CN221991101U - Clara pipe installation erects device - Google Patents

Clara pipe installation erects device Download PDF

Info

Publication number
CN221991101U
CN221991101U CN202420339014.5U CN202420339014U CN221991101U CN 221991101 U CN221991101 U CN 221991101U CN 202420339014 U CN202420339014 U CN 202420339014U CN 221991101 U CN221991101 U CN 221991101U
Authority
CN
China
Prior art keywords
rotating
rod
connecting rod
pipe
clara
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202420339014.5U
Other languages
Chinese (zh)
Inventor
赵文涛
叶建丽
王浩崇
孙伟凡
薛炯
苏文宇
王红光
高杨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Tongtao Pipe Group Co ltd
Original Assignee
Hebei Tongtao Pipe Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Tongtao Pipe Group Co ltd filed Critical Hebei Tongtao Pipe Group Co ltd
Priority to CN202420339014.5U priority Critical patent/CN221991101U/en
Application granted granted Critical
Publication of CN221991101U publication Critical patent/CN221991101U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to the technical field of auxiliary devices for pipeline installation, in particular to a device for installing and erecting a Clar pipe, which comprises a bottom plate and a supporting frame, wherein auxiliary frames are arranged on two sides between the bottom plate and the supporting frame, clamping mechanisms are arranged on the auxiliary frames, each clamping mechanism comprises two rotating arms arranged on the auxiliary frames, the rotating arms and the auxiliary frames are arranged in a rotating way through a first rotating rod, the top ends of the two rotating arms are penetrated with a first connecting rod, the first connecting rod is provided with a clamping block, and the middle parts of the two rotating arms are provided with connecting blocks, and the device has the advantages that: through the arrangement of the clamping mechanism, the driving rod is rotated to vertically act on the connecting block, the rotating arm starts to draw close to the inner side, clamping of the Kela pipe is achieved, and then pipelines with different sizes can be clamped and fixed, so that the clamping mechanism is more convenient to use; through the cooperation of cylinder and flexible leg, can establish different height with the clara pipe support, the setting of pointed cone end further increases the stability of this device, makes the position of clara pipe more stable.

Description

Clara pipe installation erects device
Technical Field
The utility model relates to the technical field of auxiliary devices for pipeline installation, in particular to a device for installing and erecting a Clara pipe.
Background
The clara pipe is made of HDPE as a main raw material by adopting a hot winding poplar process, and a PP single-wall corrugated pipe as a supporting structure, and is made into a special structure wall pipe with higher external pressure resistance, and the structure of the clara pipe is shown in figure 3. The outer side wall of the main pipe in the clara pipe is wound with a PP single-wall corrugated pipe, and the PP single-wall corrugated pipe is welded with the outer side wall of the main pipe. With the development of large-scale infrastructure construction, sponge city construction, city drainage and sewage disposal system construction and the like at home and abroad, the demand for pipelines is increasing.
When the Kela pipe is installed, a groove channel for installing the Kela pipe is firstly excavated on the ground, and corresponding pipelines are stacked in the groove channel. The existing pipeline arrangement generally utilizes a crane to place the corresponding pipeline in the channel dug in advance, but the position of the pipeline after being placed is difficult to determine, the offset is large, manual adjustment is needed, the pipeline is in butt joint with the corresponding pipeline, the workload is large, and popularization and use are not facilitated.
Disclosure of utility model
The utility model aims to solve the technical problems that floating sundries accumulated on one side of a blocking net are inconvenient to clean, and meanwhile, the blocking net holes are easy to block after long-time use, so that the smoothness is reduced.
In order to solve the technical problems, the technical scheme provided by the utility model is as follows: the utility model provides a carat pipe installation erects device, includes bottom plate and support frame, both sides all are equipped with the auxiliary frame between bottom plate and the support frame, the auxiliary frame is a pair of setting, be equipped with fixture on the auxiliary frame, fixture is including setting up two rocking arms on the auxiliary frame, rocking arm and auxiliary frame pass through the bull stick one and rotate the setting, two the rocking arm top runs through and is equipped with connecting rod one, be equipped with the grip block on the connecting rod one, two the rocking arm middle part is equipped with the connecting block, the connecting block both sides are equipped with the bull stick three, the bottom of connecting block is equipped with the actuating lever, be equipped with connecting rod two on the auxiliary frame, the actuating lever runs through connecting rod two, and two threaded connection of connecting rod, the bottom of bottom plate is equipped with the expansion leg, the bottom of expansion leg is equipped with the removal wheel.
As an improvement, a cylinder is arranged in the middle of the bottom end of the bottom plate, and a pointed cone end is arranged at the bottom end of the cylinder.
As an improvement, the surface of the supporting frame is provided with a mark.
As an improvement, a plurality of round holes are formed in the auxiliary frame, and the round holes are matched with the first rotating rod, the second rotating rod and the third rotating rod.
As an improvement, the bottom end of the driving rod is provided with a handle.
As an improvement, the swivel arm has a V-shaped structure, and the lower part is longer than the upper part.
As an improvement, a buckle is arranged on the auxiliary frame, and the second connecting rod is arranged in the buckle.
Compared with the prior art, the utility model has the advantages that:
1. Through the arrangement of the clamping mechanism, the driving rod is rotated to vertically act on the connecting block, the rotating arm starts to draw close to the inner side, clamping of the Kela pipe is achieved, and then pipelines with different sizes can be clamped and fixed, so that the clamping mechanism is more convenient to use;
2. Through the cooperation of cylinder and flexible leg, can establish different height with the clara pipe support, the setting of pointed cone end further increases the stability of this device, makes the position of clara pipe more stable.
Drawings
FIG. 1 is a schematic view of a construction of a Kraft pipe installation and erection device of the present utility model.
Fig. 2 is a schematic structural view of the clamping mechanism of the present utility model.
Fig. 3 is an exploded view of the clamping mechanism of the present utility model.
Fig. 4 is a schematic structural view of the auxiliary frame of the present utility model.
As shown in the figure: 1. a bottom plate; 2. an auxiliary frame; 3. a support frame; 4. a rotating arm; 5. a clamping block; 6. a second connecting rod; 7. a driving rod; 8. a handle; 9. a cylinder; 10. a pointed cone end; 11. a telescoping leg; 12. a moving wheel; 13. a connecting block; 201. a buckle; 202. a first rotating rod; 301. marking; 401. a round hole; 402. a second rotating rod; 501. a first connecting rod; 1301. a third rotating rod;
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
The problems of the prior art are completely explained in the technical background, the problems of the prior art are not superior and general, the problems to be solved by the utility model are specifically described in the following summary and the specific embodiments, the technical problems to be solved by the technical scheme are clear, and the technical scheme of the utility model has beneficial effects compared with the objective prior art.
Referring to fig. 1-4, an embodiment of the present utility model is provided:
The utility model provides a carat pipe installation erects device, includes bottom plate 1 and support frame 3, the bottom of bottom plate 1 is equipped with flexible leg 11, the bottom of flexible leg 11 is equipped with and removes round 12, is convenient for the removal of this device; the middle part of the bottom end of the bottom plate 1 is provided with a cylinder 9, and the bottom end of the cylinder 9 is provided with a pointed cone end 10 for the stability of the device; the surface of the supporting frame 3 is provided with a mark 301, which is beneficial to observing the placement position of the Kela tube;
Auxiliary frames 2 are arranged on two sides between the bottom plate 1 and the supporting frame 3, the auxiliary frames 2 are arranged in a pair, a clamping mechanism is arranged on the auxiliary frames 2 and comprises two rotating arms 4 arranged on the auxiliary frames 2, the rotating arms 4 and the auxiliary frames 2 are rotatably arranged through a first rotating rod 202, a first connecting rod 501 is arranged at the top ends of the two rotating arms 4 in a penetrating mode, clamping blocks 5 are arranged on the first connecting rod 501, a connecting block 13 is arranged in the middle of the two rotating arms 4, a third rotating rod 1301 is arranged on two sides of the connecting block 13, a driving rod 7 is arranged at the bottom end of the connecting block 13, and a handle 8 is arranged at the bottom end of the driving rod 7, so that rotation of the driving rod 7 is facilitated;
The auxiliary frame 2 is provided with a connecting rod 501, the driving pipe penetrates through the second connecting rod 6 and is in threaded connection with the second connecting rod 6, the auxiliary frame 2 is provided with a buckle 201, the second connecting rod 6 is arranged in the buckle 201, the buckle 201 is beneficial to mounting and fixing the second connecting rod 6, and meanwhile, the second connecting rod 6 is beneficial to replacement;
The auxiliary frame 2 is provided with a plurality of round holes 401, the round holes 401 are matched with the first rotating rod 202, the second rotating rod 402 and the third rotating rod 1301, and when the driving rod 7 moves in the second connecting rod 6, the rotating arm 4 and the auxiliary frame 2 can be in rotary connection;
The rotary arm 4 is of a V-shaped structure, the lower part of the rotary arm is longer than the upper part of the rotary arm, and the height distance between the clamping block and the clara pipe is increased, so that the rotary arm is suitable for clamping clara pipes with different diameters;
In the practical use process of the structure, an operator firstly selects a proper erection device according to the installation length of the clara pipe, lifts the clara pipe onto the support frame 3, clamps and fixes the clara pipe through operating the clamping mechanism, when the position of the clara pipe is improper, the device is moved through the moving wheel 12, after the clara pipe is moved to a designated position, the cylinder 9 is started, the cylinder 9 drives the pointed cone end 10 to vertically move downwards until the pointed cone end 10 is inserted into soil, the operation of the cylinder 9 is stopped, and the stability of the device is improved;
In combination with the attached drawings of the specification, the clamping mechanism is realized in a mode that an operator holds the handle 8 by hand, rotates the handle 8, the handle 8 drives the driving rod 7 to be in threaded connection in the connecting rod 6, the driving rod 7 vertically moves upwards, the connecting block 13 vertically acts upwards, the rotating arm 4 rotates anticlockwise by taking the second rotating rod 402 as a center point, the clamping block 5 approaches inwards until being tangent with the outer wall of the clara tube, the clamping effect on the clara tube is realized, and the clamping mechanism of the device can adapt to clara tubes with different diameters and improves the application range of the device;
The telescopic leg 11 is arranged in any telescopic structure in the prior art, can be an electric telescopic rod structure or a manual telescopic structure, and is implemented and processed by referring to the prior art structure by a person skilled in the art without any creation and effort;
Other embodiments of the application will be apparent to those skilled in the art from consideration of the specification and practice of the application disclosed herein. This application is intended to cover any variations, uses, or adaptations of the application following, in general, the principles of the application and including such departures from the present disclosure as come within known or customary practice within the art to which the application pertains. It is intended that the specification and examples be considered as exemplary only, with a true scope of the application being indicated by the following claims.
It is to be understood that the application is not limited to the precise arrangements and instrumentalities shown in the drawings, which have been described above, and that various modifications and changes may be effected without departing from the scope thereof. The embodiments of the present application described above do not limit the scope of the present application.

Claims (7)

1.一种克拉管安装架设装置,包括底板(1)和支撑架(3),所述底板(1)和支撑架(3)之间两侧均设有辅助架(2),所述辅助架(2)为一对设置,所述辅助架(2)上设有夹持机构,其特征在于:所述夹持机构包括设置在辅助架(2)上的两个转臂(4),所述转臂(4)与辅助架(2)通过转杆一(202)转动设置,两个所述转臂(4)顶端贯穿设有连接杆一(501),所述连接杆一(501)上设有夹持块(5),两个所述转臂(4)中部设有连接块(13),所述连接块(13)两侧设有转杆三(1301),所述连接块(13)的底端设有驱动杆(7),所述辅助架(2)上设有连接杆二(6),所述驱动杆贯穿连接杆二(6),且与连接杆二(6)螺纹连接,所述底板(1)的底端设有伸缩腿(11),所述伸缩腿(11)的底端设有移动轮(12)。1. A carat pipe installation and erection device, comprising a base plate (1) and a support frame (3), wherein auxiliary frames (2) are arranged on both sides between the base plate (1) and the support frame (3), wherein the auxiliary frames (2) are arranged in a pair, and wherein a clamping mechanism is arranged on the auxiliary frames (2), wherein the clamping mechanism comprises two rotating arms (4) arranged on the auxiliary frames (2), wherein the rotating arms (4) and the auxiliary frames (2) are rotatably arranged via a rotating rod (202), wherein a connecting rod (501) is penetrated through the top ends of the two rotating arms (4), and wherein the connecting rod (501) is provided on the top ends of the two rotating arms (4). The connecting rod 1 (501) is provided with a clamping block (5), the middle part of the two rotating arms (4) is provided with a connecting block (13), the two sides of the connecting block (13) are provided with a rotating rod 3 (1301), the bottom end of the connecting block (13) is provided with a driving rod (7), the auxiliary frame (2) is provided with a connecting rod 2 (6), the driving rod passes through the connecting rod 2 (6) and is threadedly connected to the connecting rod 2 (6), the bottom end of the base plate (1) is provided with a telescopic leg (11), and the bottom end of the telescopic leg (11) is provided with a moving wheel (12). 2.根据权利要求1所述的一种克拉管安装架设装置,其特征在于:所述底板(1)的底端中部设有气缸(9),所述气缸(9)的底端设有尖锥端(10)。2. A carat pipe installation and erection device according to claim 1, characterized in that: a cylinder (9) is provided at the middle of the bottom end of the base plate (1), and a pointed cone end (10) is provided at the bottom end of the cylinder (9). 3.根据权利要求1所述的一种克拉管安装架设装置,其特征在于:所述支撑架(3)的表面设有记号标识(301)。3. A carat pipe installation and erection device according to claim 1, characterized in that: a mark (301) is provided on the surface of the support frame (3). 4.根据权利要求1所述的一种克拉管安装架设装置,其特征在于:所述辅助架(2)上设有多个圆孔(401),多个所述圆孔(401)与转杆一(202)、转杆二(402)、转杆三(1301)匹配。4. A carat pipe installation and erection device according to claim 1, characterized in that: the auxiliary frame (2) is provided with a plurality of circular holes (401), and the plurality of circular holes (401) match with the first rotating rod (202), the second rotating rod (402), and the third rotating rod (1301). 5.根据权利要求1所述的一种克拉管安装架设装置,其特征在于:所述驱动杆(7)的底端设有手柄(8)。5. A carat tube installation and erection device according to claim 1, characterized in that a handle (8) is provided at the bottom end of the driving rod (7). 6.根据权利要求1所述的一种克拉管安装架设装置,其特征在于:所述转臂(4)呈V形结构,且下部比上部长度长。6. A carat tube installation and erection device according to claim 1, characterized in that: the rotating arm (4) is in a V-shaped structure, and the lower part is longer than the upper part. 7.根据权利要求1所述的一种克拉管安装架设装置,其特征在于:所述辅助架(2)上开设有卡扣(201),所述连接杆二(6)设置在卡扣(201)内。7. A carat tube installation and erection device according to claim 1, characterized in that: a buckle (201) is provided on the auxiliary frame (2), and the second connecting rod (6) is arranged in the buckle (201).
CN202420339014.5U 2024-02-23 2024-02-23 Clara pipe installation erects device Active CN221991101U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202420339014.5U CN221991101U (en) 2024-02-23 2024-02-23 Clara pipe installation erects device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202420339014.5U CN221991101U (en) 2024-02-23 2024-02-23 Clara pipe installation erects device

Publications (1)

Publication Number Publication Date
CN221991101U true CN221991101U (en) 2024-11-12

Family

ID=93373814

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202420339014.5U Active CN221991101U (en) 2024-02-23 2024-02-23 Clara pipe installation erects device

Country Status (1)

Country Link
CN (1) CN221991101U (en)

Similar Documents

Publication Publication Date Title
CN221991101U (en) Clara pipe installation erects device
CN210050390U (en) Strutting arrangement is used in town road pipeline construction
CN210007289U (en) Supporting frame suitable for temporary cable support on power infrastructure construction site
CN214364927U (en) Building engineering construction is with hanging mould device
CN219485619U (en) Auxiliary overhaul equipment for urban heat supply pipeline
CN220337621U (en) Pipeline construction device
CN219671568U (en) A fixing device for drainage pipe construction
CN217871761U (en) Formwork bracket locking device for building construction
CN222229696U (en) A pipeline support frame for water conservancy and hydropower construction
CN221855767U (en) A desilting device suitable for municipal drainage construction
CN220133056U (en) Municipal pipeline installation device
WO2022120725A1 (en) Device for laying gutter rolled roofing additional layer on roof for residential area reconstruction
CN221545856U (en) Sewage pipeline laying and fixing device in municipal engineering
CN222502929U (en) Pipeline construction connecting device for water supply and drainage
CN219975642U (en) Pipeline fastener for building water supply and drainage
CN217815403U (en) Strutting arrangement is used in municipal works construction
CN222101090U (en) Portable artificial urban rainwater and sewage diversion pipe construction device
CN213868958U (en) Building construction equipment
CN221704635U (en) Pipeline support frame for hydraulic engineering
CN221971097U (en) A municipal drainage pipe hoisting equipment
CN215721227U (en) Municipal administration gas pipeline construction is with protection fixing device
CN221380421U (en) Pipeline equipment
CN218178093U (en) Pipeline laying device for water supply and drainage construction
CN222503023U (en) A municipal water supply and drainage pipeline connection structure
CN218378136U (en) Anti-seepage device for water supply and drainage pipes in building engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant