CN221971207U - A kind of viaduct safety construction device - Google Patents

A kind of viaduct safety construction device Download PDF

Info

Publication number
CN221971207U
CN221971207U CN202420252832.1U CN202420252832U CN221971207U CN 221971207 U CN221971207 U CN 221971207U CN 202420252832 U CN202420252832 U CN 202420252832U CN 221971207 U CN221971207 U CN 221971207U
Authority
CN
China
Prior art keywords
lifting
construction
guide rail
viaduct
construction device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202420252832.1U
Other languages
Chinese (zh)
Inventor
吴家震
吕静
张�杰
仝勋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Jinyu Information Technology Group Co Ltd
Original Assignee
Shandong Jinyu Information Technology Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Jinyu Information Technology Group Co Ltd filed Critical Shandong Jinyu Information Technology Group Co Ltd
Priority to CN202420252832.1U priority Critical patent/CN221971207U/en
Application granted granted Critical
Publication of CN221971207U publication Critical patent/CN221971207U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本实用新型公开了一种高架桥安全施工装置,属于施工器械领域。本实用新型采用的技术方案为,一种高架桥安全施工装置,包括可移动底座,所述可移动底座上设有升降导轨,所述升降导轨上滑动连接有升降平台,所述升降平台底部设有底板,所述底板上设有通口,所述底板上铰接有用于封闭通口的盖板,所述升降导轨上端设有吊装机构;本实用新型可以转运的隔音板材数量增多,降低了补充材料的频率,提升了声屏障安装施工的效率,通过可移动底座的设置可以在第一个施工点位安装完成后,移动至下一施工点位进行施工安装,保证了施工的连续性,进而加快施工效率,通过吊装机构的设置便于有效降低施工人员的劳动强度,加快施工效率,控制人工成本。

The utility model discloses a viaduct safety construction device, which belongs to the field of construction machinery. The technical solution adopted by the utility model is a viaduct safety construction device, including a movable base, a lifting guide rail is provided on the movable base, a lifting platform is slidably connected to the lifting guide rail, a bottom plate is provided at the bottom of the lifting platform, a through opening is provided on the bottom plate, a cover plate for closing the through opening is hinged on the bottom plate, and a hoisting mechanism is provided at the upper end of the lifting guide rail; the utility model increases the number of sound insulation plates that can be transported, reduces the frequency of supplementary materials, and improves the efficiency of sound barrier installation and construction. Through the setting of the movable base, after the installation of the first construction site is completed, it can be moved to the next construction site for construction and installation, ensuring the continuity of construction, thereby accelerating construction efficiency. Through the setting of the hoisting mechanism, it is convenient to effectively reduce the labor intensity of construction personnel, accelerate construction efficiency, and control labor costs.

Description

一种高架桥安全施工装置A kind of viaduct safety construction device

技术领域Technical Field

本实用新型属于施工器械技术领域,具体涉及一种高架桥安全施工装置。The utility model belongs to the technical field of construction equipment, and in particular relates to a safe construction device for an elevated bridge.

背景技术Background Art

高架桥施工项目中包括安装声屏障的安装施工,声屏障作为垂直于桥面的竖向构件包括间隔设置的立柱以及固定安装在相邻立柱之间隔音板材,立柱一般为槽钢结构,隔音板材安装时需要自上而下插入立柱的槽型结构内并通过螺栓或者焊接的方式与立柱固定。The viaduct construction project includes the installation of sound barriers. As a vertical component perpendicular to the bridge deck, the sound barrier includes spaced columns and sound insulation panels fixed between adjacent columns. The columns are generally channel steel structures. When installing, the sound insulation panels need to be inserted into the channel structure of the columns from top to bottom and fixed to the columns by bolts or welding.

目前,声屏障的安装施工依赖于的人工进行,一般工人借助吊机或者小型吊车将隔音板材吊至立柱的上端,然后借助脚手架、液压升降工作平台将工人提升至施工高度,然后工人再对吊车吊起的隔音板材与立柱装配在一起,并通过螺栓或者焊接工艺使板材与立柱固定,操作较为繁琐,设备和人工的投入成本较大,施工进度却难以得到有效提升。而且,这种施工方式的连续性差,需要频繁的向施工区域运输板材,施工效率较低。At present, the installation and construction of sound barriers rely on manual labor. Generally, workers use cranes or small cranes to lift the sound insulation panels to the upper end of the columns, and then use scaffolding and hydraulic lifting work platforms to lift the workers to the construction height. Then the workers assemble the sound insulation panels lifted by the crane with the columns and fix the panels to the columns through bolts or welding processes. The operation is cumbersome, the investment cost of equipment and labor is high, and the construction progress is difficult to be effectively improved. Moreover, this construction method has poor continuity and requires frequent transportation of panels to the construction area, which has low construction efficiency.

实用新型内容Utility Model Content

本实用新型提供了一种高架桥安全施工装置,以解决上述技术问题中的至少一个。The utility model provides a viaduct safety construction device to solve at least one of the above technical problems.

本实用新型所采用的技术方案为:The technical solution adopted by the utility model is:

一种高架桥安全施工装置,包括可移动底座,所述可移动底座上设有升降导轨,所述升降导轨上滑动连接有升降平台,所述升降平台底部设有底板,所述底板上设有通口,所述底板上铰接有用于封闭通口的盖板,所述升降导轨上端设有吊装机构。A safe construction device for an elevated bridge comprises a movable base, a lifting guide rail is arranged on the movable base, a lifting platform is slidably connected to the lifting guide rail, a bottom plate is arranged at the bottom of the lifting platform, a through opening is arranged on the bottom plate, a cover plate for closing the through opening is hinged on the bottom plate, and a lifting mechanism is arranged at the upper end of the lifting guide rail.

优选地,所述可移动底座上设有放置台,所述放置台位于通口的下方。Preferably, a placing platform is provided on the movable base, and the placing platform is located below the through opening.

优选地,相邻所述升降导轨上端连接有横梁,所述横梁与升降平台之间设有提升机构。Preferably, a crossbeam is connected to the upper ends of adjacent lifting guide rails, and a lifting mechanism is provided between the crossbeam and the lifting platform.

优选地,所述吊装机构包括支撑架,所述支撑架设置于升降导轨的上端,所述支撑架上设有转轴,所述转轴侧壁固定连接有水平导轨,所述水平导轨上设有驱动车,所述驱动车底部设有吊装组件。Preferably, the hoisting mechanism includes a support frame, which is arranged at the upper end of the lifting guide rail. The support frame is provided with a rotating shaft, and the side wall of the rotating shaft is fixedly connected to a horizontal guide rail. A driving vehicle is provided on the horizontal guide rail, and a hoisting assembly is provided at the bottom of the driving vehicle.

优选地,所述吊装组件采用卷扬机装置,所述卷扬机装置通过导线连接有控制手柄,所述卷扬机装置具有用于提升物料缆绳,所述缆绳末端设有拉钩。Preferably, the hoisting assembly adopts a winch device, the winch device is connected to a control handle via a wire, the winch device has a cable for lifting materials, and a hook is provided at the end of the cable.

优选地,所述水平导轨与转轴之间固定连接有加固杆。Preferably, a reinforcement rod is fixedly connected between the horizontal guide rail and the rotating shaft.

优选地,所述升降平台四周设有防护栏,所述升降平台任一侧防护栏上设有入口,所述防护栏上转动连接有用于封堵入口的栅栏门,所述栅栏门与防护栏之间设有锁止部。Preferably, guardrails are arranged around the lifting platform, an entrance is arranged on the guardrail on either side of the lifting platform, a fence door for blocking the entrance is rotatably connected to the guardrail, and a locking portion is arranged between the fence door and the guardrail.

优选地,所述盖板上设有提拉把手。Preferably, a lifting handle is provided on the cover plate.

优选地,所述可移动底座包括支撑座,所述支撑座底部四周设有若干组轮子。Preferably, the movable base comprises a support base, and a plurality of groups of wheels are arranged around the bottom of the support base.

优选地,所述底板底部焊接有用于支撑盖板的限位支撑板。Preferably, a limiting support plate for supporting the cover plate is welded to the bottom of the base plate.

由于采用了上述技术方案,本实用新型所取得的有益效果为:Due to the adoption of the above technical solution, the beneficial effects achieved by the utility model are as follows:

1.通过本申请进行声屏障的施工作业时,首先通过可移动底座将本装置移动至隔音板材存放区,通过吊装机构向升降平台上吊装适量的隔音板材,通过控制升降平台升高至施工高度,此时,可移动底座上形成了具有收纳空间的放置区域,然后通过人工搬运的方式向该放置区域码放更多的隔音板材,进而使本装置可以转运的隔音板材数量增多,降低了补充材料的频率,提升了声屏障安装施工的效率。隔音板材装载完成后通过可移动底座将本装置移动至施工区域,位于升降平台上的工人操作控制吊装机构先吊取升降平台上码放的隔音板材,当升降平台上的隔音板材安装完后,位于升降平台上的工人将盖板向上翻转使通口打开,控制吊装机构的牵引端通过通口吊起码放在可移动底座上的隔音板材。1. When the construction of the sound barrier is carried out through this application, the device is first moved to the sound insulation board storage area through the movable base, and an appropriate amount of sound insulation boards are hoisted onto the lifting platform through the lifting mechanism. The lifting platform is raised to the construction height by controlling the lifting platform. At this time, a placement area with storage space is formed on the movable base, and then more sound insulation boards are stacked in the placement area by manual transportation, thereby increasing the number of sound insulation boards that can be transported by the device, reducing the frequency of replenishing materials, and improving the efficiency of the installation and construction of the sound barrier. After the sound insulation boards are loaded, the device can be moved to the construction area through the movable base. The worker on the lifting platform operates and controls the lifting mechanism to first lift the sound insulation boards stacked on the lifting platform. When the sound insulation boards on the lifting platform are installed, the worker on the lifting platform flips the cover plate upward to open the opening, and controls the traction end of the lifting mechanism to lift at least the sound insulation board placed on the movable base through the opening.

通过可移动底座的设置可以在第一个施工点位安装完成后,移动至下一施工点位进行施工安装,保证了施工的连续性,进而加快施工效率,降低施工人员的劳动强度。通过吊装机构的设置便于有效降低施工人员的劳动强度,加快施工效率,控制人工成本。The movable base can be set up to move to the next construction site for construction and installation after the first construction site is installed, ensuring the continuity of construction, thereby speeding up construction efficiency and reducing the labor intensity of construction workers. The setting of the hoisting mechanism is convenient for effectively reducing the labor intensity of construction workers, speeding up construction efficiency and controlling labor costs.

2.作为本实用新型的一种优选实施方式,放置台的设置便于在可移动底座上码放隔音板材,放置台上可以设置与隔音板材适配的限位支撑块,用于增加可移动底座移动过程中,其上部码放的隔音板材的稳定性。2. As a preferred embodiment of the present invention, the placement table is provided to facilitate stacking of sound insulation panels on the movable base, and a limiting support block adapted to the sound insulation panels can be provided on the placement table to increase the stability of the sound insulation panels stacked on the upper part of the movable base during movement.

3.作为本实用新型的一种优选实施方式,通过横梁的设置有利于提高升降导轨的结构强度,还有利于为提升机构提供安装工位。3. As a preferred embodiment of the present invention, the provision of a crossbeam is helpful in improving the structural strength of the lifting guide rail and is also helpful in providing an installation station for the lifting mechanism.

4.作为本实用新型的一种优选实施方式,工人通过吊装组件将隔音板材吊至槽型结构的上方,使板材自上而下穿插至槽型结构内,进一步的,工人通过转轴的设置可以调节水平导轨的位置,通过水平导轨、驱动车的设置便于灵活调整吊装组件的位置,进而实现代替人工转运板材,使板材可以自码放区域转运至安装区域。4. As a preferred embodiment of the present invention, workers lift the sound insulation panels to the top of the trough structure through the lifting assembly, so that the panels are inserted into the trough structure from top to bottom. Furthermore, workers can adjust the position of the horizontal guide rails through the setting of the rotating shaft. The setting of the horizontal guide rails and the driving vehicle facilitates the flexible adjustment of the position of the lifting assembly, thereby replacing the manual transfer of the panels, so that the panels can be transferred from the stacking area to the installation area.

5.作为本实用新型的一种优选实施方式,通过加固杆的设置便于增加水平导轨的结构强度,提高其抗压能力,增加本装置使用过程中的安全性。5. As a preferred embodiment of the present invention, the provision of a reinforcement rod facilitates increasing the structural strength of the horizontal guide rail, improving its compression resistance, and increasing the safety of the device during use.

6.作为本实用新型的一种优选实施方式,通过防护栏的设置便于对升降平台上站立的工人进行有效的安全防护,防止工人从升降平台上跌落,同时工人还可以将安全带固定在防护栏上,进一步增加工人施工过程中的安全保障,防护栏的设置还有利于对升降平台上码放的建材进行防护,防止建材从升降平台上滑落,砸伤下方工人,造成安全事故。6. As a preferred embodiment of the present utility model, the provision of a guardrail facilitates effective safety protection for workers standing on the lifting platform to prevent them from falling from the lifting platform. At the same time, workers can also fix their safety belts on the guardrail to further increase the safety of the workers during the construction process. The provision of the guardrail is also beneficial for protecting the building materials stacked on the lifting platform to prevent them from sliding off the lifting platform and injuring the workers below, causing safety accidents.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

图1为本实用新型具体实施方式的结构示意图之一;FIG1 is a schematic diagram of a structure of a specific embodiment of the utility model;

图2为本实用新型具体实施方式的结构示意图之二。FIG. 2 is a second schematic structural diagram of a specific implementation method of the utility model.

此处所说明的附图用来提供对本实用新型的进一步理解,构成本实用新型的一部分,本实用新型的示意性实施例及其说明用于解释本实用新型,并不构成对本实用新型的不当限定。The drawings described herein are used to provide a further understanding of the present invention and constitute a part of the present invention. The illustrative embodiments of the present invention and their descriptions are used to explain the present invention and do not constitute an improper limitation on the present invention.

在附图中:In the attached picture:

1、支撑座;101、放置台;102、轮子;2、升降导轨;3、升降平台;301、底板;302、通口;303、盖板;304、提拉把手;305、限位支撑板;306、栅栏门;307、锁止部;4、提升机构;5、支撑架;501、转轴;6、水平导轨;601、加固杆;7、卷扬机装置;701、控制手柄;702、拉钩。1. Support seat; 101. Placement table; 102. Wheels; 2. Lifting guide rail; 3. Lifting platform; 301. Bottom plate; 302. Through hole; 303. Cover plate; 304. Lifting handle; 305. Limit support plate; 306. Fence door; 307. Locking part; 4. Lifting mechanism; 5. Support frame; 501. Rotating shaft; 6. Horizontal guide rail; 601. Reinforcement rod; 7. Winch device; 701. Control handle; 702. Hook.

具体实施方式DETAILED DESCRIPTION

为了更清楚的阐释本实用新型的整体构思,下面结合说明书附图以示例的方式进行详细说明。In order to more clearly illustrate the overall concept of the present invention, a detailed description is given below in the form of examples in conjunction with the accompanying drawings.

在下面的描述中阐述了很多具体细节以便于充分理解本实用新型,但是,本实用新型还可以采用其他不同于在此描述的其他方式来实施,因此,本实用新型的保护范围并不受下面公开的具体实施例的限制。In the following description, many specific details are set forth to facilitate a full understanding of the present invention. However, the present invention may also be implemented in other ways different from those described herein. Therefore, the protection scope of the present invention is not limited to the specific embodiments disclosed below.

另外,在本实用新型的描述中,需要理解的是,术语“顶”、“底”、“内”、“外”、“轴向”、“径向”、“周向”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。In addition, in the description of the present invention, it should be understood that the terms "top", "bottom", "inside", "outside", "axial", "radial", "circumferential", etc., indicating orientations or positional relationships, are based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

在本实用新型中,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”、“固定”等术语应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或成一体;可以是机械连接,也可以是电连接,还可以是通信;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通或两个元件的相互作用关系。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本实用新型中的具体含义。In the present invention, unless otherwise clearly specified and limited, the terms "install", "connect", "connect", "fix" and the like should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection, an electrical connection, or a communication; it can be a direct connection, or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

在本实用新型中,除非另有明确的规定和限定,第一特征在第二特征“上”或“下”可以是第一和第二特征直接接触,或第一和第二特征通过中间媒介间接接触。在本说明书的描述中,参考术语“实施方式”、“实施例”、“一种实施例”、“示例”或“具体示例”等的描述意指结合该实施例或示例描述的具体特征、结构、材料或者特点包含于本实用新型的至少一个实施例或示例中。在本说明书中,对上述术语的示意性表述不必须针对的是相同的实施例或示例。而且,描述的具体特征、结构、材料或者特点可以在任一个或多个实施例或示例中以合适的方式结合。In the present utility model, unless otherwise clearly specified and limited, the first feature "above" or "below" the second feature may be that the first and second features are in direct contact, or the first and second features are in indirect contact through an intermediate medium. In the description of this specification, the description with reference to the terms "implementation method", "example", "one embodiment", "example" or "specific example" means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the utility model. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described may be combined in an appropriate manner in any one or more embodiments or examples.

参照图1-2,一种高架桥安全施工装置,包括可移动底座,可移动底座上设有升降导轨2,升降导轨2上滑动连接有升降平台3,升降平台3底部设有底板301,底板301上设有通口302,底板301上铰接有用于封闭通口302的盖板303,升降导轨2上端设有吊装机构。1-2, a device for safe construction of an elevated bridge includes a movable base, a lifting guide rail 2 is provided on the movable base, a lifting platform 3 is slidably connected to the lifting guide rail 2, a bottom plate 301 is provided at the bottom of the lifting platform 3, a through opening 302 is provided on the bottom plate 301, a cover plate 303 for closing the through opening 302 is hinged on the bottom plate 301, and a lifting mechanism is provided at the upper end of the lifting guide rail 2.

本领域技术人员可以理解的是,高架桥施工项目中包括安装声屏障的安装施工,声屏障作为垂直于桥面的竖向构件包括间隔设置的立柱以及固定安装在相邻立柱之间隔音板材,立柱一般为槽钢结构,隔音板材安装时需要自上而下插入立柱的槽型结构内并通过螺栓或者焊接的方式与立柱固定。通过本申请进行声屏障的施工作业时,首先通过可移动底座将本装置移动至隔音板材存放区,通过吊装机构向升降平台3上吊装适量的隔音板材,需要注意的是,升降平台3上码放的隔音板材量不能影响工人的正常施工操作,升降平台3上的隔音板材吊装完成后,施工人员进入升降平台3上,通过控制升降平台3升高至施工高度,此时,可移动底座上形成了具有收纳空间的放置区域,然后通过人工搬运的方式向该放置区域码放更多的隔音板材,进而使本装置可以转运的隔音板材数量增多,降低了补充材料的频率,提升了声屏障安装施工的效率。隔音板材装载完成后通过可移动底座将本装置移动至施工区域,位于升降平台3上的工人操作控制吊装机构先吊取升降平台3上码放的隔音板材,当升降平台3上的隔音板材安装完后,位于升降平台3上的工人将盖板303向上翻转使通口302打开,控制吊装机构的牵引端通过通口302吊起码放在可移动底座上的隔音板材。It can be understood by those skilled in the art that the viaduct construction project includes the installation of sound barriers. As a vertical component perpendicular to the bridge deck, the sound barrier includes columns arranged at intervals and sound insulation plates fixedly installed between adjacent columns. The columns are generally channel steel structures. When installing the sound insulation plates, they need to be inserted into the channel structure of the columns from top to bottom and fixed to the columns by bolts or welding. When the sound barrier is constructed through this application, the device is first moved to the sound insulation plate storage area through the movable base, and an appropriate amount of sound insulation plates are hoisted onto the lifting platform 3 through the hoisting mechanism. It should be noted that the amount of sound insulation plates stacked on the lifting platform 3 cannot affect the normal construction operation of the workers. After the sound insulation plates on the lifting platform 3 are hoisted, the construction personnel enter the lifting platform 3 and control the lifting platform 3 to rise to the construction height. At this time, a placement area with a storage space is formed on the movable base, and then more sound insulation plates are stacked in the placement area by manual transportation, thereby increasing the number of sound insulation plates that can be transported by the device, reducing the frequency of supplementary materials, and improving the efficiency of the installation and construction of the sound barrier. After the sound insulation panels are loaded, the device is moved to the construction area through the movable base. The workers on the lifting platform 3 operate the lifting mechanism to lift the sound insulation panels stacked on the lifting platform 3 first. When the sound insulation panels on the lifting platform 3 are installed, the workers on the lifting platform 3 flip the cover 303 upward to open the opening 302, and control the traction end of the lifting mechanism to lift the sound insulation panels placed on the movable base through the opening 302.

盖板303可以与底板301沿水平方向滑动连接,当需要封闭通口302时,使盖板303向靠近通口302的方向滑动至完全遮蔽通口302的位置,当需要开启通口302时,使盖板303向远离通口302的方向滑动。这种实施方式中盖板303的位置变化不会对升降平台3上部和下部空间造成影响,保证隔音板材的码放量的同时还可以避免盖板303将通口302打开后与施工人员发生干涉,影响施工人员进行正常的施工操作。The cover plate 303 can be connected to the bottom plate 301 in a horizontal sliding direction. When the opening 302 needs to be closed, the cover plate 303 is slid toward the opening 302 to completely cover the opening 302. When the opening 302 needs to be opened, the cover plate 303 is slid away from the opening 302. In this embodiment, the position change of the cover plate 303 will not affect the space above and below the lifting platform 3, and while ensuring the stacking amount of the sound insulation board, it can also prevent the cover plate 303 from interfering with the construction personnel after opening the opening 302, affecting the normal construction operation of the construction personnel.

通过可移动底座的设置可以在第一个施工点位安装完成后,移动至下一施工点位进行施工安装,保证了施工的连续性,进而加快施工效率,降低施工人员的劳动强度。通过吊装机构的设置便于有效降低施工人员的劳动强度,加快施工效率,控制人工成本。The movable base can be set up to move to the next construction site for construction and installation after the first construction site is installed, ensuring the continuity of construction, thereby speeding up construction efficiency and reducing the labor intensity of construction workers. The setting of the hoisting mechanism is convenient for effectively reducing the labor intensity of construction workers, speeding up construction efficiency and controlling labor costs.

作为上述实施方式的一种优选示例,参照图1和图2,可移动底座上设有放置台101,放置台101位于通口302的下方。放置台101的设置便于在可移动底座上码放隔音板材,放置台101上可以设置与隔音板材适配的限位支撑块(图中未示出),用于增加可移动底座移动过程中,其上部码放的隔音板材的稳定性。As a preferred example of the above embodiment, referring to FIG. 1 and FIG. 2 , a placing platform 101 is provided on the movable base, and the placing platform 101 is located below the through opening 302. The placing platform 101 is provided to facilitate stacking of sound insulation panels on the movable base, and a limiting support block (not shown in the figure) adapted to the sound insulation panels can be provided on the placing platform 101 to increase the stability of the sound insulation panels stacked on the upper part thereof during the movement of the movable base.

作为本申请的一种优选实施方式,参照图1-图2,相邻升降导轨2上端连接有横梁,横梁与升降平台3之间设有提升机构4。通过横梁的设置有利于提高升降导轨2的结构强度,还有利于为提升机构4提供安装工位,由于本申请中的提升机构4为成熟的现有技术,因此本申请对提升机构4的具体结构不做限定,其可以采用液压伸缩杆驱动也可以采用链轮、链条驱动的任意一种,在此不做过多赘述。As a preferred embodiment of the present application, referring to Figures 1 and 2, a crossbeam is connected to the upper ends of adjacent lifting rails 2, and a lifting mechanism 4 is provided between the crossbeam and the lifting platform 3. The provision of the crossbeam is conducive to improving the structural strength of the lifting rail 2, and is also conducive to providing an installation position for the lifting mechanism 4. Since the lifting mechanism 4 in the present application is a mature prior art, the present application does not limit the specific structure of the lifting mechanism 4, which can be driven by a hydraulic telescopic rod or by a sprocket or chain, and no further details are given here.

作为吊装机构的一种具体实施方式,参照图1和图2,吊装机构包括支撑架5,支撑架5设置于升降导轨2的上端,支撑架5上设有转轴501,转轴501侧壁固定连接有水平导轨6,水平导轨6上设有驱动车,驱动车底部设有吊装组件。As a specific embodiment of the lifting mechanism, referring to Figures 1 and 2, the lifting mechanism includes a support frame 5, which is arranged at the upper end of the lifting guide rail 2. A rotating shaft 501 is provided on the support frame 5. The side wall of the rotating shaft 501 is fixedly connected to a horizontal guide rail 6. A driving vehicle is provided on the horizontal guide rail 6, and a lifting assembly is provided at the bottom of the driving vehicle.

工人通过吊装组件将隔音板材吊至槽型结构的上方,使板材自上而下穿插至槽型结构内,进一步的,工人通过转轴501的设置可以调节水平导轨6的位置,通过水平导轨6、驱动车的设置便于灵活调整吊装组件的位置,进而实现代替人工转运板材,使板材可以自码放区域转运至安装区域。Workers use the lifting assembly to lift the sound insulation panels to the top of the trough structure, so that the panels are inserted into the trough structure from top to bottom. Furthermore, workers can adjust the position of the horizontal guide rail 6 through the setting of the rotating shaft 501. The setting of the horizontal guide rail 6 and the driving vehicle facilitates the flexible adjustment of the position of the lifting assembly, thereby replacing manual transportation of the panels, so that the panels can be transported from the stacking area to the installation area.

吊装组件的结构以及工作原理为成熟的现有技术,在此不做过多赘述,本申请对吊装组件不做具体限定,优选地,吊装组件采用卷扬机装置7,卷扬机装置7通过导线连接有控制手柄701,卷扬机装置7具有用于提升物料缆绳,缆绳末端设有拉钩702,工人通过控制卷扬机装置7放缆绳将拉钩702降至码放在升降平台3或放置台101码放区域,将板材与拉钩702固定后启动卷扬机装置7收缆绳即可实现板材的垂直运输,通过控制手柄701的设置可以控制转轴501的转动以及驱动车的移动,还可以控制卷扬机装置7的启停。The structure and working principle of the lifting component are mature existing technologies and will not be elaborated on here. The present application does not make specific limitations on the lifting component. Preferably, the lifting component adopts a winch device 7, and the winch device 7 is connected to a control handle 701 through a wire. The winch device 7 has a cable for lifting materials, and a hook 702 is provided at the end of the cable. The worker controls the winch device 7 to release the cable to lower the hook 702 to the stacking area of the lifting platform 3 or the placement table 101. After fixing the plate and the hook 702, the winch device 7 is started to retract the cable to realize the vertical transportation of the plate. The rotation of the rotating shaft 501 and the movement of the drive vehicle can be controlled by setting the control handle 701, and the start and stop of the winch device 7 can also be controlled.

作为上述实施方式的一种优选示例,参照图1和图2,水平导轨6与转轴501之间固定连接有加固杆601。通过加固杆601的设置便于增加水平导轨6的结构强度,提高其抗压能力,增加本装置使用过程中的安全性。As a preferred example of the above embodiment, referring to Figures 1 and 2, a reinforcing rod 601 is fixedly connected between the horizontal guide rail 6 and the rotating shaft 501. The arrangement of the reinforcing rod 601 facilitates increasing the structural strength of the horizontal guide rail 6, improving its compression resistance, and increasing the safety of the device during use.

作为升降平台3的一种优选实施方式,参照图2,升降平台3四周设有防护栏,升降平台3任一侧防护栏上设有入口,防护栏上转动连接有用于封堵入口的栅栏门306,栅栏门306与防护栏之间设有锁止部307。As a preferred embodiment of the lifting platform 3, referring to Figure 2, the lifting platform 3 is provided with guardrails around it, and an entrance is provided on the guardrails on either side of the lifting platform 3. A fence door 306 for blocking the entrance is rotatably connected to the guardrail, and a locking portion 307 is provided between the fence door 306 and the guardrail.

通过防护栏的设置便于对升降平台3上站立的工人进行有效的安全防护,防止工人从升降平台3上跌落,同时工人还可以将安全带固定在防护栏上,进一步增加工人施工过程中的安全保障,防护栏的设置还有利于对升降平台3上码放的建材进行防护,防止建材从升降平台3上滑落,砸伤下方工人,造成安全事故。The provision of the guardrail facilitates effective safety protection for workers standing on the lifting platform 3 to prevent them from falling from the lifting platform 3. At the same time, the workers can also fix their safety belts on the guardrail to further increase the safety of the workers during the construction process. The provision of the guardrail is also beneficial for protecting the building materials stacked on the lifting platform 3 to prevent them from sliding off the lifting platform 3 and injuring the workers below, causing safety accidents.

作为盖板303的一种优选实施方式,参照图1,盖板303上设有提拉把手304。通过提拉把手304的设置便于工人拉动盖板303旋转。As a preferred embodiment of the cover plate 303, referring to Fig. 1, a lifting handle 304 is provided on the cover plate 303. The provision of the lifting handle 304 facilitates workers to pull the cover plate 303 to rotate.

作为可移动底座的一种具体实施方式,参照图1-图2,可移动底座包括支撑座1,支撑座1底部四周设有若干组轮子102。As a specific implementation of the movable base, referring to FIG. 1-FIG . 2 , the movable base includes a support base 1 , and a plurality of groups of wheels 102 are arranged around the bottom of the support base 1 .

优选的,底板301底部焊接有用于支撑盖板303的限位支撑板305。通过限位支撑板305的设置便于为盖板303远离的铰接端的一侧提供限位支撑。Preferably, a limiting support plate 305 for supporting the cover plate 303 is welded to the bottom of the bottom plate 301. The setting of the limiting support plate 305 facilitates providing limiting support for one side of the cover plate 303 away from the hinged end.

本实用新型中未述及的地方采用或借鉴已有技术即可实现。The parts not described in the present invention can be realized by adopting or drawing on the existing technology.

本说明书中的各个实施例均采用递进的方式描述,各个实施例之间相同相似的部分互相参见即可,每个实施例重点说明的都是与其他实施例的不同之处。The various embodiments in this specification are described in a progressive manner, and the same or similar parts between the various embodiments can be referenced to each other, and each embodiment focuses on the differences from other embodiments.

以上所述仅为本实用新型的实施例而已,并不用于限制本实用新型。对于本领域技术人员来说,本实用新型可以有各种更改和变化。凡在本实用新型的精神和原理之内所作的任何修改、等同替换、改进等,均应包含在本实用新型的权利要求范围之内。The above description is only an embodiment of the present invention and is not intended to limit the present invention. For those skilled in the art, the present invention may have various modifications and variations. Any modification, equivalent substitution, improvement, etc. made within the spirit and principle of the present invention shall be included in the scope of the claims of the present invention.

Claims (10)

1.一种高架桥安全施工装置,其特征在于,包括可移动底座,所述可移动底座上设有升降导轨(2),所述升降导轨(2)上滑动连接有升降平台(3),所述升降平台(3)底部设有底板(301),所述底板(301)上设有通口(302),所述底板(301)上铰接有用于封闭通口(302)的盖板(303),所述升降导轨(2)上端设有吊装机构。1. A safe construction device for an elevated bridge, characterized in that it comprises a movable base, wherein a lifting guide rail (2) is provided on the movable base, a lifting platform (3) is slidably connected to the lifting guide rail (2), a bottom plate (301) is provided at the bottom of the lifting platform (3), a through opening (302) is provided on the bottom plate (301), a cover plate (303) for closing the through opening (302) is hinged on the bottom plate (301), and a hoisting mechanism is provided at the upper end of the lifting guide rail (2). 2.根据权利要求1所述的一种高架桥安全施工装置,其特征在于,所述可移动底座上设有放置台(101),所述放置台(101)位于通口(302)的下方。2. A viaduct safety construction device according to claim 1, characterized in that a placing platform (101) is provided on the movable base, and the placing platform (101) is located below the through opening (302). 3.根据权利要求1所述的一种高架桥安全施工装置,其特征在于,相邻所述升降导轨(2)上端连接有横梁,所述横梁与升降平台(3)之间设有提升机构(4)。3. A viaduct safety construction device according to claim 1, characterized in that a crossbeam is connected to the upper end of the adjacent lifting guide rail (2), and a lifting mechanism (4) is provided between the crossbeam and the lifting platform (3). 4.根据权利要求1所述的一种高架桥安全施工装置,其特征在于,所述吊装机构包括支撑架(5),所述支撑架(5)设置于升降导轨(2)的上端,所述支撑架(5)上设有转轴(501),所述转轴(501)侧壁固定连接有水平导轨(6),所述水平导轨(6)上设有驱动车,所述驱动车底部设有吊装组件。4. A viaduct safety construction device according to claim 1, characterized in that the hoisting mechanism includes a support frame (5), the support frame (5) is arranged at the upper end of the lifting guide rail (2), the support frame (5) is provided with a rotating shaft (501), the side wall of the rotating shaft (501) is fixedly connected with a horizontal guide rail (6), the horizontal guide rail (6) is provided with a driving vehicle, and the bottom of the driving vehicle is provided with a hoisting assembly. 5.根据权利要求4所述的一种高架桥安全施工装置,其特征在于,所述吊装组件采用卷扬机装置(7),所述卷扬机装置(7)通过导线连接有控制手柄(701),所述卷扬机装置(7)具有用于提升物料缆绳,所述缆绳末端设有拉钩(702)。5. A viaduct safety construction device according to claim 4, characterized in that the hoisting assembly adopts a winch device (7), the winch device (7) is connected to a control handle (701) through a wire, the winch device (7) has a cable for lifting materials, and a hook (702) is provided at the end of the cable. 6.根据权利要求5所述的一种高架桥安全施工装置,其特征在于,所述水平导轨(6)与转轴(501)之间固定连接有加固杆(601)。6. A viaduct safety construction device according to claim 5, characterized in that a reinforcement rod (601) is fixedly connected between the horizontal guide rail (6) and the rotating shaft (501). 7.根据权利要求1所述的一种高架桥安全施工装置,其特征在于,所述升降平台(3)四周设有防护栏,所述升降平台(3)任一侧防护栏上设有入口,所述防护栏上转动连接有用于封堵入口的栅栏门(306),所述栅栏门(306)与防护栏之间设有锁止部(307)。7. A viaduct safety construction device according to claim 1, characterized in that the lifting platform (3) is surrounded by guardrails, an entrance is provided on the guardrail on either side of the lifting platform (3), a fence door (306) for blocking the entrance is rotatably connected to the guardrail, and a locking portion (307) is provided between the fence door (306) and the guardrail. 8.根据权利要求7所述的一种高架桥安全施工装置,其特征在于,所述盖板(303)上设有提拉把手(304)。8. A viaduct safety construction device according to claim 7, characterized in that a lifting handle (304) is provided on the cover plate (303). 9.根据权利要求1所述的一种高架桥安全施工装置,其特征在于,所述可移动底座包括支撑座(1),所述支撑座(1)底部四周设有若干组轮子(102)。9. A viaduct safety construction device according to claim 1, characterized in that the movable base comprises a support base (1), and a plurality of groups of wheels (102) are arranged around the bottom of the support base (1). 10.根据权利要求1-9任一项所述的一种高架桥安全施工装置,其特征在于,所述底板(301)底部焊接有用于支撑盖板(303)的限位支撑板(305)。10. A viaduct safety construction device according to any one of claims 1 to 9, characterized in that a limiting support plate (305) for supporting the cover plate (303) is welded to the bottom of the base plate (301).
CN202420252832.1U 2024-01-31 2024-01-31 A kind of viaduct safety construction device Active CN221971207U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202420252832.1U CN221971207U (en) 2024-01-31 2024-01-31 A kind of viaduct safety construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202420252832.1U CN221971207U (en) 2024-01-31 2024-01-31 A kind of viaduct safety construction device

Publications (1)

Publication Number Publication Date
CN221971207U true CN221971207U (en) 2024-11-08

Family

ID=93315447

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202420252832.1U Active CN221971207U (en) 2024-01-31 2024-01-31 A kind of viaduct safety construction device

Country Status (1)

Country Link
CN (1) CN221971207U (en)

Similar Documents

Publication Publication Date Title
KR20130105536A (en) Motorized height access device for tower cranes
CN214653269U (en) Simple ALC wallboard hoisting equipment
CN112027982B (en) Lifting type power equipment maintenance device and use method thereof
CN209163488U (en) A building construction material receiving platform with lifting function
CN221971207U (en) A kind of viaduct safety construction device
CN107829370A (en) High pier self-climbing hydraulic rollover construction process
CN216105701U (en) Hoisting device for engineering reinforcement construction
CN107119966A (en) A kind of pole upside-down mounting group founds lifting device
CN116230381A (en) Transformer core stacking and overturning system
US4022330A (en) Apparatus for mounting building panels
KR100293687B1 (en) Concrete delivery device and its installation method
CN118601622A (en) Method for using a trolley mold frame mobile vehicle
CN118639913A (en) A method for constructing a bulk grain flat warehouse
CN206815943U (en) A kind of pole upside-down mounting group founds lifting device
CN217438822U (en) A retractable multifunctional assembled suspension platform
JP2008214062A (en) Lifting device and structural material mounting method
CN210001549U (en) hydraulic movable lifting platform for building
CN221093460U (en) A mobile hanger device for pile foundation construction near operating lines
CN222757791U (en) A lifting device
CN112110316A (en) Elevator shaft traction rotary telescopic construction elevator and installation and use method thereof
CN221645843U (en) Prefabricated composite panel construction device
CN215666814U (en) Light reactor hoisting device
CN113216593A (en) Anti-falling hoisting device for elevator shaft of high-rise building
CN104860212A (en) Micro crane
CN220978749U (en) Automatic lifting elevator shaft operating platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant