Leakage-proof butt joint device for pe sewage pipes
Technical Field
The utility model relates to the technical field of pe drain pipe butt joint, in particular to a leakage-proof butt joint device for a pe drain pipe.
Background
The drain pipe is an important drain facility in modern buildings, is made of PVC, PP, PE and other materials, has good corrosion resistance, pressure resistance and sealing performance, is a common drain pipe, and is widely applied to various building and engineering fields.
The pe blow off pipe is used as a main blow off pipe, and the standard of leakage prevention is needed in the installation process, especially in the butt joint process, but the common pe blow off pipe is large in caliber, heavy in whole, large in butt joint difficulty, long in butt joint time, inconvenient to carry the pe blow off pipe into hot melting equipment, especially in outdoor operation, and no condition support exists.
Disclosure of utility model
Aiming at the defects of the prior art, the utility model provides the leakage-proof butt joint device for the pe sewage pipes, which overcomes the defects of the prior art and effectively solves the problems of large difficulty and long time of butt joint.
In order to achieve the above purpose, the present utility model adopts the following technical scheme:
The utility model provides a pe is leak protection interfacing apparatus for drain, includes the mount, mount top outer wall is through the servo motor of bolt fixedly connected with, and servo motor output shaft has first bevel gear through the shaft coupling, first bevel gear outer wall meshing has the second bevel gear, and the first two-way lead screw of second bevel gear inner wall fixedly connected with, the equal spiro union in first two-way lead screw both ends outer wall has spacing frame, and spacing frame inner wall rotation is connected with the two-way lead screw of second, the two-way lead screw outer wall spiro union has the splint of symmetric distribution;
The electric fusion welding machine is arranged on one side of the fixing frame, electric fusion cables which are symmetrically distributed are connected to one side of the electric fusion welding machine, electric fusion sleeves are connected to one side of the electric fusion cables in a threaded mode, and resistance wires are connected to two ends of the inner walls of the electric fusion sleeves.
Preferably, the first bidirectional screw rod is rotatably connected to inner walls of two sides of the fixing frame.
Preferably, the inner walls at two ends of the electric melting sleeve are provided with the pe drain pipes, and the clamping plates are tightly attached to the outer walls of the pe drain pipes.
Preferably, supporting legs which are symmetrically distributed are welded on the outer walls of two sides of the fixing frame, and universal wheels are installed on the outer walls of the bottoms of the supporting legs.
Preferably, the outer walls of the two sides of the fixing frame are welded with guide rods, and the guide rods are connected to the outer wall of one side of the limiting frame in a sliding mode.
Preferably, the outer wall of the other side of the fixing frame is fixedly connected with the electric control cabinet through bolts.
The beneficial effects of the utility model are as follows:
1. According to the anti-leakage butt joint device for the pe sewage pipe, the clamping plate is driven by the second bidirectional screw rod to be close to the pe sewage pipe, so that a pipeline can be clamped, the quick positioning of the pe sewage pipe is realized, the first bevel gear is driven by the servo motor to rotate, the first bidirectional screw rod can control the two limiting frames to be close to each other, the quick butt joint of the pe sewage pipe and the electric melting sleeve is realized, and the difficulty and time for butt joint of the pipeline are reduced;
2. The anti-leakage butt joint device for the pe sewage pipes of the design can achieve the purpose of fusion welding by heating the resistance wire in the fusion welding sleeve through the fusion welding machine after the two pe sewage pipes are respectively transferred to the two ends of the fusion welding sleeve, is fast and reliable in connection, high in sealing strength, does not need to additionally add sealing materials, does not need to be transferred to the fusion welding equipment, and meets the condition of outdoor operation.
Drawings
FIG. 1 is a schematic diagram of the overall structure of a leak-proof docking device for a pe drain pipe according to the present utility model;
FIG. 2 is a schematic diagram of a connection structure of a fixing frame of a leak-proof docking device for a pe sewage pipe;
Fig. 3 is a schematic diagram of an electric fusion welding machine connection structure of a leakage-proof butt joint device for a pe drain pipe according to the present utility model.
The electric welding machine comprises a fixing frame, a servo motor, a first bevel gear, a second bevel gear, a first bidirectional screw rod, a limiting frame, a second bidirectional screw rod, a clamping plate, an electric welding machine, an electric melting cable, an electric melting sleeve, a resistance wire, a supporting leg, a universal wheel, a guide rod, a electric control cabinet and an electric control cabinet, wherein the electric melting cable, the electric melting sleeve, the electric melting wire, the electric welding machine, the electric melting wire, the electric melting sleeve and the electric control cabinet are sequentially arranged in sequence from the beginning to the end of the electric welding machine.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments.
First embodiment, refer to fig. 2, a leakage-proof butt joint device for pe drain pipe, including mount 1, the outer wall of mount 1 top is through bolt fixedly connected with servo motor 2, and servo motor 2 output shaft has first bevel gear 3 through the coupling joint, first bevel gear 3 outer wall meshing has second bevel gear 4, and the first two-way lead screw 5 of second bevel gear 4 inner wall fixedly connected with, the equal spiro union in first two-way lead screw 5 both ends outer wall has spacing frame 6, and spacing frame 6 inner wall rotation is connected with second two-way lead screw 7, the splint 8 of second two-way lead screw 7 outer wall spiro union symmetric distribution.
In this embodiment, drive splint 8 and be close to the quick location of pe drain through rotating second bidirectional screw rod 7 and can press from both sides tight pipeline, realized the pe drain to drive first bevel gear 3 through servo motor 2 and rotate, first bidirectional screw rod 5 can control two spacing frames 6 and be close to each other, realized the quick butt joint of pe drain and electric smelting sleeve 11, reduced the degree of difficulty and the time of pipeline butt joint.
In the second embodiment, referring to fig. 3, a leak-proof docking device for a pe sewage pipe is provided with an electric fusion welding machine 9 on one side of a fixing frame 1, symmetrically distributed electric fusion cables 10 are connected on one side of the electric fusion welding machine 9, an electric fusion sleeve 11 is screwed on one side of the electric fusion cable 10, and resistance wires 12 are connected at two ends of the inner wall of the electric fusion sleeve 11.
In this embodiment, after two pe drain pipes are respectively transported to two ends of the electric melting sleeve 11, the electric melting machine 9 heats the resistance wire 12 in the electric melting sleeve 11 to achieve the purpose of welding, so that the connection is fast and reliable, the sealing strength is high, no additional sealing material is needed, no transportation to the hot melting equipment is needed, and the condition of outdoor operation is satisfied.
Referring to fig. 2, first bidirectional screw rods 5 are rotatably connected to inner walls of both sides of the fixing frame 1.
Referring to fig. 2-3, the inner walls of the two ends of the electrofusion sleeve 11 are respectively provided with a pe sewage discharge pipe, and the clamping plates 8 are tightly attached to the outer walls of the pe sewage discharge pipes.
Referring to fig. 1, symmetrically distributed supporting legs 13 are welded on the outer walls of the two sides of the fixing frame 1, and universal wheels 14 are mounted on the outer walls of the bottoms of the supporting legs 13.
Referring to fig. 1-2, guide rods 15 are welded on the outer walls of both sides of the fixing frame 1, and the guide rods 15 are slidably connected to the outer wall of one side of the limit frame 6.
Referring to fig. 1, an outer wall of the other side of the fixing frame 1 is fixedly connected with an electric control cabinet 16 through bolts.
The working principle is that firstly, an electric melting sleeve 11 is prepared and placed between two pe drain pipes, then a fixing frame 1 is moved to the vicinity of a pipeline, a second bidirectional screw rod 7 is rotated to drive a clamping plate 8 to clamp the pipeline close to the pe drain pipes, then a servo motor 2 is used for driving a first bevel gear 3 to rotate, the first bevel gear 3 can drive a first bidirectional screw rod 5 on the inner wall of a second bevel gear 4 to rotate, further the first bidirectional screw rod 5 is used for controlling two limiting frames 6 to be mutually close, the two pe drain pipes are inserted into the electric melting sleeve 11, and then a resistance wire 12 in the electric melting sleeve 11 is heated by an electric melting welder 9 to achieve the purpose of welding.
The foregoing is only a preferred embodiment of the present utility model, but the scope of the present utility model is not limited thereto, and any person skilled in the art, who is within the scope of the present utility model, should make equivalent substitutions or modifications according to the technical scheme of the present utility model and the inventive concept thereof, and should be covered by the scope of the present utility model.