting structure connected to the vertical supporting frame, and a first connecting rod with one end connected to the head and the other end connected to the second connecting structure.
Further, the first hoisting connecting piece comprises a first suspender, two first fastening nuts, a pre-buried angle code, a conversion angle code, wherein one end of the pre-buried angle code is connected to a wellhead square column, one end of the conversion angle code is detachably connected to the other end of the pre-buried angle code, the bottom end of the first suspender is connected to the other end of the conversion angle code, the top end of the first suspender penetrates through a first mounting through hole of a first mounting frame, and the two first fastening nuts are respectively in threaded connection with the parts, located on two sides of the first mounting frame, of the first suspender so as to detachably and fixedly connect the first suspender with the first mounting frame.
Further, the second hoisting connecting piece comprises a first screw pipe, two second fastening nuts and two second hanging rods which are arranged up and down, wherein the bottom end of the first second hanging rod penetrates through a drawing beam and is connected with Shan Caimo degrees of arch, the top end of the first second hanging rod is in threaded connection with the bottom of the first screw pipe, the top end of the second hanging rod penetrates through a first installation through hole of a second first installation frame, the bottom end of the second hanging rod is in threaded connection with the top of the first screw pipe, and the two second fastening nuts are respectively in threaded connection with the parts, located on two sides of the first installation frame, of the second hanging rod and the first installation frame, so that the second hanging rod and the first installation frame are detachably and fixedly connected.
Further, the third hoisting connecting piece comprises a second screw pipe, two third fastening nuts and two third hanging rods which are arranged up and down, wherein the bottom end of the first third hanging rod penetrates through a wellhead square and is connected with a carriage bracket, the top end of the first third hanging rod is in threaded connection with the bottom of the second screw pipe, the top end of the second third hanging rod penetrates through a first installation through hole of a third first installation frame, the bottom end of the second third hanging rod is in threaded connection with the top of the second screw pipe, and the two third fastening nuts are respectively in threaded connection with the parts, located on two sides of the first installation frame, of the second third hanging rod and the first installation frame, so that the second third hanging rod and the first installation frame can be detachably and fixedly connected.
Further, the bucket arch assembly further comprises a mounting gap arranged between the different components and a caulking slurry filled in the mounting gap.
Further, the first installation through hole is a slotted hole.
Further, the bucket arch assembly is a GRG bucket arch assembly, the first suspender, the second suspender and the third suspender are all wire suspenders, the vertical support frame is galvanized steel channel, the horizontal support frame is galvanized steel angle, the first mounting frame is galvanized steel angle, and the first connection structure is galvanized steel channel.
The first suspension rod is characterized in that the first suspension rod is vertically arranged, the first suspension connecting piece further comprises first shock absorption structures which are respectively connected with the two first suspension rods, the top ends of the first suspension rods located above penetrate through first mounting through holes of the first mounting frame, the two first fastening nuts are respectively connected with the portions located on two sides of the first mounting frame in a threaded mode on the first suspension rod located above, the bottom ends of the first suspension rods located below are connected with the other end of the conversion angle sign indicating number, the first spiral tube comprises two first unit tubes which are vertically arranged, the second suspension connecting piece further comprises second shock absorption structures which are respectively connected with the two first unit tubes, the top ends of the first unit tubes located above are connected with the bottom ends of the first second suspension rods, the bottom ends of the first unit tubes located below are connected with the top ends of the second suspension rods, the second spiral tube comprises two second unit tubes which are arranged above and below, the third suspension connecting piece further comprises a third shock absorption structure which is respectively connected with the top ends of the second unit tubes located below the second suspension rod, and the third shock absorption structure is located on the top ends of the third suspension rod.
The assembled bracket mounting device has the following beneficial effects:
The two ends of the first lifting connecting piece are respectively provided with a supporting piece and a wellhead balk, one end of the second lifting connecting piece is connected with the supporting piece, the other end of the second lifting connecting piece passes through the balk and is connected with Shan Caimo degrees, one end of the third lifting connecting piece is connected with the supporting piece, the other end of the third lifting connecting piece passes through the wellhead balk and is connected with the carriage degrees, the structure is simple, the installation is quick, the installation time is saved, and the bucket arch hanging stability is higher.
Drawings
The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments of the utility model and together with the description, serve to explain the principles of the utility model. In the drawings, like reference numerals are used to identify like elements. The drawings, which are included in the description, illustrate some, but not all embodiments of the utility model. Other figures can be derived from these figures by one of ordinary skill in the art without undue effort.
FIG. 1 is a schematic view of an assembled bracket mounting device according to an embodiment of the present utility model;
FIG. 2 is a schematic view of a part of a fabricated bracket mounting device according to an embodiment of the present utility model;
FIG. 3 is a schematic view of an arch assembly of an assembled bracket mounting device according to an embodiment of the present utility model;
FIG. 4 is a left side view of an arch assembly of the fabricated bracket mounting device according to the present utility model;
FIG. 5 is a front view of an arch assembly of an assembled bracket mounting device according to an embodiment of the present utility model;
FIG. 6 is a bottom view of an arch assembly of the fabricated bracket mounting device according to the present utility model;
FIG. 7 is a schematic view illustrating a structure of an assembled bracket mounting device according to an embodiment of the present utility model when two first suspension rods are respectively connected to first shock absorbing structures;
FIG. 8 is a schematic view of a first damping structure of an assembled bracket mounting device according to an embodiment of the present utility model;
Fig. 9 is a schematic structural view of an assembled bracket mounting device according to an embodiment of the present utility model, in which two first unit pipes are respectively connected to a second shock absorbing structure;
FIG. 10 is a schematic view of a second damping structure of the fabricated bracket mounting device according to the embodiment of the present utility model;
FIG. 11 is a schematic diagram illustrating a structure of an assembled type bucket mounting apparatus according to an embodiment of the present utility model when two second unit pipes are respectively connected to a third shock absorbing structure;
FIG. 12 is a schematic view of a third damping structure of the fabricated bracket mounting device according to the embodiment of the present utility model;
fig. 13 is a cross-sectional view of a first mounting bracket of the fabricated bracket mounting device according to the embodiment of the present utility model.
In the figure: 1-bucket arch assembly, 11-well head square frame, 12-single material square frame, 13-carriage frame, 14-head warping, 15-big bucket, 16-Shan Caigua square frame, 17-three square frame, 181-two warping, 182-hemp She Tou, 183-eighteen bucket, 184-slot lifting, 185-center square frame, 186-center square frame, 187-pulling square frame, 188-center square frame, 2-first lifting connecting piece, 21-first suspender, 22-embedded angle code, 23-conversion angle code, 24-first shock absorbing structure, 241-first shock absorbing frame, 242-first abutting plate, 243-second abutting plate, 244-first screw rod, 245-first spring, 246-fourth fastening nut, 247-fifth fastening nut, 248-first fixing rod, 25-first fastening nut, 3-second lifting connection, 31-second boom, 32-first screw, 321-first unit pipe, 33-second shock absorbing structure, 331-second shock absorbing frame, 332-third abutment plate, 333-fourth abutment plate, 334-second screw, 335-second spring, 336-sixth fastening nut, 337-seventh fastening nut, 338-second fixing rod, 34-second fastening nut, 4-support, 41-vertical support frame, 42-lateral support frame, 43-first mounting frame, 431-first mounting through hole, 44-first connection structure, 45-first connection rod, 46-second connection structure, 5-third lifting connection, 51-third boom, 52-second screw pipe, 521-second unit pipe, 53-third shock-absorbing structure, 531-third shock-absorbing frame, 532-fifth butt plate, 533-sixth butt plate, 534-third screw rod, 535-third spring, 536-eighth fastening nut, 537-ninth fastening nut, 538-third dead lever, 54-third fastening nut.
Detailed Description
For the purpose of making the objects, technical solutions and advantages of the embodiments of the present utility model more apparent, the technical solutions of the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model, and it is apparent that the described embodiments are some embodiments of the present utility model, but not all embodiments of the present utility model. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model. It should be noted that, without conflict, the embodiments of the present utility model and features of the embodiments may be arbitrarily combined with each other.
Please refer to fig. 1 to 13. The utility model provides an assembled type bracket mounting device, which comprises an bracket component 1, a supporting piece 4, a first lifting connecting piece 2, a second lifting connecting piece 3 and a third lifting connecting piece 5, wherein the bracket component 1 comprises a wellhead square 11, a pulling square 187, a single material Mo and a box bracket 13, two ends of the first lifting connecting piece 2 are respectively connected with the supporting piece 4 and the wellhead square 11, one end of the second lifting connecting piece 3 is connected with the supporting piece 4, the other end of the second lifting connecting piece passes through the pulling square 187 and is connected with the Shan Caimo square 12, one end of the third lifting connecting piece 5 is connected with the supporting piece 4, and the other end of the third lifting connecting piece passes through the wellhead square 11 and is connected with the box bracket 13.
Here, lift the connecting piece 2 through first lifting and lift the connecting piece 2 with well head purlin 11, the second lifts by crane the connecting piece 3 with single material ten thousand bed frame 12 and the third lifts by crane the connecting piece 5 with the railway carriage or compartment frame 13 to realize lifting the bucket arch subassembly 1, it is convenient to install, does not have special requirement to workman's technical ability, and convenient tissue production is favorable to the allotment of labour, effectively uses manpower sparingly cost. The bucket arch assembly 1 is fixedly connected with the supporting piece 4 in a hanging mode, and the hanging stability is high.
The support 4 may include a transverse supporting frame 42, a vertical supporting frame 41, a first connecting structure 44, and a plurality of first installation frames 43, where the first connecting structure 44 is respectively connected to the transverse supporting frame 42 and the vertical supporting frame 41, the plurality of first installation frames 43 are respectively connected to the transverse supporting frame 42, a first installation through hole 431 is formed in the first installation frame 43 in a penetrating manner, and the top end of the first lifting connecting member 2, the top end of the second lifting connecting member 3, and the top end of the third lifting connecting member 5 are respectively connected to the first installation through holes 431 of the corresponding first installation frames 43.
Specifically, the vertical supporting frame 41 is vertically arranged, the horizontal supporting frame 42 is horizontally arranged, the bucket arch assembly 1 is vertically arranged, and the first lifting connecting piece 2, the second lifting connecting piece 3 and the third lifting connecting piece 5 are vertically arranged. The first connection structure 44 is welded to the vertical support frame 41 and the horizontal support frame 42 respectively, the vertical support frame 41 is fixedly connected with the rear embedded part in a welding mode, the rear embedded part is fixedly connected with the main structure by adopting an expansion bolt, and the main structure can be a building floor slab or a building beam. The first mounting frame 43 may be a longitudinal main steel frame, the transverse supporting frame 42 may be a transverse main steel frame, the vertical supporting frame 41 may be a vertical galvanized steel channel, and the first connecting structure 44 may be a longitudinal galvanized steel channel. The first mounting frames 43 are welded to the transverse supporting frame 42, and the distance between two adjacent first mounting frames 43 is determined according to the distance between two of the first lifting connecting piece 2, the second lifting connecting piece 3 and the third lifting connecting piece 5.
The bucket arch assembly 1 may further comprise a head rest 14, the support 4 further comprises a second connection structure 46 connected to the vertical support 41, and a first connection rod 45 having one end connected to the head rest 14 and the other end connected to the second connection structure 46.
Specifically, the first connecting rod 45 may be an embedded steel bar, the second connecting structure 46 may be galvanized angle steel, the head of each bracket 14 of the bracket assembly will be embedded with two embedded steel bars in the horizontal direction, and the other end of the embedded steel bar is fixed with the second connecting structure 46 connected to the vertical supporting frame 41 by welding.
The first lifting connection piece 2 may comprise a first suspender 21, two first fastening nuts 25, a pre-buried angle 22 with one end connected to the wellhead square 11, a conversion angle 23 with one end detachably connected to the other end of the pre-buried angle 22, the bottom end of the first suspender 21 is connected to the other end of the conversion angle 23, the top end of the first suspender 21 passes through a first mounting through hole 431 of a first mounting frame 43, and the two first fastening nuts 25 are respectively screwed to portions of the first suspender 21 located on two sides of the first mounting frame 43, so as to detachably and fixedly connect the first suspender 21 with the first mounting frame 43.
Specifically, the two first fastening nuts 25 are respectively abutted against the top end and the bottom end of the first mounting frame 43. The wellhead purlin 11 is segmented before being installed on site, an embedded corner connector 22 and a conversion corner connector 23 on the wellhead purlin 11 are fixed through bolts, and then the conversion corner connector 23 and the first suspender 21 are fixed through nuts. And determining the installation height position of the wellhead purlin 11 by using an infrared level meter, and fixing a nut after leveling and correcting. The first boom 21 is disposed vertically.
The second lifting connection member 3 may include a first screw tube 32, two second fastening nuts 34, two second lifting rods 31 disposed up and down, wherein the bottom end of the first second lifting rod 31 passes through a pull beam 187 and is connected to Shan Caimo k 12, the top end of the first second lifting rod 31 is screwed to the bottom of the first screw tube 32, the top end of the second lifting rod 31 passes through a first mounting hole 431 of the second first mounting frame 43, the bottom end of the second lifting rod 31 is screwed to the top of the first screw tube 32, and two second fastening nuts 34 are respectively screwed to portions of the second lifting rod 31 located at two sides of the first mounting frame 43, so as to detachably and fixedly connect the second lifting rod 31 with the first mounting frame 43.
Specifically, the two second fastening nuts 34 are respectively abutted against the top end and the bottom end of the first mounting frame 43. The axes of the two second booms 31 coincide, and the second booms 31 are arranged vertically. The first second hanger bar 31 may be a pre-buried lead screw, and the second hanger bar 31 may be a full-wire hanger bar. The upper end of the second suspender 31 passes through the first mounting through hole 431 and is fixed on the first mounting frame 43 through two second fastening nuts 34, and the lower end of the second suspender 31 is fixedly connected with the first suspender 31 on the bucket bracket assembly by adopting the first screw pipe 32. The first screw 32 has an internal thread, and two ends of the first screw are respectively connected to the second boom 31 and the first boom 31 of the bracket assembly. The second suspenders 31 are vertically arranged, the two second suspenders 31 can be respectively connected with different positions of the inner side of the first spiral tube 32 in a screwed mode, and the length of the part of the top end of the second suspender 31, which penetrates through the first mounting through hole 431 and protrudes out of the top end of the first mounting frame 43, can be adjusted, so that the height of the bucket arch assembly 1 can be adjusted along the up-down direction.
The third lifting connection piece 5 may comprise a second screw pipe 52, two third fastening nuts 54, and two third lifting rods 51 disposed up and down, wherein the bottom end of the first third lifting rod 51 passes through the wellhead square 11 and is connected to the carriage bracket 13, the top end of the first third lifting rod 51 is screwed to the bottom of the second screw pipe 52, the top end of the second third lifting rod 51 passes through the first mounting through hole 431 of the third first mounting frame 43, the bottom end of the second third lifting rod 51 is screwed to the top of the second screw pipe 52, and the two third fastening nuts 54 are respectively screwed to the portions of the second third lifting rod 51 located at two sides of the first mounting frame 43 for detachably and fixedly connecting the second third lifting rod 51 and the first mounting frame 43.
Specifically, the two third fastening nuts 54 are respectively abutted against the top end and the bottom end of the first mounting frame 43. The axes of the two third booms 51 coincide, and the third booms 51 are arranged vertically. The first third boom 51 may be a pre-buried lead screw, and the second third boom 51 may be a full-wire boom. The upper end of the second third suspender 51 passes through the first mounting hole 431 and is fixed on the first mounting frame 43 through two third fastening nuts 54, and the lower end of the second suspender 31 is fixedly connected with the first third suspender 51 on the bucket bracket assembly by adopting a second screw pipe 52. The second screw 52 has an internal thread, and two ends of the second screw are respectively connected to the second third boom 51 and the first third boom 51 of the bracket assembly.
Specifically, the two components of the bracket 13 and the single-material universal bracket 12 are respectively embedded with two embedded screws in the vertical direction, the embedded screws are used for hoisting and fixing each bucket bracket assembly and the whole wire suspender, namely, the bracket 13 is embedded with two third suspenders 51 in the vertical direction, the two third suspenders 51 are used for hoisting and fixing each bucket bracket assembly 1 and the other two third suspenders 51, the single-material universal bracket 12 is embedded with two second suspenders 31 in the vertical direction, and the two second suspenders 31 are used for hoisting and fixing each bucket bracket assembly 1 and the other two second suspenders 31.
The bucket arch assembly 1 may further include a mounting gap provided between the different members, and a caulking slurry filled in the mounting gap.
Specifically, the bucket arch assembly 1 further comprises a big bucket 15, a straight melon bracket 186, a straight square bracket 188, a straight square bracket 185, a plurality of eighteen buckets 183, a single melon bracket 16, two-stick brackets 181, hemp She Tou 182, a plurality of groove lifting members 184 and a plurality of three-lift brackets 17, wherein before each component of the bucket arch assembly is assembled, mechanical polishing is required on site, so that the surface of the component achieves a smooth effect. After the member is polished smooth, the assembly of the bucket assembly is performed. The components of the GRG bucket arch assembly are connected with each other by adopting a mortise and tenon structure, and the mortise and tenon structure is bonded and fixed by using special GRG glue.
Specifically, the lowest layer of each bracket is a big bracket 15, a cross-shaped opening is carved on the big bracket 15 in the middle to install the head bracket 14 and the straight melon bracket 186, the opening perpendicular to the face width direction is a notch for installing the head bracket, and the opening parallel to the face width is a notch for installing the straight melon bracket 186. The second layer is provided with a straight melon bracket 186 parallel to the face width direction, a buckling head bracket 14 which is heavier than the face width direction, two parts are crossed in the notch of the big bucket 15, all transverse and longitudinal members of the bucket bracket are crossed by the notch, the cross members are crossed by a principle of 'mountain face eave pressing surface', all the members parallel to the face width direction are notched on the members by equal tenons, the members heavier than the face width direction are notched on the bottom surfaces of the members by cover tenons, the face width direction members are firstly arranged and then the members in the depth direction are arranged when the straight melon bracket is installed, two ends of the straight melon bracket 186 are respectively provided with a groove lifter 184, and two ends of the head bracket 14 are respectively provided with an eighteen bucket 183. The third layer is arranged on the front-heart melon bracket 186 in the face width direction, is arranged on the front-heart melon bracket 185, is arranged on the eighteen hoppers 183 at the two ends of the head and back-head bracket 14, is respectively arranged on the front-heart melon bracket, is respectively arranged on the three front-heart melon bracket 17, is respectively arranged on the two ends of the front-heart melon bracket 185, is respectively arranged on the groove lifting 184 at the two ends of the front-heart melon bracket 185, is buckled on the back-heart melon bracket 181 in the depth direction, and is respectively arranged on the eighteen hoppers 183 at the two ends of the two-back bracket 181. The fourth layer is provided with a center column 188 on the center column 185 in the face width direction, a single column base 12 on the single column base 16, three columns 17 at two ends of the single column base 12 respectively for holding the pulling column 187 thereon, a carriage column 13 on the two-warping 181 eighteen-bucket 183, three columns 17 at two ends of the carriage column 13 respectively, and a buckling hemp She Tou 182 in the depth direction. Fifth layer, drag one piece of purlin 187 on the single material ten thousand bracket 12, put one piece of well head purlin 11 on the carriage bracket 13.
Specifically, after the assembly of each bracket assembly is completed, the adjacent components are provided with mounting gaps, so that the mounting gaps among the components of the bracket assembly need to be repaired, and the gypsum slurry used for repairing the mounting gaps is the same as the gypsum raw material for production. The bucket arch assembly 1 can be an imitation clear type building I-shaped five-step bucket arch, a wellhead square 11 in the I-shaped five-step bucket arch is firstly installed, the wellhead square 11 is a through long component after being installed, the wellhead square 11 is segmented before being installed on site, gaps between every two sections of wellhead square 11 and gaps between every three liters 17 and the wellhead square 11 all need to be subjected to joint treatment, gypsum slurry used for joint filling is the same as gypsum raw materials used for production, the filling slurry can be gypsum slurry, when the gypsum slurry is stirred, chopped glass fiber mats or glass fiber filaments are added, and alkali-resistant glass fiber grid cloth is adhered at the joint between every two sections of wellhead square 11.
Specifically, after the filling work of the mounting gap is completed, the facing treatment of the bracket assembly 1 is performed. After the GRG imitation wood bucket arch is installed on site, putty is fully filled in two times, then polishing is carried out, priming paint, drawing lines, upper surface color and color are carried out after polishing is completed, and surface varnish sealing is carried out. After paint, the GRG bucket arch can achieve the real effect of imitating wood grains. The method comprises the following steps of cleaning dust on the surface of an arch assembly 1, rolling glue, leveling a base blank by using GRG powder and gypsum powder, leveling, filling putty for two times, polishing, starting to apply a first primer after polishing, repairing the paint surface with putty for one time after finishing, polishing, spraying a second primer with preset color, finishing with putty for one time, spraying a third primer after polishing, and finishing the next procedure of drawing lines. The purpose of the drawing lines is to simulate the effect of real wood grains, and the upper surface color is the same after the drawing lines are drawn. In order to avoid chromatic aberration of the surface color, the second color repair or multiple color repair can be performed, so that the surface varnish is sealed after the colors are basically consistent, and the paint facing spraying is finished.
The first mounting through hole 431 may be a oblong hole.
Specifically, the axis of the oblong hole may be coincident with or parallel to the axis of the first mounting frame 43, so that the bracket assembly 1 can conveniently perform position adjustment along the axis direction of the first mounting frame 43. The first suspender 21, the second suspender 31, the third suspender 51 and the bucket arch assembly 1 are vertically arranged, the transverse supporting frame 42 is horizontally arranged, the axis of the first installation frame 43 is respectively perpendicular to the axis of the bucket arch assembly 1 and the axis of the transverse supporting frame 42, the axis of the bucket arch assembly 1 is parallel to the up-down direction, the axis of the transverse supporting frame 42 is parallel to the left-right direction, namely, the axis of the first installation frame 43 is parallel to the front-back direction, the axis of the oblong hole is parallel to the front-back direction, and the bucket arch assembly 1 is convenient to adjust the position along the front-back direction.
Specifically, the first mounting through hole 431 may also be a cross-shaped through hole, where the cross-shaped through hole includes two oblong holes that are disposed in a crossing manner, the axes of the two oblong holes are perpendicular, the axis of one oblong hole is parallel to the axis of the transverse supporting frame 42, the axis of the transverse supporting frame 42 is parallel to the left-right direction, that is, the axis of one oblong hole is parallel to the left-right direction, the axis of the other oblong hole is parallel to or coincides with the axis of the first mounting bracket 43, and the axis of the first mounting bracket 43 is parallel to the front-back direction, that is, the axis of the other oblong hole is parallel to the front-back direction, so that the bucket arch assembly 1 is convenient to perform position adjustment along the left-right direction and the front-back direction, respectively.
The bucket arch assembly 1 may be a GRG bucket arch assembly, the first hanger rod 21, the second hanger rod 31, and the third hanger rod 51 are all full-wire hanger rods, the vertical support frame 41 is galvanized steel channel, the horizontal support frame 42 is galvanized steel angle, the first mounting frame 43 is galvanized steel angle, and the first connection structure 44 is galvanized steel channel.
Specifically, the bucket arch assembly 1 can be a GRG bucket arch assembly, and then the bucket arch assembly 1 can be a GRG wood-like bucket arch assembly 1, a GRG wood-like bucket arch hanging installation technology is adopted, the GRG mold is utilized to produce the component members of the bucket arch assembly in batches, the processing production efficiency is high, the processing quality of the bucket arch assembly is ensured by industrial production, each member of the GRG bucket arch assembly is mechanically polished on site, the surface is smoother, the members are connected with each other by adopting a mortise and tenon structure, and the mortise and tenon joints are bonded and fixed by using special GRG glue. GRG is a renewable material, and waste in the production process can be recycled, so that the pressure on the environment is reduced, and precious wood resources are saved. The GRG bucket arch assembly is not easy to deform, has a dry and wet shrinkage rate of less than 0.01 percent, stable performance, no cracking or deformation and long service life. The GRG bucket arch assembly is light in weight and can reduce the load of the structural floor slab. The GRG material belongs to class A fireproof materials, and can release water accounting for 15 to 20 percent of the self weight besides flame retardance when a fire disaster occurs, so that the temperature of a fire surface can be greatly reduced, and the fire disaster loss is reduced. The GRG material has a large number of micropore structures inside, and can adjust the humidity of the indoor environment.
Specifically, the full-wire suspender is that the outer side surface of the suspender is provided with a first external thread with the same length as the suspender.
Specifically, the elastic wire determines the mounting position of the bucket bracket assembly and the fixing positions of the first suspender 21, the second suspender 31 and the third suspender 51, the positions of the first suspender 21, the second suspender 31 and the third suspender 51 are accurate, the first suspender 21, the second suspender 31 and the third suspender 51 are vertical, the stress of the first suspender 21, the second suspender 31 and the third suspender 51 is balanced, and the bucket bracket assembly is prevented from generating large-area unevenness. The first mounting bracket 43 is provided with a first mounting through hole 431 at the position where the first suspender 21, the second suspender 31 or the third suspender 51 is mounted, the first suspender 21 is inserted into the first mounting through hole 431 of the first mounting bracket 43 after the first fastening nut 25 is sleeved at the upper end of the first suspender 21, the second first fastening nut 25 is sleeved again, only temporary assembly is performed, the first fastening nut 25 is not fastened, and after the bottom end of the first suspender 21 is connected with the conversion angle bracket 23, the two first fastening nuts 25 are fastened. The first screw pipe 32 is fixedly connected with the first second suspender 31, the upper end of the second suspender 31 is sleeved with the first second fastening nut 34, the lower end of the second suspender 31 is penetrated into the first mounting through hole 431 of the first mounting frame 43, then sleeved with the second fastening nut 34, only temporary assembly is carried out, the second fastening nut 34 is not fastened, the first screw pipe 32 is fixedly connected with the second suspender 31 after the lower end of the second suspender 31 is sleeved with the first screw pipe 32, and then the two second fastening nuts 34 are fastened. The second screw pipe 52 is fixedly connected with the first third suspender 51, after the upper end of the second third suspender 51 is sleeved with the first third fastening nut 54, the lower end of the second third suspender 51 is penetrated into the first mounting through hole 431 of the first mounting frame 43, then sleeved with the second third fastening nut 54, only temporary assembly is performed, the third fastening nut 54 is not fastened, the second screw pipe 52 is fixedly connected with the second third suspender 51 after the lower end of the second third suspender 51 is sleeved with the second screw pipe 52, and then the two third fastening nuts 54 are fastened.
Specifically, after all the segmented wellhead beams 11 are installed, the first GRG header assembly is installed. After the three lifting frames 17 on the upper carriage leg 13 of the GRG bucket leg assembly are firmly jacked with the wellhead square 11, the first third lifting frame 51 on the top of the GRG bucket leg assembly sequentially penetrates through holes reserved in the wellhead square 11 and the three lifting frames 17 and is fixedly connected with the carriage leg 13, the second third lifting frame 51 is connected with the second screw pipe 52, the first third lifting frame 51 sleeved on the top of the GRG bucket leg assembly is rotated together, the first third lifting frame 51 on the top of the GRG bucket leg assembly is fixedly connected with the second screw pipe 52, the installation height position of the GRG bucket leg assembly is determined by utilizing an infrared level meter, and the third fastening nut 54 is fixed after leveling and correction. After the three lifting rods 17 on the upper part of the GRG bracket assembly are firmly jacked with the pulling square bracket 187, the first second lifting rod 31 on the top of the GRG bracket assembly sequentially penetrates through the holes reserved by the pulling square bracket 187 and the three lifting rods 17 and is fixedly connected with the Shan Caimo bracket 12, the second lifting rod 31 is connected with the first screw pipe 32, the first second lifting rod 31 sleeved on the top of the GRG bracket assembly is rotated together, the first second lifting rod 31 on the top of the GRG bracket assembly is fixedly connected with the first screw pipe 32, the installation height position of the GRG bracket assembly is determined by utilizing an infrared ray level meter, and the second fastening nut 34 is fixed after leveling and correcting. And then welding and fixing the embedded bars in the horizontal direction of the head warp 14 of the GRG bucket arch assembly with galvanized angle steel connected to the vertical channel steel. After the first GRG bracket assembly is installed, the rest GRG bracket assemblies in the same row are installed in sequence.
The first suspender 21 may be two units arranged up and down, the first suspension connecting piece 2 further comprises a first shock absorbing structure 24 respectively connected to the two first suspenders 21, the top ends of the first suspender 21 positioned above pass through a first mounting through hole 431 of the first mounting frame 43, the two first fastening nuts 25 are respectively screwed on two sides of the first mounting frame 43 on the first suspender 21 positioned above, the bottom ends of the first suspender 21 positioned below are connected to the other end of the conversion corner bracket 23, the first screwed pipe 32 comprises two first unit pipes 321 arranged up and down, the second suspension connecting piece 3 further comprises a second shock absorbing structure 33 respectively connected to the two first unit pipes 321, the top ends of the first unit pipes 321 positioned above are connected to the bottom ends of the first second suspender 31, the bottom ends of the first unit pipes 321 positioned below are connected to the top ends of the second suspender 31, the second screwed pipe 52 comprises two second unit pipes 521 arranged up and down, the third suspension connecting piece 5 further comprises a third shock absorbing structure 521 respectively connected to the top ends of the second unit pipes 53 and the third unit pipes 53 positioned above the second unit pipes 53, and the top ends of the third shock absorbing structure 521 are connected to the top ends of the third unit pipes 53.
Specifically, the first damping structure 24, the second damping structure 33 and the third damping structure 53 can be vertically arranged, so that the first damping structure 24, the second damping structure 33 and the third damping structure 53 can be damped along the vertical direction, and the first damping structure 24, the second damping structure 33 and the third damping structure 53 can be damped along the vertical direction for the bucket arch assembly 1 after the first lifting connecting piece 2, the second lifting connecting piece 3 and the third lifting connecting piece 5 are respectively connected with the bucket arch assembly 1.
Specifically, the first shock absorbing structure 24 includes a first shock absorbing frame 241, a first abutting plate 242, a second abutting plate 243, a first screw 244, a first spring 245, a fourth fastening nut 246, a fifth fastening nut 247, a first fixing rod 248, a second mounting through hole penetrating through the first abutting plate 242, a third mounting through hole penetrating through the second abutting plate 243, and a first connecting through hole penetrating through the bottom end of the first shock absorbing frame 241, wherein the first abutting plate 242, the first spring 245, and the second abutting plate 243 are disposed inside the first shock absorbing frame 241, the second abutting plate 243 abuts against the bottom end of the first shock absorbing frame 241, the first abutting plate 242 and the second abutting plate 243 are disposed up and down, the top end and the bottom end of the first spring 245 are respectively abutted against the first abutting plate 242 and the second abutting plate 243, the bottom end of the first screw 244 sequentially passes through the second mounting through hole, the inner side of the first spring 245, the third mounting through hole, the first connecting through hole and extends to one side of the first shock absorbing frame 241, the fourth fastening nut 246 is in threaded connection with the top end of the first screw 244, the fifth fastening nut 247 is in threaded connection with the part of the first screw 244 extending to one side of the first shock absorbing frame 241, the fourth fastening nut 246 is abutted against the first abutting plate 242, the fifth fastening nut 247 is abutted against the first shock absorbing frame 241, the different positions of the fourth fastening nut 246 and the fifth fastening nut 247 on the first screw 244 are respectively adjusted, thereby adjust the flexible length of first spring 245, realize adjusting the shock attenuation intensity of first shock-absorbing structure 24, the top of first shock-absorbing frame 241 is connected to the bottom of first dead lever 248, and the top of first dead lever 248 is connected in the bottom of the first jib 21 that is located the top, and the one end of protrusion in first shock-absorbing frame 241 one side on first screw 244 is connected in the top of the first jib 21 that is located the below.
Specifically, the second shock absorbing structure 33 includes a second shock absorbing frame 331, a third abutting plate 332, a fourth abutting plate 333, a second screw 334, a second spring 335, a sixth fastening nut 336, a seventh fastening nut 337, a second fixing rod 338, a fourth mounting through hole penetrating through the third abutting plate 332, a fifth mounting through hole penetrating through the fourth abutting plate 333, and a second connecting through hole penetrating through the bottom end of the second shock absorbing frame 331, wherein the third abutting plate 332, the second spring 335, and the fourth abutting plate 333 are disposed inside the second shock absorbing frame 331, the fourth abutting plate 333 abuts against the bottom end of the second shock absorbing frame 331, the third abutting plate 332 and the fourth abutting plate 333 are disposed up and down, the top end and the bottom end of the second spring 335 abut against the third abutting plate 332 and the fourth abutting plate 333, respectively, the bottom end of the second screw 334 penetrates through the fourth mounting through hole, the inside the second spring 335, the fifth mounting through hole, the second connecting through hole and extends to one side of the second shock absorbing frame 331, the sixth fastening nut 336 is screwed on the top end of the second screw 334, the seventh fastening nut 337 is screwed on the part of the second screw 334 extending out of one side of the second shock absorbing frame 331, the seventh fastening nut 337 is abutted on the third abutting plate 332, the seventh fastening nut 337 is abutted on the second shock absorbing frame 331, and the different positions of the sixth fastening nut 336 and the seventh fastening nut 337 on the second screw 334 are respectively adjusted, so as to adjust the expansion length of the second spring 335, realize the shock absorbing strength of the second shock absorbing structure 33, the bottom end of the second fixing rod 338 is connected with the top end of the second shock absorbing frame 331, the top end of the second fixing rod 338 is connected with the bottom end of the first unit pipe 321 positioned above, the end of the second screw 334 extending out of one side of the second shock absorbing frame 331 is connected with the top end of the first unit pipe 321 positioned below, the second fixing rod 338 and the second screw 334 may be respectively screw-coupled to the first unit pipe 321.
Specifically, the third shock absorbing structure 53 includes a third shock absorbing frame 531, a fifth abutting plate 532, a sixth abutting plate 533, a third screw 534, a third spring 535, an eighth fastening nut 536, a ninth fastening nut 537, a third fixing rod 538, a sixth mounting through hole penetrating through the fifth abutting plate 532, a seventh mounting through hole penetrating through the sixth abutting plate 533, a third connecting through hole penetrating through the bottom end of the third shock absorbing frame 531, the fifth abutting plate 532, the third spring 535, the sixth abutting plate 533 being disposed inside the third shock absorbing frame 531, the sixth abutting plate 533 being abutted against the bottom end of the third shock absorbing frame 531, the fifth abutting plate 532, the sixth abutting plate 533 being disposed up and down, the top end and the bottom end of the third spring 535 being abutted against the fifth abutting plate 532 and the sixth abutting plate 533, respectively, the bottom end of the third screw 534 penetrating through the sixth mounting through hole, the inside the third spring 535, the seventh mounting through hole, the third connecting through hole and extending to one side of the second shock absorbing frame 331, the eighth fastening nut 536 is screwed on the top end of the third screw 534, the ninth fastening nut 537 is screwed on the part of the third screw 534 extending out of one side of the third shock absorbing frame 531, the eighth fastening nut 536 is abutted on the fifth abutting plate 532, the ninth fastening nut 537 is abutted on the third shock absorbing frame 531, the different positions of the eighth fastening nut 536 and the ninth fastening nut 537 on the third screw 534 are respectively adjusted, thereby adjusting the expansion length of the third spring 535, realizing the adjustment of the shock absorbing strength of the third shock absorbing structure 53, the bottom end of the third fixing rod 538 is connected with the top end of the third shock absorbing frame 531, the top end of the third fixing rod 538 is connected with the bottom end of the second unit pipe 521 positioned above, the end of the third screw 534 extending out of one side of the third shock absorbing frame 531 is connected with the top end of the second unit pipe 521 positioned below, the third fixing rod 538 and the third screw 534 may be respectively screw-coupled to the second unit pipe 521.
Specifically, the adjustability of the mounting structure of the application improves the mounting precision of the bracket assembly, ensures the mounting quality of the bracket assembly, has no special requirements on the technical capability of workers, is convenient for organization production, is beneficial to the allocation of labor force and effectively saves the labor cost.
The above description may be implemented alone or in various combinations and these modifications are within the scope of the present utility model.
It should be noted that, in the description of the present application, the terms "upper end," "lower end," and "bottom end" of the indicated orientation or positional relationship are based on the orientation or positional relationship shown in the drawings, or the orientation or positional relationship conventionally put in use of the product of the application, are merely for convenience of describing the present application and simplifying the description, and do not indicate or imply that the device to be referred to must have a specific orientation, be configured and operated in a specific orientation, and therefore should not be construed as limiting the present application. Moreover, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising one.," does not exclude the presence of additional identical elements in a process, method, article, or apparatus that comprises an element.
Finally, it should be noted that the above-mentioned embodiments are only for illustrating the technical solution of the present utility model, and are not limiting. Although the present utility model has been described in detail with reference to the foregoing embodiments, those skilled in the art will understand that modifications may be made to the technical solutions described in the foregoing embodiments or equivalents may be substituted for some of the technical features thereof, and that such modifications or substitutions do not depart from the spirit and scope of the technical solutions of the embodiments of the present utility model in essence of the corresponding technical solutions.

Claims (10)

1. The assembled bucket arch mounting device is characterized by comprising an bucket arch assembly (1), a supporting piece (4), a first lifting connecting piece (2), a second lifting connecting piece (3) and a third lifting connecting piece (5), wherein the bucket arch assembly (1) comprises a wellhead square (11), a drawing square (187), a single material universal arch (12) and a box arch (13), two ends of the first lifting connecting piece (2) are respectively connected to the supporting piece (4) and the wellhead square (11), one end of the second lifting connecting piece (3) is connected to the supporting piece (4), the other end of the second lifting connecting piece passes through the drawing square (187) and is connected to the Shan Caimo-arch (12), one end of the third lifting connecting piece (5) is connected to the supporting piece (4), and the other end of the third lifting connecting piece passes through the wellhead square (11) and is connected to the box arch (13).
2. The assembly type bucket mounting device as set forth in claim 1, wherein the supporting member (4) comprises a transverse supporting frame (42), a vertical supporting frame (41), a first connecting structure (44) and a plurality of first mounting frames (43), the first connecting structure (44) is respectively connected to the transverse supporting frame (42) and the vertical supporting frame (41), the plurality of first mounting frames (43) are respectively connected to the transverse supporting frame (42), a first mounting through hole (431) is formed in the first mounting frames (43) in a penetrating mode, and the top ends of the first lifting connecting member (2), the top ends of the second lifting connecting members (3) and the top ends of the third lifting connecting members (5) are respectively connected to the first mounting through holes (431) of the corresponding first mounting frames (43).
3. The mounting device as set forth in claim 2, wherein the bracket assembly (1) further comprises a head bracket (14), the support member (4) further comprises a second connecting structure (46) connected to the vertical support frame (41), and a first connecting rod (45) having one end connected to the head bracket (14) and the other end connected to the second connecting structure (46).
4. The assembly type bucket mounting device as set forth in claim 2 or 3, wherein the first lifting connector (2) comprises a first hanging rod (21), two first fastening nuts (25), a pre-buried angle bracket (22) with one end connected to the wellhead square bracket (11), a conversion angle bracket (23) with one end detachably connected to the other end of the pre-buried angle bracket (22), the bottom end of the first hanging rod (21) is connected to the other end of the conversion angle bracket (23), the top end of the first hanging rod (21) passes through a first mounting through hole (431) of a first mounting frame (43), and the two first fastening nuts (25) are respectively screwed to portions of the first hanging rod (21) located on two sides of the first mounting frame (43) so as to detachably and fixedly connect the first hanging rod (21) with the first mounting frame (43).
5. The mounting device as set forth in claim 4, wherein the second lifting connector (3) comprises a first screw pipe (32), two second fastening nuts (34), and two second lifting rods (31) disposed up and down, the bottom end of the first second lifting rod (31) passes through a drawing column (187) and is connected to Shan Caimo bars (12), the top end of the first second lifting rod (31) is screwed to the bottom of the first screw pipe (32), the top end of the second lifting rod (31) passes through a first mounting through hole (431) of a second first mounting frame (43), the bottom end of the second lifting rod (31) is screwed to the top of the first screw pipe (32), and the two second fastening nuts (34) are respectively screwed to the portions of the second lifting rod (31) located at two sides of the first mounting frame (43) so as to detachably and fixedly connect the second lifting rod (31) with the first mounting frame (43).
6. The mounting device as set forth in claim 5, wherein the third lifting connector (5) comprises a second screw pipe (52), two third fastening nuts (54) and two third lifting rods (51) arranged up and down, the bottom end of the first third lifting rod (51) passes through the wellhead (11) and is connected to the box arch (13), the top end of the first third lifting rod (51) is screwed to the bottom of the second screw pipe (52), the top end of the second third lifting rod (51) passes through a first mounting through hole (431) of a third first mounting frame (43), the bottom end of the second third lifting rod (51) is screwed to the top of the second screw pipe (52), and the two third fastening nuts (54) are respectively screwed to portions of the second lifting rod (51) located at two sides of the first mounting frame (43) so as to detachably and fixedly connect the second lifting rod (51) with the first mounting frame (43).
7. The mounting device for the fabricated bracket as set forth in claim 1, 2 or 3, wherein the bracket assembly (1) further comprises a mounting gap provided between the different members, and a caulking slurry filled in the mounting gap.
8. A mounting device for a fabricated bucket according to claim 2 or 3, wherein the first mounting hole (431) is a slotted hole.
9. The assembly type bucket arch mounting device according to claim 6, wherein the bucket arch assembly (1) is a GRG bucket arch assembly, the first suspender (21), the second suspender (31) and the third suspender (51) are all full-wire suspenders, the vertical supporting frame (41) is galvanized steel channel, the transverse supporting frame (42) is galvanized steel angle, the first mounting frame (43) is galvanized steel angle, and the first connecting structure (44) is galvanized steel channel.
10. The assembly type bucket mounting device as defined in claim 6, wherein the first hanger rods (21) are two parts arranged up and down, the first lifting connecting piece (2) further comprises first shock absorbing structures (24) respectively connected to the two first hanger rods (21), the top ends of the first hanger rods (21) above pass through first mounting holes (431) of the first mounting frame (43), the two first fastening nuts (25) are respectively screwed on the parts of the first hanger rods (21) above located on the two sides of the first mounting frame (43), the bottom ends of the first hanger rods (21) below located on the other ends of the conversion angle code (23), the first spiral tube (32) comprises two first unit tubes (321) arranged up and down, the second lifting connecting piece (3) further comprises second shock absorbing structures (33) respectively connected to the two first unit tubes (321), the top ends of the first unit tubes (321) above are connected to the second spiral tube (31) below the second unit tubes (521), the bottom ends of the second spiral tube (321) are connected to the second unit tubes (31) below the second unit tubes (521) respectively, the top end of the second unit pipe (521) positioned above is connected to the bottom end of the first third suspender (51), the bottom end of the second unit pipe (521) positioned below is connected to the top end of the second third suspender (51), and the first damping structure (24), the second damping structure (33) and the third damping structure (53) are used for respectively damping the bucket arch assembly (1).
CN202420999919.5U 2024-05-10 2024-05-10 Assembled bracket installation device Active CN222375834U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202420999919.5U CN222375834U (en) 2024-05-10 2024-05-10 Assembled bracket installation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202420999919.5U CN222375834U (en) 2024-05-10 2024-05-10 Assembled bracket installation device

Publications (1)

Publication Number Publication Date
CN222375834U true CN222375834U (en) 2025-01-21

Family

ID=94248406

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202420999919.5U Active CN222375834U (en) 2024-05-10 2024-05-10 Assembled bracket installation device

Country Status (1)

Country Link
CN (1) CN222375834U (en)

Similar Documents

Publication Publication Date Title
CN205604464U (en) Exterior wall cladding antidetonation is connecting piece down
CN107558723B (en) Method for manufacturing and installing hanging bracket of hanging basket for inclined roof
CN104120811B (en) A kind of metal decking unit curtain wall system
CN209443580U (en) A kind of building construction antidetonation movable plank house
CN110670772B (en) A curtain wall installation method and system based on BIM technology
CN111749378B (en) A large-span glass rib support curtain wall system and its installation process
CN110565850A (en) Concave glass and convex metal plate combined type assembled curtain wall and construction method
CN204609092U (en) A kind of combined type conversion layer connector
CN103306453B (en) Structure for mounting stone and method for mounting stone
CN215253811U (en) An inclined cable-type glass curtain wall system
CN211974027U (en) Adaptor convenient to GRG jib is adjusted location
CN211873494U (en) Formula of falling furred ceiling light groove structure
CN215106409U (en) Mounting support for unit body plate
CN208792669U (en) Concealed frame type wall brick system in a kind of assembled room
CN118441852A (en) Assembled bucket arch installation device
CN212053407U (en) Adjustable conversion layer component of assembled
CN204531130U (en) A kind of telescopic conversion layer connector
CN217896902U (en) Curtain wall connecting structure
CN221095548U (en) Hanging framework and stone curtain wall mounting system
CN219753509U (en) Column foot structure of curtain wall
CN108999320B (en) A vertical clay stick system for building curtain walls
CN207419732U (en) Modular keel shoe CCA slates cotton outer heat preservation system
CN112942789B (en) Water drop type curtain wall construction method
CN213868520U (en) Light steel keel frame with stable structure for indoor suspended ceiling
CN110847454B (en) Aluminum alloy outer frame for mounting combined curtain wall board

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant