CN222183014U - Asphalt pavement crack repair grouting equipment - Google Patents

Asphalt pavement crack repair grouting equipment Download PDF

Info

Publication number
CN222183014U
CN222183014U CN202420865514.2U CN202420865514U CN222183014U CN 222183014 U CN222183014 U CN 222183014U CN 202420865514 U CN202420865514 U CN 202420865514U CN 222183014 U CN222183014 U CN 222183014U
Authority
CN
China
Prior art keywords
fixedly arranged
asphalt pavement
pavement crack
pipe
cracks
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202420865514.2U
Other languages
Chinese (zh)
Inventor
陈志军
刘建平
马振宇
乔木
张睿杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Traffic Maintenance Group Co ltd
Original Assignee
Shanxi Traffic Maintenance Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Traffic Maintenance Group Co ltd filed Critical Shanxi Traffic Maintenance Group Co ltd
Priority to CN202420865514.2U priority Critical patent/CN222183014U/en
Application granted granted Critical
Publication of CN222183014U publication Critical patent/CN222183014U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Road Repair (AREA)

Abstract

本实用新型公开了一种沥青路面裂缝修复注浆设备,具体涉及公路施工领域,包括出料口,所述出料口上设置有清扫机构,所述清扫机构包括固定在出料口上的第一限位块,所述出料口外壁上转动设有转盘,所述出料口外壁上固定设有第二限位块,所述转盘顶部固定设有移动块,所述移动块一侧固定设有连接管,所述连接管内底部固定设有减震器。本实用新型中,当需要对裂缝进行修复时,可将该装置推动至需要进行修补的路面,使刷丝深入裂缝内,推动该装置,可使刷丝向前移动将缝中的杂物扫出,并在连接管内固定设置了减震器,通过此种设置可使刷丝回弹,能够在凹凸不平的地缝之中能够平稳地向前移动,从而更好地适应地面的变化。

The utility model discloses a grouting device for repairing cracks in asphalt pavement, which specifically relates to the field of highway construction, including a discharge port, a cleaning mechanism provided on the discharge port, the cleaning mechanism including a first limit block fixed on the discharge port, a turntable rotatably provided on the outer wall of the discharge port, a second limit block fixedly provided on the outer wall of the discharge port, a moving block fixedly provided on the top of the turntable, a connecting pipe fixedly provided on one side of the moving block, and a shock absorber fixedly provided on the bottom of the connecting pipe. In the utility model, when it is necessary to repair the cracks, the device can be pushed to the road surface that needs to be repaired, so that the brush wire can penetrate into the cracks, and the device can be pushed so that the brush wire can move forward to sweep out the debris in the cracks, and a shock absorber is fixedly provided in the connecting pipe, and the brush wire can be rebounded by this arrangement, so that it can move forward smoothly in the uneven ground cracks, so as to better adapt to the changes in the ground.

Description

Asphalt pavement crack repair grouting equipment
Technical Field
The utility model relates to the technical field of highway construction, in particular to asphalt pavement crack repairing grouting equipment.
Background
After the road bears vehicles repeatedly and repeatedly rolling for a long time, cracks appear on the road surface, the cracks not only affect the appearance of the asphalt road surface, but also weaken the structural integrity of the road surface, reduce the service performance of the road surface and shorten the service life of the road surface, the existence of the cracks can lead moisture, sundries and oxygen to penetrate into the inside of the road surface structure, and the aging, fatigue and damage processes of the road surface are accelerated, so that the cracks are one of the common quality common faults of the asphalt road surface, and higher requirements are put on the maintenance and the service of the road surface.
In the course of road maintenance, the crack sealer is a key device commonly used for repairing cracks of a road surface, and fills and seals the cracks by pouring asphalt mixture into the cracks to prevent moisture and impurities from further invading the road surface structure, so that the aging and damage of the road surface are slowed down, however, the existing crack sealer mostly lacks pretreatment functions for the cracks, such as not cleaning dust and broken stone in the cracks, which may reduce the repairing effect of the cracks.
In addition, in practice, the cleaning of the cracks is a challenge, and the cracks often exhibit irregular concave-convex shapes and tortuous structures, which can make it difficult for cleaning tools provided on the crack sealer to clean dirt in the cracks according to road conditions.
Disclosure of utility model
In order to overcome the defects in the prior art, an asphalt pavement crack repairing grouting device is provided to solve the problems in the background art.
In order to achieve the above purpose, the present utility model provides the following technical solutions:
The asphalt pavement crack repairing grouting equipment comprises a discharge port, wherein a cleaning mechanism is arranged on the discharge port;
The cleaning mechanism comprises a first limiting block fixed on a discharge hole, a rotary table is rotationally arranged on the outer wall of the discharge hole, a second limiting block is fixedly arranged on the outer wall of the discharge hole, a moving block is fixedly arranged at the top of the rotary table, a connecting pipe is fixedly arranged on one side of the moving block, a shock absorber is fixedly arranged at the inner bottom of the connecting pipe, a sliding rod is fixedly arranged at the bottom of the shock absorber, a mounting block is fixedly arranged at the bottom of the sliding rod, brush wires are fixedly arranged at the bottom of the mounting block, and the section of the brush wires is triangular;
Through the technical scheme, when the crack needs to be repaired, the device can be pushed to the pavement needing to be repaired, the brush wire penetrates into the crack, the device is pushed, the brush wire can move forwards to sweep out sundries in the crack, the shock absorber is fixedly arranged in the connecting pipe, the brush wire can rebound through the arrangement, the brush wire can move forwards steadily in the rugged ground crack, so that the change of the ground is better adapted, the shape of the ground crack is more tortuous and is not linear, the rotary table is rotationally arranged on the discharge hole, the movable block is fixedly arranged on the rotary table, the movable block can only rotate by a small extent due to the limitation of the second limiting block, the brush wire can also move forwards along the ground crack through the arrangement, and the design of the pavement repairing device takes the conditions of shock absorption and the tortuous pavement into consideration when the garbage in the ground crack is cleaned, so that the sundries in the ground crack are better cleaned, and the quality of asphalt ground crack is improved.
Further, a conveying iron pipe is fixedly arranged at the top of the discharge hole, and a booster pump is fixedly arranged at one side of the conveying iron pipe;
Through the technical scheme, the booster pump is started to enable the asphalt mixture to be sent out from the discharge port through the conveying iron pipe.
Further, a stirring box is fixedly arranged on one side of the booster pump, and a feeding port is fixedly arranged at the top of the stirring box;
Through the technical scheme, the asphalt mixture can enter the stirring box through the arrangement of the feeding port.
Further, a servo motor is fixedly arranged at the top of the stirring box, a stirring rod is fixedly arranged at the output end of the servo motor, and the stirring rod penetrates through the stirring box and extends into the stirring box;
Through above-mentioned technical scheme, start servo motor, drive the puddler and rotate, can prevent through this kind of setting that pitch from sinking the end caking.
Further, a bottom plate is fixedly arranged at the bottom of the stirring box, and two handles are fixedly arranged at the top of the bottom plate;
Through above-mentioned technical scheme, set up the bottom plate so that place the agitator tank, set up the handle and can promote the device.
Further, support columns are fixedly arranged at four corners of the bottom plate, and universal wheels are fixedly arranged at the bottoms of the four support columns;
Through the technical scheme, the universal wheels are arranged on the supporting columns, so that the device can be conveniently moved.
Further, a blower is fixedly arranged at the top of the bottom plate, and a blast pipe is fixedly arranged at an air outlet of the blower;
through the technical scheme, the blower is started to enable air to be blown out by the air outlet pipe through the conveying of the air supply pipe.
Further, an air outlet pipe is fixedly arranged at the bottom of the air supply pipe, a connecting rod is fixedly arranged on the air outlet pipe, and the connecting rod is fixedly connected with the connecting pipe;
Through above-mentioned technical scheme, can carry out fixed connection with connecting pipe and play tuber pipe through the connecting rod, make play tuber pipe and brush silk at same angle removal.
The utility model has the technical effects and advantages that:
1. The asphalt pavement crack repairing grouting equipment provided by the utility model can push the device to the pavement to be repaired when the crack is required to be repaired, so that the brush wire penetrates into the crack, the device is pushed to enable the brush wire to move forwards to sweep sundries in the crack, and a shock absorber is fixedly arranged in the connecting pipe, by the arrangement, the brush wire can rebound, the brush wire can move forwards smoothly in the uneven ground crack, thereby being better suitable for the change of the ground, the shape of the ground crack is more tortuous and not straight, therefore, the rotary table is rotationally arranged on the discharge hole, the movable block is fixedly arranged on the rotary table, the movable block can only rotate in a small amplitude under the limit of the second limiting block, through the arrangement, the brush wire can also move along the ground seam on a tortuous road surface, the road surface crack repairing device is designed by taking the conditions of shock absorption and a zigzag road surface into consideration when the garbage in the ground cracks are cleaned, so that the garbage in the ground cracks is cleaned better, and the quality of asphalt ground crack repairing is improved.
2. According to the asphalt pavement crack repairing grouting equipment provided by the utility model, after the air blower is started, air passes through the air supply pipe and the air outlet pipe and is blown out by the air outlet pipe, dust and sundries in the ground cracks are blown out, and then the ground cracks are cleaned, so that the cleaning effect can be effectively improved.
Drawings
FIG. 1 is an isometric view of an asphalt pavement crack repair grouting device according to the present utility model;
FIG. 2 is an isometric view of a cleaning mechanism of a grouting device for repairing asphalt pavement cracks;
FIG. 3 is a top view of an asphalt pavement crack repair grouting device according to the present utility model;
FIG. 4 is a front cross-sectional view of an asphalt pavement crack repair grouting device according to the present utility model;
Fig. 5 is an enlarged view at a in fig. 4.
The device comprises a discharge port 1, a first limiting block 2, a rotary table 3, a second limiting block 4, a moving block 5, a connecting pipe 6, a connecting pipe 7, a shock absorber 8, a connecting rod 9, a sliding rod 10, a mounting block 11, a wire brushing 12, a conveying iron pipe 13, a booster pump 14, a stirring box 15, a feed inlet 16, a servo motor 17, a stirring rod 18, a bottom plate 19, a handle 20, a supporting column 21, universal wheels 22, a blower 23, an air supply pipe 24 and an air outlet pipe.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
The asphalt pavement crack repairing grouting equipment shown in the attached figures 1-5 comprises a discharge port 1, wherein a cleaning mechanism is arranged on the discharge port 1;
The cleaning mechanism comprises a first limiting block 2 fixed on a discharge hole 1, a rotary table 3 is rotationally arranged on the outer wall of the discharge hole 1, a second limiting block 4 is fixedly arranged on the outer wall of the discharge hole 1, a movable block 5 is fixedly arranged at the top of the rotary table 3, a connecting pipe 6 is fixedly arranged on one side of the movable block 5, a shock absorber 7 is fixedly arranged at the bottom in the connecting pipe 6, a sliding rod 9 is fixedly arranged at the bottom of the shock absorber 7, a mounting block 10 is fixedly arranged at the bottom of the sliding rod 9, a brush wire 11 is fixedly arranged at the bottom of the mounting block 10, the section of the brush wire 11 is triangular, when a crack needs to be repaired, the device can be pushed to a pavement needing to be repaired, the brush wire 11 is enabled to penetrate into the crack, the device is pushed, sundries in the crack can be cleaned by the forward movement of the brush wire 11, and the shock absorber 7 is fixedly arranged in the connecting pipe 6, through this kind of setting can make brush silk 11 kick-back, can steadily move forward in the rugged ground seam, thereby adapt to the change on ground better, and the shape of ground seam is comparatively tortuous, and not sharp, consequently, rotating on discharge gate 1 has set up carousel 3, fixed movable block 5 that has set up on carousel 3, movable block 5 passes through the restriction of second stopper 4, can only carry out the rotation of a small margin, through this kind of setting, can make brush silk 11 also can follow ground seam forward at the road surface of bending, clean debris in the ground seam, the design of this kind of road surface crack prosthetic devices has considered when cleaning rubbish in the ground seam, shock attenuation and the road surface condition of bending are designed, clean debris in the ground seam better and have improved the quality that asphalt ground seam was repaired.
In some embodiments, according to the embodiment shown in fig. 1-5, a conveying iron pipe 12 is fixedly arranged at the top of a discharge hole 1, a booster pump 13 is fixedly arranged at one side of the conveying iron pipe 12, the booster pump 13 is started to enable asphalt mixture to be discharged from the discharge hole 1 through the conveying iron pipe 12, a stirring tank 14 is fixedly arranged at one side of the booster pump 13, a feed inlet 15 is fixedly arranged at the top of the stirring tank 14, the feeding inlet 15 is arranged to enable the asphalt mixture to enter the stirring tank 14, a servo motor 16 is fixedly arranged at the top of the stirring tank 14, a stirring rod 17 is fixedly arranged at the output end of the servo motor 16, the stirring rod 17 penetrates through the stirring tank 14 and extends inside, the servo motor 16 is started to drive the stirring rod 17 to rotate, asphalt sediment caking can be prevented through the arrangement, a bottom plate 18 is fixedly arranged at the bottom of the stirring tank 14, two handles 19 are fixedly arranged at the top of the bottom plate 18, setting up bottom plate 18 so that place agitator tank 14, setting up handle 19 and can promoting the device, bottom plate 18 bottom four corners department all is fixed and is equipped with support column 20, all fixed the being equipped with of four support column 20 bottoms universal wheel 21, set up the removal that universal wheel 21 can make things convenient for the device on support column 20, bottom plate 18 top is fixed and is equipped with air-blower 22, air-blower 22 air outlet department is fixed and is equipped with blast pipe 23 after opening air-blower 22, the air can be through blast pipe 23 and play tuber pipe 24, finally be blown out by play tuber pipe 24, the fixed tuber pipe 24 that is equipped with in blast pipe 23 bottom, the fixed connecting rod 8 that is equipped with on play tuber pipe 24, connecting rod 8 and connecting pipe 6 fixed connection can carry out fixed connection with play tuber pipe 24 through connecting rod 8, make play tuber pipe 24 and brush silk 11 at same angle.
When the asphalt mixture repairing device is used, asphalt mixture is poured into the stirring box 14 through the material inlet 15, the servo motor 16 can be started to drive the stirring rod 17 to rotate, asphalt bottom agglomeration can be prevented through the arrangement, when a crack needs to be repaired, the device can be pushed to a pavement needing to be repaired, the brush wire 11 penetrates into the crack, the blower 22 is started to enable air to be blown out by the air outlet pipe 24 through the conveying of the air supply pipe 23, dust and sundries in a ground crack are blown out, the device is pushed, the brush wire 11 can be enabled to move forwards to sweep sundries in the crack, the shock absorber 7 is fixedly arranged in the connecting pipe 6, the brush wire 11 can rebound through the arrangement, the smooth forward movement can be achieved among the rugged ground cracks, the asphalt mixture can be pushed more smoothly, the shape of the ground crack is more tortuous, and is not straight, therefore, the turntable 3 is rotatably arranged on the material outlet 1, the movable block 5 is fixedly arranged on the turntable 3, the movable block 5 can be limited by the second limiting block 4, the rotation of the second limiting block 4 is arranged, the sundries in the ground crack can be cleaned, and finally the sundries can be blown out of the ground through the pavement 13, and the ground crack can be repaired, and the asphalt mixture can be smoothly cleaned through the pavement through the arrangement of the limit of the limiting block.

Claims (8)

1. The asphalt pavement crack repairing grouting equipment comprises a discharge port (1) and is characterized in that a cleaning mechanism is arranged on the discharge port (1);
The cleaning mechanism comprises a first limiting block (2) fixed on a discharge hole (1), a rotary table (3) is rotationally arranged on the outer wall of the discharge hole (1), a second limiting block (4) is fixedly arranged on the outer wall of the discharge hole (1), a moving block (5) is fixedly arranged at the top of the rotary table (3), a connecting pipe (6) is fixedly arranged on one side of the moving block (5), a shock absorber (7) is fixedly arranged in the connecting pipe (6), a sliding rod (9) is fixedly arranged at the bottom of the shock absorber (7), a mounting block (10) is fixedly arranged at the bottom of the sliding rod (9), a brush wire (11) is fixedly arranged at the bottom of the mounting block (10), and the section of the brush wire (11) is triangular.
2. The asphalt pavement crack repairing grouting equipment according to claim 1 is characterized in that a conveying iron pipe (12) is fixedly arranged at the top of the discharge hole (1), and a booster pump (13) is fixedly arranged on one side of the conveying iron pipe (12).
3. The asphalt pavement crack repairing grouting equipment according to claim 2, wherein a stirring box (14) is fixedly arranged on one side of the booster pump (13), and a feeding port (15) is fixedly arranged at the top of the stirring box (14).
4. The asphalt pavement crack repairing grouting equipment according to claim 3, wherein a servo motor (16) is fixedly arranged at the top of the stirring box (14), a stirring rod (17) is fixedly arranged at the output end of the servo motor (16), and the stirring rod (17) penetrates through the stirring box (14) and extends into the stirring box.
5. The asphalt pavement crack repairing grouting equipment according to claim 3, wherein a bottom plate (18) is fixedly arranged at the bottom of the stirring box (14), and two handles (19) are fixedly arranged at the top of the bottom plate (18).
6. The asphalt pavement crack repairing grouting device according to claim 5, wherein supporting columns (20) are fixedly arranged at four corners of the bottom plate (18), and universal wheels (21) are fixedly arranged at the bottoms of the four supporting columns (20).
7. The asphalt pavement crack repairing grouting equipment according to claim 5, wherein a blower (22) is fixedly arranged at the top of the bottom plate (18), and an air supply pipe (23) is fixedly arranged at an air outlet of the blower (22).
8. The asphalt pavement crack repairing grouting equipment according to claim 7, wherein an air outlet pipe (24) is fixedly arranged at the bottom of the air supply pipe (23), a connecting rod (8) is fixedly arranged on the air outlet pipe (24), and the connecting rod (8) is fixedly connected with the connecting pipe (6).
CN202420865514.2U 2024-04-24 2024-04-24 Asphalt pavement crack repair grouting equipment Active CN222183014U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202420865514.2U CN222183014U (en) 2024-04-24 2024-04-24 Asphalt pavement crack repair grouting equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202420865514.2U CN222183014U (en) 2024-04-24 2024-04-24 Asphalt pavement crack repair grouting equipment

Publications (1)

Publication Number Publication Date
CN222183014U true CN222183014U (en) 2024-12-17

Family

ID=93837993

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202420865514.2U Active CN222183014U (en) 2024-04-24 2024-04-24 Asphalt pavement crack repair grouting equipment

Country Status (1)

Country Link
CN (1) CN222183014U (en)

Similar Documents

Publication Publication Date Title
CN207159724U (en) A kind of railroad tie detection repairing robot
CN211395297U (en) Crack filling type reinforcing device for highway bridge
CN114941277A (en) Crack repairing device for bridge construction and using method
CN215179079U (en) Expressway bridge bituminous pavement crack detection device
CN222183014U (en) Asphalt pavement crack repair grouting equipment
CN212983547U (en) Highway construction curing means
CN112962410A (en) Road surface crack patching device is used in traffic engineering construction
CN218756913U (en) Bridge road crack reinforcing apparatus
CN217203546U (en) Expressway bridge bituminous pavement crack detects patching device
CN217052976U (en) Crack repairing device for highway maintenance
CN118007505A (en) Asphalt joint filling equipment for pavement construction
CN116516787A (en) Pavement repairing device for municipal engineering
CN221398607U (en) A local road repair equipment for roads and bridges
CN111424519B (en) Unmanned car of line is mended in engineering road marking washing
CN221798100U (en) Pavement crack repair equipment
CN218540327U (en) A mobile crack rapid maintenance machine for road bridges
CN221918904U (en) A road crack treatment device
CN221740877U (en) Highway engineering road surface patching device
CN219653466U (en) Permeable concrete construction joint plugging device
CN221663368U (en) A damaged road cleaning device
CN221371800U (en) Asphalt pavement joint treatment structure
CN222435031U (en) A road bridge crack repair device
CN221741086U (en) A cleaning device before asphalt pavement regeneration construction
CN221972047U (en) A road crack disease repair device
CN112323597A (en) Road marking device for repairing cracks

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant