CN221972789U - A hyperbolic aluminum ceiling - Google Patents
A hyperbolic aluminum ceiling Download PDFInfo
- Publication number
- CN221972789U CN221972789U CN202420235849.6U CN202420235849U CN221972789U CN 221972789 U CN221972789 U CN 221972789U CN 202420235849 U CN202420235849 U CN 202420235849U CN 221972789 U CN221972789 U CN 221972789U
- Authority
- CN
- China
- Prior art keywords
- frame
- ceiling
- screw
- hole
- hole frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 title claims abstract description 25
- 229910052782 aluminium Inorganic materials 0.000 title claims abstract description 25
- 239000004411 aluminium Substances 0.000 claims 1
- 230000035515 penetration Effects 0.000 claims 1
- 238000009434 installation Methods 0.000 abstract description 18
- 238000000034 method Methods 0.000 abstract description 6
- 230000008569 process Effects 0.000 abstract description 5
- 238000003780 insertion Methods 0.000 description 17
- 230000037431 insertion Effects 0.000 description 17
- 238000010586 diagram Methods 0.000 description 5
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 101000827703 Homo sapiens Polyphosphoinositide phosphatase Proteins 0.000 description 1
- 102100023591 Polyphosphoinositide phosphatase Human genes 0.000 description 1
- 101100012902 Saccharomyces cerevisiae (strain ATCC 204508 / S288c) FIG2 gene Proteins 0.000 description 1
- 101100233916 Saccharomyces cerevisiae (strain ATCC 204508 / S288c) KAR5 gene Proteins 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011017 operating method Methods 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
Landscapes
- Mirrors, Picture Frames, Photograph Stands, And Related Fastening Devices (AREA)
Abstract
本实用新型属于吊顶技术领域,具体涉及一种双曲面铝吊顶,包括曲面吊顶和安装件,曲面吊顶的外弧形面顶部横向水平设置有多块吊板,且吊板的端部水平固定有孔框,安装件包括安装架和吊装件,安装架的两端均竖直螺纹贯穿安装有组装螺钉,且组装螺钉固定在天花板上,吊装件设置在安装架的下侧,吊装件包括卡孔框,卡孔框水平设置在安装架的下方,且卡孔框的顶面上竖直滑动贯穿插接有定位杆架,孔框插入卡孔框中,且孔框上竖直贯通开设有定位孔。本实用新型将需要安装的曲面吊顶安装时提前进行固定,从而对曲面吊顶进行预先支撑,避免人力托举过程繁琐,不需要多次调节托举高度,从而保证了曲面铝板的安装便捷性。
The utility model belongs to the field of ceiling technology, and specifically relates to a hyperbolic aluminum ceiling, including a curved ceiling and a mounting part, a plurality of hanging plates are horizontally arranged on the top of the outer arc surface of the curved ceiling, and a hole frame is horizontally fixed at the end of the hanging plate, the mounting part includes a mounting frame and a hanging part, both ends of the mounting frame are vertically threaded and penetrated with assembly screws, and the assembly screws are fixed on the ceiling, the hanging part is arranged on the lower side of the mounting frame, the hanging part includes a hole frame, the hole frame is horizontally arranged below the mounting frame, and a positioning rod frame is vertically slidably penetrated and inserted on the top surface of the hole frame, the hole frame is inserted into the hole frame, and a positioning hole is vertically penetrated on the hole frame. The utility model fixes the curved ceiling to be installed in advance, thereby pre-supporting the curved ceiling, avoiding the cumbersome process of manual lifting, and does not need to adjust the lifting height multiple times, thereby ensuring the convenience of installation of the curved aluminum plate.
Description
技术领域Technical Field
本实用新型属于吊顶技术领域,具体涉及一种双曲面铝吊顶。The utility model belongs to the technical field of suspended ceilings, and in particular relates to a hyperbolic aluminum suspended ceiling.
背景技术Background Art
现今的吊顶结构一般是平整的呈水平面的,或者是主要呈阶梯面的,各个面主要也是呈水平面的,但如果内顶的设计较为复杂,有很多非水平面的曲面,即使这个曲面是由众多独立的平整面板拼接的,整个面板背后的吊顶结构将比较复杂,往往需要现场定做,成本高,维修拆卸困难。Today's ceiling structures are generally flat and horizontal, or mainly stepped, and each surface is mainly horizontal. However, if the design of the inner ceiling is more complicated and there are many non-horizontal curved surfaces, even if this curved surface is made up of many independent flat panels, the ceiling structure behind the entire panel will be more complicated and often needs to be customized on site, which is costly and difficult to repair and disassemble.
现有公告号CN220225898U,名称为一种装配式双曲面铝板吊顶结构,包括铝板主体,通过设置固定组件,相邻的延伸块延伸至卡座的内侧后,将限位框套在相邻两个安装板的外侧,解除卡杆对手柄的固定,转动手柄带动螺纹转杆转动,使得螺纹块下移带动移动板向下移动,使得卡块延伸至限位框内侧,从而完成对两个安装板的卡接,从而完成安装,实现了安装方便的目的。The existing announcement number CN220225898U is named as an assembled hyperbolic aluminum plate ceiling structure, which includes an aluminum plate main body. By setting a fixing component, the adjacent extension blocks are extended to the inner side of the card seat, and the limit frame is put on the outer side of the two adjacent mounting plates, the fixation of the card rod to the handle is released, and the handle is rotated to drive the threaded rotating rod to rotate, so that the threaded block moves downward and drives the movable plate to move downward, so that the card block extends to the inner side of the limit frame, thereby completing the card connection of the two mounting plates, thereby completing the installation and achieving the purpose of convenient installation.
但是上述吊设组装双曲面铝板的方式,利用固定组件上卡接相邻两块曲面铝板安装板,完成了曲面铝板的吊设组装,这种吊装曲面铝板时,缺少预安装定位支撑结构,导致安装时需要人力托举支撑曲面铝板,才能配合固定组件进行组装,人力托举过程繁琐,需要多次调节托举高度,从而影响了曲面铝板的安装便捷性。However, the above-mentioned method of hanging and assembling the hyperbolic aluminum plate utilizes the fixing component to clamp the two adjacent curved aluminum plate mounting plates to complete the hanging and assembly of the curved aluminum plate. When hanging the curved aluminum plate in this way, there is a lack of a pre-installed positioning support structure, resulting in the need for manual lifting and support of the curved aluminum plate during installation so that it can be assembled with the fixing component. The manual lifting process is cumbersome and the lifting height needs to be adjusted multiple times, which affects the convenience of installation of the curved aluminum plate.
实用新型内容Utility Model Content
针对现有技术中存在的问题,本实用新型的目的在于提供一种双曲面铝吊顶,它可以实现,安装时将曲面吊顶外弧面顶部水平固定的吊板端部孔框插入卡孔框中,然后松开定位杆架,定位杆架插入孔框和卡孔框中,从而对曲面吊顶进行预先定位安装,从而将需要安装的曲面吊顶安装时提前进行固定,从而对曲面吊顶进行预先支撑,避免人力托举过程繁琐,不需要多次调节托举高度,从而保证了曲面铝板的安装便捷性。In view of the problems existing in the prior art, the purpose of the utility model is to provide a hyperbolic aluminum ceiling, which can be achieved by inserting the hole frame at the end of the hanging plate horizontally fixed on the top of the outer arc surface of the curved ceiling into the card hole frame during installation, and then loosening the positioning rod frame, and inserting the positioning rod frame into the hole frame and the card hole frame, so as to pre-position and install the curved ceiling, so that the curved ceiling to be installed can be fixed in advance during installation, thereby pre-supporting the curved ceiling, avoiding the cumbersome manual lifting process, and eliminating the need to adjust the lifting height multiple times, thereby ensuring the convenience of installation of the curved aluminum plate.
为实现上述目的,本实用新型提供如下技术方案:In order to achieve the above purpose, the utility model provides the following technical solutions:
一种双曲面铝吊顶,包括曲面吊顶和安装件,曲面吊顶的外弧形面顶部横向水平设置有多块吊板,且吊板的端部水平固定有孔框,安装件包括安装架和吊装件,安装架的两端均竖直螺纹贯穿安装有安装螺钉,且安装螺钉固定在天花板上,吊装件设置在安装架的下侧,吊装件包括卡孔框,卡孔框水平设置在安装架的下方,且卡孔框的顶面上竖直滑动贯穿插接有定位杆架,孔框插入卡孔框中,且孔框上竖直贯通开设有定位孔,定位杆架竖直滑动贯穿孔框上的定位孔组装连接孔框和卡孔框。A hyperbolic aluminum ceiling comprises a curved ceiling and a mounting piece, wherein a plurality of hanging plates are horizontally arranged on the top of the outer arc-shaped surface of the curved ceiling, and hole frames are horizontally fixed to the ends of the hanging plates, the mounting piece comprises a mounting frame and a hanging piece, both ends of the mounting frame are vertically threaded with mounting screws, and the mounting screws are fixed to the ceiling, the hanging piece is arranged on the lower side of the mounting frame, the hanging piece comprises a card hole frame, the card hole frame is horizontally arranged below the mounting frame, and a positioning rod frame is vertically slidably inserted and inserted on the top surface of the card hole frame, the hole frame is inserted into the card hole frame, and a positioning hole is vertically opened on the hole frame, the positioning rod frame vertically slides through the positioning hole on the hole frame to assemble and connect the hole frame and the card hole frame.
进一步的,所述定位杆架的竖杆上竖直套设有弹簧,且弹簧的两端分别固定在卡孔框的顶面上和定位杆架上。Furthermore, a spring is vertically sleeved on the vertical rod of the positioning rod frame, and two ends of the spring are respectively fixed on the top surface of the clamping hole frame and the positioning rod frame.
进一步的,所述卡孔框的顶面上竖直固定有螺杆,且螺杆上竖直螺纹组装有螺筒。Furthermore, a screw rod is vertically fixed on the top surface of the clamping hole frame, and a screw barrel is assembled on the vertical thread of the screw rod.
进一步的,所述螺筒的顶面上竖直固定有转杆,且转杆的顶面上竖直开设有螺槽。Furthermore, a rotating rod is vertically fixed on the top surface of the screw barrel, and a screw groove is vertically opened on the top surface of the rotating rod.
进一步的,所述吊板上竖直贯通开设有转孔,且转孔与转杆转动贯通插接。Furthermore, a rotating hole is vertically opened on the hanging plate, and the rotating hole is rotatably connected with the rotating rod.
进一步的,所述转杆上竖直套设有橡胶圈,且转杆的螺槽中竖直螺纹组装有顶板。Furthermore, a rubber ring is vertically sleeved on the rotating rod, and a top plate is assembled on the vertical thread in the screw groove of the rotating rod.
进一步的,所述卡孔框的底面上竖直固定有插板,且插板上竖直套设有插框,且插框的底面上水平固定有螺孔板,且插框的螺孔板上竖直螺纹组装有固定螺钉,曲面吊顶的两端均水平固定有螺孔板,且曲面吊顶端部的螺孔板与相邻的固定螺钉螺纹组装。Furthermore, an insertion plate is vertically fixed on the bottom surface of the card hole frame, and an insertion frame is vertically sleeved on the insertion plate, and a screw hole plate is horizontally fixed on the bottom surface of the insertion frame, and the vertical threads on the screw hole plate of the insertion frame are assembled with fixing screws, screw hole plates are horizontally fixed at both ends of the curved ceiling, and the screw hole plate at the top of the curved ceiling is assembled with adjacent fixing screw threads.
与现有技术相比,本实用新型的有益效果是:使用中安装曲面吊顶时,将安装件上的安装架通过安装螺钉固定在天花板上,向上拉动卡孔框上的定位杆架,然后安装时将曲面吊顶外弧面顶部水平固定的吊板端部孔框插入卡孔框中,然后松开定位杆架,定位杆架插入孔框和卡孔框中,从而对曲面吊顶进行预先定位安装,从而将需要安装的曲面吊顶安装时提前进行固定,从而对曲面吊顶进行预先支撑,避免人力托举过程繁琐,不需要多次调节托举高度,从而保证了曲面铝板的安装便捷性。Compared with the prior art, the beneficial effect of the utility model is that when installing the curved ceiling during use, the mounting frame on the mounting part is fixed to the ceiling by means of mounting screws, the positioning rod frame on the card hole frame is pulled upward, and then the hole frame at the end of the hanging plate horizontally fixed on the top of the outer arc surface of the curved ceiling is inserted into the card hole frame during installation, and then the positioning rod frame is loosened, and the positioning rod frame is inserted into the hole frame and the card hole frame, thereby pre-positioning and installing the curved ceiling, so that the curved ceiling to be installed can be fixed in advance during installation, thereby pre-supporting the curved ceiling, avoiding the cumbersome manual lifting process, and eliminating the need to adjust the lifting height multiple times, thereby ensuring the convenience of installation of the curved aluminum plate.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
图1为本实用新型的整体结构示意图;Figure 1 is a schematic diagram of the overall structure of the utility model;
图2为本实用新型的整体分解状态下的结构示意图;FIG2 is a schematic diagram of the structure of the utility model in an overall exploded state;
图3为本实用新型的实施例中安装件在分解状态下的结构示意图;FIG3 is a schematic structural diagram of a mounting member in an exploded state in an embodiment of the present utility model;
图4为本实用新型的实施例中吊装件在分解状态下的结构示意图;FIG4 is a schematic structural diagram of a lifting member in an embodiment of the present utility model in a disassembled state;
图5为本实用新型的实施例中曲面吊顶在分解状态下的结构示意图。FIG. 5 is a schematic structural diagram of a curved ceiling in an exploded state according to an embodiment of the present invention.
附图中,各标号所代表的部件列表如下:In the accompanying drawings, the components represented by the reference numerals are listed as follows:
1、曲面吊顶;11、吊板;12、孔框;2、安装件;21、安装架;211、转孔;212、安装螺钉;22、吊装件;221、卡孔框;222、螺杆;223、螺筒;224、转杆;225、定位杆架;226、弹簧;227、插板;228、插框;229、固定螺钉;23、橡胶圈;24、顶板。1. Curved ceiling; 11. Hanging plate; 12. Hole frame; 2. Mounting parts; 21. Mounting frame; 211. Turning hole; 212. Mounting screws; 22. Hanging parts; 221. Hole frame; 222. Screw rod; 223. Screw barrel; 224. Turning rod; 225. Positioning rod frame; 226. Spring; 227. Insert plate; 228. Insert frame; 229. Fixing screws; 23. Rubber ring; 24. Top plate.
具体实施方式DETAILED DESCRIPTION
为了使本实用新型的目的及优点更加清楚明白,以下结合实施例对本实用新型进行具体说明。应当理解,以下文字仅仅用以描述本实用新型的一种或几种具体的实施方式,并不对本实用新型具体请求的保护范围进行严格限定。In order to make the purpose and advantages of the utility model more clear, the utility model is specifically described in combination with the following embodiments. It should be understood that the following text is only used to describe one or several specific implementations of the utility model, and does not strictly limit the protection scope of the specific request of the utility model.
如图1-5所示,一种双曲面铝吊顶,包括曲面吊顶1和安装件2,曲面吊顶1的外弧形面顶部横向水平设置有多块吊板11,且吊板11的端部水平固定有孔框12,安装件2包括安装架21和吊装件22,安装架21的两端均竖直螺纹贯穿安装有安装螺钉212,且安装螺钉212固定在天花板上,吊装件22设置在安装架21的下侧,吊装件22包括卡孔框221,卡孔框221水平设置在安装架21的下方,且卡孔框221的顶面上竖直滑动贯穿插接有定位杆架225,孔框12插入卡孔框221中,且孔框12上竖直贯通开设有定位孔,定位杆架225竖直滑动贯穿孔框12上的定位孔组装连接孔框12和卡孔框221。As shown in Fig. 1-5, a hyperbolic aluminum ceiling comprises a curved ceiling 1 and a mounting member 2. A plurality of hanging plates 11 are horizontally arranged on the top of the outer arc-shaped surface of the curved ceiling 1, and a hole frame 12 is horizontally fixed to the end of the hanging plate 11. The mounting member 2 comprises a mounting frame 21 and a hanging member 22. Both ends of the mounting frame 21 are vertically threaded with mounting screws 212, and the mounting screws 212 are fixed to the ceiling. The hanging member 22 is arranged on the lower side of the mounting frame 21. The hanging member 22 comprises a hole frame 221. The hole frame 221 is horizontally arranged below the mounting frame 21, and a positioning rod frame 225 is vertically slidably inserted through the top surface of the hole frame 221. The hole frame 12 is inserted into the hole frame 221, and a positioning hole is vertically penetrated on the hole frame 12. The positioning rod frame 225 vertically slides through the positioning hole on the hole frame 12 to assemble and connect the hole frame 12 and the hole frame 221.
根据上述结构,使用中安装曲面吊顶1时,将安装件2上的安装架21通过安装螺钉212固定在天花板上,向上拉动卡孔框221上的定位杆架225,然后安装时将曲面吊顶1外弧面顶部水平固定的吊板11端部孔框12插入卡孔框221中,然后松开定位杆架225,定位杆架225插入孔框12和卡孔框221中,从而对曲面吊顶1进行预先定位安装,从而将需要安装的曲面吊顶1安装时提前进行固定,从而对曲面吊顶1进行预先支撑,避免人力托举过程繁琐,不需要多次调节托举高度,从而保证了曲面铝板的安装便捷性。According to the above structure, when installing the curved ceiling 1 during use, the mounting frame 21 on the mounting part 2 is fixed to the ceiling by the mounting screws 212, and the positioning rod frame 225 on the card hole frame 221 is pulled upward, and then the hole frame 12 at the end of the hanging plate 11 horizontally fixed on the top of the outer arc surface of the curved ceiling 1 is inserted into the card hole frame 221 during installation, and then the positioning rod frame 225 is loosened, and the positioning rod frame 225 is inserted into the hole frame 12 and the card hole frame 221, so that the curved ceiling 1 is pre-positioned and installed, so that the curved ceiling 1 to be installed can be fixed in advance during installation, thereby pre-supporting the curved ceiling 1, avoiding the cumbersome manual lifting process, and there is no need to adjust the lifting height multiple times, thereby ensuring the convenience of installation of the curved aluminum plate.
如图3和图4所示,定位杆架225的竖杆上竖直套设有弹簧226,且弹簧226的两端分别固定在卡孔框221的顶面上和定位杆架225上。As shown in FIG. 3 and FIG. 4 , a spring 226 is vertically sleeved on the vertical rod of the positioning rod frame 225 , and two ends of the spring 226 are respectively fixed on the top surface of the clamping hole frame 221 and the positioning rod frame 225 .
根据上述结构,定位杆架225的竖杆上竖直套设的弹簧226,安装曲面吊顶1时向上拉动定位杆架225,拉伸弹簧226形变产生形变力,松开定位杆架225在弹簧226的形变压力下,带动定位杆架225的竖杆向下滑动,从而定位插接卡孔框221与孔框12,保持预先安装的稳定性。According to the above structure, the spring 226 is vertically sleeved on the vertical rod of the positioning rod frame 225. When installing the curved ceiling 1, the positioning rod frame 225 is pulled upward, and the stretching spring 226 is deformed to generate a deformation force. When the positioning rod frame 225 is released, the vertical rod of the positioning rod frame 225 is driven to slide downward under the deformation pressure of the spring 226, thereby positioning the plug-in card hole frame 221 and the hole frame 12 to maintain the stability of the pre-installation.
如图3和图4所示,卡孔框221的顶面上竖直固定有螺杆222,且螺杆222上竖直螺纹组装有螺筒223。As shown in FIG. 3 and FIG. 4 , a screw rod 222 is vertically fixed on the top surface of the hole frame 221 , and a screw barrel 223 is vertically threadedly assembled on the screw rod 222 .
根据上述结构,使用中根据安装曲面吊顶1的高度,转动螺筒223螺纹竖直驱动内部的螺杆222,竖直向下调节吊装曲面吊顶1的高度。According to the above structure, in use, according to the height of the curved ceiling 1 to be installed, the screw barrel 223 is rotated to vertically drive the internal screw rod 222 to vertically adjust the height of the suspended curved ceiling 1 downward.
如图3和图4所示,螺筒223的顶面上竖直固定有转杆224,且转杆224的顶面上竖直开设有螺槽。As shown in FIG. 3 and FIG. 4 , a rotating rod 224 is vertically fixed on the top surface of the screw barrel 223 , and a screw groove is vertically opened on the top surface of the rotating rod 224 .
根据上述结构,螺筒223上的转杆224方便转动后期调节吊装高度,转杆224顶端竖直开设的螺槽,便于限位安装在吊板11上。According to the above structure, the rotating rod 224 on the screw barrel 223 is convenient to rotate to adjust the lifting height later, and the screw groove vertically opened at the top of the rotating rod 224 is convenient for limiting the installation on the hanging plate 11.
如图3和图4所示,吊板11上竖直贯通开设有转孔211,且转孔211与转杆224转动贯通插接。As shown in FIG. 3 and FIG. 4 , a rotating hole 211 is vertically opened on the hanging plate 11 , and the rotating hole 211 is rotatably connected with the rotating rod 224 .
根据上述结构,吊板11上的转杆224转动插入吊板11的转孔211中,从而方便后期转动竖直调节安装曲面吊顶1的高度。According to the above structure, the rotating rod 224 on the hanging plate 11 is rotated and inserted into the rotating hole 211 of the hanging plate 11, so as to facilitate the subsequent rotation and vertical adjustment of the height of the installed curved ceiling 1.
如图3和图4所示,转杆224上竖直套设有橡胶圈23,且转杆224的螺槽中竖直螺纹组装有顶板24。As shown in FIG. 3 and FIG. 4 , a rubber ring 23 is vertically sleeved on the rotating rod 224 , and a top plate 24 is vertically threadedly assembled in the screw groove of the rotating rod 224 .
根据上述结构,转杆224上套设的橡胶圈23,同时转杆224的螺槽中螺纹组装的顶板24,后期吊装时转杆224受到向下的吊装力,挤压橡胶圈23,有效吸收吊装震动力。According to the above structure, the rubber ring 23 is sleeved on the rotating rod 224, and the top plate 24 is threadedly assembled in the screw groove of the rotating rod 224. When the rotating rod 224 is hoisted later, the rotating rod 224 is subjected to a downward hoisting force, which squeezes the rubber ring 23 and effectively absorbs the hoisting vibration force.
如图5所示,卡孔框221的底面上竖直固定有插板227,且插板227上竖直套设有插框228,且插框228的底面上水平固定有螺孔板,且插框228的螺孔板上竖直螺纹组装有固定螺钉229,曲面吊顶1的两端均水平固定有螺孔板,且曲面吊顶1端部的螺孔板与相邻的固定螺钉229螺纹组装。As shown in Figure 5, an insertion plate 227 is vertically fixed on the bottom surface of the card hole frame 221, and an insertion frame 228 is vertically sleeved on the insertion plate 227, and a screw hole plate is horizontally fixed on the bottom surface of the insertion frame 228, and the screw hole plate of the insertion frame 228 is vertically threadedly assembled with fixing screws 229, and screw hole plates are horizontally fixed at both ends of the curved ceiling 1, and the screw hole plates at the ends of the curved ceiling 1 are threadedly assembled with adjacent fixing screws 229.
根据上述结构,使用中安装曲面吊顶1时,滑动插板227上的插框228下移,然后利用插框228底端的螺孔板上固定螺钉229与曲面吊顶1上的螺孔板固定组装,从而保持了曲面吊顶1安装的稳定性。According to the above structure, when the curved ceiling 1 is installed during use, the insertion frame 228 on the sliding insertion plate 227 is moved downward, and then the insertion frame 228 is fixedly assembled with the screw hole plate on the curved ceiling 1 using the fixing screws 229 on the screw hole plate at the bottom of the insertion frame 228, thereby maintaining the stability of the installation of the curved ceiling 1.
本实用新型的工作原理为:使用中安装曲面吊顶1时,将安装件2上的安装架21通过安装螺钉212固定在天花板上,向上拉动卡孔框221上的定位杆架225,然后安装时将曲面吊顶1外弧面顶部水平固定的吊板11端部孔框12插入卡孔框221中,然后松开定位杆架225,定位杆架225插入孔框12和卡孔框221中,从而对曲面吊顶1进行预先定位安装,安装曲面吊顶1时,滑动插板227上的插框228下移,然后利用插框228底端的螺孔板上固定螺钉229与曲面吊顶1上的螺孔板固定组装。The working principle of the utility model is as follows: when installing the curved ceiling 1 during use, the mounting frame 21 on the mounting part 2 is fixed to the ceiling by the mounting screws 212, and the positioning rod frame 225 on the card hole frame 221 is pulled upward, and then the hole frame 12 at the end of the hanging plate 11 horizontally fixed on the top of the outer arc surface of the curved ceiling 1 is inserted into the card hole frame 221 during installation, and then the positioning rod frame 225 is loosened, and the positioning rod frame 225 is inserted into the hole frame 12 and the card hole frame 221, so as to pre-position and install the curved ceiling 1. When installing the curved ceiling 1, the insertion frame 228 on the sliding insertion plate 227 is moved downward, and then the screw hole plate fixing screws 229 at the bottom of the insertion frame 228 are used to fix and assemble with the screw hole plate on the curved ceiling 1.
以上所述仅是本实用新型的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以作出若干改进和润饰,这些改进和润饰也应视为本实用新型的保护范围。本实用新型中未具体描述和解释说明的结构、装置以及操作方法,如无特别说明和限定,均按照本领域的常规手段进行实施。The above is only a preferred embodiment of the present invention. It should be noted that, for ordinary technicians in the technical field, several improvements and modifications can be made without departing from the principle of the present invention, and these improvements and modifications should also be regarded as the protection scope of the present invention. The structures, devices and operating methods not specifically described and explained in the present invention shall be implemented according to the conventional means in the field unless otherwise specified and limited.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202420235849.6U CN221972789U (en) | 2024-01-30 | 2024-01-30 | A hyperbolic aluminum ceiling |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202420235849.6U CN221972789U (en) | 2024-01-30 | 2024-01-30 | A hyperbolic aluminum ceiling |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN221972789U true CN221972789U (en) | 2024-11-08 |
Family
ID=93318203
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202420235849.6U Active CN221972789U (en) | 2024-01-30 | 2024-01-30 | A hyperbolic aluminum ceiling |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN221972789U (en) |
-
2024
- 2024-01-30 CN CN202420235849.6U patent/CN221972789U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN221972789U (en) | A hyperbolic aluminum ceiling | |
| CN116446574B (en) | A curtain wall connection structure and curtain wall construction method | |
| CN222862662U (en) | Suspended ceiling mounting structure | |
| CN211949082U (en) | Installation device for sheet metal curtain wall | |
| CN216664632U (en) | Combined glass curtain wall | |
| CN220353444U (en) | A composite panel curtain wall installation system | |
| CN219102830U (en) | Light screen mounting structure of stage lamp | |
| CN218645129U (en) | Central control equipment fixing frame | |
| CN220728108U (en) | Lamp mounting bracket | |
| CN222630779U (en) | Elevator car furred ceiling structure | |
| CN220527585U (en) | Pipeline bracket for building | |
| CN220540583U (en) | Pipeline hoisting connecting frame for building engineering construction | |
| CN217669109U (en) | Combined door and window splicing platform | |
| CN217998590U (en) | Ceiling connecting piece | |
| CN222668797U (en) | A sheet metal part made of metal | |
| CN219528078U (en) | Building curtain wall decoration inhaul cable and suspension rod positioning and mounting structure | |
| CN219994785U (en) | Electromechanical support with adjustable electromechanical installation is used | |
| CN219678362U (en) | Photovoltaic power generation tile fixing device | |
| CN219431188U (en) | Courtyard daylighting roof mounting structure | |
| CN223263356U (en) | Fire control pipeline support | |
| CN222570623U (en) | Spring installation appurtenance | |
| CN223826476U (en) | A retractable air conditioner wall panel | |
| CN213066036U (en) | Classroom lamp installation accessory convenient to installation is fixed | |
| CN222893803U (en) | Noise control equipment for environmental protection and energy saving engineering | |
| CN213837247U (en) | An easy-to-install curtain wall connector |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CP03 | Change of name, title or address |
Address after: 5th Floor, Tongxin Building, 5020 Binhe Avenue, Fushan Community, Futian Street, Futian District, Shenzhen City, Guangdong Province 518000 Patentee after: Shenzhen Yiyue Construction Group Co.,Ltd. Country or region after: China Address before: 518000 Room 301, building 6, Hongshu Fuyuan, No. 21, Guihua Road, Fubao community, Fubao street, Futian District, Shenzhen City, Guangdong Province Patentee before: Shenzhen Yiyue Construction Group Co.,Ltd. Country or region before: China |
|
| CP03 | Change of name, title or address |