CN221971148U - A powder bag elevator - Google Patents
A powder bag elevator Download PDFInfo
- Publication number
- CN221971148U CN221971148U CN202420799880.2U CN202420799880U CN221971148U CN 221971148 U CN221971148 U CN 221971148U CN 202420799880 U CN202420799880 U CN 202420799880U CN 221971148 U CN221971148 U CN 221971148U
- Authority
- CN
- China
- Prior art keywords
- cavity
- guide
- support plate
- hollow support
- gear
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Basic Packing Technique (AREA)
Abstract
本实用新型提供一种粉体料袋升降机,包括安装腔体,所述安装腔体顶部的两侧皆固定安装有中空支撑板,所述中空支撑板的内部对接安装有传导螺杆,且传导螺杆的底端延伸至安装腔体内,所述安装腔体的内部装配有与传导螺杆传动连接的驱动机构,所述中空支撑板的内侧设置有第一导口,所述传导螺杆上套装有延伸出第一导口的第一导块,所述第一导块之间共同固定安装有载料组件,所述中空支撑板的外侧固定安装有延伸至内侧的抽粉组件。本实用新型通过载料组件不但可以对料带进行安置承载,又可以对料带上的粉尘进行分层接收,避免袋体或袋口处的粉尘残留在载料面,减少人员清理的频率,并且利用内部收集件可以对粉尘进行接收。
The utility model provides a powder bag elevator, including a mounting cavity, both sides of the top of the mounting cavity are fixedly mounted with a hollow support plate, a conductive screw is mounted inside the hollow support plate, and the bottom end of the conductive screw extends into the mounting cavity, the mounting cavity is equipped with a driving mechanism that is transmission-connected with the conductive screw, a first guide port is provided on the inner side of the hollow support plate, a first guide block extending from the first guide port is mounted on the conductive screw, a loading assembly is fixedly mounted between the first guide blocks, and a powder extraction assembly extending to the inner side is fixedly mounted on the outer side of the hollow support plate. The utility model can not only place and carry the material belt through the loading assembly, but also receive the dust on the material belt in layers, so as to avoid dust from the bag body or the bag mouth remaining on the loading surface, reduce the frequency of personnel cleaning, and receive the dust using an internal collector.
Description
技术领域Technical Field
本实用新型涉及卡纸生产技术领域,具体涉及一种粉体料袋升降机。The utility model relates to the technical field of cardboard production, in particular to a powder bag elevator.
背景技术Background Art
卡纸是制作银行卡、地铁卡、SIM卡等各种卡片的主要原料,各个卡纸叠合压制形成卡片;卡纸的制作原料包括聚氯乙烯树脂、色料、添加剂;Cardboard is the main raw material for making bank cards, subway cards, SIM cards and other cards. Cards are formed by stacking and pressing individual cardboards. The raw materials for making cardboard include polyvinyl chloride resin, colorants and additives.
卡纸在制备时,需要先将袋装的色料、添加剂输送至制备设备处,等待与原料进行混合制备,由于制备设备的制备罐体较高,所以需要通过升降设备进行辅助完成,现有的输送设备常用升降机进行作业完成;When preparing cardboard, it is necessary to first transport the bagged colorants and additives to the preparation equipment and wait for mixing with the raw materials. Since the preparation tank of the preparation equipment is relatively high, it needs to be assisted by a lifting device. The existing conveying equipment often uses a lift to complete the operation;
现有的升降机在对粉料袋进行承载升降时,人员需要先将粉袋放置在升降机内,但是在放置时,粉料袋表面或袋口会存在残留的粉尘或杂质,所以在放置时,袋上的粉尘就会掉落滞留在升降机内的承载面上,需要人员进行频繁清理;同时粉料袋在上下料时,料袋在动态作业时,料带上的粉尘就会在升降机内进行扬尘,导致人员在作业时就会出现呛嗓;When the existing elevator is used to carry and lift powder bags, personnel need to place the powder bags in the elevator first. However, when placing the powder bags, there will be residual dust or impurities on the surface or bag mouth. Therefore, when placing the powder bags, the dust on the bags will fall and stay on the load-bearing surface in the elevator, which requires personnel to clean frequently. At the same time, when the powder bags are loaded and unloaded, the dust on the material belt will be raised in the elevator when the bags are in dynamic operation, causing choking of personnel during operation.
因此,本申请提出了一种粉体料袋升降机。Therefore, the present application proposes a powder bag elevator.
实用新型内容Utility Model Content
针对现有技术的不足,本实用新型提供了一种粉体料袋升降机,解决了背景技术中提到的问题。In view of the deficiencies in the prior art, the utility model provides a powder bag elevator to solve the problems mentioned in the background technology.
为实现以上目的,本实用新型通过以下技术方案予以实现:In order to achieve the above objectives, the present invention is implemented through the following technical solutions:
一种粉体料袋升降机,包括安装腔体,所述安装腔体顶部的两侧皆固定安装有中空支撑板,所述中空支撑板的内部对接安装有传导螺杆,且传导螺杆的底端延伸至安装腔体内,所述安装腔体的内部装配有与传导螺杆传动连接的驱动机构,所述中空支撑板的内侧设置有第一导口,所述传导螺杆上套装有延伸出第一导口的第一导块,所述第一导块之间共同固定安装有载料组件,所述中空支撑板的外侧固定安装有延伸至内侧的抽粉组件;所述驱动机构包括传导部件、驱动部件,所述安装腔体内的底部固定安装有传导部件,且传导部件与传导螺杆的底端装配连接,传导部件后侧的安装腔体上固定安装有传动连接的驱动部件,抽粉组件包括抽气扇、安装筒,中空支撑板的内部对接安装有贯穿的安装筒,安装筒的内部固定安装有抽气扇;载料组件包括安装槽体、支撑腔体、收集盒体、支撑网板,第一导块的内侧共同固定安装有安装槽体,安装槽体的内部安置有支撑腔体,且支撑腔体的顶部固定安装有支撑网板,支撑腔体的内部滑动安装有收集盒体。A powder bag elevator comprises a mounting cavity, hollow support plates are fixedly mounted on both sides of the top of the mounting cavity, a conductive screw is mounted in a butt joint inside the hollow support plate, and the bottom end of the conductive screw extends into the mounting cavity, a driving mechanism connected to the conductive screw is assembled inside the mounting cavity, a first guide port is arranged on the inner side of the hollow support plate, a first guide block extending from the first guide port is mounted on the conductive screw, a loading assembly is fixedly mounted between the first guide blocks, a powder pumping assembly extending to the inner side is fixedly mounted on the outer side of the hollow support plate; the driving mechanism comprises a conducting component and a driving component, A conduction component is fixedly installed at the bottom of the installation cavity, and the conduction component is assembled and connected to the bottom end of the conduction screw, and a driving component with a transmission connection is fixedly installed on the installation cavity on the rear side of the conduction component. The powder extraction component includes an exhaust fan and a mounting cylinder, and a penetrating mounting cylinder is installed in the hollow support plate, and an exhaust fan is fixedly installed in the installation cylinder; the loading component includes a mounting trough, a support cavity, a collection box, and a support mesh plate, and the inner side of the first guide block is fixedly installed with the mounting trough, the interior of the mounting trough is arranged with a support cavity, and a support mesh plate is fixedly installed on the top of the support cavity, and the collection box is slidably installed in the support cavity.
进一步的,所述传导部件包括固定座一、副齿轮一、从动齿轮、固定座二、副齿轮二、导轴,安装腔体内的底部固定安装有两组固定座一,固定座一之间的安装腔体上固定安装有固定座二,固定座二与固定座一之间对接安装有导轴,导轴的两端分别对接安装有副齿轮一与副齿轮二,固定座一的内部对接安装有与传导螺杆连接的从动齿轮,且从动齿轮与副齿轮一相互啮合。Furthermore, the conduction component includes a fixed seat 1, a sub-gear 1, a driven gear, a fixed seat 2, a sub-gear 2, and a guide shaft. Two groups of fixed seat 1s are fixedly installed at the bottom of the installation cavity, a fixed seat 2 is fixedly installed on the installation cavity between the fixed seats 1, a guide shaft is butt-mounted between the fixed seat 2 and the fixed seat 1, sub-gear 1 and sub-gear 2 are butt-mounted at both ends of the guide shaft, a driven gear connected to the conduction screw is butt-mounted inside the fixed seat 1, and the driven gear and sub-gear 1 are meshed with each other.
进一步的,所述驱动部件包括电机、主齿轮,安装腔体内的底部固定安装有电机,电机的输出轴对接安装有主齿轮,主齿轮与副齿轮二相互啮合。Furthermore, the driving component includes a motor and a main gear. The motor is fixedly installed at the bottom of the installation cavity, and the main gear is butt-jointed with the output shaft of the motor. The main gear is meshed with the second auxiliary gear.
进一步的,所述第一导口的两侧皆设置有第二导口,安装槽体的两侧皆固定安装有贯穿第二导口的第二导块,且第二导块延伸至中空支撑板内,中空支撑板的内部固定安装有贯穿第二导块的导杆。Furthermore, second guide openings are provided on both sides of the first guide opening, second guide blocks passing through the second guide openings are fixedly installed on both sides of the mounting groove body, and the second guide blocks extend into the hollow support plate, and a guide rod passing through the second guide blocks is fixedly installed inside the hollow support plate.
进一步的,所述收集盒体的正面设置有抽拉口,收集盒体的两侧设置有与支撑腔体滑动连接的导轨,收集盒体与支撑腔体顶部的前侧设置有对应的定位孔;Furthermore, a drawer opening is provided on the front of the collection box body, guide rails slidably connected to the support cavity are provided on both sides of the collection box body, and corresponding positioning holes are provided on the front sides of the collection box body and the top of the support cavity;
载料组件还包括定位销,支撑腔体的顶部对接安装有与定位孔对接的定位销,定位销用于对支撑腔体内的收集盒体进行定位。The loading assembly also includes a positioning pin, and the top of the supporting cavity is docked with a positioning pin that docks with the positioning hole. The positioning pin is used to position the collection box body in the supporting cavity.
进一步的,所述抽粉组件还包括导气腔、导气通道,中空支撑板的外侧固定安装有导气腔,导气腔与安装筒外端口连通,导气腔上对接安装有连通的导气通道。Furthermore, the powder extraction assembly also includes an air guide cavity and an air guide channel. The air guide cavity is fixedly installed on the outer side of the hollow support plate, the air guide cavity is connected to the outer port of the mounting tube, and a connected air guide channel is butt-mounted on the air guide cavity.
进一步的,所述中空支撑板的背面共同固定安装有背板。Furthermore, a back plate is fixedly mounted on the back side of the hollow support plate.
本实用新型提供了一种粉体料袋升降机。与现有技术相比,具备以下有益效果:The utility model provides a powder bag elevator. Compared with the prior art, it has the following beneficial effects:
1、通过载料组件不但可以对料带进行安置承载,又可以对料带上的粉尘进行分层接收,避免袋体或袋口处的粉尘残留在载料面,减少人员清理的频率,并且利用内部收集件可以对粉尘进行接收,便于人员在作业后进行统一处理;1. The loading assembly can not only place and load the material belt, but also collect the dust on the material belt in layers, so as to avoid the dust in the bag body or bag mouth remaining on the loading surface, reduce the frequency of personnel cleaning, and use the internal collection piece to collect the dust, so that personnel can handle it uniformly after the operation;
2、通过抽粉组件使升降机可以在作业时对料袋上扬起的粉尘进行快速排放,避免升降机在作业期间内部出现大量的扬尘效果,保证人员在上下料时不会被粉尘呛住;2. The powder extraction component enables the elevator to quickly discharge the dust raised from the material bags during operation, avoiding a large amount of dust inside the elevator during operation and ensuring that personnel will not be choked by dust when loading and unloading materials;
3、通过传导螺杆与驱动机构之间的相互配合实现了升降机的自动化驱动升降,并且传导螺杆采用了双螺杆结构,保证升降机双边驱动的效果,保证升降机的承载期间的稳定性。3. The automatic driving and lifting of the elevator is realized through the mutual cooperation between the conduction screw and the driving mechanism, and the conduction screw adopts a double-screw structure to ensure the double-sided driving effect of the elevator and the stability of the elevator during the load-bearing period.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
图1示出了本实用新型的粉体料袋升降机第一装配状态结构示意图;FIG1 shows a schematic structural diagram of a powder bag elevator of the present invention in a first assembly state;
图2示出了本实用新型的粉体料袋升降机第二装配状态结构示意图;FIG2 shows a schematic structural diagram of the powder bag elevator of the present invention in a second assembly state;
图3示出了本实用新型的安装腔体与驱动机构装配状态结构示意图;FIG3 is a schematic structural diagram of the installation cavity and the drive mechanism of the utility model in an assembled state;
图4示出了本实用新型的载料组件装配状态结构示意图;FIG4 shows a schematic structural diagram of the material loading assembly of the present invention in an assembled state;
图中所示:1、安装腔体;2、驱动机构;21、传导部件;211、固定座一;212、副齿轮一;213、从动齿轮;214、固定座二;215、副齿轮二;216、导轴;22、驱动部件;221、电机;222、主齿轮;3、抽粉组件;31、导气腔;32、导气通道;33、抽气扇;34、安装筒;4、中空支撑板;41、第一导口;42、第二导口;5、背板;6、载料组件;61、安装槽体;62、支撑腔体;63、收集盒体;631、抽拉口;632、定位孔;633、导轨;64、支撑网板;65、定位销;7、传导螺杆;8、第一导块;9、第二导块;10、导杆。As shown in the figure: 1. Installation cavity; 2. Driving mechanism; 21. Conducting component; 211. Fixed seat 1; 212. Sub gear 1; 213. Driven gear; 214. Fixed seat 2; 215. Sub gear 2; 216. Guide shaft; 22. Driving component; 221. Motor; 222. Main gear; 3. Powder extraction assembly; 31. Air guide cavity; 32. Air guide channel; 33. Exhaust fan; 34. Installation cylinder; 4. Hollow support plate; 41. First guide port; 42. Second guide port; 5. Back plate; 6. Loading assembly; 61. Installation trough; 62. Support cavity; 63. Collection box; 631. Pull-out port; 632. Positioning hole; 633. Guide rail; 64. Support mesh plate; 65. Positioning pin; 7. Conducting screw; 8. First guide block; 9. Second guide block; 10. Guide rod.
具体实施方式DETAILED DESCRIPTION
为使本实用新型实施例的目的、技术方案和优点更加清楚,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。In order to make the purpose, technical solution and advantages of the embodiments of the utility model clearer, the technical solution in the embodiments of the utility model is described clearly and completely. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
实施例一Embodiment 1
为解决背景技术中的技术问题,给出如下的一种粉体料袋升降机:In order to solve the technical problems in the background technology, a powder bag elevator is provided as follows:
结合图1-图4所示,本实用新型提供的一种粉体料袋升降机,包括安装腔体1,所述安装腔体1顶部的两侧皆固定安装有中空支撑板4,中空支撑板4的背面共同固定安装有背板5,所述中空支撑板4的内部对接安装有传导螺杆7,且传导螺杆7的底端延伸至安装腔体1内,所述安装腔体1的内部装配有与传导螺杆7传动连接的驱动机构2,所述中空支撑板4的内侧设置有第一导口41,所述传导螺杆7上套装有延伸出第一导口41的第一导块8,所述第一导块8之间共同固定安装有载料组件6,所述中空支撑板4的外侧固定安装有延伸至内侧的抽粉组件3;As shown in Figures 1 to 4, the utility model provides a powder bag elevator, including an installation cavity 1, hollow support plates 4 are fixedly installed on both sides of the top of the installation cavity 1, and a back plate 5 is fixedly installed on the back of the hollow support plate 4. A conductive screw 7 is installed in the hollow support plate 4, and the bottom end of the conductive screw 7 extends into the installation cavity 1. A driving mechanism 2 connected to the conductive screw 7 is assembled inside the installation cavity 1. A first guide port 41 is provided on the inner side of the hollow support plate 4, and a first guide block 8 extending from the first guide port 41 is mounted on the conductive screw 7. A loading assembly 6 is fixedly installed between the first guide blocks 8, and a powder pumping assembly 3 extending to the inner side is fixedly installed on the outer side of the hollow support plate 4.
通过中空支撑板4与安装腔体1之间的配合,组成装置的基本架构,通过传导螺杆7与驱动机构2之间的相互配合实现了升降机的自动化驱动升降,并且传导螺杆7采用了双螺杆结构,保证升降机双边驱动的效果,保证升降机的承载期间的稳定性,通过第一导口41配合传导螺杆7进行导引作业,通过载料组件6不但可以对料带进行安置承载,又可以对料带上的粉尘进行分层接收,避免袋体或袋口处的粉尘残留在载料面,减少人员清理的频率,并且利用内部收集件可以对粉尘进行接收,便于人员在作业后进行统一处理,通过抽粉组件3使升降机可以在作业时对料袋上扬起的粉尘进行快速排放,避免升降机在作业期间内部出现大量的扬尘效果,保证人员在上下料时不会被粉尘呛住。The basic structure of the device is formed by the cooperation between the hollow support plate 4 and the installation cavity 1. The automatic driving and lifting of the elevator is realized by the mutual cooperation between the conduction screw 7 and the driving mechanism 2. The conduction screw 7 adopts a double-screw structure to ensure the double-sided driving effect of the elevator and the stability of the elevator during the load-bearing period. The first guide port 41 cooperates with the conduction screw 7 to perform guiding operations. The loading component 6 can not only place and load the material belt, but also receive the dust on the material belt in layers to avoid dust residue at the bag body or bag mouth on the loading surface and reduce the frequency of personnel cleaning. The dust can be received by the internal collection piece to facilitate unified processing by personnel after the operation. The powder extraction component 3 allows the elevator to quickly discharge the dust raised on the material bag during operation to avoid a large amount of dust inside the elevator during operation, ensuring that personnel will not be choked by dust when loading and unloading.
所述驱动机构2包括传导部件21、驱动部件22,所述安装腔体1内的底部固定安装有传导部件21,且传导部件21与传导螺杆7的底端装配连接,传导部件21后侧的安装腔体1上固定安装有传动连接的驱动部件22,抽粉组件3包括抽气扇33、安装筒34,中空支撑板4的内部对接安装有贯穿的安装筒34,安装筒34的内部固定安装有抽气扇33;载料组件6包括安装槽体61、支撑腔体62、收集盒体63、支撑网板64,第一导块8的内侧共同固定安装有安装槽体61,安装槽体61的内部安置有支撑腔体62,且支撑腔体62的顶部固定安装有支撑网板64,支撑腔体62的内部滑动安装有收集盒体63;The driving mechanism 2 includes a conducting component 21 and a driving component 22. The conducting component 21 is fixedly installed at the bottom of the installation cavity 1, and the conducting component 21 is assembled and connected to the bottom end of the conducting screw 7. The driving component 22 with transmission connection is fixedly installed on the installation cavity 1 on the rear side of the conducting component 21. The powder extraction component 3 includes an exhaust fan 33 and an installation cylinder 34. The hollow support plate 4 is connected to the inside of the installation cylinder 34 and the exhaust fan 33 is fixedly installed inside the installation cylinder 34. The loading component 6 includes a mounting groove 61, a supporting cavity 62, a collecting box 63, and a supporting mesh plate 64. The inner side of the first guide block 8 is fixedly installed with the mounting groove 61. The interior of the mounting groove 61 is provided with a supporting cavity 62, and the top of the supporting cavity 62 is fixedly installed with a supporting mesh plate 64. The interior of the supporting cavity 62 is slidably installed with a collecting box 63.
期间,通过传导部件21、驱动部件22之间相互配合,利用驱动部件22对传导部件21进行驱动,促使传导部件21带动传导螺杆7进行旋转,期间,通过安装筒34内的抽气扇33进行启动,促使抽气扇33将中空支撑板4内的粉尘进行快速抽离,避免料袋在放置时出现扬尘的情况,通过安装槽体61对支撑腔体62进行承载,期间,通过支撑腔体62与支撑网板64之间的相互配合,完成收集盒体63对掉落的粉尘或杂质进行收集,这样人员在作业完毕后,即可通过对收集盒体63内的粉尘或杂质进行统一处理。During this period, the conduction component 21 and the driving component 22 cooperate with each other, and the driving component 22 is used to drive the conduction component 21, so that the conduction component 21 drives the conduction screw 7 to rotate. During this period, the exhaust fan 33 in the installation cylinder 34 is started, so that the exhaust fan 33 quickly extracts the dust in the hollow support plate 4 to avoid dust when the bag is placed. The support cavity 62 is supported by the installation groove 61. During this period, the collection box 63 collects the fallen dust or impurities through the cooperation between the support cavity 62 and the support mesh plate 64. In this way, after the work is completed, the personnel can uniformly process the dust or impurities in the collection box 63.
实施例二Embodiment 2
如图1和图4所示,在上述实施例的基础上,本实施例进一步给出如下内容:As shown in FIG. 1 and FIG. 4 , based on the above embodiments, this embodiment further provides the following contents:
在本实施例中,传导部件21包括固定座一211、副齿轮一212、从动齿轮213、固定座二214、副齿轮二215、导轴216,安装腔体1内的底部固定安装有两组固定座一211,固定座一211之间的安装腔体1上固定安装有固定座二214,固定座二214与固定座一211之间对接安装有导轴216,导轴216的两端分别对接安装有副齿轮一212与副齿轮二215,固定座一211的内部对接安装有与传导螺杆7连接的从动齿轮213,且从动齿轮213与副齿轮一212相互啮合。In this embodiment, the conduction component 21 includes a fixing seat 1 211, a sub-gear 1 212, a driven gear 213, a fixing seat 214, a sub-gear 215, and a guide shaft 216. Two sets of fixing seats 1 211 are fixedly installed at the bottom of the installation cavity 1, a fixing seat 214 is fixedly installed on the installation cavity 1 between the fixing seats 1 211, a guide shaft 216 is butt-mounted between the fixing seat 214 and the fixing seat 1 211, and sub-gear 1 212 and sub-gear 2 215 are butt-mounted at both ends of the guide shaft 216, and a driven gear 213 connected to the conduction screw 7 is butt-mounted inside the fixing seat 1 211, and the driven gear 213 and sub-gear 1 212 are meshed with each other.
固定座一211、固定座二214可以分别对传动零件进行承载安装;The fixing seat 1 211 and the fixing seat 214 can respectively carry and install the transmission parts;
副齿轮二215受到传导力时即可同步带动导轴216进行旋转,进行一次传动,然后再通过导轴216另一端的副齿轮一212来带动从动齿轮213进行同步旋转,届时即可利用从动齿轮213完成的传导螺杆7的驱动作业。When the secondary gear 215 is subjected to the transmission force, it can synchronously drive the guide shaft 216 to rotate, perform a transmission, and then drive the driven gear 213 to rotate synchronously through the secondary gear 1 212 at the other end of the guide shaft 216. At this time, the driving operation of the transmission screw 7 can be completed by the driven gear 213.
在本实施例中,驱动部件22包括电机221、主齿轮222,安装腔体1内的底部固定安装有电机221,电机221的输出轴对接安装有主齿轮222,主齿轮222与副齿轮二215相互啮合。In this embodiment, the driving component 22 includes a motor 221 and a main gear 222. The motor 221 is fixedly installed at the bottom of the installation cavity 1, and the main gear 222 is installed on the output shaft of the motor 221. The main gear 222 is meshed with the auxiliary gear 215.
通过结合上述内容,作业时,人员即可启动电机221,电机221的输出端即可带动主齿轮222进行旋转,届时主齿轮222的旋转即可带动啮合的两组副齿轮二215进行旋转,实现传导螺杆7的双螺杆传动作业。By combining the above contents, during operation, the personnel can start the motor 221, and the output end of the motor 221 can drive the main gear 222 to rotate. At that time, the rotation of the main gear 222 can drive the two sets of meshing sub-gears 215 to rotate, thereby realizing the double-screw transmission operation of the conduction screw 7.
实施例三Embodiment 3
如图1-图4所示,在上述实施例的基础上,本实施例进一步给出如下内容:As shown in FIG. 1 to FIG. 4 , based on the above embodiment, this embodiment further provides the following contents:
在本实施例中,第一导口41的两侧皆设置有第二导口42,安装槽体61的两侧皆固定安装有贯穿第二导口42的第二导块9,且第二导块9延伸至中空支撑板4内,中空支撑板4的内部固定安装有贯穿第二导块9的导杆10。In this embodiment, a second guide opening 42 is provided on both sides of the first guide opening 41, and a second guide block 9 penetrating the second guide opening 42 is fixedly installed on both sides of the mounting groove 61, and the second guide block 9 extends into the hollow support plate 4, and a guide rod 10 penetrating the second guide block 9 is fixedly installed inside the hollow support plate 4.
第二导口42设置有两组,第一导口41位于第二导口42之间;The second guide openings 42 are provided in two groups, and the first guide openings 41 are located between the second guide openings 42;
第二导口42与第二导块9之间相互配合,保证第二导块9可以在第二导口42内进行顺势导引,并且导杆10对第二导块9进行贯穿定位,第二导块9即可沿着导杆10进行限位滑动,保证安装槽体61在升降期间的稳定性。The second guide opening 42 cooperates with the second guide block 9 to ensure that the second guide block 9 can be guided in the second guide opening 42, and the guide rod 10 penetrates and positions the second guide block 9, so that the second guide block 9 can slide along the guide rod 10 to ensure the stability of the installation slot 61 during lifting.
在本实施例中,收集盒体63的正面设置有抽拉口631,收集盒体63的两侧设置有与支撑腔体62滑动连接的导轨633,收集盒体63与支撑腔体62顶部的前侧设置有对应的定位孔632;In this embodiment, a draw-out opening 631 is provided on the front of the collection box body 63, guide rails 633 slidably connected to the support cavity 62 are provided on both sides of the collection box body 63, and corresponding positioning holes 632 are provided on the front sides of the collection box body 63 and the top of the support cavity 62;
载料组件6还包括定位销65,支撑腔体62的顶部对接安装有与定位孔632对接的定位销65,定位销65用于对支撑腔体62内的收集盒体63进行定位。The loading assembly 6 also includes a positioning pin 65 . The top of the supporting cavity 62 is docked with a positioning pin 65 docked with the positioning hole 632 . The positioning pin 65 is used to position the collecting box body 63 in the supporting cavity 62 .
当人员需要对收集盒体63内的粉尘与杂质进行清理时,则人员即可通过抽拉口631拉动收集盒体63,促使收集盒体63通过导轨633从支撑腔体62内导出清理;When the personnel need to clean the dust and impurities in the collection box body 63, the personnel can pull the collection box body 63 through the drawer opening 631, so that the collection box body 63 is guided out of the support cavity 62 through the guide rail 633 for cleaning;
当收集盒体63在进行作业时,则人员即可将定位销65插入到定位孔632内,通过定位销65完成对收集盒体63与支撑腔体62之间的插接限位,防止升降机在作业期间,收集盒体63不会从支撑腔体62内导出。When the collection box body 63 is in operation, the personnel can insert the positioning pin 65 into the positioning hole 632, and complete the insertion and limiting of the collection box body 63 and the support cavity 62 through the positioning pin 65 to prevent the collection box body 63 from being guided out of the support cavity 62 during the operation of the elevator.
在本实施例中,抽粉组件3还包括导气腔31、导气通道32,中空支撑板4的外侧固定安装有导气腔31,导气腔31与安装筒34外端口连通,导气腔31上对接安装有连通的导气通道32。In this embodiment, the powder extraction assembly 3 also includes an air guide cavity 31 and an air guide channel 32. The air guide cavity 31 is fixedly installed on the outer side of the hollow support plate 4. The air guide cavity 31 is connected to the outer port of the mounting tube 34. The air guide channel 32 is connected to the air guide cavity 31.
期间,抽气扇33在作业期间,抽气扇33将粉尘抽入到安装筒34内,然后粉尘统一进入到导气腔31内部,最后粉尘再通过导气腔31上的导气通道32进行对外导出,导气通道32与外部的收集管道连接。During the operation, the exhaust fan 33 draws the dust into the installation tube 34, and then the dust enters the air guide cavity 31, and finally the dust is discharged to the outside through the air guide channel 32 on the air guide cavity 31, and the air guide channel 32 is connected to the external collection pipe.
需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在包括所述要素的过程、方法、物品或者设备中还存在另外的相同要素。It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.
以上实施例仅用以说明本实用新型的技术方案,而非对其限制;尽管参照前述实施例对本实用新型进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本实用新型各实施例技术方案的精神和范围。The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202420799880.2U CN221971148U (en) | 2024-04-17 | 2024-04-17 | A powder bag elevator |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202420799880.2U CN221971148U (en) | 2024-04-17 | 2024-04-17 | A powder bag elevator |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN221971148U true CN221971148U (en) | 2024-11-08 |
Family
ID=93330645
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202420799880.2U Active CN221971148U (en) | 2024-04-17 | 2024-04-17 | A powder bag elevator |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN221971148U (en) |
-
2024
- 2024-04-17 CN CN202420799880.2U patent/CN221971148U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN210214010U (en) | Automatic feeding device is used in processing of PCB board | |
| CN105475179A (en) | Automatic royal jelly collecting device | |
| CN221971148U (en) | A powder bag elevator | |
| CN217650479U (en) | Rice conveying control device | |
| CN218230486U (en) | An automatic conveying device for the processing of SUV trunk cover | |
| CN219766074U (en) | Wet towel finished product detection and rejection machine | |
| CN118768682A (en) | A spot welding device for circuit board production | |
| CN116765911A (en) | A rear-out chip removal device for a vertical machining center | |
| CN112474293B (en) | A closed high-efficiency vibrating screen | |
| CN213733559U (en) | Waste treatment device convenient to compress and used for mold processing | |
| CN211733174U (en) | Corn raw material unloader is used in feed factory | |
| CN213855643U (en) | Closed high-efficient shale shaker | |
| CN115666120A (en) | Feed mechanism of high-speed SMT chip mounter | |
| CN212049500U (en) | A pallet automatic loading and unloading device | |
| CN215499160U (en) | Automatic film feeding device for industrial film digital scanner | |
| CN221912322U (en) | Multilayer board perforating device | |
| CN209480692U (en) | An automatic stacking device for waste aluminum recycled aluminum materials | |
| CN209882282U (en) | High-density HD (high-definition) lamination multilayer circuit board production line | |
| CN221817683U (en) | Laser cutting equipment | |
| CN223253939U (en) | Automatic blank taking, conveying and overturning lifter | |
| CN221758564U (en) | A transfer device for fully automatic ring-shaped parts processing | |
| CN221894093U (en) | A C-shaped steel stacking device | |
| CN221067265U (en) | Efficient squeezing equipment for edible oil production | |
| CN223117607U (en) | Sand adding device for stacking ceramic knife blanks | |
| CN219170299U (en) | A waste collection device with a pressing structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |