Center column structure of flexible photovoltaic bracket and flexible photovoltaic bracket
Technical Field
The utility model relates to the technical field of photovoltaic power generation, in particular to a neutral column structure of a flexible photovoltaic bracket and the flexible photovoltaic bracket.
Background
Photovoltaic power generation is widely favored in the market as a renewable clean energy source with mature technology and better environmental protection and economy. With the rapid development of the photovoltaic industry in China, the high-quality project construction land is rapidly consumed, so that the full development and utilization of non-high-quality space resources (such as beaches, barren mountainous areas and the like) have wide market prospect. In order to meet the development requirement, a flexible photovoltaic support structure based on a prestress inhaul cable system is generated in recent years.
The structure of flexible photovoltaic support is usually including two support posts along vertical interval, is provided with the crossbeam along transversely extending in the upper end of every support post, is provided with longitudinal prestressing force cable (i.e. longitudinal horizontal cable) between two vertically opposite crossbeams, is used for installing photovoltaic board between two horizontal cables, is provided with the stay cable in opposite sides of two support posts usually, improves stability, and the accessible cable exerts prestressing force like this, realizes photovoltaic module's large-span arrangement.
In the flexible photovoltaic bracket, as the prestress horizontal guy wires are longitudinally arranged in a multi-span mode, a middle column transition is usually arranged between two support columns, and stability is improved. In the prior art, the Chinese patent with the bulletin number of CN219124128U is entitled, and the disclosed 'hinged type stand column flexible photovoltaic support' comprises at least three support columns, main ropes are connected between beams at the top ends of adjacent support columns, the support columns at the two ends are steel side columns (namely support columns), the support column at the middle part is a precast concrete middle column (namely middle column), the beams at the top ends of the steel side columns are connected with the main ropes through anchors, the beams at the top ends of the precast concrete middle column are hinged with the main ropes, and the precast concrete middle column is of a pile column integrated structure.
In the prior art, the bottom of the middle upright post is usually directly fixed on the ground, and in the actual use process, certain lateral force is easy to form under the action of lateral wind vibration, a bending moment is generated, and especially when the number of longitudinal spans of the flexible photovoltaic bracket is more, the middle upright post is easy to break, so that the lateral instability of a structural system is caused.
Disclosure of utility model
The utility model aims to solve the technical problem of providing a middle column structure of a flexible photovoltaic bracket and the flexible photovoltaic bracket, wherein the lower end of an upper support column is hinged with the upper end of a bottom pile foundation, so that the hinge can be utilized to release bending moment generated by longitudinal side force from a longitudinal horizontal stay rope, the stress of the middle column is reduced, the fracture and damage risk of the middle column is reduced, the horizontal connecting rod can be utilized to connect the opposite ends of adjacent top balance beams, further, two adjacent rows of support systems are transversely connected, the lateral rigidity resistance is improved, the overall lateral force resistance capability of the flexible photovoltaic bracket system is improved, and the lateral instability of a structural system is avoided.
According to the technical scheme, the middle upright post structure of the flexible photovoltaic bracket comprises an upright post foundation, wherein the upright post foundation comprises at least two middle upright posts which are arranged at intervals in the transverse direction, the middle upright posts comprise a bottom pile foundation and an upper support post, the lower end of the upper support post is hinged with the upper end of the bottom pile foundation, the hinge axes of the upper support post and the lower support post extend in the transverse direction, the lower end of the bottom pile foundation is fixed on the ground, the upper end of the upper support post is provided with a top balance beam extending in the transverse direction, the top balance beam is provided with an installation position for installing a longitudinal horizontal stay cable, and a horizontal connecting rod is connected between two opposite ends of the adjacent top balance beam.
Further, the vertical column foundation structure further comprises two groups of stay cable mechanisms, the two groups of stay cable mechanisms are symmetrically arranged on two lateral sides of the vertical column foundation, and each stay cable mechanism comprises a pile system foundation and stay cables connected between the pile system foundation and top balance beams on the corresponding sides.
Further, the top compensating beam of the corresponding side of the stay cable is provided with a connecting lug towards one end of the stay cable, the connecting lug is hinged with a swinging rod, the upper end of the stay cable is provided with a U-shaped hanging ring, the upper end of the U-shaped hanging ring is hinged on the swinging rod, and the lower end of the U-shaped hanging ring is connected with the stay cable through a wedge-shaped fixed wire clamp.
Further, the height of the upper end of the pile system foundation is not higher than that of the upper end of the bottom pile foundation.
Further, a connecting lug is arranged at one end of the top balance beam, which faces the horizontal connecting rod, and one end of the horizontal connecting rod, which faces the top balance beam, is hinged to the connecting lug.
Further, the installation position comprises a flat penetrating ring arranged at the upper end of the top balance beam, a penetrating hole extending longitudinally is formed in the flat penetrating ring, the vertical height of the penetrating hole is used for being matched with the outer diameter of the longitudinal horizontal inhaul cable, and the transverse width of the penetrating hole is used for being larger than the outer diameter of the longitudinal horizontal inhaul cable.
Further, the two flat threading rings are symmetrically arranged on two lateral sides of the top balance beam.
Further, a balance beam diagonal bracing is arranged between the top balance beam and the upper support, and two balance beam diagonal bracing are symmetrically arranged in the transverse direction.
The utility model further provides a flexible photovoltaic bracket, which comprises two supporting columns and a longitudinal horizontal stay rope, wherein the two supporting columns are arranged at intervals in the longitudinal direction, the longitudinal horizontal stay rope penetrates through the space between the two supporting columns, a middle column structure is arranged between the two supporting columns, the upper end of the middle column structure is connected to the longitudinal horizontal stay rope, the middle column structure comprises a column foundation, the column foundation comprises at least two middle columns arranged at intervals in the transverse direction, the middle column foundation comprises a bottom pile foundation and an upper support, the lower end of the upper support is hinged with the upper end of the bottom pile foundation, the hinge axes of the lower support and the upper support extend in the transverse direction, the lower end of the bottom pile foundation is used for being fixed on the ground, the upper end of the upper support is provided with a top balance beam extending in the transverse direction, the top balance beam is provided with a mounting position for mounting the longitudinal horizontal stay rope, and a horizontal connecting rod is connected between the two opposite ends of the adjacent top balance beam.
Further, the vertical column foundation structure further comprises two groups of stay cable mechanisms, the two groups of stay cable mechanisms are symmetrically arranged on two lateral sides of the vertical column foundation, and each stay cable mechanism comprises a pile system foundation and stay cables connected between the pile system foundation and top balance beams on the corresponding sides.
Further, the top compensating beam of the corresponding side of the stay cable is provided with a connecting lug towards one end of the stay cable, the connecting lug is hinged with a swinging rod, the upper end of the stay cable is provided with a U-shaped hanging ring, the upper end of the U-shaped hanging ring is hinged on the swinging rod, and the lower end of the U-shaped hanging ring is connected with the stay cable through a wedge-shaped fixed wire clamp.
Further, the height of the upper end of the pile system foundation is not higher than that of the upper end of the bottom pile foundation.
Further, a connecting lug is arranged at one end of the top balance beam, which faces the horizontal connecting rod, and one end of the horizontal connecting rod, which faces the top balance beam, is hinged to the connecting lug.
Further, the installation position comprises a flat penetrating ring arranged at the upper end of the top balance beam, a penetrating hole extending longitudinally is formed in the flat penetrating ring, the vertical height of the penetrating hole is used for being matched with the outer diameter of the longitudinal horizontal inhaul cable, and the transverse width of the penetrating hole is used for being larger than the outer diameter of the longitudinal horizontal inhaul cable.
Further, the two flat threading rings are symmetrically arranged on two lateral sides of the top balance beam.
Further, a balance beam diagonal bracing is arranged between the top balance beam and the upper support, and two balance beam diagonal bracing are symmetrically arranged in the transverse direction.
Compared with the prior art, the utility model has the beneficial effects that:
(1) The lower end of the upper prop is hinged with the upper end of the bottom pile foundation, the hinge axes of the upper prop and the lower prop extend transversely, the whole middle prop is of a semi-rigid structure, so that when a longitudinal horizontal stay rope extending longitudinally is located on the installation position of the upper prop, the hinge can be used for releasing bending moment generated by longitudinal side force of the longitudinal horizontal stay rope, stress of the middle prop is reduced, the fracture and damage risk of the middle prop is reduced, the reduction of the section of the upright post and the material saving are facilitated, the horizontal connecting rod can be used for connecting the opposite ends of the adjacent top balance beams, and then the adjacent two rows of support systems are transversely connected, the lateral rigidity resistance is improved, the whole lateral force resistance of the flexible photovoltaic support system is improved, and the lateral instability of the structure system is avoided.
(2) A group of stay cable mechanisms are respectively arranged on two lateral sides of the upright post foundation, the upright post foundation can be transversely anchored in a bilateral symmetry stay cable mode, the overall lateral overturning resistance of the upright post structure is improved, and the stability and the constructability of the overall structure are improved.
(3) The one end that the roof beam of top was towards the horizontal connecting rod is provided with the engaging lug, and the horizontal connecting rod is articulated to be connected on the engaging lug towards the one end of roof beam of top, utilizes the horizontal connecting rod to realize the semi-rigid connection between the adjacent roof beam of top like this, but in the in-service use relative displacement, avoid the rigidity atress, improve structural stability.
(4) The installation position comprises a flat threading ring, and the flat threading ring is utilized, so that the multi-span longitudinal horizontal inhaul cable can move in the flat threading ring when the multi-span longitudinal horizontal inhaul cable is not in a straight line in the longitudinal direction or when serpentine deviation exists, the release and adaptation of the transverse force of the longitudinal horizontal inhaul cable are realized, and the adverse effect of the lateral stability of the centering column structure due to the installation deviation or the prestress lateral component force is reduced.
Drawings
Fig. 1 is a schematic structural view of a center pillar structure in embodiment 1 of the present utility model.
Fig. 2 is a partial enlarged view at a in fig. 1.
Fig. 3 is a partial enlarged view at B in fig. 1.
Fig. 4 is a partial enlarged view at C in fig. 1.
The pile system foundation comprises a pile system foundation, an adjustable cable clamp, a stay cable, a wedge-shaped fixing cable clamp, a U-shaped hanging ring, a flat penetrating ring, a top balance beam, an upper support, a horizontal connecting rod, a balance beam diagonal bracing, a bottom pile foundation, a longitudinal horizontal cable, a connecting lug, a 14, a swinging rod, a 15, a middle vertical column, a 16, a vertical column foundation and a ground.
Detailed Description
For the purpose of making the objects, technical solutions and advantages of the embodiments of the present application more clear, the technical solutions of the embodiments of the present application will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present application:
Specific example 1:
Referring to fig. 1 to 4, a flexible photovoltaic bracket includes two support columns (not shown in the drawings) arranged at intervals in a longitudinal direction and a longitudinal horizontal cable 12 penetrating between the two support columns, a middle column structure is arranged between the two support columns, an upper end of the middle column structure is connected to the longitudinal horizontal cable 12, so that an upper end of the longitudinal horizontal cable 12 arranged in a longitudinal multi-span manner can be located on the middle column structure, the middle column structure is utilized to provide support for the longitudinal horizontal cable 12, and a multi-span arrangement requirement of the longitudinal horizontal cable 12 is met.
As shown in fig. 1, the center pillar structure includes a pillar base 16, the pillar base 16 includes at least two center pillars 15 arranged at intervals in the lateral direction, in this embodiment, the pillar base 16 includes two center pillars 15 arranged at intervals in the lateral direction, but in other embodiments, the number of the center pillars 15 in the pillar base 16 may be set according to actual needs, such as 3, 4, etc. at intervals.
In this embodiment, the middle column 15 includes a bottom pile foundation 11 and an upper column 8, the lower end of the bottom pile foundation 11 extends into and is fixed on the ground S, the lower end of the upper column 8 is hinged with the upper end of the bottom pile foundation 11, and the hinge axis of the two extends along the transverse direction, a top balance beam 7 extending along the transverse direction is fixedly provided at the upper end of the upper column 8, a mounting position for mounting a longitudinal horizontal cable 12 is provided on the top balance beam 7, and a horizontal connecting rod 9 is connected between two opposite ends of adjacent top balance beams 7.
Specifically, as shown in fig. 3, the opposite ends of the adjacent top balance beams 7 are respectively provided with a connecting lug 13, that is, one end of the top balance beam 7 facing the horizontal connecting rod 9 is provided with a connecting lug 13, and one end of the horizontal connecting rod 9 facing the top balance beam 7 is hinged on the connecting lug 13. Thus, two ends of the horizontal connecting rod 9 are respectively hinged to two opposite ends of the adjacent top balance beams 7, semi-rigid connection between the adjacent top balance beams 7 is realized by utilizing the horizontal connecting rod 9, and the two top balance beams 7 can relatively displace in actual use, so that rigid stress is avoided, and structural stability is improved. In other embodiments, of course, the horizontal links 9 may be fixedly attached to the top balance beam 7 on the respective side when the actual requirements are met.
In this embodiment, as shown in fig. 1, the upper support column 8 is disposed at the midpoint of the top balance beam 7 in the lateral direction, preferably, a balance beam diagonal brace 10 is disposed between the top balance beam 7 and the upper support column 8, and the balance beam diagonal brace 10 is symmetrically disposed in the lateral direction in two, so that a triangular structure can be enclosed between the upper support column 8, the top balance beam 7 and the balance beam diagonal brace 10, thereby improving the stability of the top balance beam 7.
In the present embodiment, as shown in fig. 1 and 2, it is preferable that the mounting position for mounting the longitudinal horizontal stay 12 on the top balance beam 7 includes the flat through-rings 6, and the flat through-rings 6 are symmetrically arranged two with respect to the upper stay 8 in the lateral direction. Therefore, two longitudinal horizontal inhaul cables 12 can be symmetrically arranged on the top supporting beam, so that the top balance beam 7 is balanced in stress in the transverse direction, and the gravity center is positioned at the position of the upper supporting column 8, and stability is improved.
Specifically, as shown in fig. 2, the flat threading ring 6 is provided with a perforation extending in the longitudinal direction, the vertical height of the perforation is used for being matched with the outer diameter of the longitudinal horizontal inhaul cable 12, and the transverse width of the perforation is used for being larger than the outer diameter of the longitudinal horizontal inhaul cable 12. Thus, the through holes can be used for limiting the longitudinal horizontal stay rope 12 in the longitudinal direction, and meanwhile, the longitudinal horizontal stay rope 12 can be ensured to slide in the transverse direction in the through holes. When the longitudinal horizontal stay 12 of the multi-span arrangement is not on a straight line in the longitudinal direction or has serpentine deviation, the longitudinal horizontal stay 12 can realize the release of lateral force in the transverse direction of the longitudinal horizontal stay 12 by moving the position in the perforation, thereby adapting to the installation requirement and reducing the adverse effect of lateral stability of the center pillar structure due to the installation deviation or the prestress lateral component force.
Of course, in other embodiments, the mounting location may be designed as a fixed seat on which the longitudinal horizontal cable 12 is fixedly mounted when the actual mounting requirement is met. In other embodiments, the number of the flat threading rings 6 on the top balance beam 7 may be set according to practical requirements, such as only 1 on the top balance beam 7, or 3, 4, etc. spaced on the top balance beam 7.
In this embodiment, preferably, as shown in fig. 1, the center pillar structure further includes stay cable mechanisms, one set of stay cable mechanisms is provided on each lateral side of the pillar base 16, and the two sets of stay cable mechanisms are symmetrically arranged. The stay cable mechanism comprises a pile foundation and stay cables 3, the lower ends of the pile system foundations 1 extend into and are fixed on the ground S, and the stay cables 3 are connected between top balance beams 7 on the corresponding sides of the upright post foundations 16 and the pile system foundations 1. The stay cables 3 are used for providing flexible tension for the column foundation 16 on two lateral sides, the column foundation 16 is transversely anchored in a mode of symmetrical stay cables 3 on two sides, the integral lateral overturning resistance of the middle column structure is improved, and the stability and the constructability of the integral structure are improved.
Preferably, in the present embodiment, as shown in fig. 2, an end of the top balance beam 7 of the corresponding side of the stay cable 3 facing the stay cable 3 is provided with a link lug 13, a swing link 14 is hinge-connected to the link lug 13, and a hinge axis of the swing link 14 extends in a longitudinal direction so that the swing link 14 can swing in a transverse section. The upper end of the stay cable 3 is provided with a wedge-shaped fixed wire clamp 4, the upper end of the stay cable 3 is fixed on the wedge-shaped fixed wire clamp 4, the upper end of the wedge-shaped fixed wire clamp 4 is fixedly connected with a U-shaped hanging ring 5, the upper end of the U-shaped hanging ring 5 is opened and is hinged on a swing rod 14 through a hinge shaft, and the hinge axis is perpendicular to the hinge axis of the swing rod 14 and a connecting lug 13. Therefore, the swing rod 14 and the U-shaped hanging ring 5 can be used for improving the rotatable range of the upper end of the stay cable 3 and the practicability of the stay cable 3. Of course, in other embodiments, the upper end of the stay cable 3 may be fixedly attached directly to the corresponding side top balance beam 7.
In this embodiment, as shown in fig. 4, the lower end of the stay cable 3 is connected to the pile foundation 1, and an adjustable cable clip 2 is provided at the end, so that the length of the stay cable 3 can be adjusted by using the adjustable cable clip 2, thereby improving practicality.
Preferably, in this embodiment, the height of the upper end of the pile foundation 1 is not higher than the height of the upper end of the bottom pile foundation 11. The stay cable 3 is ensured to penetrate through the whole upper support column 8, the traction effect on the upper support column 8 is improved, and the stability is improved.
In summary, the flexible photovoltaic bracket of the utility model can ensure that the middle upright post 15 is in a semi-rigid structure as a whole by hinging the lower end of the upper upright post 8 with the upper end of the bottom pile foundation 11 and transversely extending the hinging axis of the upper upright post 8 and the lower end of the lower upright post, when the longitudinal horizontal stay rope 12 extending along the longitudinal direction is located on the installation position of the upper upright post 8, the hinging can be utilized to release the bending moment generated by the longitudinal side force of the longitudinal horizontal stay rope 12, the stress of the middle upright post 15 is reduced, the fracture damage risk of the middle upright post 15 is reduced, the reduction of upright post section and the material saving are facilitated, the horizontal connecting rod 9 can be utilized to connect the opposite ends of the adjacent top balance beams 7, and then the adjacent two rows of support systems are transversely connected, so that the lateral rigidity resistance is improved, the lateral instability resistance of the whole flexible photovoltaic bracket system is improved, and the lateral instability of the structure system is avoided.
In the embodiment of the neutral column structure of the flexible photovoltaic support, the neutral column structure of the flexible photovoltaic support is the same as that of the flexible photovoltaic support in the above embodiment, and will not be described herein.
The above is only a preferred embodiment of the present application, and is not intended to limit the present application, but various modifications and variations can be made to the present application by those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included in the protection scope of the present application.
In the description of the embodiments of the present application, it should be noted that, if the terms "upper," "lower," "horizontal," "inner," and the like indicate an azimuth or a positional relationship based on the azimuth or the positional relationship shown in the drawings, or the azimuth or the positional relationship in which the inventive product is conventionally put in use, it is merely for convenience of describing the present application and simplifying the description, and does not indicate or imply that the apparatus or element to be referred to must have a specific azimuth, be configured and operated in a specific azimuth, and thus should not be construed as limiting the present application. Furthermore, the terms "first," "second," and the like, are used merely to distinguish between descriptions and should not be construed as indicating or implying relative importance.
Furthermore, the term "horizontal" if present does not mean that the component is required to be absolutely horizontal, but may be slightly inclined. As "horizontal" merely means that its direction is more horizontal than "vertical", and does not mean that the structure must be perfectly horizontal, but may be slightly inclined.