CN221919647U - An antifreeze device for building water supply and drainage - Google Patents

An antifreeze device for building water supply and drainage Download PDF

Info

Publication number
CN221919647U
CN221919647U CN202420528334.5U CN202420528334U CN221919647U CN 221919647 U CN221919647 U CN 221919647U CN 202420528334 U CN202420528334 U CN 202420528334U CN 221919647 U CN221919647 U CN 221919647U
Authority
CN
China
Prior art keywords
protective shell
drainage
water supply
arc
protective housing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202420528334.5U
Other languages
Chinese (zh)
Inventor
王英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shijiazhuang Ningrong New Energy Technology Co ltd
Original Assignee
Shijiazhuang Ningrong New Energy Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shijiazhuang Ningrong New Energy Technology Co ltd filed Critical Shijiazhuang Ningrong New Energy Technology Co ltd
Priority to CN202420528334.5U priority Critical patent/CN221919647U/en
Application granted granted Critical
Publication of CN221919647U publication Critical patent/CN221919647U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joints Allowing Movement (AREA)

Abstract

The utility model discloses an antifreezing device for building water supply and drainage, which comprises a water pipe, wherein a fast-assembling component is arranged on the outer side wall of the water pipe, the fast-assembling component comprises a first protective shell and a second protective shell, the first protective shell and the second protective shell are arranged on the outer side wall of the water pipe, heat-insulating cotton is respectively arranged on the inner side walls of the first protective shell and the second protective shell, an arc-shaped plate I is arranged on one side of the second protective shell, a clamping rod I is fixedly arranged on one side of the arc-shaped plate I, the clamping rod I is clamped with the second protective shell, and an arc-shaped plate II is arranged on one side of the first protective shell; this freeze-proof device of building water supply and drainage through fast-assembling subassembly, can carry out quick assembly, and assemble simple convenient, has more reduced the inconvenient extravagant time of assembly, and bare-handed just can accomplish the equipment work, has also reduced the inconvenience of carrying the instrument, and durable after the equipment, also lets freezing prevention effect better for the effect of using can be better, convenient to popularize and use.

Description

一种建筑给排水的防冻装置An antifreeze device for building water supply and drainage

技术领域Technical Field

本实用新型涉及建筑排水技术领域,具体是一种建筑给排水的防冻装置。The utility model relates to the technical field of building drainage, in particular to an antifreeze device for building water supply and drainage.

背景技术Background Art

建筑设计中,排水系统是至关重要的一个环节。一个优秀的排水系统不仅可以有效地排除雨水和废水,保证建筑物的正常使用,还能在一定程度上提升建筑的整体品质和使用寿命,首先,建筑排水系统的主要功能是将建筑内部产生的污水和雨水迅速、安全地排出。这包括卫生间、厨房等生活污水,以及屋顶、地面等区域的雨水,为了实现这一目标,设计师需要精心规划排水管道的布局和管径大小,确保水流能够顺畅无阻地流向预定的排放点。In architectural design, the drainage system is a crucial link. An excellent drainage system can not only effectively remove rainwater and wastewater to ensure the normal use of the building, but also improve the overall quality and service life of the building to a certain extent. First of all, the main function of the building drainage system is to quickly and safely discharge the sewage and rainwater generated inside the building. This includes domestic sewage from toilets, kitchens, etc., as well as rainwater from roofs, ground and other areas. In order to achieve this goal, designers need to carefully plan the layout and diameter of the drainage pipes to ensure that the water can flow smoothly and unimpeded to the predetermined discharge point.

专利公开号“CN217419827U”公开的“一种用于建筑给排水的防冻装置,属于建筑给排水技术领域,以解决目前的防冻装置一般都是在给排水管道的外围包裹上保温层,对管道的内部进行保温操作,但是这种保温层保温效果有限,还非常容易脱落,造成使用不便的技术问题,包括防冻升温箱,所述防冻升温箱的左侧面固定连通有进水管,所述防冻升温箱的右侧面固定连通有出水管,所述进水管的外表面和出水管的外表面均套设有保温套,通过防冻升温箱中的加热组件配合,螺旋加热棒对进入防冻升温箱中的水进行加热升温,提高给排水的出水温度,同时输送管上缠绕发热线,通过发热线与保温套的配合,对给排水管道进行保温,防止在冬季输送过程中出现结冰的情况”。Patent publication number "CN217419827U" discloses "an antifreeze device for building water supply and drainage, belonging to the technical field of building water supply and drainage, to solve the current antifreeze device generally wraps an insulation layer on the periphery of the water supply and drainage pipe to insulate the inside of the pipe, but the insulation effect of this insulation layer is limited and it is very easy to fall off, causing inconvenience in use. The technical problem includes an antifreeze heating box, the left side of the antifreeze heating box is fixedly connected to a water inlet pipe, and the right side of the antifreeze heating box is fixedly connected to a water outlet pipe. The outer surface of the water inlet pipe and the outer surface of the water outlet pipe are both covered with insulation sleeves. Through the cooperation of the heating component in the antifreeze heating box, the spiral heating rod heats and heats the water entering the antifreeze heating box to increase the outlet water temperature of the water supply and drainage. At the same time, a heating wire is wrapped around the delivery pipe. Through the cooperation of the heating wire and the insulation sleeve, the water supply and drainage pipe is insulated to prevent freezing during the transportation process in winter."

针对上述相关问题,现有的防冻装置不方便快速安装,使用的过程中安装会浪费大量的时间,且不便于多个防冻装置之间快速连接在一起,很难根据水管的长度来调节使用。In view of the above-mentioned related problems, the existing antifreeze device is not convenient to install quickly, and the installation process will waste a lot of time. It is also not convenient to quickly connect multiple antifreeze devices together, and it is difficult to adjust the use according to the length of the water pipe.

为此,本实用新型提供了一种建筑给排水的防冻装置,以解决上述问题。Therefore, the utility model provides an antifreeze device for building water supply and drainage to solve the above problems.

实用新型内容Utility Model Content

针对现有技术的不足,本实用新型提供了一种建筑给排水的防冻装置,解决了上述现有的防冻装置不方便快速安装,使用的过程中安装会浪费大量的时间的问题。In view of the deficiencies in the prior art, the utility model provides an antifreeze device for building water supply and drainage, which solves the problem that the prior antifreeze devices are inconvenient to install quickly and the installation process wastes a lot of time.

为实现以上目的,本实用新型通过以下技术方案予以实现:一种建筑给排水的防冻装置,包括水管,所述水管的外侧壁设置有快装组件,所述快装组件包括保护壳一与保护壳二,所述保护壳一和所述保护壳二设置在所述水管的外侧壁,所述保护壳一和所述保护壳二的内侧壁分别设置有保温棉,所述保护壳二的一侧设置有弧形板一,所述弧形板一的一侧固定安装有卡杆一,所述卡杆一与所述保护壳二之间相卡接,所述保护壳一的一侧设置有弧形板二,所述弧形板二的一侧固定安装有卡杆二,所述卡杆二与所述保护壳一之间相卡接,所述弧形板一和所述弧形板二的侧壁上均通过螺纹连接有圆环。To achieve the above objectives, the utility model is implemented through the following technical solutions: an antifreeze device for building water supply and drainage, comprising a water pipe, the outer wall of the water pipe is provided with a quick-install assembly, the quick-install assembly comprises a protective shell 1 and a protective shell 2, the protective shell 1 and the protective shell 2 are arranged on the outer wall of the water pipe, the inner walls of the protective shell 1 and the protective shell 2 are respectively provided with thermal insulation cotton, an arc plate 1 is provided on one side of the protective shell 2, a clamping rod 1 is fixedly installed on one side of the arc plate 1, the clamping rod 1 and the protective shell 2 are clamped together, an arc plate 2 is provided on one side of the protective shell 1, a clamping rod 2 is fixedly installed on one side of the arc plate 2, the clamping rod 2 and the protective shell 1 are clamped together, and circular rings are connected on the side walls of the arc plate 1 and the arc plate 2 through threads.

进一步的,所述圆环的一侧设置有连接组件,所述连接组件包括固定架与拆装架,所述固定架固定安装在所述圆环的一侧,所述拆装架设置在所述固定架的内侧壁,所述拆装架的内侧壁滑动连接移动板,所述移动板的一侧设置有弹簧,所述移动板的一侧固定安装有球头卡块,所述球头卡块与所述固定架之间相卡接。Furthermore, a connecting component is provided on one side of the circular ring, and the connecting component includes a fixing frame and a disassembling frame, the fixing frame is fixedly installed on one side of the circular ring, the disassembling frame is arranged on the inner side wall of the fixing frame, the inner side wall of the disassembling frame is slidably connected to a movable plate, a spring is provided on one side of the movable plate, a ball head block is fixedly installed on one side of the movable plate, and the ball head block is clamped with the fixing frame.

采用上述技术方案,便于多个快装组件连接在一起,使得使用的效果会更好。The above technical solution is adopted to facilitate the connection of multiple quick-install components, so that the use effect will be better.

进一步的,所述连接组件还包括拉板,所述拉板与所述移动板之间固定安装。Furthermore, the connection assembly also includes a pull plate, and the pull plate is fixedly installed between the movable plate.

采用上述技术方案,方便拉动移动板,使得其移动更轻便。By adopting the above technical solution, it is convenient to pull the movable plate, making it easier to move.

进一步的,所述水管的一侧固定安装有加固板,所述加固板的一侧通过螺纹连接有螺栓。Furthermore, a reinforcement plate is fixedly installed on one side of the water pipe, and a bolt is threadedly connected to one side of the reinforcement plate.

采用上述技术方案,可以起到加固效果,使得使用起来更牢靠。The above technical solution can achieve a reinforcement effect, making it more reliable to use.

进一步的,所述螺栓与所述加固板的数量相等。Furthermore, the number of the bolts is equal to the number of the reinforcement plates.

采用上述技术方案,可以让加固的效果更好。The adoption of the above technical solution can achieve better reinforcement effect.

进一步的,所述保护壳一和所述保护壳二的一侧分别设置有密封垫,且所述密封垫分别与所述保护壳一和所述保护壳二之间相粘合。Furthermore, a sealing gasket is provided on one side of the protective shell 1 and the protective shell 2 respectively, and the sealing gasket is bonded to the protective shell 1 and the protective shell 2 respectively.

采用上述技术方案,可以起到很好的密封效果,使得防冻的效果会更好。The above technical solution can achieve a good sealing effect, so that the antifreeze effect will be better.

有益效果Beneficial Effects

本实用新型提供了一种建筑给排水的防冻装置。与现有技术相比具备以下有益效果:The utility model provides an antifreeze device for building water supply and drainage. Compared with the prior art, it has the following beneficial effects:

1、该建筑给排水的防冻装置,通过快装组件,可以进行快速装配,且装配起来简单便捷,更减少了装配不便所浪费的时间,徒手就能完成组装工作,也减少了携带工具的不便,且组装之后结实耐用,也让防冻的效果更佳,使得使用的效果会更好,便于推广使用。1. The antifreeze device for the building's water supply and drainage can be quickly assembled through quick-assembly components. The assembly is simple and convenient, which reduces the time wasted due to assembly inconveniences. The assembly work can be completed by hand, which reduces the inconvenience of carrying tools. After assembly, it is strong and durable, and the antifreeze effect is better, making the use effect better and facilitating promotion and use.

2、该建筑给排水的防冻装置,通过连接组件,可以将多个快装组件之间快速连接在一起,且连接起来简单便捷,更减少了连接不便所浪费的时间,且可以根据水管的长度来连接使用,也让对水管保护效果更贴合,使用的效果也会随之增加。2. The antifreeze device for the building's water supply and drainage can quickly connect multiple quick-install components together through connecting components. The connection is simple and convenient, which reduces the time wasted due to inconvenient connection. It can be connected and used according to the length of the water pipe, which makes the protection effect of the water pipe more suitable and the effect of use will also increase accordingly.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

为了更清楚地说明本实用新型实施方案或现有技术中的技术方案,下面将对实施方案或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施方案,对于本领域普通技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the implementation scheme of the utility model or the technical scheme in the prior art, the drawings required for use in the implementation scheme or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some implementation schemes of the utility model. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative labor.

图1是本实用新型的整体结构示意图;Figure 1 is a schematic diagram of the overall structure of the utility model;

图2是本实用新型图1中A处结构的放大图;FIG2 is an enlarged view of the structure at A in FIG1 of the present utility model;

图3是本实用新型的整体结构侧视图;Figure 3 is a side view of the overall structure of the utility model;

图4是本实用新型图3中B处结构的放大图。FIG. 4 is an enlarged view of the structure at point B in FIG. 3 of the present invention.

图中:1、水管;2、快装组件;21、保护壳一;22、保护壳二;23、保温棉;24、弧形板一;25、卡杆一;26、弧形板二;27、卡杆二;28、圆环;3、连接组件;31、固定架;32、拆装架;33、移动板;34、弹簧;35、球头卡块;36、拉板;4、密封垫。In the figure: 1. water pipe; 2. quick-release assembly; 21. protective shell 1; 22. protective shell 2; 23. thermal insulation cotton; 24. arc plate 1; 25. clamping rod 1; 26. arc plate 2; 27. clamping rod 2; 28. ring; 3. connecting assembly; 31. fixing frame; 32. disassembly frame; 33. moving plate; 34. spring; 35. ball head block; 36. pull plate; 4. sealing gasket.

具体实施方式DETAILED DESCRIPTION

需要说明的是,本申请实施例的描述中,术语“前、后”、“左、右”、“上、下”等指示的方位或位置关系均为基于附图所示的方位或位置关系,仅仅是为了便于描述本申请和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本申请的限制。术语“安装”、“连接”、“相连”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本申请中的具体含义。It should be noted that in the description of the embodiments of the present application, the terms "front, rear", "left, right", "up, down", etc. indicating directions or positional relationships are based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present application. The terms "install", "connect", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or an indirect connection through an intermediate medium, or it can be a connection between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present application can be understood according to specific circumstances.

下面通过附图和实施例对本申请作进一步详细阐述。The present application is further described in detail below through drawings and examples.

参照图1至图4,本申请实施例提供一种建筑给排水的防冻装置,包括水管1,水管1的外侧壁设置有快装组件2,快装组件2包括保护壳一21与保护壳二22,保护壳一21和保护壳二22设置在水管1的外侧壁,保护壳一21和保护壳二22的内侧壁分别设置有保温棉23,保护壳二22的一侧设置有弧形板一24,弧形板一24的一侧固定安装有卡杆一25,卡杆一25与保护壳二22之间相卡接,保护壳一21的一侧设置有弧形板二26,弧形板二26的一侧固定安装有卡杆二27,卡杆二27与保护壳一21之间相卡接,弧形板一24和弧形板二26的侧壁上均通过螺纹连接有圆环28。1 to 4 , an embodiment of the present application provides an antifreeze device for building water supply and drainage, comprising a water pipe 1, a quick-install assembly 2 being provided on the outer wall of the water pipe 1, the quick-install assembly 2 comprising a protective shell 1 21 and a protective shell 2 22, the protective shell 1 21 and the protective shell 2 22 being provided on the outer wall of the water pipe 1, the inner walls of the protective shell 1 21 and the protective shell 2 22 being provided with thermal insulation cotton 23 respectively, an arc plate 1 24 being provided on one side of the protective shell 22, a clamping rod 1 25 being fixedly installed on one side of the arc plate 1 24, the clamping rod 1 25 being clamped with the protective shell 2 22, an arc plate 26 being provided on one side of the protective shell 1 21, a clamping rod 27 being fixedly installed on one side of the arc plate 26, the clamping rod 27 being clamped with the protective shell 1 21, and a circular ring 28 being threadedly connected to the side walls of the arc plate 1 24 and the arc plate 26.

本实施例中,首先将保护壳一21和保护壳二22固定在水管1的外部,然后通过卡杆一25和卡杆二27可以将其与保护壳二22和保护壳一21之间卡接在一起,然后转动圆环28可以将其与弧形板一24和弧形板二26之间拧在一起,以便于完成装配工作,且装配起来简单便捷,更减少了装配不便所浪费的时间,使得使用的效果会更好。In this embodiment, the protective shell 1 21 and the protective shell 2 22 are first fixed to the outside of the water pipe 1, and then they can be clamped together with the protective shell 2 22 and the protective shell 1 21 through the clamping rod 1 25 and the clamping rod 2 27, and then the circular ring 28 can be rotated to screw it together with the arc plate 1 24 and the arc plate 2 26 to complete the assembly work. The assembly is simple and convenient, and the time wasted due to assembly inconvenience is reduced, so that the use effect will be better.

参照图1至图4,在本实施例的一个方面中,圆环28的一侧设置有连接组件3,连接组件3包括固定架31与拆装架32,固定架31固定安装在圆环28的一侧,拆装架32设置在固定架31的内侧壁,拆装架32的内侧壁滑动连接移动板33,移动板33的一侧设置有弹簧34,移动板33的一侧固定安装有球头卡块35,球头卡块35与固定架31之间相卡接,连接组件3还包括拉板36,拉板36与移动板33之间固定安装。1 to 4 , in one aspect of the present embodiment, a connecting assembly 3 is provided on one side of the circular ring 28, and the connecting assembly 3 includes a fixing frame 31 and a disassembling frame 32, the fixing frame 31 is fixedly mounted on one side of the circular ring 28, the disassembling frame 32 is arranged on the inner side wall of the fixing frame 31, the inner side wall of the disassembling frame 32 is slidably connected to a moving plate 33, a spring 34 is provided on one side of the moving plate 33, a ball head block 35 is fixedly mounted on one side of the moving plate 33, the ball head block 35 is clamped with the fixing frame 31, and the connecting assembly 3 also includes a pulling plate 36, which is fixedly mounted on the moving plate 33.

本实施例中,然后将拆装架32卡进固定架31的内部,使得球头卡块35会受到固定架31的挤压,从而让移动板33可以挤压弹簧34进行收缩,从而让球头卡块35可以与固定架31之间卡接在一起,以便于对多个快装组件2之间进行快速连接,且连接起来简单方便。In this embodiment, the disassembly frame 32 is then inserted into the interior of the fixed frame 31, so that the ball head block 35 is squeezed by the fixed frame 31, so that the movable plate 33 can squeeze the spring 34 to contract, so that the ball head block 35 can be clamped together with the fixed frame 31, so as to facilitate the quick connection between multiple quick-release components 2, and the connection is simple and convenient.

参照图1至图4,在本实施例的一个方面中,水管1的一侧固定安装有加固板,加固板的一侧通过螺纹连接有螺栓,螺栓与加固板的数量相等。1 to 4 , in one aspect of the present embodiment, a reinforcing plate is fixedly mounted on one side of the water pipe 1 , and bolts are threadedly connected to one side of the reinforcing plate, and the number of the bolts is equal to the number of the reinforcing plate.

本实施例中,可以对水管进行固定,使得其安装之后会更牢靠。In this embodiment, the water pipe can be fixed so that it will be more secure after installation.

参照图1至图4,在本实施例的一个方面中,保护壳一21和保护壳二22的一侧分别设置有密封垫4,且密封垫4分别与保护壳一21和保护壳二22之间相粘合。1 to 4 , in one aspect of the present embodiment, a sealing gasket 4 is provided on one side of the protective shell 1 21 and the protective shell 2 22 , respectively, and the sealing gasket 4 is bonded to the protective shell 1 21 and the protective shell 2 22 , respectively.

本实施例中,密封垫4可以让保护壳一21和保护壳二22之间的密封效果更佳,保温效果也会随之增加。In this embodiment, the sealing gasket 4 can improve the sealing effect between the protective shell 1 21 and the protective shell 2 22, and the heat preservation effect will also be increased accordingly.

工作原理:首先将保护壳一21和保护壳二22固定在水管1的外部,然后通过卡杆一25和卡杆二27可以将其与保护壳二22和保护壳一21之间卡接在一起,然后转动圆环28可以将其与弧形板一24和弧形板二26之间拧在一起。Working principle: first fix the protective shell 1 21 and the protective shell 2 22 on the outside of the water pipe 1, then clamp them together with the protective shell 2 22 and the protective shell 1 21 through the clamping rod 1 25 and the clamping rod 2 27, and then rotate the ring 28 to screw it together with the arc plate 1 24 and the arc plate 2 26.

然后将拆装架32卡进固定架31的内部,使得球头卡块35会受到固定架31的挤压,从而让移动板33可以挤压弹簧34进行收缩,从而让球头卡块35可以与固定架31之间卡接在一起。Then the disassembly frame 32 is inserted into the fixing frame 31 , so that the ball head block 35 is squeezed by the fixing frame 31 , so that the movable plate 33 can squeeze the spring 34 to contract, so that the ball head block 35 can be clamped together with the fixing frame 31 .

需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.

尽管已经示出和描述了本申请的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本申请的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本申请的范围由所附权利要求及其等同物限定。Although the embodiments of the present application have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present application, and that the scope of the present application is defined by the appended claims and their equivalents.

Claims (6)

1. An antifreezing device for building water supply and drainage, comprising a water pipe (1), and being characterized in that: the utility model provides a water pipe, including water pipe (1) lateral wall is provided with fast-assembling subassembly (2), fast-assembling subassembly (2) include protective housing one (21) and protective housing two (22), protective housing one (21) with protective housing two (22) set up the lateral wall of water pipe (1), protective housing one (21) with the inside wall of protective housing two (22) is provided with heat preservation cotton (23) respectively, one side of protective housing two (22) is provided with arc one (24), one side fixed mounting of arc one (24) has clamping bar one (25), clamping bar one (25) with looks joint between protective housing two (22), one side of protective housing one (21) is provided with arc two (26), one side fixed mounting of arc two (26) has clamping bar two (27), clamping bar two (27) with phase joint between protective housing one (21), arc one (24) with all have ring (28) through threaded connection on the lateral wall of arc two (26).
2. The antifreeze apparatus for water supply and drainage of buildings according to claim 1, wherein: one side of ring (28) is provided with coupling assembling (3), coupling assembling (3) are in including mount (31) and dismouting frame (32), mount (31) fixed mounting is in one side of ring (28), dismouting frame (32) set up the inside wall of mount (31), the inside wall sliding connection movable plate (33) of dismouting frame (32), one side of movable plate (33) is provided with spring (34), one side fixed mounting of movable plate (33) has bulb fixture block (35), bulb fixture block (35) with looks joint between mount (31).
3. An antifreeze apparatus for water supply and drainage of buildings as claimed in claim 2, wherein: the connecting assembly (3) further comprises a pulling plate (36), and the pulling plate (36) and the moving plate (33) are fixedly installed.
4. The antifreeze apparatus for water supply and drainage of buildings according to claim 1, wherein: one side of the water pipe (1) is fixedly provided with a reinforcing plate, and one side of the reinforcing plate is connected with a bolt through threads.
5. The antifreeze apparatus for water supply and drainage of buildings according to claim 4, wherein: the number of the bolts is equal to that of the reinforcing plates.
6. The antifreeze apparatus for water supply and drainage of buildings according to claim 1, wherein: one side of the first protective shell (21) and one side of the second protective shell (22) are respectively provided with a sealing gasket (4), and the sealing gaskets (4) are respectively adhered with the first protective shell (21) and the second protective shell (22).
CN202420528334.5U 2024-03-19 2024-03-19 An antifreeze device for building water supply and drainage Active CN221919647U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202420528334.5U CN221919647U (en) 2024-03-19 2024-03-19 An antifreeze device for building water supply and drainage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202420528334.5U CN221919647U (en) 2024-03-19 2024-03-19 An antifreeze device for building water supply and drainage

Publications (1)

Publication Number Publication Date
CN221919647U true CN221919647U (en) 2024-10-29

Family

ID=93199112

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202420528334.5U Active CN221919647U (en) 2024-03-19 2024-03-19 An antifreeze device for building water supply and drainage

Country Status (1)

Country Link
CN (1) CN221919647U (en)

Similar Documents

Publication Publication Date Title
CN202041074U (en) A Rotary Kiln Shell Waste Heat Utilization Device
CN221919647U (en) An antifreeze device for building water supply and drainage
CN211597433U (en) A pipeline waterproofing device extending out of the roof
CN202327434U (en) Fastening fixture for quick pipeline joint
CN207350974U (en) A kind of solar heating engineering thermal collecting header
CN210484923U (en) Prefabricated direct-burried keeps warm concentric reducing pipe connection spare
CN208457439U (en) A kind of thermodynamic transport energy saving pipeline
CN222163913U (en) A prefabricated direct buried thermal insulation pipe that is easy to install
CN218719606U (en) Low temperature resistant PPR tubular product installation elbow
CN214064138U (en) Novel water supply and drainage pipe connecting device
CN219258372U (en) Denitration sampling pipe drainage device that prevents frostbite
CN2577198Y (en) Anti-leakage apparatus of electric water-heater
CN219474398U (en) Antifreezing heat exchanger water chamber
CN215861112U (en) High-performance sealing device of hydraulic oil way
CN220954765U (en) Cooling and cracking-resistant device for mass concrete circulating water
CN219999623U (en) Carbon removal heater convenient to installation is fixed
CN221732626U (en) Elbow filter
CN212658089U (en) A plastic alloy tube heat exchanger with good heat exchange effect
CN220416579U (en) Bypass ventilation process pipeline
CN220171890U (en) Efficient energy-saving oil immersed transformer
CN222865687U (en) A heat exchange copper tube
CN217108624U (en) Water supply pipe for external use for building convenient to assemble
CN219198545U (en) anti frost pipe
CN2548000Y (en) Heating and antifreezing apparatus for oil-gas and fire pipeline
CN223580298U (en) A distribution pipe assembly for a refrigeration equipment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant