CN221942020U - A socket-and-socket scaffolding full-height erection edge protection construction structure - Google Patents

A socket-and-socket scaffolding full-height erection edge protection construction structure Download PDF

Info

Publication number
CN221942020U
CN221942020U CN202420235623.6U CN202420235623U CN221942020U CN 221942020 U CN221942020 U CN 221942020U CN 202420235623 U CN202420235623 U CN 202420235623U CN 221942020 U CN221942020 U CN 221942020U
Authority
CN
China
Prior art keywords
socket
short
edge protection
layer
poles
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202420235623.6U
Other languages
Chinese (zh)
Inventor
祝世文
王安勤
王朝晖
贾良
吴庆一
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 19th Metallurgical Group Co ltd
Original Assignee
China 19th Metallurgical Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 19th Metallurgical Group Co ltd filed Critical China 19th Metallurgical Group Co ltd
Priority to CN202420235623.6U priority Critical patent/CN221942020U/en
Application granted granted Critical
Publication of CN221942020U publication Critical patent/CN221942020U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to the technical field of road and bridge engineering construction and discloses a face edge protection construction structure for building a full hall of a socket scaffold. Solves the problem that the edge safety in the construction process in the prior art is difficult to ensure. The support comprises a support body consisting of a plurality of vertical rods, horizontal rods and inclined rods, wherein the support body consists of a plurality of layers of support bodies, each layer of horizontal rods at the top of the support body extend to form short rods, safety nets for receiving falling objects are arranged on the short rods in an extending mode, and one layer of support body sequentially corresponds to one layer of safety net. The full-hall erecting edge protection construction structure of the socket joint type disc scaffold is used for the edge protection of the scaffold, has the characteristics of simple structure, convenience in installation, high installation efficiency, low installation cost and the like, and effectively ensures the safety of edge personnel and tool equipment in the construction process of each layer of scaffold body.

Description

一种承插式盘口脚手架满堂搭设临边防护施工结构A socket-and-socket scaffolding full-height erection edge protection construction structure

技术领域Technical Field

本实用新型涉及道路桥梁工程施工技术领域,尤其是一种承插式盘口脚手架满堂搭设临边防护施工结构。The utility model relates to the technical field of road and bridge engineering construction, in particular to a socket-and-spigot type pan-shaped scaffolding full-height erection edge protection construction structure.

背景技术Background Art

我国市政高架桥梁项目持续处于施工高峰态势,其中大量的快速路桥梁工程位于市区繁华地段,有保证外部行人通行需求,施工便道以及周边作业空间有限,而桥梁工程的现浇梁体位于市区道路中间,安全防护形式严峻。为了实现施工平面布置、将城市道路桥梁部份及施工过程中受限于作业空间狭小,防护临边作业人员以及周边通行安全极为重要与关键。因此,在设计桥梁梁体整体现浇段,如何提高工效、保进度、节约投资、保安全的关键施工方法技术,一直困扰着施工单位。my country's municipal elevated bridge projects continue to be in a construction peak. Among them, a large number of expressway bridge projects are located in busy urban areas. There is a need to ensure the passage of external pedestrians. The construction access roads and surrounding working space are limited. The cast-in-place beams of the bridge projects are located in the middle of the urban roads, and the safety protection situation is severe. In order to realize the construction plane layout, the urban road bridge part and the construction process are limited by the small working space, it is extremely important and critical to protect the workers on the edge and the safety of the surrounding traffic. Therefore, in the design of the overall cast-in-place section of the bridge beam, how to improve work efficiency, ensure progress, save investment, and ensure safety has always been a key construction method and technology that troubles construction units.

申请号为CN202210648282.0的发明专利“一种折叠式便于安装的建筑脚手架用防护机构”,包括提供了一种折叠式便于安装的建筑脚手架用防护机构,包括保护装置,中间板上下两端均开设有端槽;端槽内插接配合有端板;端板顶部转动连接有轴板,轴板连接有锁定体;锁定体与轴板连接的内板,内板一端设有外板,外板通过螺栓与所述内板螺纹连接;中间板一侧开设有中间槽,中间槽内设有一对连接体;连接体包括一对连接架、一号轴;一号轴与中间槽内上下两端转动连接,连接架另一端设有二号轴;中间槽开设有贯穿其表面的滑槽,二号轴与滑槽滑动连接,连接架中部设有中轴,中轴穿过另一个连接架中部。存在的问题:工艺复杂、需要另外加装防护临边装置、经济效益不高,没有解决施工过程中可能引起的临边坠物风险。目前,常规的施工方法先引做好架体后搭设安全网,安全网随架体升高搭设,架体后搭设过程中没有临边防护装置,施工过程中的临边安全难以保证。The invention patent with application number CN202210648282.0, "A foldable and easy-to-install protective mechanism for building scaffolding", includes a foldable and easy-to-install protective mechanism for building scaffolding, including a protective device, end slots are provided at both ends of the middle plate; end plates are plugged into the end slots; the top of the end plate is rotatably connected to an axis plate, and the axis plate is connected to a locking body; the locking body is connected to an inner plate connected to the axis plate, and an outer plate is provided at one end of the inner plate, and the outer plate is threadedly connected to the inner plate by bolts; an intermediate slot is provided on one side of the middle plate, and a pair of connectors are provided in the intermediate slot; the connector includes a pair of connecting frames and a No. 1 shaft; the No. 1 shaft is rotatably connected to the upper and lower ends of the middle slot, and a No. 2 shaft is provided at the other end of the connecting frame; the middle slot is provided with a slide groove running through its surface, and the No. 2 shaft is slidably connected to the slide groove, and a central axis is provided in the middle of the connecting frame, and the central axis passes through the middle of another connecting frame. Existing problems: the process is complicated, an additional protective device for the edge is required, the economic benefits are not high, and the risk of falling objects from the edge that may be caused during the construction process is not solved. At present, the conventional construction method is to first build the frame and then set up the safety net. The safety net is set up as the frame rises. There is no edge protection device during the frame erection process, and the edge safety during the construction process is difficult to ensure.

实用新型内容Utility Model Content

本实用新型提供一种承插式盘口脚手架满堂搭设临边防护施工结构,结构简单,有效保证每层架体施工过程中的临边人员和工具设备安全。The utility model provides a socket-and-spigot type pan-mouth scaffolding full-hall erection edge protection construction structure, which has a simple structure and effectively ensures the safety of edge personnel and tools and equipment during the construction of each layer of the frame.

为达到上述目的,本实用新型采用的技术方案是:In order to achieve the above purpose, the technical solution adopted by the utility model is:

本实用新型公开的一种承插式盘口脚手架满堂搭设临边防护施工结构,包括由多根立杆、水平杆和斜杆组成的架体,所述架体由多层支架体组成,所述水平杆由多根短杆组成,每层所述支架体的顶部的所述水平杆延伸设置所述短杆,延伸设置的所述短杆上设置有接纳坠物的安全网,一层所述支架体依次对应设置一层安全网。The utility model discloses a socket-and-spigot type pan-shaped scaffolding full-hall erection edge protection construction structure, comprising a frame body composed of multiple vertical poles, horizontal poles and diagonal poles, the frame body is composed of multiple layers of support bodies, the horizontal poles are composed of multiple short poles, the short poles are extended from the horizontal poles at the top of each layer of the support bodies, and a safety net for receiving falling objects is arranged on the extended short poles, and one layer of safety net is arranged corresponding to each layer of the support bodies in turn.

进一步的,延伸设置的所述短杆的下方设置有所述斜杆,所述斜杆固定设置在对应的所述短杆和所述立杆之间。Furthermore, the oblique rod is arranged below the extended short rod, and the oblique rod is fixedly arranged between the corresponding short rod and the vertical rod.

进一步的,所述水平杆延伸设置的对应所述短杆的数量为至少一根。Furthermore, the number of the short rods extending from the horizontal rod is at least one.

进一步的,所述安全网覆盖设置在所述短杆的上方。Furthermore, the safety net is arranged to cover the top of the short pole.

进一步的,所述安全网设置在相邻延伸设置的所述短杆之间。Furthermore, the safety net is arranged between the adjacent extending short rods.

本实用新型的有益效果是:本申请的一种承插式盘口脚手架满堂搭设临边防护施工结构,支架体的顶部的水平杆延伸设置短杆,延伸设置的短杆上设置接纳坠物的安全网组成临边防护结构,结构简单;其中短杆为组成水平杆的相同零件,安装成本低,短杆的长度相同,延伸同等数量的短杆延伸距离一致,直接延伸安装不会出现多余或缺失部分,无需对安装后的短杆加工处理,避免加工造成环境污染,相同的短杆对安全网起到更好的支撑,使临边防护结构整体性和安全性更强;安装时直接将相同的短杆延伸对接在水平杆,非常方便,安装效率高。当支架的临边物品或工作人员发生坠落时,临边坠物或工作人员掉到短杆上设置的安全网上,避免掉到地面,对临边物品或工作人员起到很好的保护作用。因此本申请的一种承插式盘口脚手架满堂搭设临边防护施工结构用于脚手架搭设临边安全防护,具有结构简单、安装方便、安装效率高、安装成本低、环保等特点,从底层支架体到顶层依次逐层安装临边防护结构,一层支架体依次对应设置一临边防护结构,避免先搭设架体后搭设安全网过程中造成的临边安全性差的问题,有效保证每层架体施工过程中的临边人员和设备的安全。The beneficial effects of the utility model are as follows: a socket-type pan-shaped scaffolding of the present application is used to set up a construction structure for edge protection in the whole hall, and a short rod is extended from the horizontal rod on the top of the bracket body, and a safety net for receiving falling objects is arranged on the extended short rod to form an edge protection structure, which has a simple structure; wherein the short rod is the same part as the horizontal rod, and the installation cost is low, the length of the short rod is the same, and the extension distance of the same number of short rods is consistent, and there will be no redundant or missing parts when directly extended and installed, and there is no need to process the short rods after installation, so as to avoid environmental pollution caused by processing, and the same short rods provide better support for the safety net, so that the integrity and safety of the edge protection structure are stronger; during installation, the same short rods are directly extended and docked on the horizontal rods, which is very convenient and has high installation efficiency. When an object or staff member on the edge of the bracket falls, the falling object or staff member falls onto the safety net arranged on the short rod to avoid falling to the ground, which provides good protection for the object or staff member on the edge. Therefore, the present application discloses a socket-and-socket type scaffolding full-hall edge protection construction structure for scaffolding edge protection, which is used for scaffolding edge safety protection and has the characteristics of simple structure, convenient installation, high installation efficiency, low installation cost and environmental protection. The edge protection structure is installed layer by layer from the bottom support body to the top layer, and one edge protection structure is arranged corresponding to each layer of the support body in turn, thereby avoiding the problem of poor edge safety caused by erecting the frame first and then the safety net, and effectively ensuring the safety of edge personnel and equipment during the construction of each layer of the frame.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the embodiments of the utility model or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

图1是本实用新型的承插式盘口脚手架满堂搭设临边防护施工结构的侧视图;FIG1 is a side view of a construction structure of a socket-and-spigot scaffolding for full-height erection of edge protection according to the present invention;

图2是本实用新型的承插式盘口脚手架满堂搭设临边防护施工结构的正视图;FIG2 is a front view of the construction structure of the socket-and-spigot scaffolding for full-height erection of edge protection according to the utility model;

图3是本实用新型的承插式盘口脚手架满堂搭设临边防护施工结构的俯视图。Fig. 3 is a top view of the construction structure of the socket-and-spigot scaffolding for full-height erection of edge protection according to the utility model.

附图标记:立杆1,短杆2,安全网3,斜杆4,底座5,桥梁6。Figure numerals: vertical pole 1, short pole 2, safety net 3, diagonal pole 4, base 5, bridge 6.

具体实施方式DETAILED DESCRIPTION

为使本实用新型的目的、技术方案和优点更加清楚,下面将对本实用新型的技术方案进行详细的描述。显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动的前提下所得到的所有其它实施方式,都属于本实用新型所保护的范围。In order to make the purpose, technical solution and advantages of the utility model clearer, the technical solution of the utility model will be described in detail below. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other implementation methods obtained by ordinary technicians in this field without creative work belong to the scope of protection of the utility model.

下面结合附图和实施例对本实用新型进一步说明。The utility model is further described below in conjunction with the accompanying drawings and embodiments.

如图1、图2、图3所示,本实用新型的一种承插式盘口脚手架满堂搭设临边防护施工结构,包括由多根立杆1、水平杆和斜杆4组成的架体,所述架体由多层支架体组成,所述水平杆由多根短杆2组成,每层所述支架体的顶部的所述水平杆延伸设置所述短杆2,延伸设置的所述短杆2上设置有接纳坠物的安全网3,一层所述支架体依次对应设置一层安全网3。其中,每层支架体的顶部的水平杆均延伸设置短杆2,或者每层支架体的顶部的水平杆间隔延伸设置短杆2(部分水平杆延伸设置短杆2),安装底层支架体在底层支架体的顶部的水平杆延伸设置短杆2,在短杆2上固定安装安全网3,然后安装第二层支架体在第二层支架体的顶部的水平杆延伸设置短杆2,在短杆2上固定安装安全网3,从底层支架体到顶层依次逐层设置安全网3。架体搭设在桥梁6周围,基土加固硬化后安装底座5,底层支架体搭设在底座5上。As shown in Fig. 1, Fig. 2 and Fig. 3, a socket-type scaffolding construction structure for full-floor edge protection of the utility model comprises a frame body composed of a plurality of vertical poles 1, horizontal poles and diagonal poles 4, the frame body is composed of a plurality of bracket bodies, the horizontal poles are composed of a plurality of short poles 2, the horizontal poles at the top of each bracket body are extended with the short poles 2, the extended short poles 2 are provided with a safety net 3 for receiving falling objects, and one layer of the bracket body is provided with a layer of safety net 3 in sequence. Among them, the horizontal poles at the top of each bracket body are extended with short poles 2, or the horizontal poles at the top of each bracket body are extended with short poles 2 at intervals (part of the horizontal poles are extended with short poles 2), the bottom bracket body is installed, the horizontal poles at the top of the bottom bracket body are extended with short poles 2, the safety net 3 is fixedly installed on the short poles 2, and then the second bracket body is installed, the horizontal poles at the top of the second bracket body are extended with short poles 2, the safety net 3 is fixedly installed on the short poles 2, and the safety net 3 is provided layer by layer from the bottom bracket body to the top layer. The frame is erected around the bridge 6 , and the base 5 is installed after the base soil is reinforced and hardened, and the bottom support body is erected on the base 5 .

基于上述结构的一种承插式盘口脚手架满堂搭设临边防护施工结构,支架体的顶部的水平杆延伸设置短杆2,延伸设置的短杆2上设置接纳坠物的安全网3组成临边防护结构,结构简单;其中短杆2为组成水平杆的相同零件,安装成本低,短杆2的长度相同,延伸同等数量的短杆2延伸距离一致,直接延伸安装不会出现多余或缺失部分,无需对安装后的短杆2加工处理,避免加工造成环境污染,相同的短杆2对安全网3起到更好的支撑,使临边防护结构整体性和安全性更强;安装时直接将相同的短杆2延伸对接在水平杆,非常方便,安装效率高。当支架的临边物品或工作人员发生坠落时,临边坠物或工作人员掉到短杆2上设置的安全网3上,避免掉到地面,对临边物品或工作人员起到很好的保护作用。因此本申请的一种承插式盘口脚手架满堂搭设临边防护施工结构用于脚手架搭设临边安全防护,具有结构简单、安装方便、安装效率高、安装成本低、环保等特点,从底层支架体到顶层依次逐层安装临边防护结构,一层支架体依次对应设置一临边防护结构,避免先搭设架体后搭设安全网过程中造成的临边安全性差的问题,有效保证每层架体施工过程中的临边人员和设备的安全。每层支架体的高度可以根据需要设置,如底层支架体设置为1.5m,在1.5m设置临边防护结构,确保1.5m高度临边安全。A socket-and-socket scaffolding with a full-hall edge protection construction structure based on the above structure, a short rod 2 is extended from the horizontal rod on the top of the bracket body, and a safety net 3 for receiving falling objects is arranged on the extended short rod 2 to form an edge protection structure, which has a simple structure; wherein the short rod 2 is the same part as the horizontal rod, and the installation cost is low, the short rod 2 has the same length, and the extension distance of the same number of short rods 2 is consistent, and there will be no redundant or missing parts when directly extended and installed, and there is no need to process the installed short rods 2, so as to avoid environmental pollution caused by processing, and the same short rod 2 provides better support for the safety net 3, so that the integrity and safety of the edge protection structure are stronger; during installation, the same short rod 2 is directly extended and docked on the horizontal rod, which is very convenient and has high installation efficiency. When the edge objects or staff of the bracket fall, the edge falling objects or staff fall onto the safety net 3 set on the short rod 2 to avoid falling to the ground, which plays a good protective role for the edge objects or staff. Therefore, the present application discloses a socket-type scaffolding full-hall edge protection construction structure for scaffolding edge safety protection, which has the characteristics of simple structure, convenient installation, high installation efficiency, low installation cost, and environmental protection. The edge protection structure is installed layer by layer from the bottom bracket body to the top bracket body, and one edge protection structure is set corresponding to each layer of the bracket body in turn, avoiding the problem of poor edge safety caused by setting up the frame body first and then setting up the safety net, and effectively ensuring the safety of edge personnel and equipment during the construction of each layer of the frame body. The height of each layer of the bracket body can be set as needed, such as the bottom bracket body is set to 1.5m, and the edge protection structure is set at 1.5m to ensure the edge safety at a height of 1.5m.

作为一种可实施方式,延伸设置的所述短杆2的下方设置有所述斜杆4,所述斜杆4固定设置在对应的所述短杆2和所述立杆1之间。As an implementable embodiment, the oblique rod 4 is arranged below the extended short rod 2 , and the oblique rod 4 is fixedly arranged between the corresponding short rod 2 and the vertical rod 1 .

斜杆4的两端分别与对应的短杆2和立杆1固定连接,如螺栓连接,斜杆4对短杆2起到支撑作用,短杆2、立杆1和斜杆4组成三角形结构,使临边防护施工结构更加稳固牢靠,如短杆2、安全网3和斜杆4能接住重量较大的坠物或施工人员,提升其安全性。The two ends of the diagonal rod 4 are respectively fixedly connected to the corresponding short rod 2 and the vertical rod 1, such as bolt connection. The diagonal rod 4 supports the short rod 2. The short rod 2, the vertical rod 1 and the diagonal rod 4 form a triangular structure, which makes the edge protection construction structure more stable and reliable. For example, the short rod 2, the safety net 3 and the diagonal rod 4 can catch heavy falling objects or construction workers, thereby improving their safety.

其中,同一根所述水平杆延伸设置的对应所述短杆2的数量为至少一根。Therein, the number of the short rods 2 extending from the same horizontal rod is at least one.

延伸设置的短杆2的数量为一根、两根或者更多根。需要的安全网3越宽对应的短杆2的数量就越多,坠物越不容易从安全网3、短杆2的外端侧坠落,临边防护施工结构的安全性越好。斜杆4靠近最外侧的延伸短杆2设置。The number of the extended short rods 2 is one, two or more. The wider the required safety net 3 is, the more short rods 2 are needed, and the less likely falling objects are to fall from the outer ends of the safety net 3 and the short rods 2, and the better the safety of the edge protection construction structure. The oblique rod 4 is arranged close to the outermost extended short rod 2.

作为一种可实施方式,所述安全网3覆盖设置在所述短杆2的上方。As an implementable embodiment, the safety net 3 is arranged to cover the top of the short rod 2 .

安全网3覆盖在所有延伸设置的短杆2的上方,安全网3为整张网结构,坠物掉落在安全网3上,安全网3受力快速扩散到整张网和各个短杆2,起到很好的应力分散,具有更好的承重,同时减少对安全网3和短杆2的损坏。安全网3可以用铁丝绑缚固定在短杆2上。The safety net 3 covers all the extended short poles 2. The safety net 3 is a whole net structure. When a falling object falls on the safety net 3, the force on the safety net 3 is quickly spread to the whole net and each short pole 2, which plays a good role in stress dispersion and has better load-bearing capacity, while reducing damage to the safety net 3 and the short poles 2. The safety net 3 can be fixed on the short poles 2 by wire binding.

作为一种可实施方式,所述安全网3设置在相邻延伸设置的所述短杆2之间。As an implementable embodiment, the safety net 3 is arranged between the adjacent extending short rods 2.

安全网3绑缚设置在两相邻延伸设置的短杆2之间,便于安全网3更换。The safety net 3 is tied between two adjacent extended short rods 2 to facilitate replacement of the safety net 3 .

以上所述,仅为本实用新型的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,可轻易想到变化或替换,都应涵盖在本实用新型的保护范围之内。The above description is only a specific implementation of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed by the present invention, which should be included in the protection scope of the present invention.

Claims (5)

1.一种承插式盘口脚手架满堂搭设临边防护施工结构,包括由多根立杆(1)、水平杆和斜杆(4)组成的架体,所述架体由多层支架体组成,其特征是,所述水平杆由多根短杆(2)组成,每层所述支架体的顶部的所述水平杆延伸设置所述短杆(2),延伸设置的所述短杆(2)上设置有接纳坠物的安全网(3),一层所述支架体依次对应设置一层安全网(3)。1. A socket-and-spigot scaffolding construction structure for erecting edge protection in a full-floor environment, comprising a frame body composed of a plurality of vertical poles (1), horizontal poles and diagonal poles (4), wherein the frame body is composed of a plurality of multi-layer bracket bodies, characterized in that the horizontal poles are composed of a plurality of short poles (2), the short poles (2) are extended from the horizontal poles at the top of each layer of the bracket body, and a safety net (3) for receiving falling objects is arranged on the extended short poles (2), and a layer of the safety net (3) is arranged corresponding to each layer of the bracket body. 2.根据权利要求1所述的一种承插式盘口脚手架满堂搭设临边防护施工结构,其特征是,延伸设置的所述短杆(2)的下方设置有所述斜杆(4),所述斜杆(4)固定设置在对应的所述短杆(2)和所述立杆(1)之间。2. According to claim 1, a socket-and-spigot scaffolding full-hall edge protection construction structure is characterized in that the diagonal rod (4) is arranged below the extended short rod (2), and the diagonal rod (4) is fixedly arranged between the corresponding short rod (2) and the vertical rod (1). 3.根据权利要求1所述的一种承插式盘口脚手架满堂搭设临边防护施工结构,其特征是,所述水平杆延伸设置的对应所述短杆(2)的数量为至少一根。3. According to the socket-and-spigot scaffolding full-hall edge protection construction structure described in claim 1, it is characterized in that the number of the short rods (2) corresponding to the extended arrangement of the horizontal rods is at least one. 4.根据权利要求3所述的一种承插式盘口脚手架满堂搭设临边防护施工结构,其特征是,所述安全网(3)覆盖设置在所述短杆(2)的上方。4. According to the socket-and-spigot scaffolding full-height edge protection construction structure described in claim 3, it is characterized in that the safety net (3) is arranged to cover the top of the short rod (2). 5.根据权利要求3所述的一种承插式盘口脚手架满堂搭设临边防护施工结构,其特征是,所述安全网(3)设置在相邻延伸设置的所述短杆(2)之间。5. According to the socket-and-spigot scaffolding full-height erection edge protection construction structure as described in claim 3, it is characterized in that the safety net (3) is arranged between the adjacent extended short rods (2).
CN202420235623.6U 2024-01-31 2024-01-31 A socket-and-socket scaffolding full-height erection edge protection construction structure Active CN221942020U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202420235623.6U CN221942020U (en) 2024-01-31 2024-01-31 A socket-and-socket scaffolding full-height erection edge protection construction structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202420235623.6U CN221942020U (en) 2024-01-31 2024-01-31 A socket-and-socket scaffolding full-height erection edge protection construction structure

Publications (1)

Publication Number Publication Date
CN221942020U true CN221942020U (en) 2024-11-01

Family

ID=93240975

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202420235623.6U Active CN221942020U (en) 2024-01-31 2024-01-31 A socket-and-socket scaffolding full-height erection edge protection construction structure

Country Status (1)

Country Link
CN (1) CN221942020U (en)

Similar Documents

Publication Publication Date Title
CN112267709A (en) Segmented demolition construction method for large-span beam string structure
CN110241727A (en) A kind of cable tower structure and bridge
CN221942020U (en) A socket-and-socket scaffolding full-height erection edge protection construction structure
CN110656723A (en) Rail support for sliding construction of cylindrical arch shell roof
CN205369229U (en) But walking hoisting frame suitable for manual hole digging pile steel reinforcement cage is laid
CN104863407A (en) Repairing tower of power transmission line
CN205711695U (en) Plate girder truss-like combinative structure construction bridge
CN212452654U (en) Safe operation platform of construction usefulness on foundation ditch
CN107060095A (en) A kind of overall top module system platform universal architecture of combined type
CN211922969U (en) Umbrella-shaped elevated structure supporting frame for integrated module house
CN209169891U (en) Split self-supporting angle steel steel pipe combined cable terminal platform
CN214994696U (en) Box truss cable connected node
CN118523203B (en) Combined crossing frame
CN206655064U (en) Type steel support column and overhead rail system for overhead rail system
CN220598191U (en) A kind of support mechanism and bridge pier construction platform
CN111676972A (en) Safe operation platform of construction usefulness on foundation ditch
CN114172081B (en) A lattice-type vehicle-mounted mobile spanning device and its use method
CN218989921U (en) Reinforcing bar operation platform of superelevation pier shaft
CN221941125U (en) Heavy-duty water construction operation platform
CN214497218U (en) Steel pipe arch assembled double-door type support
CN219860295U (en) A kind of transverse tower crane steel beam base device
CN221663424U (en) A operation platform for high mound support filler stone
CN221878749U (en) A device for pier construction in foundation pit
CN220724825U (en) Assembled string bridge structure
CN110593081A (en) Component hoisting walking foundation for large railway station house under complex environment and construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant