CN221958321U - Vibration-damping and shock-resistant comprehensive support with limit function - Google Patents
Vibration-damping and shock-resistant comprehensive support with limit function Download PDFInfo
- Publication number
- CN221958321U CN221958321U CN202420390739.7U CN202420390739U CN221958321U CN 221958321 U CN221958321 U CN 221958321U CN 202420390739 U CN202420390739 U CN 202420390739U CN 221958321 U CN221958321 U CN 221958321U
- Authority
- CN
- China
- Prior art keywords
- channel steel
- wall
- limited
- vibration
- mounting plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000035939 shock Effects 0.000 title claims 3
- 238000013016 damping Methods 0.000 title description 11
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 111
- 239000010959 steel Substances 0.000 claims abstract description 111
- 238000002955 isolation Methods 0.000 claims abstract description 26
- 239000003351 stiffener Substances 0.000 claims description 24
- 230000000694 effects Effects 0.000 abstract description 10
- 238000009434 installation Methods 0.000 description 6
- 230000000087 stabilizing effect Effects 0.000 description 4
- 101001121408 Homo sapiens L-amino-acid oxidase Proteins 0.000 description 3
- 102100026388 L-amino-acid oxidase Human genes 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 230000002708 enhancing effect Effects 0.000 description 2
- 238000004378 air conditioning Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Vibration Prevention Devices (AREA)
Abstract
本申请涉及抗震支架的领域,尤其是涉及一种带限位减振抗震综合支架,其包括:槽钢组件,与墙体相连接,包括与墙体相垂直连接的多个第一槽钢以及与墙体呈角度连接的第二槽钢;第一连接组件,设置在所述第一槽钢和墙体之间;第二连接组件,设置在所述第二槽钢和墙体之间;安装板,与所述第一槽钢和所述第二槽钢均相连接;限位减震垫,用于减缓横向的振动,设置在所述安装板上,设置有多个,多个所述限位减震垫相平行设置;横担,设置在两个相邻的所述限位减震垫之间,用于减缓纵向的振动。本申请能够提升抗震支架的隔振效果。
The present application relates to the field of earthquake-resistant brackets, and in particular to an integrated earthquake-resistant bracket with limited vibration reduction, which includes: a channel steel assembly connected to a wall, including a plurality of first channel steels vertically connected to the wall and a second channel steel connected to the wall at an angle; a first connection assembly arranged between the first channel steel and the wall; a second connection assembly arranged between the second channel steel and the wall; a mounting plate connected to both the first channel steel and the second channel steel; a limited vibration-reducing pad for reducing lateral vibration, arranged on the mounting plate, with a plurality of the limited vibration-reducing pads arranged in parallel; a cross arm arranged between two adjacent limited vibration-reducing pads for reducing longitudinal vibration. The present application can enhance the vibration isolation effect of the earthquake-resistant bracket.
Description
技术领域Technical Field
本申请涉及抗震支架的领域,尤其是涉及一种带限位减振抗震综合支架。The present application relates to the field of earthquake-resistant brackets, and in particular to an earthquake-resistant integrated bracket with limiting vibration reduction.
背景技术Background Art
抗震支架是限制附属机电工程设施产生位移,控制设施振动,并将荷载传递至承载结构上的各类组件或装置。经抗震加固后的建筑给水排水、消防、供暖、通风、空调、燃气、热力、电力、通讯等机电工程设施,当遭遇到本地区抗震设防烈度的地震发生时,可以达到减轻地震破坏,减少和尽可能防止次生灾害的发生,从而达到减少人员伤亡及财产损失的目的。Seismic supports are used to limit the displacement of attached electromechanical engineering facilities, control the vibration of facilities, and transfer the load to various components or devices on the bearing structure. When encountering an earthquake with the seismic fortification intensity in the region, the electromechanical engineering facilities such as water supply and drainage, fire protection, heating, ventilation, air conditioning, gas, heat, electricity, and communications of buildings that have been seismically reinforced can reduce earthquake damage, reduce and prevent the occurrence of secondary disasters as much as possible, thereby achieving the purpose of reducing casualties and property losses.
目前,现有的抗震支架,包括稳定装置、抱箍和斜支架,抱箍安装在稳定装置的内腔,斜支架设置在稳定装置的侧端,所述稳定装置包括连接板、斜支板、滑动装置、固定块、缓冲装置、支撑柱、缓冲件和底板。但是,现有的抗震支架有一定的抗震效果,但是依然对振动能够产生传递的效果,导致当发生较大振动时,抗震支架的隔振效果不佳。At present, the existing anti-seismic bracket includes a stabilizing device, a clamp and an oblique bracket, the clamp is installed in the inner cavity of the stabilizing device, and the oblique bracket is set at the side end of the stabilizing device. The stabilizing device includes a connecting plate, an oblique support plate, a sliding device, a fixing block, a buffer device, a support column, a buffer and a bottom plate. However, the existing anti-seismic bracket has a certain anti-seismic effect, but it can still produce a transmission effect on vibration, resulting in poor vibration isolation effect of the anti-seismic bracket when a large vibration occurs.
实用新型内容Utility Model Content
为了提升抗震支架的隔振效果,本申请提供一种带限位减振抗震综合支架。In order to improve the vibration isolation effect of the seismic support, the present application provides a comprehensive seismic support with limited vibration reduction.
本申请提供的一种带限位减振抗震综合支架采用如下的技术方案:The present application provides a comprehensive support with limited vibration reduction and earthquake resistance, which adopts the following technical solution:
一种带限位减振抗震综合支架,包括:A comprehensive support with limited vibration reduction and earthquake resistance, comprising:
槽钢组件,与墙体相连接,包括与墙体相垂直连接的多个第一槽钢以及与墙体呈角度连接的第二槽钢;A channel steel assembly connected to the wall, comprising a plurality of first channel steels connected perpendicularly to the wall and a second channel steel connected to the wall at an angle;
第一连接组件,设置在所述第一槽钢和墙体之间;A first connecting assembly is arranged between the first channel steel and the wall;
第二连接组件,设置在所述第二槽钢和墙体之间;A second connecting assembly is arranged between the second channel steel and the wall;
安装板,与所述第一槽钢和所述第二槽钢均相连接;A mounting plate connected to both the first channel steel and the second channel steel;
限位减震垫,用于减缓横向的振动,设置在所述安装板上,设置有多个,多个所述限位减震垫相平行设置;A limit shock-absorbing pad, used to reduce lateral vibration, is arranged on the mounting plate, and a plurality of limit shock-absorbing pads are arranged in parallel;
横担,设置在两个相邻的所述限位减震垫之间,用于减缓纵向的振动。The cross arm is arranged between two adjacent limit shock-absorbing pads to reduce longitudinal vibration.
通过采用上述技术方案,操作时,将第一槽钢先通过第一连接组件与墙体和安装板安装在一起,再将第二槽钢通过第二连接组件与墙体和安装板安装在一起,安装板上通过安装限位减震垫横担来限制抗震支架上的管束的位置,并且能够在两个方位上均起到限位的作用,提升了抗震支架的隔振效果。By adopting the above technical solution, during operation, the first channel steel is first installed together with the wall and the mounting plate through the first connecting component, and then the second channel steel is installed together with the wall and the mounting plate through the second connecting component. The mounting plate is limited by installing a limit shock-absorbing pad cross arm to limit the position of the pipe bundle on the seismic support, and it can play a limiting role in two directions, thereby improving the vibration isolation effect of the seismic support.
可选的,所述限位减震垫至少设置有两个,所述横担垂直设置在两个所述限位减震垫靠近侧面的边缘,所述横担与所述限位减震垫之间形成供管束放置的空间。Optionally, at least two of the limiting shock-absorbing pads are provided, and the cross arm is vertically provided at the edges of the two limiting shock-absorbing pads close to the sides, and a space for placing the tube bundle is formed between the cross arm and the limiting shock-absorbing pads.
通过采用上述技术方案,限位减震垫不仅能够减缓横向的振动,同时还能够对安装板上的管束进行限位。限位减震垫设置有两个能够对管束两侧进行限位。横担与限位减震垫之间形成的空间能够将管束的移动完全限制住,从而将管束的位置固定。By adopting the above technical solution, the limit damping pad can not only reduce the lateral vibration, but also limit the position of the tube bundle on the mounting plate. Two limit damping pads are provided to limit the two sides of the tube bundle. The space formed between the cross arm and the limit damping pad can completely limit the movement of the tube bundle, thereby fixing the position of the tube bundle.
可选的,所述第二连接组件分别设置在所述第二槽钢与所述墙体之间、所述第二槽钢与所述安装板之间,所述第二连接组件包括与所述第二槽钢两端铰接的隔振连接座以及与所述隔振连接座相连接的扣垫。Optionally, the second connecting component is respectively arranged between the second channel steel and the wall, and between the second channel steel and the mounting plate, and the second connecting component includes a vibration isolation connecting seat hinged to both ends of the second channel steel and a buckle pad connected to the vibration isolation connecting seat.
通过采用上述技术方案,第二连接组件向上用于连接第二槽钢和墙体,向下连接第二槽钢和安装板。安装时,先将第二槽钢两端的位置定位好,再将扣垫分别抵接在墙体上和安装板上,再将隔振连接座安装上,再用过旋拧螺栓使第二槽钢、隔振连接座以及扣垫固定在一起。By adopting the above technical solution, the second connecting assembly is used to connect the second channel steel and the wall upwards, and to connect the second channel steel and the mounting plate downwards. During installation, first position the two ends of the second channel steel, then place the buckle pads against the wall and the mounting plate respectively, then install the vibration isolation connection seat, and then use the bolts to fix the second channel steel, the vibration isolation connection seat and the buckle pads together.
可选的,所述第一连接组件包括嵌设在所述墙体上的锚栓以及与所述锚栓相连接的六角长螺母,所述六角长螺母与所述第一槽钢相连接。Optionally, the first connecting component includes an anchor bolt embedded in the wall and a long hexagonal nut connected to the anchor bolt, and the long hexagonal nut is connected to the first channel steel.
通过采用上述技术方案,第一连接组件的设置使得第一槽钢与墙体、第一槽钢与安装板之间的连接强度。操作时,先将锚栓嵌设在墙体上,再将锚栓穿设至墙体上,再将六角长螺母与锚栓相连接,最后将六角长螺母和第一槽钢相连接,第一槽钢和安装板之间同样通过六角长螺杆和锚栓相连接。By adopting the above technical solution, the first connecting assembly is arranged to increase the connection strength between the first channel steel and the wall, and between the first channel steel and the mounting plate. During operation, the anchor bolt is first embedded in the wall, then the anchor bolt is passed through the wall, and then the hexagonal long nut is connected to the anchor bolt, and finally the hexagonal long nut is connected to the first channel steel. The first channel steel and the mounting plate are also connected through the hexagonal long screw and the anchor bolt.
可选的,多个所述第一槽钢相对的一侧设置有吊杆加劲件。Optionally, a hanger rod stiffener is provided on one side opposite to the first channel steels.
通过采用上述技术方案,每个第一槽钢上都设置有吊杆加劲件,使得第一槽钢的结构强度更大,吊杆加劲件安装在第一槽钢的集中荷载处,为保证构件局部稳定并传递集中力所设置的吊杆加劲件,可以提高第一槽钢的稳定性和抗扭性能。By adopting the above technical solution, a hanger stiffener is provided on each first channel steel, so that the structural strength of the first channel steel is greater. The hanger stiffener is installed at the concentrated load of the first channel steel. The hanger stiffener is provided to ensure the local stability of the component and transmit the concentrated force, which can improve the stability and torsional resistance of the first channel steel.
可选的,所述吊杆加劲件设置有多个,多个所述吊杆加劲件沿所述第一槽钢的长度方向间隔设置。Optionally, a plurality of the hanger rod stiffeners are provided, and the plurality of the hanger rod stiffeners are arranged at intervals along the length direction of the first channel steel.
通过采用上述技术方案,吊杆加劲件设置有多个从而能够进一步加强第一槽钢的安装稳定性,并且多个吊杆加劲件沿第一槽钢的长度方向间隔设置能够使得第一槽钢的稳定性进一步加深。更多的吊杆加劲件的设置能够增加稳定性,但是不宜设置过多,会在提升较少的稳定性的情况下,增加更多的人力。By adopting the above technical solution, a plurality of hanger rod stiffeners are provided, thereby further enhancing the installation stability of the first channel steel, and the plurality of hanger rod stiffeners are arranged at intervals along the length direction of the first channel steel, thereby further enhancing the stability of the first channel steel. The provision of more hanger rod stiffeners can increase stability, but it is not advisable to provide too many hanger rod stiffeners, as this will increase more manpower while improving less stability.
可选的,所述第一槽钢和所述第二槽钢选用C41的所述第一槽钢和所述第二槽钢。Optionally, the first channel steel and the second channel steel are the first channel steel and the second channel steel of C41.
通过采用上述技术方案,C41形槽钢具有精确尺寸、结构牢固、重量轻等优点,用于安装板和墙体之间的支撑和搭建,可以承受较大的荷载并保持结构稳定,并且高强度、隔振性能好,能够进一步提升抗震支架带来的隔振性能。By adopting the above technical solution, the C41 channel steel has the advantages of precise size, solid structure, light weight, etc. It is used for support and construction between the installation plate and the wall. It can withstand large loads and maintain structural stability. It also has high strength and good vibration isolation performance, which can further enhance the vibration isolation performance brought by the seismic bracket.
可选的,所述横担上设置有桥架,所述桥架用于连接相邻的抗震支架。Optionally, a bridge is provided on the cross arm, and the bridge is used to connect adjacent earthquake-resistant supports.
通过采用上述技术方案,桥架的设置能够加强不同抗震支架之间的连接稳定性,从而进一步提升抗震支架的隔振性。连接时,先将每个抗震支架上的横担安装好,再将管束横放穿过多个抗震支架,从而再将桥架在多个横担之间,实现连接。By adopting the above technical solution, the setting of the bridge can strengthen the connection stability between different seismic supports, thereby further improving the vibration isolation of the seismic supports. When connecting, first install the cross arm on each seismic support, then place the pipe bundle horizontally through multiple seismic supports, and then place the bridge between the multiple cross arms to achieve connection.
综上所述,本申请包括以下至少一种有益技术效果:In summary, the present application includes at least one of the following beneficial technical effects:
1.通过设置了槽钢组件、第一槽钢、第二槽钢、第一连接组件、第二连接组件、安装板、横担以及限位减震垫,操作时,将第一槽钢先通过第一连接组件与墙体和安装板安装在一起,再将第二槽钢通过第二连接组件与墙体和安装板安装在一起,安装板上通过安装限位减震垫横担来限制抗震支架上的管束的位置,并且能够在两个方位上均起到限位的作用,提升了抗震支架的隔振效果;1. By setting the channel steel assembly, the first channel steel, the second channel steel, the first connecting assembly, the second connecting assembly, the mounting plate, the cross arm and the limit shock-absorbing pad, during operation, the first channel steel is first installed with the wall and the mounting plate through the first connecting assembly, and then the second channel steel is installed with the wall and the mounting plate through the second connecting assembly. The position of the pipe bundle on the seismic support is limited by installing the limit shock-absorbing pad cross arm on the mounting plate, and it can play a role of limiting in both directions, thereby improving the vibration isolation effect of the seismic support;
2.通过设置了隔振连接座以及扣垫,第二连接组件向上用于连接第二槽钢和墙体,向下连接第二槽钢和安装板。安装时,先将第二槽钢两端的位置定位好,再将扣垫分别抵接在墙体上和安装板上,再将隔振连接座安装上,再用过旋拧螺栓使第二槽钢、隔振连接座以及扣垫固定在一起;2. By setting up the vibration isolation connection seat and the buckle pad, the second connection assembly is used to connect the second channel steel and the wall upward, and to connect the second channel steel and the mounting plate downward. During installation, first position the two ends of the second channel steel, then place the buckle pad against the wall and the mounting plate respectively, then install the vibration isolation connection seat, and then use the bolts to fix the second channel steel, the vibration isolation connection seat and the buckle pad together;
3.通过设置了锚栓以及六角长螺母,第一连接组件的设置使得第一槽钢与墙体、第一槽钢与安装板之间的连接强度。操作时,先将锚栓嵌设在墙体上,再将锚栓穿设至墙体上,再将六角长螺母与锚栓相连接,最后将六角长螺母和第一槽钢相连接,第一槽钢和安装板之间同样通过六角长螺杆和锚栓相连接。3. By setting anchor bolts and long hexagonal nuts, the setting of the first connection assembly makes the connection strength between the first channel steel and the wall, and between the first channel steel and the mounting plate. During operation, the anchor bolt is first embedded in the wall, then the anchor bolt is penetrated into the wall, and then the long hexagonal nut is connected to the anchor bolt, and finally the long hexagonal nut is connected to the first channel steel. The first channel steel and the mounting plate are also connected through the long hexagonal screw and anchor bolt.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
图1是本申请的整体结构示意图。FIG1 is a schematic diagram of the overall structure of the present application.
附图标记说明:1、槽钢组件;11、第一槽钢;12、第二槽钢;2、第一连接组件;21、锚栓;22、六角长螺母;3、第二连接组件;31、隔振连接座;32、扣垫;4、安装板;5、横担;6、限位减震垫;7、吊杆加劲件;8、桥架。Explanation of the reference numerals: 1. channel steel assembly; 11. first channel steel; 12. second channel steel; 2. first connecting assembly; 21. anchor bolt; 22. long hexagonal nut; 3. second connecting assembly; 31. vibration isolation connecting seat; 32. buckle pad; 4. mounting plate; 5. cross arm; 6. limit shock-absorbing pad; 7. hanger stiffener; 8. bridge frame.
具体实施方式DETAILED DESCRIPTION
以下结合附图1对本申请作进一步详细说明。The present application is further described in detail below in conjunction with FIG1 .
本申请实施例公开一种带限位减振抗震综合支架。The embodiment of the present application discloses a comprehensive support with limited vibration reduction and earthquake resistance.
参照图1,一种带限位减振抗震综合支架,包括与墙体相连接的槽钢组件1、第一连接组件2、第二连接组件3、安装板4、横担5以及用于减缓横向的振动的限位减震垫6。1 , a comprehensive support with limited vibration reduction and earthquake resistance includes a channel steel component 1 connected to a wall, a first connection component 2, a second connection component 3, a mounting plate 4, a cross arm 5, and a limited vibration reduction pad 6 for reducing lateral vibration.
槽钢组件1包括与墙体相垂直连接的多个第一槽钢11以及与墙体呈角度连接的第二槽钢12;第一连接组件2设置在第一槽钢11和墙体之间,第二连接组件3设置在第二槽钢12和墙体之间;安装板4与第一槽钢11和第二槽钢12均相连接;限位减震垫6设置在安装板4上,设置有多个,多个限位减震垫6相平行设置;横担5设置在两个相邻的限位减震垫6之间,用于减缓纵向的振动。The channel steel assembly 1 includes a plurality of first channel steels 11 connected perpendicularly to the wall and a second channel steel 12 connected at an angle to the wall; the first connection assembly 2 is arranged between the first channel steel 11 and the wall, and the second connection assembly 3 is arranged between the second channel steel 12 and the wall; the mounting plate 4 is connected to both the first channel steel 11 and the second channel steel 12; the limit shock-absorbing pad 6 is arranged on the mounting plate 4, and a plurality of limit shock-absorbing pads 6 are arranged in parallel; the cross arm 5 is arranged between two adjacent limit shock-absorbing pads 6 to reduce longitudinal vibration.
操作时,将第一槽钢11先通过第一连接组件2与墙体和安装板4安装在一起,再将第二槽钢12通过第二连接组件3与墙体和安装板4安装在一起,安装板4上通过安装限位减震垫6横担5来限制抗震支架上的管束的位置,并且能够在两个方位上均起到限位的作用,提升了抗震支架的隔振效果。During operation, the first channel steel 11 is first installed together with the wall and the mounting plate 4 through the first connecting component 2, and then the second channel steel 12 is installed together with the wall and the mounting plate 4 through the second connecting component 3. The mounting plate 4 is provided with a limit shock-absorbing pad 6 and a cross arm 5 to limit the position of the pipe bundle on the seismic support, and can play a limiting role in both directions, thereby improving the vibration isolation effect of the seismic support.
参照图1,限位减震垫6至少设置有两个,横担5垂直设置在两个限位减震垫6靠近侧面的边缘,横担5与限位减震垫6之间形成供管束放置的空间。限位减震垫6不仅能够减缓横向的振动,同时还能够对安装板4上的管束进行限位。限位减震垫6设置有两个能够对管束两侧进行限位。横担5与限位减震垫6之间形成的空间能够将管束的移动完全限制住,从而将管束的位置固定。Referring to FIG1 , at least two limit damping pads 6 are provided, and the cross arm 5 is vertically arranged at the edges of the two limit damping pads 6 close to the sides, and a space for placing the tube bundle is formed between the cross arm 5 and the limit damping pad 6. The limit damping pad 6 can not only reduce the lateral vibration, but also limit the tube bundle on the mounting plate 4. Two limit damping pads 6 are provided to limit the two sides of the tube bundle. The space formed between the cross arm 5 and the limit damping pad 6 can completely limit the movement of the tube bundle, thereby fixing the position of the tube bundle.
第二连接组件3分别设置在第二槽钢12与墙体之间、第二槽钢12与安装板4之间,第二连接组件3包括与第二槽钢12两端铰接的隔振连接座31以及与隔振连接座31相连接的扣垫32。The second connection assembly 3 is respectively arranged between the second channel steel 12 and the wall, and between the second channel steel 12 and the mounting plate 4. The second connection assembly 3 includes a vibration isolation connection seat 31 hinged to both ends of the second channel steel 12 and a buckle pad 32 connected to the vibration isolation connection seat 31.
第二连接组件3向上用于连接第二槽钢12和墙体,向下连接第二槽钢12和安装板4。安装时,先将第二槽钢12两端的位置定位好,再将扣垫32分别抵接在墙体上和安装板4上,再将隔振连接座31安装上,再用过旋拧螺栓使第二槽钢12、隔振连接座31以及扣垫32固定在一起。The second connecting assembly 3 is used to connect the second channel steel 12 and the wall upward, and to connect the second channel steel 12 and the mounting plate 4 downward. During installation, first position the two ends of the second channel steel 12, then place the buckle pads 32 against the wall and the mounting plate 4 respectively, then install the vibration isolation connection seat 31, and then use the bolts to fix the second channel steel 12, the vibration isolation connection seat 31 and the buckle pads 32 together.
参照图1,第一连接组件2包括嵌设在墙体上的锚栓21以及与锚栓21相连接的六角长螺母22,六角长螺母22与第一槽钢11相连接。1 , the first connection assembly 2 includes an anchor bolt 21 embedded in the wall and a long hexagonal nut 22 connected to the anchor bolt 21 , and the long hexagonal nut 22 is connected to the first channel steel 11 .
第一连接组件2的设置使得第一槽钢11与墙体、第一槽钢11与安装板4之间的连接强度。操作时,先将锚栓21嵌设在墙体上,再将锚栓21穿设至墙体上,再将六角长螺母22与锚栓21相连接,最后将六角长螺母22和第一槽钢11相连接,第一槽钢11和安装板4之间同样通过六角长螺杆和锚栓21相连接。The first connection assembly 2 is provided to increase the connection strength between the first channel steel 11 and the wall, and between the first channel steel 11 and the mounting plate 4. During operation, the anchor bolt 21 is first embedded in the wall, and then the anchor bolt 21 is passed through the wall, and then the hexagonal long nut 22 is connected to the anchor bolt 21, and finally the hexagonal long nut 22 is connected to the first channel steel 11, and the first channel steel 11 and the mounting plate 4 are also connected through the hexagonal long screw and the anchor bolt 21.
参照图1,多个第一槽钢11相对的一侧设置有吊杆加劲件7。吊杆加劲件7设置有多个,多个吊杆加劲件7沿第一槽钢11的长度方向间隔设置。每个第一槽钢11上都设置有吊杆加劲件7,使得第一槽钢11的结构强度更大,吊杆加劲件7安装在第一槽钢11的集中荷载处,为保证构件局部稳定并传递集中力所设置的吊杆加劲件7,可以提高第一槽钢11的稳定性和抗扭性能。吊杆加劲件7设置有多个从而能够进一步加强第一槽钢11的安装稳定性,并且多个吊杆加劲件7沿第一槽钢11的长度方向间隔设置能够使得第一槽钢11的稳定性进一步加深。更多的吊杆加劲件7的设置能够增加稳定性,但是不宜设置过多,会在提升较少的稳定性的情况下,增加更多的人力。Referring to Figure 1, a hanger rod stiffener 7 is provided on one side opposite to the plurality of first channel steels 11. A plurality of hanger rod stiffeners 7 are provided, and the plurality of hanger rod stiffeners 7 are arranged at intervals along the length direction of the first channel steel 11. A hanger rod stiffener 7 is provided on each first channel steel 11, so that the structural strength of the first channel steel 11 is greater. The hanger rod stiffener 7 is installed at the concentrated load of the first channel steel 11. The hanger rod stiffener 7 provided to ensure the local stability of the component and transmit the concentrated force can improve the stability and torsional resistance of the first channel steel 11. A plurality of hanger rod stiffeners 7 are provided, so that the installation stability of the first channel steel 11 can be further strengthened, and the plurality of hanger rod stiffeners 7 are arranged at intervals along the length direction of the first channel steel 11, so that the stability of the first channel steel 11 can be further deepened. The provision of more hanger rod stiffeners 7 can increase stability, but it is not advisable to provide too many hanger rod stiffeners 7, which will increase more manpower while improving less stability.
第一槽钢11和第二槽钢12选用C4扣垫32扣垫32扣垫321的第一槽钢11和第二槽钢12。4扣垫32扣垫32扣垫321形槽钢具有精确尺寸、结构牢固、重量轻等优点,用于安装板4和墙体之间的支撑和搭建,可以承受较大的荷载并保持结构稳定,并且高强度、隔振性能好,能够进一步提升抗震支架带来的隔振性能。The first channel steel 11 and the second channel steel 12 are first channel steel 11 and second channel steel 12 with C4 buckle pads 32 buckle pads 32 buckle pads 321. The 4-buckle pad 32 buckle pad 32 buckle pad 321-shaped channel steel has the advantages of precise size, strong structure, and light weight. It is used for support and construction between the mounting plate 4 and the wall, can withstand large loads and maintain structural stability, and has high strength and good vibration isolation performance, which can further enhance the vibration isolation performance brought by the seismic-resistant bracket.
横担5上设置有桥架8,桥架8用于连接相邻的抗震支架。桥架8的设置能够加强不同抗震支架之间的连接稳定性,从而进一步提升抗震支架的抗震性。连接时,先将每个抗震支架上的横担5安装好,再将管束横放穿过多个抗震支架,从而再将桥架8在多个横担5之间,实现连接。A bridge 8 is provided on the cross arm 5, and the bridge 8 is used to connect adjacent seismic supports. The provision of the bridge 8 can enhance the connection stability between different seismic supports, thereby further improving the seismic resistance of the seismic supports. When connecting, first install the cross arm 5 on each seismic support, then place the pipe bundle horizontally through multiple seismic supports, and then place the bridge 8 between multiple cross arms 5 to achieve connection.
本申请实施例一种带限位减振抗震综合支架的实施原理为:操作时,将第一槽钢11先通过第一连接组件2与墙体和安装板4安装在一起,再将第二槽钢12通过第二连接组件3与墙体和安装板4安装在一起,安装板4上通过安装限位减震垫6横担5来限制抗震支架上的管束的位置,并且能够在两个方位上均起到限位的作用,提升了抗震支架的隔振效果。The implementation principle of the earthquake-resistant integrated bracket with limit vibration reduction in the embodiment of the present application is: during operation, the first channel steel 11 is first installed together with the wall and the mounting plate 4 through the first connecting component 2, and then the second channel steel 12 is installed together with the wall and the mounting plate 4 through the second connecting component 3. The position of the pipe bundle on the earthquake-resistant bracket is limited by installing a limit vibration-damping pad 6 and a cross arm 5 on the mounting plate 4, and it can play a limiting role in both directions, thereby improving the vibration isolation effect of the earthquake-resistant bracket.
以上均为本申请的较佳实施例,并非依此限制本申请的保护范围,故:凡依本申请的结构、形状、原理所做的等效变化,均应涵盖于本申请的保护范围之内。The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202420390739.7U CN221958321U (en) | 2024-02-29 | 2024-02-29 | Vibration-damping and shock-resistant comprehensive support with limit function |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202420390739.7U CN221958321U (en) | 2024-02-29 | 2024-02-29 | Vibration-damping and shock-resistant comprehensive support with limit function |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN221958321U true CN221958321U (en) | 2024-11-05 |
Family
ID=93281694
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202420390739.7U Active CN221958321U (en) | 2024-02-29 | 2024-02-29 | Vibration-damping and shock-resistant comprehensive support with limit function |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN221958321U (en) |
-
2024
- 2024-02-29 CN CN202420390739.7U patent/CN221958321U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102287578A (en) | Spring-rubber vibration isolating hanging frame for damping vibration and reducing noise for warm ventilation pipe | |
| CN108612917A (en) | A kind of vertical vibration damping antidetonation suspension and support based on disk spring | |
| CN108548012A (en) | A kind of universal antidetonation suspension and support of novel single rod | |
| CN109944983A (en) | Shock-absorbing piping system based on frictional energy consumption | |
| CN108533834A (en) | A kind of adjustable damping type antidetonation suspension and support of support stiffness | |
| CN108506584A (en) | A kind of antidetonation suspension and support based on disk spring vibration damping | |
| CN212536960U (en) | Integrated anti-vibration support hanger | |
| CN211289185U (en) | A pipeline checkpost structure for antidetonation support | |
| CN2524005Y (en) | Three-dimensional shock absorbing supports | |
| CN217519353U (en) | A door type anti-vibration bracket | |
| CN217519376U (en) | A single-suspension anti-seismic bracket | |
| CN220365908U (en) | Vibration suppression device of flexible photovoltaic bracket | |
| CN222596989U (en) | Floor vibration reduction and shock resistance support | |
| CN222977607U (en) | Wind pipe anti-seismic bracket with bidirectional support | |
| CN222513265U (en) | Pipeline top rooting anti-seismic structure parallel to steel structure beam body bottom | |
| CN220366110U (en) | Single-pipe pipeline anti-seismic bracket | |
| CN219692605U (en) | Anti-seismic bracket for pipeline | |
| CN203129350U (en) | Woven metal damper | |
| CN208381503U (en) | A kind of antidetonation suspension and support based on disk spring vibration damping | |
| CN209743771U (en) | Multi-pipeline anti-seismic support | |
| CN217583417U (en) | A two-way anti-seismic support for a circular pipe | |
| CN207349592U (en) | A kind of multi-layer piping para-seismic support | |
| CN221196380U (en) | House pipeline anti-seismic bracket | |
| CN218670887U (en) | Assembled antidetonation support | |
| CN219954506U (en) | An anti-seismic bracket |