CN221920236U - Novel wall connecting piece suitable for concrete - Google Patents
Novel wall connecting piece suitable for concrete Download PDFInfo
- Publication number
- CN221920236U CN221920236U CN202420248768.XU CN202420248768U CN221920236U CN 221920236 U CN221920236 U CN 221920236U CN 202420248768 U CN202420248768 U CN 202420248768U CN 221920236 U CN221920236 U CN 221920236U
- Authority
- CN
- China
- Prior art keywords
- fastener
- wall connecting
- buckle
- main structure
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 abstract description 12
- 229910000831 Steel Inorganic materials 0.000 description 11
- 239000010959 steel Substances 0.000 description 11
- 238000009434 installation Methods 0.000 description 8
- 238000010586 diagram Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 4
- 101001121408 Homo sapiens L-amino-acid oxidase Proteins 0.000 description 2
- 102100026388 L-amino-acid oxidase Human genes 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000005266 casting Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 229910001335 Galvanized steel Inorganic materials 0.000 description 1
- 101100012902 Saccharomyces cerevisiae (strain ATCC 204508 / S288c) FIG2 gene Proteins 0.000 description 1
- 101100233916 Saccharomyces cerevisiae (strain ATCC 204508 / S288c) KAR5 gene Proteins 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- 230000002457 bidirectional effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000008397 galvanized steel Substances 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
Description
技术领域Technical Field
本实用新型涉及建筑施工技术领域,具体涉及一种适用于混凝土的新型连墙件。The utility model relates to the technical field of building construction, in particular to a new wall connecting piece suitable for concrete.
背景技术Background Art
在建筑施工时通常会在建筑外侧搭设钢管脚手架。为了使脚手架有可靠的防倾覆措施,通常会设置连墙结构,这样可以加强脚手架的整体稳定性,提高脚手架稳定承载能力和避免脚手架出现倾倒或坍塌等重大事故。During construction, steel pipe scaffolding is usually erected outside the building. In order to make the scaffolding have reliable anti-overturning measures, a wall connection structure is usually set up, which can enhance the overall stability of the scaffolding, improve the scaffolding's stable bearing capacity and avoid major accidents such as toppling or collapse of the scaffolding.
落地式扣件钢管脚手架的连墙结构,简称连墙件,一般分为刚性连墙结构和柔性连墙结构,目前《建筑施工扣件式钢管脚手架安全技术规范》中规定的连墙件为刚性连墙件。针对目前最为常用的连墙件做法所存在的弊端,公司在先专利CN220184608U公开了一种适用于清水混凝土的连墙件,解决了现有的连墙件会对清水混凝土饰面带来不良影响以及影响幕墙安装的技术问题。但由于该方案中丝杆从连墙钢管的两端穿出,因此丝杆需要的长度较长,在外墙空间受限的情况下,该连墙件不方便安装及拆卸。The wall-connecting structure of the ground-type clip-on steel pipe scaffolding, referred to as the wall-connecting part, is generally divided into a rigid wall-connecting structure and a flexible wall-connecting structure. The wall-connecting parts specified in the current "Safety Technical Specifications for Clip-on Steel Pipe Scaffolding in Construction" are rigid wall-connecting parts. In view of the drawbacks of the most commonly used wall-connecting parts, the company's prior patent CN220184608U discloses a wall-connecting part suitable for plain concrete, which solves the technical problem that the existing wall-connecting parts will have adverse effects on the plain concrete finish and affect the installation of curtain walls. However, since the screw rod in this solution passes through both ends of the wall-connecting steel pipe, the required length of the screw rod is relatively long. When the outer wall space is limited, the wall-connecting part is not convenient to install and disassemble.
实用新型内容Utility Model Content
本实用新型目的在于:针对公司在先设计的连墙件方案,需要用到的丝杆长度较长,在外墙空间受限的情况下不方便安装及拆卸,提供一种适用于混凝土的新型连墙件,该连墙件构造简单,安拆方便,可重复使用节约成本,并有效的保护了混凝土结构,同时不占用楼层外立面空间,不会影响施工作业面。The purpose of the utility model is to provide a new wall connection member suitable for concrete, in response to the company's previous design of a wall connection member scheme, which requires a long screw rod and is inconvenient to install and disassemble when the outer wall space is limited. The wall connection member has a simple structure, is easy to install and disassemble, can be reused to save costs, and effectively protects the concrete structure. At the same time, it does not occupy the outer facade space of the floor and will not affect the construction work surface.
本实用新型通过下述技术方案实现:The utility model is realized by the following technical solutions:
本实用新型提供了一种适用于混凝土的新型连墙件,连接在主体结构和脚手架之间,包括连墙杆、连接扣件、螺栓杆和紧固件;所述连墙杆固定在脚手架上,所述主体结构内设有预埋套管,所述连接扣件固定在连墙杆上面向主体结构的一端,所述紧固件位于主体结构背离脚手架的一侧,所述螺栓杆穿过连接扣件、预埋套管后通过紧固件固定在主体结构上。The utility model provides a novel wall connecting member suitable for concrete, which is connected between a main structure and a scaffolding, and comprises a wall connecting rod, a connecting fastener, a bolt rod and a fastener; the wall connecting rod is fixed on the scaffolding, a pre-buried sleeve is arranged in the main structure, the connecting fastener is fixed on one end of the wall connecting rod facing the main structure, the fastener is located on a side of the main structure away from the scaffolding, and the bolt rod passes through the connecting fastener and the pre-buried sleeve and is fixed to the main structure through the fastener.
在一些实施例中,所述连接扣件包括扣座、扣环、扣环螺栓和扣环螺母,所述扣座与所述扣环上具有相对的半圆形凹槽,所述扣环一端与扣座活动铰接,所述扣环螺栓一端与扣座相连,另一端穿过扣环的自由端,所述扣环螺母设置于扣环螺栓上,以使扣环向扣座靠近,所述扣座上设有固定孔,所述螺栓杆穿入固定孔后将连接扣件压紧在主体结构上。In some embodiments, the connecting fastener includes a buckle seat, a buckle ring, a buckle ring bolt and a buckle ring nut. The buckle seat and the buckle ring have relative semicircular grooves. One end of the buckle ring is movably hinged to the buckle seat. One end of the buckle ring bolt is connected to the buckle seat, and the other end passes through the free end of the buckle ring. The buckle ring nut is arranged on the buckle ring bolt to make the buckle ring close to the buckle seat. The buckle seat is provided with a fixing hole. After the bolt rod is inserted into the fixing hole, the connecting fastener is pressed against the main structure.
在一些实施例中,所述扣环螺栓一端与扣座活动铰接,所述扣环的自由端开有与扣环螺栓适配的U型槽。In some embodiments, one end of the retaining ring bolt is movably hinged to the buckle seat, and the free end of the retaining ring is provided with a U-shaped groove adapted to the retaining ring bolt.
在一些实施例中,所述紧固件在面向主体结构的一侧设置有垫板。In some embodiments, the fastener is provided with a backing plate on a side facing the main structure.
在一些实施例中,所述垫板的尺寸大于所述紧固件的径向尺寸。In some embodiments, the backing plate has a dimension greater than a radial dimension of the fastener.
在一些实施例中,所述脚手架包括立杆、小横杆和大横杆,所述小横杆和大横杆均固定在立柱上。In some embodiments, the scaffolding includes vertical poles, small cross bars and large cross bars, and the small cross bars and large cross bars are both fixed on the vertical poles.
在一些实施例中,所述小横杆设在大横杆上方,且小横杆和大横杆交错连接为网格状。In some embodiments, the small crossbars are arranged above the large crossbars, and the small crossbars and the large crossbars are staggered and connected in a grid shape.
在一些实施例中,所述紧固件为与所述螺栓杆相适配的螺母。In some embodiments, the fastener is a nut matched with the bolt rod.
在一些实施例中,所述连墙杆通过扣件固定在脚手架上。In some embodiments, the wall connecting rod is fixed to the scaffolding by fasteners.
在一些实施例中,所述主体结构包括墙柱结构和梁结构。In some embodiments, the main structure includes a wall column structure and a beam structure.
本实用新型与现有技术相比,具有如下的优点和有益效果:Compared with the prior art, the utility model has the following advantages and beneficial effects:
本实用新型通过将连墙杆固定在脚手架上,连接扣件固定在连墙杆上面向主体结构的一端,紧固件设于主体结构背离脚手架的一侧,螺栓杆穿过连接扣件、预埋套管后通过紧固件固定在主体结构上,从而使脚手架与主体结构稳固连接,该连墙件构造简单,且大大缩短了螺栓杆的长度,连墙件的拆装更加方便,可重复使用节约成本,并有效的保护了混凝土结构,同时不占用楼层外立面空间,不会影响施工作业面。The utility model fixes the wall connecting rod on the scaffolding, fixes the connecting fastener on the end of the wall connecting rod facing the main structure, and the fastener is arranged on the side of the main structure away from the scaffolding. The bolt rod passes through the connecting fastener and the embedded sleeve and is fixed to the main structure by the fastener, so that the scaffolding and the main structure are firmly connected. The wall connecting piece has a simple structure and greatly shortens the length of the bolt rod. The wall connecting piece is more convenient to disassemble and assemble, can be reused to save cost, and effectively protects the concrete structure. At the same time, it does not occupy the outer facade space of the floor and will not affect the construction work surface.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
为了更清楚地说明本实用新型示例性实施方式的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,应当理解,以下附图仅示出了本实用新型的某些实施例,因此不应被看作是对范围的限定,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他相关的附图。在附图中:In order to more clearly illustrate the technical solutions of the exemplary embodiments of the present utility model, the following is a brief introduction to the drawings required for use in the embodiments. It should be understood that the following drawings only illustrate certain embodiments of the present utility model, and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other relevant drawings can be obtained based on these drawings without creative work. In the drawings:
图1为本实用新型中的新型连墙件与墙柱连接的结构示意图;FIG1 is a schematic diagram of the structure of the connection between the novel wall connecting member and the wall column in the utility model;
图2为图1中A部位的放大示意图;FIG2 is an enlarged schematic diagram of portion A in FIG1 ;
图3为本实用新型中的新型连墙件与梁连接的结构示意图;FIG3 is a schematic diagram of the structure of the connection between the new wall connecting member and the beam in the utility model;
图4为本实用新型中的连接扣件结构示意图。FIG. 4 is a schematic diagram of the structure of the connecting fastener in the present invention.
附图中标记及对应的零部件名称:Marks and corresponding parts names in the attached drawings:
1-墙柱结构,2-脚手架,21-立杆,22-小横杆,23-大横杆,3-连墙杆,4-连接扣件,41-扣座,411-固定孔,42-扣环,43-扣环螺栓,44-扣环螺母,5-螺栓杆,6-紧固件,7-预埋套管,8-垫板,9-梁结构。1- wall column structure, 2- scaffolding, 21- vertical pole, 22- small cross bar, 23- large cross bar, 3- wall connecting rod, 4- connecting fastener, 41- buckle seat, 411- fixing hole, 42- buckle, 43- buckle bolt, 44- buckle nut, 5- bolt rod, 6- fastener, 7- embedded sleeve, 8- pad, 9- beam structure.
具体实施方式DETAILED DESCRIPTION
为使本实用新型的目的、技术方案和优点更加清楚明白,下面结合实施例和附图,对本实用新型作进一步的详细说明,本实用新型的示意性实施方式及其说明仅用于解释本实用新型,并不作为对本实用新型的限定。In order to make the purpose, technical solutions and advantages of the utility model more clearly understood, the utility model is further described in detail below in conjunction with embodiments and drawings. The schematic implementation manner of the utility model and its description are only used to explain the utility model and are not intended to limit the utility model.
除非另有定义,本文所使用的所有的技术和科学术语与属于本申请的技术领域的技术人员通常理解的含义相同;本文中所使用的术语只是为了描述具体的实施例的目的,不是旨在于限制本申请;本申请的说明书和权利要求书及上述附图说明中的术语“包括”和“具有”以及它们的任何变形,意图在于覆盖不排他的包含。Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by technicians in the technical field to which this application belongs; the terms used herein are only for the purpose of describing specific embodiments and are not intended to limit this application; the terms "including" and "having" in the specification and claims of this application and the above-mentioned figure descriptions and any variations thereof are intended to cover non-exclusive inclusions.
在本申请实施例的描述中,技术术语“第一”“第二”等仅用于区别不同对象,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量、特定顺序或主次关系。In the description of the embodiments of the present application, technical terms such as "first" and "second" are only used to distinguish different objects and cannot be understood as indicating or implying relative importance or implicitly indicating the number, specific order or primary and secondary relationship of the indicated technical features.
在本文中提及“实施例”意味着,结合实施例描述的特定特征、结构或特性可以包含在本申请的至少一个实施例中。在说明书中的各个位置出现该短语并不一定均是指相同的实施例,也不是与其它实施例互斥的独立的或备选的实施例。本领域技术人员显式地和隐式地理解的是,本文所描述的实施例可以与其它实施例相结合。Reference to "embodiments" herein means that a particular feature, structure, or characteristic described in conjunction with the embodiments may be included in at least one embodiment of the present application. The appearance of the phrase in various locations in the specification does not necessarily refer to the same embodiment, nor is it an independent or alternative embodiment that is mutually exclusive with other embodiments. It is explicitly and implicitly understood by those skilled in the art that the embodiments described herein may be combined with other embodiments.
在本申请实施例的描述中,术语“和/或”仅仅是一种描述关联对象的关联关系,表示可以存在三种关系,例如A和/或B,可以表示:存在A,同时存在A和B,存在B这三种情况。另外,本文中字符“/”,一般表示前后关联对象是一种“或”的关系。In the description of the embodiments of the present application, the term "and/or" is only a description of the association relationship of associated objects, indicating that three relationships may exist. For example, A and/or B can represent: A exists, A and B exist at the same time, and B exists. In addition, the character "/" in this article generally indicates that the associated objects before and after are in an "or" relationship.
在本申请的实施例中,相同的附图标记表示相同的部件,并且为了简洁,在不同实施例中,省略对相同部件的详细说明。应理解,附图示出的本申请实施例中的各种部件的厚度、长宽等尺寸,以及集成装置的整体厚度、长宽等尺寸仅为示例性说明,而不应对本申请构成任何限定。In the embodiments of the present application, the same reference numerals represent the same components, and for the sake of brevity, detailed descriptions of the same components are omitted in different embodiments. It should be understood that the thickness, length, width and other dimensions of various components in the embodiments of the present application shown in the drawings, as well as the overall thickness, length, width and other dimensions of the integrated device are only exemplary descriptions and should not constitute any limitation to the present application.
在本申请实施例的描述中,术语“多个”指的是两个以上(包括两个),同理,“多组”指的是两组以上(包括两组),“多片”指的是两片以上(包括两片),除非另有明确具体的限定。In the description of the embodiments of the present application, the term "multiple" refers to more than two (including two). Similarly, "multiple groups" refers to more than two groups (including two groups), and "multiple pieces" refers to more than two pieces (including two pieces), unless otherwise clearly and specifically defined.
在本申请实施例的描述中,技术术语“中心”“纵向”“横向”“长度”“宽度”“厚度”“上”“下”“前”“后”“左”“右”“竖直”“水平”“顶”“底”“内”“外”“顺时针”“逆时针”“轴向”“径向”“周向”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本申请实施例和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本申请实施例的限制。In the description of the embodiments of the present application, the technical terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, which are only for the convenience of describing the embodiments of the present application and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the embodiments of the present application.
在本申请实施例的描述中,除非另有明确的规定和限定,技术术语“安装”“相连”“连接”“固定”等术语应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或成一体;也可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通或两个元件的相互作用关系。对于本领域的普通技术人员而言,可以根据具体情况理解上述术语在本申请实施例中的具体含义。In the description of the embodiments of the present application, unless otherwise clearly specified and limited, technical terms such as "installed", "connected", "connected", "fixed" and the like should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, and it can be the internal connection of two elements or the interaction relationship between two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the embodiments of the present application can be understood according to the specific circumstances.
请参照图1至图4,本申请实施例中提供的一种适用于混凝土的新型连墙件,连接在主体结构和脚手架2之间,包括连墙杆3、连接扣件4、螺栓杆5和紧固件6;所述连墙杆3固定在脚手架2上,所述主体结构内设有预埋套管7,所述连接扣件4固定在连墙杆3上面向主体结构的一端,所述紧固件6位于主体结构背离脚手架2的一侧,所述螺栓杆5穿过连接扣件4、预埋套管7后通过紧固件6固定在主体结构上。Please refer to Figures 1 to 4. A new type of wall connecting member suitable for concrete is provided in the embodiment of the present application, which is connected between the main structure and the scaffolding 2, including a wall connecting rod 3, a connecting fastener 4, a bolt rod 5 and a fastener 6; the wall connecting rod 3 is fixed on the scaffolding 2, and a pre-embedded sleeve 7 is provided in the main structure. The connecting fastener 4 is fixed to one end of the wall connecting rod 3 facing the main structure, and the fastener 6 is located on the side of the main structure away from the scaffolding 2. The bolt rod 5 passes through the connecting fastener 4 and the pre-embedded sleeve 7 and is fixed to the main structure through the fastener 6.
需要说明的是,本实施例中主体结构内的预埋套管7是混凝土浇筑模板架设时预埋的,以作为浇筑模板对拉螺栓孔,预埋套管7的管径规格可以为25mm。该方案利用混凝土的对拉螺栓孔来设置连墙件,不用预埋钢管,不占用楼层外立面空间,不影响施工作业面,在连墙件位置进行外墙面施工时,不影响幕墙安装,有效地保障了施工进度。It should be noted that the embedded sleeve 7 in the main structure of this embodiment is embedded when the concrete casting template is erected to serve as the casting template tension bolt hole, and the diameter of the embedded sleeve 7 can be 25mm. This solution uses the concrete tension bolt hole to set the wall connection piece, does not need to embed steel pipes, does not occupy the floor facade space, does not affect the construction work surface, and does not affect the curtain wall installation when the exterior wall is constructed at the wall connection piece position, effectively ensuring the construction progress.
根据本申请的一些实施例,所述连接扣件4包括扣座41、扣环42、扣环螺栓43和扣环螺母44,所述扣座41与所述扣环42上具有相对的半圆形凹槽,两个半圆形凹槽用于共同抱紧连墙杆3的外周壁,所述扣环42一端与扣座41活动铰接,所述扣环螺栓43一端与扣座41相连,另一端穿过扣环42的自由端,所述扣环螺母44设置于扣环螺栓43上,以使扣环42向扣座41靠近,所述扣座41上设置有固定孔411,该固定孔411在厚度方向上贯穿扣座41,且固定孔411的轴线平行于扣座41和扣环42上的半圆形凹槽的轴线,所述螺栓杆5穿入固定孔411后将连接扣件4压紧在主体结构上。According to some embodiments of the present application, the connecting fastener 4 includes a buckle seat 41, a buckle ring 42, a buckle ring bolt 43 and a buckle ring nut 44, the buckle seat 41 and the buckle ring 42 have relative semicircular grooves, the two semicircular grooves are used to jointly clamp the outer peripheral wall of the wall connecting rod 3, one end of the buckle ring 42 is movably hinged to the buckle seat 41, one end of the buckle ring bolt 43 is connected to the buckle seat 41, and the other end passes through the free end of the buckle ring 42, the buckle ring nut 44 is arranged on the buckle ring bolt 43 to make the buckle ring 42 approach the buckle seat 41, and a fixing hole 411 is provided on the buckle seat 41, which passes through the buckle seat 41 in the thickness direction, and the axis of the fixing hole 411 is parallel to the axis of the semicircular grooves on the buckle seat 41 and the buckle ring 42, and the bolt rod 5 is inserted into the fixing hole 411 to press the connecting fastener 4 onto the main structure.
根据本申请的一些实施例,所述扣环螺栓43一端与扣座41活动铰接,所述扣环42的自由端开有与扣环螺栓43适配的U型槽,且U型槽的开口方向与扣环螺栓43的转动方向相对应。在连接扣件4与连墙杆3固定连接时,扣环螺栓43的杆体位于该U型槽内。通过上述设置,当需要将连接扣件与连墙杆分离时,只需先旋松扣环螺母,然后转动扣环螺栓使其脱离U型槽,这样即可将扣环绕扣座翻转,从而取下连墙杆,扣环螺栓和扣环螺母不用完全分离,有利于提高连墙杆的安装以及拆卸效率。According to some embodiments of the present application, one end of the retaining ring bolt 43 is movably hinged with the buckle seat 41, and the free end of the retaining ring 42 is provided with a U-shaped groove adapted to the retaining ring bolt 43, and the opening direction of the U-shaped groove corresponds to the rotation direction of the retaining ring bolt 43. When the connecting fastener 4 is fixedly connected to the wall connecting rod 3, the rod body of the retaining ring bolt 43 is located in the U-shaped groove. Through the above arrangement, when it is necessary to separate the connecting fastener from the wall connecting rod, it is only necessary to first loosen the retaining ring nut, and then rotate the retaining ring bolt to disengage it from the U-shaped groove, so that the buckle can be turned around the buckle seat, thereby removing the wall connecting rod, and the retaining ring bolt and the retaining ring nut do not need to be completely separated, which is conducive to improving the installation and disassembly efficiency of the wall connecting rod.
根据本申请的一些实施例,所述紧固件6在面向主体结构的一侧设置有垫板8,该垫板8可以采用镀锌钢板。通过设置垫板,一方面可以增大紧固件与混凝土面的接触面积,使主体结构均匀承受压力,防止松动;另一方面可以保护混凝土面不被损坏。According to some embodiments of the present application, the fastener 6 is provided with a pad 8 on the side facing the main structure, and the pad 8 can be made of a galvanized steel plate. By providing the pad, on the one hand, the contact area between the fastener and the concrete surface can be increased, so that the main structure can evenly bear the pressure and prevent loosening; on the other hand, the concrete surface can be protected from damage.
根据本申请的一些实施例,所述垫板8的尺寸大于所述紧固件6的径向尺寸。具体地,垫板8尺寸可以为200*200mm,厚度为5mm。这样设计可以确保紧固件不会直接接触混凝土墙面,避免对混凝土墙面造成损坏。According to some embodiments of the present application, the size of the pad 8 is larger than the radial size of the fastener 6. Specifically, the pad 8 may be 200*200 mm in size and 5 mm in thickness. This design ensures that the fastener does not directly contact the concrete wall surface, thereby avoiding damage to the concrete wall surface.
根据本申请的一些实施例,所述脚手架2包括立杆21、小横杆22和大横杆23,所述小横杆22和大横杆23均固定在立柱21上。具体地,立杆21、小横杆22和大横杆23通过扣件形成固定连接。需要说明的是,扣件可以采用现有技术中常用的扣件即可。According to some embodiments of the present application, the scaffold 2 includes a vertical pole 21, a small cross bar 22 and a large cross bar 23, and the small cross bar 22 and the large cross bar 23 are fixed on the vertical pole 21. Specifically, the vertical pole 21, the small cross bar 22 and the large cross bar 23 are fixedly connected by fasteners. It should be noted that the fasteners can be commonly used fasteners in the prior art.
根据本申请的一些实施例,所述小横杆22设在大横杆23上方,且小横杆22和大横杆23交错连接为网格状。具体地,立杆21沿竖直方向设置,大横杆23沿水平方向设置且平行于主体结构的外立面,小横杆22沿水平方向设置且垂直于主体结构的外立面。According to some embodiments of the present application, the small crossbar 22 is arranged above the large crossbar 23, and the small crossbar 22 and the large crossbar 23 are staggered and connected in a grid shape. Specifically, the vertical rod 21 is arranged in the vertical direction, the large crossbar 23 is arranged in the horizontal direction and parallel to the facade of the main structure, and the small crossbar 22 is arranged in the horizontal direction and perpendicular to the facade of the main structure.
需要说明的是,上述为常规脚手架的结构组成,当然也可采用其他结构的脚手架,对本实施例中的连墙件的安装和使用并不影响。It should be noted that the above is the structural composition of a conventional scaffold. Of course, scaffolds with other structures can also be used, which will not affect the installation and use of the wall connecting parts in this embodiment.
根据本申请的一些实施例,所述紧固件6为与所述螺栓杆5相适配的螺母。具体地,紧固件6可以包括两个螺母,螺栓杆5可以采用M16六角普通螺栓杆。通过在螺栓杆尾端设置两个螺母,可以起到一定的放松效果,确保将脚手架与主体结构稳定连接。According to some embodiments of the present application, the fastener 6 is a nut that matches the bolt rod 5. Specifically, the fastener 6 may include two nuts, and the bolt rod 5 may be an M16 hexagonal common bolt rod. By arranging two nuts at the tail end of the bolt rod, a certain loosening effect can be achieved to ensure that the scaffold is stably connected to the main structure.
根据本申请的一些实施例,所述连墙杆3通过扣件固定在脚手架2上。具体地,连墙杆3可以采用钢管。需要说明的是,扣件可以采用现有技术中常用的扣件即可。According to some embodiments of the present application, the wall connecting rod 3 is fixed to the scaffold 2 by a fastener. Specifically, the wall connecting rod 3 can be a steel pipe. It should be noted that the fastener can be a fastener commonly used in the prior art.
根据本申请的一些实施例,所述主体结构包括墙柱结构1和梁结构9。According to some embodiments of the present application, the main structure includes a wall column structure 1 and a beam structure 9 .
本申请实施例中的新型连墙件至少具有以下几方面优点:The novel wall connecting member in the embodiment of the present application has at least the following advantages:
1、利用脚手架排布图上连墙件部位固化边梁、山墙部位对拉螺栓孔位置,有效利用主体结构上的对拉螺栓孔安装连墙件,无需主体结构另外打孔,后期工程修补量大大减少;1. Use the location of the tension bolt holes on the gable and side beams of the wall connection parts on the scaffolding layout diagram to effectively use the tension bolt holes on the main structure to install the wall connection parts. There is no need to drill additional holes in the main structure, which greatly reduces the amount of repair work in the later stage.
2、使用此连墙件不占用楼层外立面空间,不影响施工作业面,加快了施工进度,在连墙件位置进行外墙面施工时,不影响幕墙安装,免二次穿过墙体进行安装,从而有效地防止了外墙渗水和漏水现象的发生,后期仅对钢管抵结构位置的对拉螺栓孔进行修复处理即可;2. The use of this wall connection piece does not occupy the external facade space of the floor, does not affect the construction work surface, speeds up the construction progress, and does not affect the curtain wall installation when the external wall construction is carried out at the location of the wall connection piece, and avoids the need to pass through the wall for installation twice, thereby effectively preventing the occurrence of water seepage and leakage in the external wall. In the later stage, only the tension bolt holes at the location of the steel pipe against the structure need to be repaired;
3、此连墙件构造简单,且安拆方便节约工时,仅需将螺母取下即可拆卸连墙件,且部件拆卸后均可重复使用,并且可以在不同项目之间循环使用,相比传统钢管、钢筋及扁钢连墙件节约了材料和成本,并有效的保护了混凝土结构;3. This wall tie has a simple structure and is easy to install and disassemble, saving time. The wall tie can be disassembled by simply removing the nut. The parts can be reused after disassembly and can be recycled between different projects. Compared with traditional steel pipes, steel bars and flat steel wall ties, it saves materials and costs and effectively protects the concrete structure.
4、本连墙件拉结牢固可靠,刚度较大,能承受和传递拉压双向荷载,显著提高脚手架整体稳定性;4. The wall connection is firm and reliable, with high rigidity, and can bear and transmit tensile and compressive bidirectional loads, significantly improving the overall stability of the scaffolding;
5、相比于常规连墙件埋设在梁顶面,影响砌体、抹灰、涂料等外墙施工,预埋件形成的架眼需要修补,还需二次改设连墙件,本连墙件较传统技术减少部分工序,节约钢材,减少安全隐患,消除外墙洞口渗漏质量通病;5. Compared with conventional wall ties that are buried on the top of beams, which affect the construction of exterior walls such as masonry, plastering, and coating, the eyelets formed by embedded parts need to be repaired, and the wall ties need to be reinstalled for the second time. Compared with traditional technology, this wall tie reduces some processes, saves steel, reduces safety hazards, and eliminates the common quality problem of leakage at the exterior wall openings;
6、此连墙件相比于其他连墙件更加工具化,无需主体结构施工时提前安装预埋件,有效避免预埋件安装偏差导致连墙件无法安装使用的情况,传统连墙件拆卸后需切割预埋钢管或者预埋螺栓,此连墙件无需此道工序,更加快捷、安全;6. Compared with other wall ties, this wall tie is more tool-based. It does not require the installation of embedded parts in advance during the main structure construction, which effectively avoids the situation where the wall tie cannot be installed and used due to the installation deviation of embedded parts. After the traditional wall tie is disassembled, it is necessary to cut the embedded steel pipe or embedded bolts. This wall tie does not require this process, which is faster and safer.
以上所述的具体实施方式,对本实用新型的目的、技术方案和有益效果进行了进一步详细说明,所应理解的是,以上所述仅为本实用新型的具体实施方式而已,并不用于限定本实用新型的保护范围,凡在本实用新型的精神和原则之内,所做的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The specific implementation methods described above further illustrate the purpose, technical solutions and beneficial effects of the utility model in detail. It should be understood that the above description is only the specific implementation method of the utility model and is not used to limit the protection scope of the utility model. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the utility model should be included in the protection scope of the utility model.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202420248768.XU CN221920236U (en) | 2024-01-31 | 2024-01-31 | Novel wall connecting piece suitable for concrete |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202420248768.XU CN221920236U (en) | 2024-01-31 | 2024-01-31 | Novel wall connecting piece suitable for concrete |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN221920236U true CN221920236U (en) | 2024-10-29 |
Family
ID=93182880
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202420248768.XU Active CN221920236U (en) | 2024-01-31 | 2024-01-31 | Novel wall connecting piece suitable for concrete |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN221920236U (en) |
-
2024
- 2024-01-31 CN CN202420248768.XU patent/CN221920236U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104032948B (en) | Steel and wood composite template and construction method | |
| CN209244226U (en) | A cable-stayed I-beam cantilever beam for scaffolding | |
| CN201078091Y (en) | Combined scaffold | |
| CN204492134U (en) | Be convenient to the height scaffolding installed | |
| CN111236639B (en) | Structural beam template reinforcing device and method free of split bolts | |
| CN221920236U (en) | Novel wall connecting piece suitable for concrete | |
| CN104120874A (en) | Assembly type scaffold and wall connecting piece | |
| CN209723616U (en) | Reinforcing back cord device for positioning and supporting for aluminum alloy mould plate frame column | |
| CN115522732A (en) | Reinforcing device for large-section concrete beam and construction method | |
| CN107795125B (en) | A structural component for beam form supports and consolidates and be connected | |
| CN204001665U (en) | A kind of scaffold assembling wall-connecting piece | |
| CN219261712U (en) | An adjustable wall connecting piece | |
| CN205804922U (en) | A kind of novel embedded tool formula scaffold wall connecting piece | |
| CN110017022A (en) | A kind of template accurate limiting device and mold method | |
| CN211850773U (en) | A kind of external wall scaffolding connecting wall | |
| CN223074790U (en) | A template device for pouring concrete on well wall | |
| CN221896185U (en) | Simple detachable scaffold combined wall connecting piece | |
| CN203499016U (en) | Wall tie bar pre-embedded positioning thread sleeve | |
| CN223358681U (en) | Universal modular horizontal rod for disc-type scaffolding | |
| CN217352923U (en) | A kind of building structure reinforcement connection device | |
| CN221567892U (en) | Building sleeve fixing device | |
| CN220467349U (en) | An independent mast for lifting air ducts | |
| KR200414930Y1 (en) | Formwork spacing | |
| CN217205236U (en) | Construction platform for elevator shaft | |
| CN220267206U (en) | A tool for reinforcing exterior facade corner structural columns |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |