Disclosure of utility model
The utility model aims to solve the technical problems that the cost is increased and glue leakage is easy to occur in the using process due to the fact that the operation process of the existing glue pouring jig is complicated.
The application provides a glue filling jig, which adopts the following technical scheme:
A glue filling jig, comprising: a first component and a second component;
The first component is provided with a first connecting piece, the second component is provided with a second connecting piece, and the first connecting piece is in buckling connection with the second connecting piece;
The first component and the second component are combined to form a containing groove, the containing groove is used for containing the product to be filled with glue, and the containing groove is used for positioning and sealing the product to be filled with glue.
Further, the second connecting piece comprises a connecting clamp and a pull ring, and the connecting clamp is connected with the side face of the second component and is connected with the pull ring.
Further, the first connecting piece comprises a first hook matched with the pull ring, and the first hook is arranged on the side face of the first component; the pull ring can be buckled with the first hook and is used for realizing the connection of the first component and the second component in the horizontal direction.
Further, a sealing column is further arranged on the first component, and is attached to the shell of the product to be filled, so that the product to be filled is sealed, and a first positioning groove for positioning the product to be filled is formed with the first component.
Further, a second positioning groove is formed in the second assembly, and the first positioning groove is matched with the second positioning groove to position the product to be filled with glue.
Further, a guide post is further arranged on the first component, and the guide post is located at the joint of the first component and the second component.
Further, the second component is provided with a guide hole matched with the guide post, and the guide post can be inserted into the guide hole.
Further, a first positioning piece is further arranged on the first component, the first positioning piece is located at one side, away from the first positioning groove, of the first component, and the first positioning piece comprises a positioning hook.
Further, a second positioning piece is arranged on the second component, the second positioning piece comprises a positioning clamp and a positioning ring, and the positioning clamp is positioned at one side of the second component far away from the first component and is connected with the positioning ring;
The positioning ring can be buckled with the positioning hook and is used for realizing the positioning of the first component and the second component in the vertical direction.
Further, the product to be filled comprises a shell with a containing cavity, wherein one side of the shell is provided with a glue inlet, and glue is filled into the jig to be filled through the glue inlet;
An opening is formed in one side of the second component, and the opening is communicated with the glue inlet.
The utility model has the beneficial effects that: according to the utility model, by adopting the design of the first component and the second component, before glue filling, the product to be filled is firstly placed on the first component, and then the second component is pushed towards the direction of the first component, and the first component is connected with the second component, so that the product to be filled is placed in the accommodating groove formed by the first component and the second component, the quick positioning and sealing of the product to be filled are realized, the glue filling jig is easy and convenient to assemble, labor energy and cost can be saved, the glue leakage condition of the product is improved, the problems encountered in the current enterprise production are well solved, and the glue filling jig has practical value.
Detailed Description
The application discloses a glue filling jig, which is used for making the purposes, the technical scheme and the effects of the application clearer and more definite, and is further described in detail below by referring to the accompanying drawings and the embodiments. It should be understood that the specific embodiments described herein are for purposes of illustration only and are not intended to limit the scope of the application.
As shown in fig. 1, an embodiment of the present application discloses a glue filling fixture for positioning and sealing a product 4 to be filled, which includes: the first assembly 1 is provided with a first connecting piece 11, the second assembly 2 is provided with a second connecting piece 21, and the first connecting piece 11 and the second connecting piece 21 are connected in a buckling way; the first component 1 and the second component 2 are connected to form a containing groove 3 for containing the product 4 to be filled, and the product 4 to be filled is positioned and sealed.
The product 4 to be filled includes a housing 41 having a receiving chamber, a glue inlet 42 is disposed on one side of the housing 41, and glue is filled into the product 4 to be filled through the glue inlet 42. The second component 2 has an opening 23 on one side, the opening 23 being in communication with the glue inlet 42.
When the glue filling device is specifically implemented, the product 4 to be filled is firstly placed on the first component 1, then the second component 2 is pushed from one side far away from the first component 1 to the direction of the first component 1, so that the product 4 to be filled is completely positioned in the accommodating groove 3 formed by the first component 1 and the second component 2, then the first connecting piece 11 and the second connecting piece 21 are buckled, the connection of the first component 1 and the second component 2 is realized, the positioning and sealing of the product 4 to be filled are realized, finally, the product 4 to be filled is filled through the opening 23, and the whole process is convenient and fast to assemble without using additional devices (such as screws), has good sealing performance, reduces the glue leakage condition while improving the production efficiency, and has practical value.
It should be noted that, in the present application, the housing 41 of the product 4 to be filled with glue and the circuit board are integrated, and the circuit board is placed in the accommodating cavity formed by the housing 41, so that the housing 41 is not completely sealed for improving the production efficiency. A glue inlet 42 is arranged at one side of the shell 41, and glue is filled into the circuit board through the glue inlet 42, and of course, an air hole 43 communicated with the accommodating cavity is arranged on the shell 41 so as to balance the internal and external air pressure of the product; in addition, the circuit board on one side of the shell 41 far away from the glue inlet 42 is exposed, so that the glue leakage phenomenon is very easy to occur when the product is erected for glue filling, and the product 4 to be glue-filled in the application can be a laser power supply, a water-cooled product and the like.
In some embodiments, as shown in fig. 2, the second connection member 21 includes a connection clip 211 and a pull ring 212, wherein the connection clip 211 is fixedly disposed at a side of the second component 2, and the pull ring 212 is connected with the connection clip 211. The first connecting piece 11 comprises a first hook 111 matched with the pull ring 212, the first hook 111 is fixedly arranged on the side surface of the first component 1, and the pull ring 212 and the first hook 111 can be buckled. Specifically, the first and second connection members 11 and 21 are respectively provided in two groups to enhance connection stability.
In practical application, as shown in fig. 5 to 7, after the product 4 to be filled is placed on the first component 1, the second component 2 is gradually closed to the first component 1, the pull ring 212 and the first hook 111 are mutually buckled, so that the connection of the first component 1 and the second component 2 in the horizontal direction is realized, the positioning and sealing of the product 4 to be filled are realized, the whole process is rapid and convenient, the operation is simple and easy, the work of production personnel is greatly facilitated, and in addition, the assembly is simpler, the time and the labor are saved, and the cost is favorably controlled.
In some embodiments, as shown in fig. 2 and 3, the first component 1 is provided with a sealing post 13, the sealing post 13 is attached to the housing 41 of the product 4 to be filled, so that the housing 41 of the product 4 to be filled is sealed, a first positioning groove 14 is formed with the first component 1, and the second component 2 is provided with a second positioning groove 24. Because when the glue is filled, the product 4 to be filled needs to be erected, the first positioning groove 14 and the second positioning groove 24 can realize the positioning of the product 4 to be filled, so that the product 4 to be filled is firmly arranged in the accommodating groove 3, the stability in the glue filling process is ensured, and due to the arrangement of the sealing column 13, the exposed part of the shell 41 of the product 4 to be filled is sealed, the tightness of the product 4 to be filled is ensured, and therefore, the glue leakage condition can not occur.
In some embodiments, the first component 1 is further provided with a guide post 15, correspondingly, the second component 2 is provided with a guide hole 25 matched with the guide post 15, and in the process that the second component 2 advances to the first component 1, the guide post 15 also gradually penetrates into the guide hole 25, so that the connection stability of the first component 1 and the second component 2 is improved, and the connection accuracy of the first component and the second component is also ensured.
In some embodiments, the first component 1 includes a bottom plate 16, a first side plate 17 and a positioning block 18, the first side plate 17 is located on the upper surface of the bottom plate 16 and is located at two ends of the bottom plate 16, the bottom plate 16 is rectangular, the positioning block 18 is located at one end of the first side plate 17 and is located at two corners of the bottom plate 16, the guide post 15 is disposed at one end of the side plate away from the positioning block 18, the positioning block 18 has an arc-shaped side surface, the sealing post 13 is located at the arc-shaped side surface and forms a first positioning groove 14 with the positioning block 18 in a horizontal direction, the first positioning piece 12 is fixedly disposed at one end of the bottom plate 16 away from the positioning block 18, the upper surface of the bottom plate 16 is further provided with a groove 19, and the length of the bottom plate 16 is longer than the length of the casing 41 of the product to be filled 4. The first positioning member 12 includes a positioning hook 121.
As shown in fig. 4, the second component 2 includes a second side plate 26 and a U-shaped block 27, the second side plate 26 is located at two ends of the U-shaped block 27, the height of the U-shaped block 27 is higher than that of the second side plate 26, specifically, the lower surface of the U-shaped block 27 protrudes downward from the lower surface of the second side plate 26 (the height of the U-shaped block 27 protruding from the second side plate 26 is the height of the bottom plate 16 with a groove 19), two ends of the U-shaped block 27 are respectively provided with a second positioning groove 24, the outer side surface of the second side plate 26 is provided with a second positioning member 22, the second positioning member 22 includes a positioning clip 221 and a positioning ring 222, and the positioning ring 222 and the positioning hook 121 can be mutually buckled to realize positioning of the first component 1 and the second component 2 in the vertical direction. In addition, the U-shaped block 27 is provided with an opening 23, and the design of the U-shaped block 27 is matched with the glue inlet 42 of the shell 41 of the product to be filled, so that the glue filling equipment can perform glue filling operation on the product 4 to be filled through the glue inlet 42.
In practical implementation, as shown in fig. 5 to 7, the product 4 to be filled is placed on the bottom plate 16 of the first component 1, when the second component 2 approaches the first component 1 gradually, the U-shaped block 27 is matched with the groove 19 of the bottom plate 16 gradually, the guide post 15 is inserted into the guide hole 25 gradually, when the first component 1 and the second component 2 are combined, the pull ring 212 and the hook are buckled with each other, and the positioning ring 222 and the positioning hook are buckled with each other, so that the connection between the first component 1 and the second component 2 is realized, and the positioning of the product 4 to be filled is realized. A double connection (first and second connection members 11 and 21, first and second positioning members 12 and 22) is used to secure the connection stability between the first and second components 1 and 2. The design of the U-shaped block 27 ensures that the product can be filled with glue through the glue inlet 42 of the shell 41, and ensures that the product is not easy to leak glue (from the glue inlet 42).
Compared with the prior art, the utility model has the following advantages:
1. According to the application, through adopting the design of the first component 1 and the second component 2, the first component 1 and the second component 2 are detachably connected, and the product 4 to be filled is placed in the accommodating groove 3 formed by the first component 1 and the second component 2, so that the product 4 to be filled is rapidly positioned and sealed, and thus no additional devices (such as screws) are needed for locking, the whole assembly process is simple and convenient, labor energy and cost are saved, the glue filling jig has good positioning and sealing effects on the product 4 to be filled, the production efficiency is improved, the glue leakage condition of the product is improved, and the glue filling jig has high practical value.
It is to be understood that the invention is not limited in its application to the examples described above, but is capable of modification and variation in light of the above teachings by those skilled in the art, and that all such modifications and variations are intended to be included within the scope of the appended claims.