CN221943418U - A seismic support for building pipeline installation - Google Patents
A seismic support for building pipeline installation Download PDFInfo
- Publication number
- CN221943418U CN221943418U CN202420678709.6U CN202420678709U CN221943418U CN 221943418 U CN221943418 U CN 221943418U CN 202420678709 U CN202420678709 U CN 202420678709U CN 221943418 U CN221943418 U CN 221943418U
- Authority
- CN
- China
- Prior art keywords
- block
- clamping block
- holes
- mounting
- seismic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 title claims abstract description 22
- 230000000694 effects Effects 0.000 abstract description 5
- 238000010586 diagram Methods 0.000 description 3
- 230000003139 buffering effect Effects 0.000 description 2
- 238000009435 building construction Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000006467 substitution reaction Methods 0.000 description 2
- 101100012902 Saccharomyces cerevisiae (strain ATCC 204508 / S288c) FIG2 gene Proteins 0.000 description 1
- 101100233916 Saccharomyces cerevisiae (strain ATCC 204508 / S288c) KAR5 gene Proteins 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
本实用新型提供一种建筑管线安装用抗震支架,属于支架领域,该一种建筑管线安装用抗震支架,包括顶板,顶板的底部设有调节组件,还包括抗震组件和夹持组件,若干个固定杆配合通孔带动若干组滑块在滑槽内的导向杆表面滑动,位置合适时将若干组限位销插进对应的若干组定位孔和限位孔内,从而将若干组滑块与条形块限位固定,实现分类安装的目的,同时便于调节安装之间的距离;当产生震动时第一夹持块和第二夹持块配合两个第一安装块和第二安装块带动两个第一推杆进行震动,两个第一推杆带动两个第一推块在两个安装套筒内移动,并对内部的两个第一弹簧进行挤压,从而将产生的震动进行缓冲,从而起到抗震效果。
The utility model provides an anti-seismic bracket for installing building pipelines, which belongs to the field of brackets. The anti-seismic bracket for installing building pipelines comprises a top plate, an adjusting component is arranged at the bottom of the top plate, an anti-seismic component and a clamping component, a plurality of fixing rods cooperate with through holes to drive a plurality of groups of sliding blocks to slide on the surface of a guide rod in a slide groove, and when the position is appropriate, a plurality of groups of limit pins are inserted into a plurality of corresponding groups of positioning holes and limit holes, so that a plurality of groups of sliding blocks are limited and fixed to the strip blocks, so as to achieve the purpose of classified installation and facilitate the adjustment of the distance between installations; when vibration occurs, the first clamping block and the second clamping block cooperate with the two first mounting blocks and the second mounting blocks to drive the two first push rods to vibrate, and the two first push rods drive the two first push blocks to move in the two mounting sleeves and squeeze the two first springs inside, so as to buffer the generated vibration, thereby achieving an anti-seismic effect.
Description
技术领域Technical Field
本实用新型涉及支架领域,具体为一种建筑管线安装用抗震支架。The utility model relates to the field of brackets, in particular to an anti-seismic bracket for installing building pipelines.
背景技术Background Art
建筑施工是指工程建设实施阶段的生产活动,是各类建筑物的建造过程,在建筑施工中在管线安装时,会用到支架用来固定并安装管线,同时考虑支架安装后的抗震效果,经检索申请号为CN201822013146.6所公开的一种用于建筑管线安装的抗震支架其记载了包括支撑腿,所述支撑腿的内部开设有弧形空腔,所述支撑腿的内部开设有贯穿支撑腿并连通弧形空腔内部的圆形槽,所述弧形空腔的两端固定连接有橡胶挡片,所述支撑腿的上表面固定连接有贯穿并连通弧形空腔内部的活塞缸,所述活塞缸的内壁活动连接有活塞。该用于建筑管线安装的抗震支架,通过管线带动弧形固定块向下移动,使得弧形固定块通过活塞杆带动活塞在活塞缸内向下移动,使得活塞缸内的空气进入弧形空腔内,并使得橡胶挡片在圆形槽内发生形变,橡胶挡片为橡胶材质,使得橡胶挡片通过空气对活塞的向下移动起到缓冲作用,从而使得对管线进行减震,但该装置在实际使用时还存在以下缺陷:该装置在使用时缺乏对建筑管线分类安装的结构,不具备调节的功能,因此需要设计一种实用性强的建筑管线安装用抗震支架。Building construction refers to production activities in the implementation stage of engineering construction, and is the construction process of various types of buildings. During the installation of pipelines in building construction, brackets are used to fix and install pipelines, and the seismic effect after the bracket is installed is considered. After searching, an anti-seismic bracket for building pipeline installation disclosed in application number CN201822013146.6 is recorded to include a support leg, an arc-shaped cavity is provided inside the support leg, a circular groove is provided inside the support leg that passes through the support leg and is connected to the inside of the arc-shaped cavity, rubber baffles are fixedly connected to both ends of the arc-shaped cavity, a piston cylinder that passes through and is connected to the inside of the arc-shaped cavity is fixedly connected to the upper surface of the support leg, and a piston is movably connected to the inner wall of the piston cylinder. The earthquake-resistant bracket for building pipeline installation drives the arc-shaped fixing block to move downward through the pipeline, so that the arc-shaped fixing block drives the piston to move downward in the piston cylinder through the piston rod, so that the air in the piston cylinder enters the arc-shaped cavity and causes the rubber baffle to deform in the circular groove. The rubber baffle is made of rubber material, so that the rubber baffle plays a buffering role on the downward movement of the piston through the air, thereby reducing the shock of the pipeline. However, the device still has the following defects in actual use: the device lacks a structure for classified installation of building pipelines when in use, and does not have an adjustment function. Therefore, it is necessary to design a highly practical earthquake-resistant bracket for building pipeline installation.
实用新型内容Utility Model Content
本实用新型的目的在于提供一种建筑管线安装用抗震支架,以解决上述背景技术提出的问题。The utility model aims to provide a seismic-resistant bracket for installing building pipelines, so as to solve the problems raised by the above-mentioned background technology.
为实现上述目的,本实用新型提供如下技术方案:一种建筑管线安装用抗震支架,包括顶板,所述顶板的底部设有调节组件;To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an anti-seismic bracket for installing building pipelines, comprising a top plate, and an adjustment component is provided at the bottom of the top plate;
调节组件,所述调节组件包括安装在顶板底部的条形块,所述条形块的底部开设有滑槽,所述滑槽的内壁上设有导向杆,所述导向杆的表面滑动连接有若干组滑块,所述两两滑块之间通过固定杆固定连接,所述滑块的两侧均开设有限位孔,所述限位孔的内壁通过限位销与滑槽内壁两侧均开设有的若干个定位孔螺纹连接,若干组所述滑块的底部均设有抗震组件。An adjustment component, the adjustment component includes a strip block installed at the bottom of the top plate, a slide groove is provided at the bottom of the strip block, a guide rod is provided on the inner wall of the slide groove, a plurality of groups of sliders are slidably connected to the surface of the guide rod, the two sliders are fixedly connected by a fixing rod, limiting holes are provided on both sides of the slider, the inner wall of the limiting hole is threadedly connected to a plurality of positioning holes provided on both sides of the inner wall of the slide groove through a limiting pin, and the bottoms of the plurality of groups of sliders are provided with anti-seismic components.
抗震组件,所述抗震组件包括安装在若干组滑块底部的若干组安装套筒,若干组所述安装套筒内壁的顶部均设有第一弹簧,所述第一弹簧的底部与第一推杆顶部的第一推块固定连接,所述第一推杆的表面设有锁紧环,且底端的表面螺纹连接有限位块,所述位于两个第一推杆表面锁紧环和限位块之间的区域设有夹持组件。An anti-seismic component, which includes several groups of mounting sleeves installed at the bottom of several groups of sliding blocks, the tops of the inner walls of the several groups of mounting sleeves are provided with first springs, the bottoms of the first springs are fixedly connected to the first push blocks at the tops of the first push rods, the surface of the first push rods is provided with locking rings, and the surface of the bottom end is threadedly connected to limit blocks, and the area between the locking rings and the limit blocks on the surfaces of the two first push rods is provided with a clamping component.
作为本实用新型一种优选方案:所述夹持组件包括安装在位于两个第一推杆表面锁紧环和限位块之间的两个第一安装块,两个所述第一安装块相对的一侧均与第一夹持块固定连接,所述第一夹持块的上方设有第二夹持块,所述第二夹持块的两侧均固定连接有第二安装块,两个所述第二安装块均设置在第一推杆的表面,所述第一夹持块和第二夹持块的表面均设有辅助组件。As a preferred solution of the utility model: the clamping assembly includes two first mounting blocks installed between locking rings and limit blocks on the surfaces of two first push rods, the opposite sides of the two first mounting blocks are fixedly connected to the first clamping block, a second clamping block is provided above the first clamping block, and second mounting blocks are fixedly connected on both sides of the second clamping block, the two second mounting blocks are both arranged on the surface of the first push rod, and auxiliary components are provided on the surfaces of the first clamping block and the second clamping block.
作为本实用新型一种优选方案:若干组所述滑块的另两侧均开设有通孔,所述通孔的内壁与导向杆的表面穿插连接。As a preferred solution of the utility model: through holes are opened on the other two sides of the plurality of groups of sliding blocks, and the inner walls of the through holes are interlaced and connected with the surface of the guide rod.
作为本实用新型一种优选方案:所述辅助组件包括安装在第一夹持块和第二夹持块表面的两个固定套筒,两个所述固定套筒的顶端均螺纹连接有调节螺杆,所述调节螺杆的底端与固定套筒内的第二弹簧固定连接,所述第二弹簧的底部与第二推杆顶端的第二推块固定连接,所述第二推杆的底部固定连接有辅助夹块,所述辅助夹块的内壁上设有弧形软垫。As a preferred solution of the utility model: the auxiliary component includes two fixed sleeves installed on the surfaces of the first clamping block and the second clamping block, the top ends of the two fixed sleeves are threadedly connected with adjusting screws, the bottom ends of the adjusting screws are fixedly connected to the second spring in the fixed sleeve, the bottom of the second spring is fixedly connected to the second push block at the top of the second push rod, the bottom of the second push rod is fixedly connected with an auxiliary clamping block, and the inner wall of the auxiliary clamping block is provided with an arc-shaped soft pad.
作为本实用新型一种优选方案:所述第一安装块和第二安装块的顶部均开设有贯穿孔,所述贯穿孔的内壁与第一推杆的表面穿插连接。As a preferred solution of the utility model: a through hole is opened on the top of each of the first mounting block and the second mounting block, and the inner wall of the through hole is interlaced and connected with the surface of the first push rod.
作为本实用新型一种优选方案:所述第一安装块和第二安装块之间的区域设置有垫块,所述垫块的表面开设有辅助孔,所述辅助孔的内壁与第一推杆的表面穿插连接。As a preferred solution of the utility model: a cushion block is arranged in the area between the first mounting block and the second mounting block, an auxiliary hole is opened on the surface of the cushion block, and the inner wall of the auxiliary hole is interlaced and connected with the surface of the first push rod.
作为本实用新型一种优选方案:所述第一夹持块和第二夹持块的表面均开设有固定孔,所述固定孔的内壁与固定套筒的表面卡合连接。As a preferred solution of the utility model: fixing holes are provided on the surfaces of the first clamping block and the second clamping block, and the inner walls of the fixing holes are snap-connected with the surface of the fixing sleeve.
作为本实用新型一种优选方案:所述顶板顶部的两侧均开设有安装孔,所述安装孔的内壁通过螺栓与外部结构安装固定。As a preferred solution of the utility model: mounting holes are provided on both sides of the top of the top plate, and the inner walls of the mounting holes are fixed to the external structure by bolts.
与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:
(1)通过若干个固定杆配合通孔带动若干组滑块在滑槽内的导向杆表面滑动,位置合适时将若干组限位销插进对应的若干组定位孔和限位孔内,从而将若干组滑块与条形块限位固定,实现分类安装的目的,同时便于调节安装之间的距离;(1) A plurality of fixed rods cooperate with the through holes to drive a plurality of groups of sliders to slide on the surface of the guide rod in the slide groove. When the position is appropriate, a plurality of groups of limit pins are inserted into the corresponding plurality of positioning holes and limit holes, thereby limiting and fixing the plurality of groups of sliders and the strip blocks, achieving the purpose of classified installation and facilitating the adjustment of the distance between installations;
(2)通过将管线置于第一夹持块和第二夹持块之间,转动两个调节螺杆,使其底部对两个固定套筒内的两个第二弹簧进行挤压,两个第二弹簧则对底部的两个第二推块和第二推杆进行挤压,从而带动两个辅助夹块进行移动,配合两个弧形软垫对管线进行夹持固定,当产生震动时第一夹持块和第二夹持块配合两个第一安装块和第二安装块带动两个第一推杆进行震动,两个第一推杆带动两个第一推块在两个安装套筒内移动,并对内部的两个第一弹簧进行挤压,从而将产生的震动进行缓冲,从而起到抗震效果。(2) By placing the pipeline between the first clamping block and the second clamping block, rotating the two adjusting screws, the bottom of the screws squeezes the two second springs in the two fixed sleeves, and the two second springs squeeze the two second push blocks and the second push rods at the bottom, thereby driving the two auxiliary clamping blocks to move, and cooperating with the two arc-shaped cushions to clamp and fix the pipeline. When vibration occurs, the first clamping block and the second clamping block cooperate with the two first mounting blocks and the second mounting blocks to drive the two first push rods to vibrate, and the two first push rods drive the two first push blocks to move in the two mounting sleeves and squeeze the two first springs inside, thereby buffering the generated vibration and achieving an anti-vibration effect.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
图1为本实用新型的结构示意图;Fig. 1 is a schematic diagram of the structure of the utility model;
图2为本实用新型的调节组件结构示意图;FIG2 is a schematic diagram of the structure of the adjustment component of the utility model;
图3为本实用新型的抗震组件和夹持组件结构示意图。FIG3 is a schematic diagram of the structure of the anti-seismic assembly and the clamping assembly of the utility model.
图中:1、顶板;11、安装孔;12、螺栓;2、调节组件;21、条形块;22、滑槽;23、导向杆;24、滑块;25、固定杆;26、限位孔;27、限位销;28、定位孔;29、通孔;3、抗震组件;31、安装套筒;32、第一弹簧;33、第一推杆;34、第一推块;35、锁紧环;36、限位块;4、夹持组件;41、第一安装块;42、第一夹持块;43、第二夹持块;44、第二安装块;45、固定套筒;46、调节螺杆;47、第二弹簧;48、第二推杆;49、第二推块;410、辅助夹块;411、弧形软垫;412、贯穿孔;413、垫块;414、辅助孔;415、固定孔。In the figure: 1. top plate; 11. mounting hole; 12. bolt; 2. adjustment assembly; 21. strip block; 22. slide groove; 23. guide rod; 24. slider; 25. fixing rod; 26. limit hole; 27. limit pin; 28. positioning hole; 29. through hole; 3. anti-seismic assembly; 31. mounting sleeve; 32. first spring; 33. first push rod; 34. first push block; 35. locking ring; 36. limit block; 4. clamping assembly; 41. first mounting block; 42. first clamping block; 43. second clamping block; 44. second mounting block; 45. fixing sleeve; 46. adjusting screw; 47. second spring; 48. second push rod; 49. second push block; 410. auxiliary clamping block; 411. arc cushion; 412. through hole; 413. cushion block; 414. auxiliary hole; 415. fixing hole.
具体实施方式DETAILED DESCRIPTION
为使本实用新型实施方式的目的、技术方案和优点更加清楚,下面将结合本实用新型实施方式中的附图,对本实用新型实施方式中的技术方案进行清楚、完整地描述,显然,所描述的实施方式是本实用新型一部分实施方式,而不是全部的实施方式。基于本实用新型中的实施方式,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施方式,都属于本实用新型保护的范围。In order to make the purpose, technical solution and advantages of the implementation of the utility model clearer, the technical solution in the implementation of the utility model will be clearly and completely described below in conjunction with the drawings in the implementation of the utility model. Obviously, the described implementation is a part of the implementation of the utility model, not all of the implementations. Based on the implementation of the utility model, all other implementations obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
请参阅图1-图3,一种建筑管线安装用抗震支架,包括顶板1,顶板1的底部设有调节组件2;Please refer to Figures 1 to 3, an anti-seismic bracket for installing building pipelines includes a top plate 1, and an adjustment component 2 is provided at the bottom of the top plate 1;
请参阅图2,调节组件2,调节组件2包括安装在顶板1底部的条形块21,条形块21的底部开设有滑槽22,滑槽22的内壁上设有导向杆23,导向杆23的表面滑动连接有若干组滑块24,两两滑块24之间通过固定杆25固定连接,滑块24的两侧均开设有限位孔26,限位孔26的内壁通过限位销27与滑槽22内壁两侧均开设有的若干个定位孔28螺纹连接,若干组滑块24的底部均设有抗震组件3。Please refer to Figure 2, the adjustment component 2, the adjustment component 2 includes a bar block 21 installed at the bottom of the top plate 1, a slide groove 22 is provided at the bottom of the bar block 21, a guide rod 23 is provided on the inner wall of the slide groove 22, a plurality of groups of sliders 24 are slidably connected to the surface of the guide rod 23, and the two sliders 24 are fixedly connected by a fixing rod 25. Limiting holes 26 are provided on both sides of the sliders 24, and the inner walls of the limiting holes 26 are threadedly connected to a plurality of positioning holes 28 provided on both sides of the inner wall of the slide groove 22 through limiting pins 27, and the bottoms of the plurality of groups of sliders 24 are provided with anti-seismic components 3.
具体使用时:若干个固定杆25配合通孔29带动若干组滑块24在滑槽22内的导向杆23表面滑动,位置合适时将若干组限位销27插进对应的若干组定位孔28和限位孔26内,从而将若干组滑块24与条形块21限位固定,实现分类安装的目的,同时便于调节安装之间的距离。During specific use: several fixing rods 25 cooperate with the through holes 29 to drive several groups of sliders 24 to slide on the surface of the guide rod 23 in the slide groove 22. When the position is appropriate, several groups of limit pins 27 are inserted into the corresponding groups of positioning holes 28 and limit holes 26, so as to limit and fix several groups of sliders 24 and the strip blocks 21, thereby achieving the purpose of classified installation and facilitating the adjustment of the distance between installations.
请参阅图3,抗震组件3,抗震组件3包括安装在若干组滑块24底部的若干组安装套筒31,若干组安装套筒31内壁的顶部均设有第一弹簧32,第一弹簧32的底部与第一推杆33顶部的第一推块34固定连接,第一推杆33的表面设有锁紧环35,且底端的表面螺纹连接有限位块36,位于两个第一推杆33表面锁紧环35和限位块36之间的区域设有夹持组件4。Please refer to Figure 3, the seismic anti-seismic component 3, the seismic anti-seismic component 3 includes several groups of mounting sleeves 31 installed at the bottom of several groups of sliders 24, the top of the inner wall of the several groups of mounting sleeves 31 is provided with a first spring 32, the bottom of the first spring 32 is fixedly connected to the first push block 34 at the top of the first push rod 33, the surface of the first push rod 33 is provided with a locking ring 35, and the surface of the bottom end is threadedly connected to a limit block 36, and the area between the locking rings 35 and the limit blocks 36 on the surfaces of the two first push rods 33 is provided with a clamping component 4.
具体使用时:当产生震动时第一夹持块42和第二夹持块43配合两个第一安装块41和第二安装块44带动两个第一推杆33进行震动,两个第一推杆33带动两个第一推块34在两个安装套筒31内移动,并对内部的两个第一弹簧32进行挤压,从而将产生的震动进行缓冲,从而起到抗震效果。During specific use: when vibration occurs, the first clamping block 42 and the second clamping block 43 cooperate with the two first mounting blocks 41 and the second mounting blocks 44 to drive the two first push rods 33 to vibrate, and the two first push rods 33 drive the two first push blocks 34 to move in the two mounting sleeves 31, and squeeze the two first springs 32 inside, so as to buffer the generated vibration, thereby achieving an anti-vibration effect.
请参阅图3,夹持组件4包括安装在位于两个第一推杆33表面锁紧环35和限位块36之间的两个第一安装块41,两个第一安装块41相对的一侧均与第一夹持块42固定连接,第一夹持块42的上方设有第二夹持块43,第二夹持块43的两侧均固定连接有第二安装块44,两个第二安装块44均设置在第一推杆33的表面,第一夹持块42和第二夹持块43的表面均设有辅助组件。Please refer to Figure 3. The clamping assembly 4 includes two first mounting blocks 41 installed between the locking rings 35 and the limit blocks 36 on the surfaces of the two first push rods 33. The opposite sides of the two first mounting blocks 41 are fixedly connected to the first clamping block 42. A second clamping block 43 is provided above the first clamping block 42. Second mounting blocks 44 are fixedly connected on both sides of the second clamping block 43. The two second mounting blocks 44 are both arranged on the surface of the first push rod 33. Auxiliary components are provided on the surfaces of the first clamping block 42 and the second clamping block 43.
具体使用时:将两个第一安装块41和第二安装块44配合贯穿孔412与两个第一推杆33的表面穿插连接,垫块413则配合辅助孔414置于两者之间,配合两个锁紧环35和限位块36将第一安装块41和第二安装块44限位固定。During specific use: the two first mounting blocks 41 and the second mounting blocks 44 are connected through the through holes 412 and the surfaces of the two first push rods 33, and the cushion block 413 is placed between the two in cooperation with the auxiliary hole 414, and the first mounting block 41 and the second mounting block 44 are limited and fixed in place in cooperation with the two locking rings 35 and the limit blocks 36.
请参阅图2,若干组滑块24的另两侧均开设有通孔29,通孔29的内壁与导向杆23的表面穿插连接。Please refer to FIG. 2 , through holes 29 are formed on the other two sides of the plurality of sets of sliding blocks 24 , and the inner walls of the through holes 29 are interlaced and connected with the surface of the guide rod 23 .
具体使用时:若干组滑块24配合通孔29在导向杆23的表面滑动,从而便于对其移动进行限位。During specific use, a plurality of groups of sliders 24 cooperate with the through holes 29 to slide on the surface of the guide rod 23, thereby facilitating the movement of the guide rod 23.
请参阅图3,辅助组件包括安装在第一夹持块42和第二夹持块43表面的两个固定套筒45,两个固定套筒45的顶端均螺纹连接有调节螺杆46,调节螺杆46的底端与固定套筒45内的第二弹簧47固定连接,第二弹簧47的底部与第二推杆48顶端的第二推块49固定连接,第二推杆48的底部固定连接有辅助夹块410,辅助夹块410的内壁上设有弧形软垫411。Please refer to Figure 3. The auxiliary component includes two fixed sleeves 45 installed on the surfaces of the first clamping block 42 and the second clamping block 43. The top ends of the two fixed sleeves 45 are threadedly connected with adjusting screws 46. The bottom ends of the adjusting screws 46 are fixedly connected to the second spring 47 in the fixed sleeve 45. The bottom of the second spring 47 is fixedly connected to the second push block 49 at the top of the second push rod 48. The bottom of the second push rod 48 is fixedly connected with an auxiliary clamping block 410, and an arc-shaped soft pad 411 is provided on the inner wall of the auxiliary clamping block 410.
具体使用时:将管线置于第一夹持块42和第二夹持块43之间,转动两个调节螺杆46,使其底部对两个固定套筒45内的两个第二弹簧47进行挤压,两个第二弹簧47则对底部的两个第二推块49和第二推杆48进行挤压,从而带动两个辅助夹块410进行移动,配合两个弧形软垫411对管线进行夹持固定。During specific use: place the pipeline between the first clamping block 42 and the second clamping block 43, rotate the two adjusting screws 46, so that the bottom thereof squeezes the two second springs 47 in the two fixed sleeves 45, and the two second springs 47 squeeze the two second push blocks 49 and the second push rods 48 at the bottom, thereby driving the two auxiliary clamping blocks 410 to move, and cooperate with the two arc-shaped cushions 411 to clamp and fix the pipeline.
请参阅图3,第一安装块41和第二安装块44的顶部均开设有贯穿孔412,贯穿孔412的内壁与第一推杆33的表面穿插连接。Please refer to FIG. 3 . A through hole 412 is formed on the top of each of the first mounting block 41 and the second mounting block 44 . The inner wall of the through hole 412 is interlaced with the surface of the first push rod 33 .
具体使用时:第一安装块41和第二安装块44配合贯穿孔412与第一推杆33的表面穿插连接,从而便于对结构进行安装和拆卸。During specific use, the first mounting block 41 and the second mounting block 44 cooperate with the through hole 412 to be inserted and connected with the surface of the first push rod 33, so as to facilitate installation and disassembly of the structure.
请参阅图3,第一安装块41和第二安装块44之间的区域设置有垫块413,垫块413的表面开设有辅助孔414,辅助孔414的内壁与第一推杆33的表面穿插连接。Please refer to FIG. 3 , a cushion block 413 is disposed between the first mounting block 41 and the second mounting block 44 , and an auxiliary hole 414 is formed on the surface of the cushion block 413 . The inner wall of the auxiliary hole 414 is interlaced and connected with the surface of the first push rod 33 .
具体使用时:垫块413配合辅助孔414置于第一安装块41和第二安装块44之间,配合两个锁紧环35和限位块36将第一安装块41和第二安装块44限位固定。During specific use, the cushion block 413 cooperates with the auxiliary hole 414 to be placed between the first mounting block 41 and the second mounting block 44 , and cooperates with the two locking rings 35 and the limiting block 36 to limit and fix the first mounting block 41 and the second mounting block 44 .
请参阅图3,第一夹持块42和第二夹持块43的表面均开设有固定孔415,固定孔415的内壁与固定套筒45的表面卡合连接。Please refer to FIG. 3 . The surfaces of the first clamping block 42 and the second clamping block 43 are both provided with fixing holes 415 . The inner walls of the fixing holes 415 are engaged with the surface of the fixing sleeve 45 .
具体使用时:将固定套筒45的表面与固定孔415的内壁卡合,从而便于将其与第一夹持块42和第二夹持块43安装固定。When used specifically, the surface of the fixing sleeve 45 is engaged with the inner wall of the fixing hole 415 , so as to facilitate installation and fixing of the fixing sleeve 45 with the first clamping block 42 and the second clamping block 43 .
请参阅图2,顶板1顶部的两侧均开设有安装孔11,安装孔11的内壁通过螺栓12与外部结构安装固定。Please refer to FIG. 2 . Mounting holes 11 are provided on both sides of the top of the top plate 1 . The inner walls of the mounting holes 11 are fixed to the external structure by bolts 12 .
具体使用时:将螺栓12插入对应的安装孔11和外部连接孔,从而便于将顶板1与外部结构安装固定。During specific use: insert the bolts 12 into the corresponding mounting holes 11 and the external connection holes, so as to facilitate the installation and fixing of the top plate 1 and the external structure.
使用时,若干个固定杆25配合通孔29带动若干组滑块24在滑槽22内的导向杆23表面滑动,位置合适时将若干组限位销27插进对应的若干组定位孔28和限位孔26内,从而将若干组滑块24与条形块21限位固定,实现分类安装的目的,同时便于调节安装之间的距离;将两个第一安装块41和第二安装块44配合贯穿孔412与两个第一推杆33的表面穿插连接,垫块413则配合辅助孔414置于两者之间,配合两个锁紧环35和限位块36将第一安装块41和第二安装块44限位固定;将管线置于第一夹持块42和第二夹持块43之间,转动两个调节螺杆46,使其底部对两个固定套筒45内的两个第二弹簧47进行挤压,两个第二弹簧47则对底部的两个第二推块49和第二推杆48进行挤压,从而带动两个辅助夹块410进行移动,配合两个弧形软垫411对管线进行夹持固定。When in use, several fixing rods 25 cooperate with through holes 29 to drive several groups of sliders 24 to slide on the surface of guide rod 23 in slide groove 22. When the position is appropriate, several groups of limit pins 27 are inserted into corresponding groups of positioning holes 28 and limit holes 26, so as to limit and fix several groups of sliders 24 and bar blocks 21, so as to achieve the purpose of classified installation, and at the same time facilitate the adjustment of the distance between installations; two first mounting blocks 41 and second mounting blocks 44 cooperate with through holes 412 to be interlaced and connected with the surfaces of two first push rods 33, and pads 413 cooperate with auxiliary holes 4 14 is placed between the two, and the two locking rings 35 and the limit blocks 36 are used to limit and fix the first mounting block 41 and the second mounting block 44; the pipeline is placed between the first clamping block 42 and the second clamping block 43, and the two adjusting screws 46 are rotated so that the bottom thereof squeezes the two second springs 47 in the two fixing sleeves 45, and the two second springs 47 squeeze the two second push blocks 49 and the second push rods 48 at the bottom, thereby driving the two auxiliary clamping blocks 410 to move, and the pipeline is clamped and fixed in cooperation with the two arc-shaped cushions 411.
本说明中未作详细描述的内容属于本领域专业技术人员公知的现有技术,尽管参照前述实施例对本实用新型进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The contents not described in detail in this specification belong to the prior art known to professional and technical personnel in the field. Although the present invention has been described in detail with reference to the aforementioned embodiments, it is still possible for technical personnel in the field to modify the technical solutions described in the aforementioned embodiments, or to make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202420678709.6U CN221943418U (en) | 2024-04-03 | 2024-04-03 | A seismic support for building pipeline installation |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202420678709.6U CN221943418U (en) | 2024-04-03 | 2024-04-03 | A seismic support for building pipeline installation |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN221943418U true CN221943418U (en) | 2024-11-01 |
Family
ID=93241838
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202420678709.6U Active CN221943418U (en) | 2024-04-03 | 2024-04-03 | A seismic support for building pipeline installation |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN221943418U (en) |
-
2024
- 2024-04-03 CN CN202420678709.6U patent/CN221943418U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107727489B (en) | A clamping and fixing device for compressing metal sheets | |
| WO2022121405A1 (en) | Dynamic damping apparatus of electromechanical device | |
| CN221943418U (en) | A seismic support for building pipeline installation | |
| CN211853260U (en) | Electromechanical device installs base | |
| CN209157547U (en) | A canister shell welding tool | |
| CN218625770U (en) | Shock-absorbing device for anti-seismic support | |
| CN220751605U (en) | Isolator performance test stand | |
| CN111120809A (en) | Electromechanical device installs base | |
| CN207456943U (en) | A kind of concrete anti-compression tests clamping device | |
| CN216590319U (en) | Indoor overhead pipeline positioning support for water supply and drainage engineering | |
| CN218718490U (en) | Self-adaptive damping rubber support | |
| CN220910688U (en) | Wall-hanging device for building water supply pipeline | |
| CN211162683U (en) | A welding fixture for oil cylinder manufacturing | |
| CN219403411U (en) | Vertical machining center hydraulic fixture | |
| CN222732028U (en) | Auxiliary vibration absorber for rotating equipment | |
| CN222232021U (en) | Fire door opening and closing reliability test device | |
| CN219189937U (en) | a fixture | |
| CN111775078A (en) | spring clamping mechanism | |
| CN222405338U (en) | A shock absorbing clamp device | |
| CN222850659U (en) | Pressing device of ICT test fixture | |
| CN219177329U (en) | An electromechanical device installation structure | |
| CN222616371U (en) | Servo cylinder structure convenient to installation | |
| CN218326587U (en) | A kind of construction pipeline support and hanger | |
| CN217634624U (en) | Vibration damping mount for engine | |
| CN220366730U (en) | Plate-fin heat exchanger with installation positioning structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |