CN221919409U - A multifunctional guide frame - Google Patents

A multifunctional guide frame Download PDF

Info

Publication number
CN221919409U
CN221919409U CN202420496358.7U CN202420496358U CN221919409U CN 221919409 U CN221919409 U CN 221919409U CN 202420496358 U CN202420496358 U CN 202420496358U CN 221919409 U CN221919409 U CN 221919409U
Authority
CN
China
Prior art keywords
frame
positioning
steel
vertical
guide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202420496358.7U
Other languages
Chinese (zh)
Inventor
熊阳
彭鹏
曾健
江晓阳
向一明
刘建国
刘鸽
关小会
杜征力
贺希英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Second Harbor Engineering Co
Original Assignee
CCCC Second Harbor Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Second Harbor Engineering Co filed Critical CCCC Second Harbor Engineering Co
Priority to CN202420496358.7U priority Critical patent/CN221919409U/en
Application granted granted Critical
Publication of CN221919409U publication Critical patent/CN221919409U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses a multifunctional guide frame, which comprises: the steel frame body is of an L-shaped frame structure and comprises a vertical part and a horizontal part; a connecting piece is fixedly arranged on one side, far away from the horizontal part, of the vertical part; the two positioning frames are respectively and fixedly arranged at two ends of one side of the horizontal part far away from the vertical part; the positioning frame is of a C-shaped frame structure, a telescopic rod is arranged at the opening of the positioning frame, and the length of the telescopic rod is adjusted to open or close the opening of the positioning frame; the openings of the two positioning frames are oppositely arranged; a positioning device is arranged in the positioning frame and used for positioning the steel pipe pile; the hanging platform is fixedly arranged at the bottom of the steel frame body. The utility model solves the problem that the steel pipe pile guide frame, the pile top distribution beam mounting platform and the inter-pile connection system mounting platform are required to be frequently dismounted and switched in the construction process of the steel trestle, greatly improves the field construction efficiency of the lower structure of the steel trestle and reduces the construction safety risk.

Description

一种多功能导向架A multifunctional guide frame

技术领域Technical Field

本实用新型涉及钢栈桥施工技术领域。更具体地说,本实用新型涉及一种多功能导向架。The utility model relates to the technical field of steel trestle construction, and more specifically, to a multifunctional guide frame.

背景技术Background Art

进入二十一世纪后,我国的桥梁发展驶入快车道,大量跨山区峡谷、跨江河湖海的桥梁正在建设或规划中。由于桥梁施工时材料、设备运输和人员通行的需要,在桥梁施工期间需修建临时栈桥,在跨江、跨海桥梁的建设中,栈桥的长度往往达到了数公里甚至十几公里,应用非常广泛。After entering the 21st century, my country's bridge development has entered the fast lane, and a large number of bridges across mountain valleys, rivers, lakes and seas are under construction or planning. Due to the need for material and equipment transportation and personnel passage during bridge construction, temporary trestles need to be built during bridge construction. In the construction of cross-river and cross-sea bridges, the length of the trestles often reaches several kilometers or even more than ten kilometers, and they are widely used.

栈桥的安拆会占用相当的设备、资源,施工工期长工期,安拆过程中还涉及到水上及高空作业,需要大量的操作平台,栈桥下部结构采用钢管桩基础,采用钓鱼法施工钢管桩时,为了控制钢管桩平面位置和垂直度,一般设计钢管桩导向架,钢管桩插打到位后,桩顶分配梁安装前,需要先拆除钢管桩导向架,安装桩顶分配梁焊接操作平台,再进行桩顶分配梁的安装,桩顶分配梁安装完成后,需要再拆除桩顶分配梁焊接操作平台,安装钢管桩桩间连接系焊接操作平台,再进行钢管桩桩间连接系安装,由于多次涉及到导向架、各种操作平台的安拆切换,施工现场经常会使用不规范或者简易的导向架和操作平台,存在极大的安全隐患,栈桥安装质量无法保证,安装效率不高。The installation and disassembly of the pier will take up considerable equipment and resources, and the construction period is long. The installation and disassembly process also involves water and high-altitude operations, and requires a large number of operating platforms. The lower structure of the pier adopts a steel pipe pile foundation. When the fishing method is used to construct the steel pipe pile, in order to control the plane position and verticality of the steel pipe pile, a steel pipe pile guide frame is generally designed. After the steel pipe pile is inserted and driven into place, before the pile top distribution beam is installed, it is necessary to first dismantle the steel pipe pile guide frame, install the pile top distribution beam welding operating platform, and then install the pile top distribution beam. After the pile top distribution beam is installed, it is necessary to dismantle the pile top distribution beam welding operating platform, install the steel pipe pile connection system welding operating platform, and then install the steel pipe pile connection system. Since it involves the installation and disassembly switching of the guide frame and various operating platforms many times, the construction site often uses non-standard or simple guide frames and operating platforms, which poses a great safety hazard, the pier installation quality cannot be guaranteed, and the installation efficiency is low.

实用新型内容Utility Model Content

本实用新型的一个目的是解决至少上述问题,并提供至少后面将说明的优点。An object of the present invention is to solve at least the above problems and to provide at least the advantages which will be described below.

为了实现根据本实用新型的这些目的和其它优点,提供了一种多功能导向架,包括:In order to achieve these purposes and other advantages according to the utility model, a multifunctional guide frame is provided, comprising:

钢架体,其为呈L型的框架结构,包括竖直部和水平部;所述竖直部远离所述水平部的一侧固定设置有连接件;The steel frame is an L-shaped frame structure, comprising a vertical portion and a horizontal portion; a connecting piece is fixedly provided on a side of the vertical portion away from the horizontal portion;

两个定位框,二者分别固定设置在所述水平部远离所述竖直部的一侧的两端;所述定位框为呈C型的框架结构,其开口处设置有伸缩杆,调节所述伸缩杆的长度以打开或关闭所述定位框的开口处;两个所述定位框的开口处相对设置;所述定位框内设置有定位装置,用以定位钢管桩;Two positioning frames, which are respectively fixedly arranged at two ends of the horizontal part away from the vertical part; the positioning frame is a C-shaped frame structure, and a telescopic rod is arranged at its opening, and the length of the telescopic rod is adjusted to open or close the opening of the positioning frame; the openings of the two positioning frames are arranged opposite to each other; a positioning device is arranged in the positioning frame to position the steel pipe pile;

吊挂平台,其固定设置在所述钢架体的底部。The hanging platform is fixedly arranged at the bottom of the steel frame.

优选的是,所述定位框包括多根主梁和多个横梁,所述主梁和横梁垂直交叉连接,且在一侧形成开口槽;所述伸缩杆设置为两个,两个所述伸缩杆分别设置在所述开口槽的开口处和中部,二者平行于所述主梁设置;两个所述伸缩杆伸长时,与其两侧的所述横梁合围形成钢管桩的导向通道。Preferably, the positioning frame includes multiple main beams and multiple cross beams, the main beams and the cross beams are vertically cross-connected, and an open groove is formed on one side; two telescopic rods are provided, and the two telescopic rods are respectively arranged at the opening and the middle of the open groove, and the two are arranged parallel to the main beams; when the two telescopic rods are extended, they are combined with the cross beams on both sides to form a guide channel for the steel pipe piles.

优选的是,所述定位装置包括四个关于所述导向通道的中心对称设置的角撑,每个所述角撑朝向所述导向通道的中心的一侧固定设置有的竖撑,所述竖撑上转动连接有导向轮。Preferably, the positioning device comprises four angle supports symmetrically arranged about the center of the guide channel, each of the angle supports is fixedly provided with a vertical support on one side facing the center of the guide channel, and a guide wheel is rotatably connected to the vertical support.

优选的是,所述钢架体还包括多个沿所述钢架体纵向间隔设置的斜拉杆,所述斜拉杆两端分别与所述竖直部和所述水平部固定连接。Preferably, the steel frame further comprises a plurality of inclined rods spaced apart along the longitudinal direction of the steel frame, and two ends of the inclined rods are respectively fixedly connected to the vertical portion and the horizontal portion.

优选的是,所述吊挂平台包括水平框架和竖向吊架,所述竖向吊架的两端分别与所述水平框架和所述钢架体固定连接。Preferably, the hanging platform includes a horizontal frame and a vertical hanger, and two ends of the vertical hanger are fixedly connected to the horizontal frame and the steel frame body respectively.

优选的是,所述竖直部和所述竖向吊架上分别设置有钢直梯。Preferably, a steel ladder is provided on the vertical portion and the vertical hanger, respectively.

优选的是,所述水平部、所述定位框和所述水平框架上均设置有脚手板和防护栏杆。Preferably, scaffolding boards and guardrails are provided on the horizontal portion, the positioning frame and the horizontal frame.

本实用新型至少包括以下有益效果:The utility model at least has the following beneficial effects:

本实用新型提供的多功能导向架,通过定位框和伸缩杆的调整控制,实现钢管桩的导向定位、接桩平台和桩顶分配梁及桩间连接系安装施工平台的功能切换,无需进行钢管桩导向架、桩顶分配梁安装平台、桩间连接系安装平台繁琐的安拆切换,极大地提高了钢栈桥下部结构的现场施工效率,降低了施工安全风险。The multifunctional guide frame provided by the utility model realizes the guiding positioning of the steel pipe piles, the functional switching of the pile connection platform, the pile top distribution beam and the pile connection system installation construction platform through the adjustment control of the positioning frame and the telescopic rod. There is no need to carry out the cumbersome installation and disassembly switching of the steel pipe pile guide frame, the pile top distribution beam installation platform and the pile connection system installation platform, which greatly improves the on-site construction efficiency of the steel trestle substructure and reduces the construction safety risks.

本实用新型的其它优点、目标和特征将部分通过下面的说明体现,部分还将通过对本实用新型的研究和实践而为本领域的技术人员所理解。Other advantages, objectives and features of the present invention will be embodied in part through the following description, and in part will be understood by those skilled in the art through research and practice of the present invention.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

图1为本实用新型所述多功能导向架的侧面结构示意图;FIG1 is a schematic diagram of the side structure of the multifunctional guide frame of the utility model;

图2为本实用新型所述伸缩杆伸长时所述多功能导向架的俯视图;FIG2 is a top view of the multifunctional guide frame when the telescopic rod of the utility model is extended;

图3为本实用新型所述伸缩杆回缩时所述多功能导向架的俯视图;FIG3 is a top view of the multifunctional guide frame when the telescopic rod of the utility model is retracted;

图4为本实用新型所述钢架体的俯视图;FIG4 is a top view of the steel frame of the present invention;

图5为本实用新型所述定位框的俯视图;FIG5 is a top view of the positioning frame of the utility model;

图6为本实用新型所述定位装置的侧面结构示意图;FIG6 is a schematic diagram of the side structure of the positioning device of the present invention;

具体实施方式DETAILED DESCRIPTION

下面结合附图对本实用新型做进一步的详细说明,以令本领域技术人员参照说明书文字能够据以实施。The present invention will be further described in detail below in conjunction with the accompanying drawings so that those skilled in the art can implement the invention with reference to the description.

需要说明的是,下述实施方案中所述实验方法,如无特殊说明,均为常规方法,所述试剂和材料,如无特殊说明,均可从商业途径获得;在本实用新型的描述中,术语“横向”、“纵向”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,并不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。It should be noted that the experimental methods described in the following embodiments are conventional methods unless otherwise specified, and the reagents and materials are commercially available unless otherwise specified; in the description of the present invention, the terms "lateral", "longitudinal", "upper", "lower", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, which are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as a limitation on the present invention.

如图1至图6所示,本实用新型提供一种多功能导向架,包括:As shown in FIGS. 1 to 6 , the utility model provides a multifunctional guide frame, comprising:

钢架体1,其为呈L型的框架结构,包括竖直部11和水平部12;所述竖直部12远离所述水平部12的一侧固定设置有连接件9;The steel frame 1 is an L-shaped frame structure, comprising a vertical portion 11 and a horizontal portion 12; a connecting member 9 is fixedly provided on a side of the vertical portion 12 away from the horizontal portion 12;

两个定位框5,二者分别固定设置在所述水平部12远离所述竖直部11的一侧的两端;所述定位框5为呈C型的框架结构,其开口处设置有伸缩杆15,调节所述伸缩杆15的长度以打开或关闭所述定位框5的开口处;两个所述定位框5的开口处相对设置;所述定位框5内设置有定位装置16,用以定位钢管桩4;Two positioning frames 5, which are respectively fixedly arranged at two ends of the horizontal portion 12 on a side away from the vertical portion 11; the positioning frame 5 is a C-shaped frame structure, and a telescopic rod 15 is arranged at its opening, and the length of the telescopic rod 15 is adjusted to open or close the opening of the positioning frame 5; the openings of the two positioning frames 5 are arranged opposite to each other; a positioning device 16 is arranged in the positioning frame 5 to position the steel pipe pile 4;

吊挂平台2,其固定设置在所述钢架体1的底部。The hanging platform 2 is fixedly arranged at the bottom of the steel frame 1 .

在这种技术方案中,以施工完成的钢管桩4和桩顶分配梁14上固定设置有贝雷梁10,所述多功能导向架通过所述连接件9与所述贝雷梁10可拆卸连接,使用时可以根据承载力要求灵活设置所述连接件9的数量。在钢管桩4插打的时候,参照图2,伸长所述伸缩杆15使所述定位框5形成完整的矩形框架结构,增强所述定位框5整体的稳定性。所述定位装置16用以在插打过程中对钢管桩4进行定位。钢管桩4插打到位后,参照图3,缩回所述伸缩杆15,以使桩顶分配梁14以及两根钢管桩4之间的桩间连接系3得以从两个所述定位框5相对的开口处进行下放安装,此时所述钢架体1和所述定位框5仅作为操作平台,承受荷载较小。所述吊挂平台2用以安装所述桩间连接系3。所述多功能导向架通过所述定位框和所述伸缩杆15的调整控制,实现钢管桩4的定位、接桩平台和桩顶分配梁14及桩间连接系3安装施工平台的功能切换,无需进行钢管桩4导向架、桩顶分配梁14安装平台、桩间连接系3安装平台繁琐的安拆切换,极大地提高了钢栈桥下部结构现场施工效率,降低了施工安全风险。In this technical solution, a Bailey beam 10 is fixedly arranged on the completed steel pipe pile 4 and the pile top distribution beam 14, and the multifunctional guide frame is detachably connected to the Bailey beam 10 through the connecting piece 9. When in use, the number of the connecting pieces 9 can be flexibly set according to the bearing capacity requirements. When the steel pipe pile 4 is driven, refer to FIG2, extend the telescopic rod 15 so that the positioning frame 5 forms a complete rectangular frame structure, thereby enhancing the overall stability of the positioning frame 5. The positioning device 16 is used to position the steel pipe pile 4 during the driving process. After the steel pipe pile 4 is driven into place, refer to FIG3, retract the telescopic rod 15 so that the pile top distribution beam 14 and the pile connection system 3 between the two steel pipe piles 4 can be lowered and installed from the opposite openings of the two positioning frames 5. At this time, the steel frame 1 and the positioning frame 5 only serve as an operating platform and bear a small load. The hanging platform 2 is used to install the pile connection system 3. The multifunctional guide frame realizes the positioning of the steel pipe pile 4, the functional switching of the pile connection platform, the pile top distribution beam 14 and the installation platform of the pile connection system 3 through the adjustment control of the positioning frame and the telescopic rod 15. There is no need to perform cumbersome installation and disassembly switching of the steel pipe pile 4 guide frame, the pile top distribution beam 14 installation platform and the pile connection system 3 installation platform, which greatly improves the on-site construction efficiency of the steel trestle substructure and reduces the construction safety risk.

在另一种实施例中,参照图2至图5,所述定位框5包括多根主梁51和多个横梁52,所述主梁51和横梁52垂直交叉连接,且在一侧形成开口槽53;所述伸缩杆15设置为两个,两个所述伸缩杆15分别设置在所述开口槽53的开口处和中部,二者平行于所述主梁51设置;两个所述伸缩杆15伸长时,与其两侧的所述横梁52合围形成钢管桩4的导向通道。所述定位框5为由所述主梁51和所述横梁52构成的C型框架结构,其一侧形成所述开口槽53,所述开口槽53的纵向深度需满足两个所述定位框的开口槽之间的长度可供所述桩顶分配梁14和所述连接系3下放穿过。因此在所述开口槽53处设置两个所述伸缩杆15以进一步在插打钢管桩4时所述多功能导向架整体的稳定性。所述伸缩杆15可以采用现有技术中多种可伸缩结构形式,在此不做限定。两个所述伸缩杆15伸长时,其两侧最近的所述横梁52与两个所述伸缩杆15共同合围形成矩形的导向通道。所述定位装置16设置在所述导向通道内。In another embodiment, referring to Fig. 2 to Fig. 5, the positioning frame 5 includes a plurality of main beams 51 and a plurality of cross beams 52, the main beams 51 and cross beams 52 are vertically cross-connected, and an open slot 53 is formed on one side; the telescopic rods 15 are provided with two, and the two telescopic rods 15 are respectively provided at the opening and the middle of the open slot 53, and the two are provided parallel to the main beam 51; when the two telescopic rods 15 are extended, the cross beams 52 on both sides thereof enclose and form a guide channel for the steel pipe pile 4. The positioning frame 5 is a C-shaped frame structure composed of the main beam 51 and the cross beam 52, and the open slot 53 is formed on one side, and the longitudinal depth of the open slot 53 needs to meet the length between the open slots of the two positioning frames so that the pile top distribution beam 14 and the connecting system 3 can be lowered and passed. Therefore, two telescopic rods 15 are provided at the open slot 53 to further improve the overall stability of the multifunctional guide frame when the steel pipe pile 4 is inserted and driven. The telescopic rod 15 can adopt a variety of telescopic structural forms in the prior art, which are not limited here. When the two telescopic rods 15 are extended, the cross beams 52 closest to the two sides thereof and the two telescopic rods 15 together enclose a rectangular guide channel. The positioning device 16 is disposed in the guide channel.

具体地,如图5和图6所示,所述定位装置16包括四个关于所述导向通道的中心对称设置的角撑161,每个所述角撑161朝向所述导向通道的中心的一侧固定设置有的竖撑162,所述竖撑162上转动连接有导向轮163。所述角撑161固定设置在开口槽53的内壁上,通过四组所述导向轮163对钢管桩4进行导向,所述导向轮的轴线与钢管桩4的轴线垂直设置。Specifically, as shown in Fig. 5 and Fig. 6, the positioning device 16 includes four angle braces 161 symmetrically arranged about the center of the guide channel, and each angle brace 161 is fixedly provided with a vertical brace 162 on one side facing the center of the guide channel, and a guide wheel 163 is rotatably connected to the vertical brace 162. The angle brace 161 is fixedly provided on the inner wall of the opening groove 53, and the steel pipe pile 4 is guided by four groups of guide wheels 163, and the axis of the guide wheel is perpendicular to the axis of the steel pipe pile 4.

在另一种实施例中,如图4所示,所述钢架体1还包括多个沿所述钢架体1纵向间隔设置的斜拉杆13,所述斜拉杆13两端分别与所述竖直部11和所述水平部12固定连接。所述斜拉杆13用以增强所述钢架体1的整体刚度。具体地,所述水平部12为由多个主纵梁122和主横梁121垂直交叉连接形成的框架结构,所述主纵梁122和所述主横梁121之间还设置有多个斜撑123;所述竖直部包括沿所述主横梁121间隔设置的竖杆111。In another embodiment, as shown in FIG4 , the steel frame 1 further includes a plurality of diagonal braces 13 spaced apart longitudinally along the steel frame 1, and the two ends of the diagonal braces 13 are fixedly connected to the vertical portion 11 and the horizontal portion 12, respectively. The diagonal braces 13 are used to enhance the overall rigidity of the steel frame 1. Specifically, the horizontal portion 12 is a frame structure formed by a plurality of main longitudinal beams 122 and main transverse beams 121 vertically cross-connected, and a plurality of diagonal braces 123 are further arranged between the main longitudinal beams 122 and the main transverse beams 121; the vertical portion includes vertical rods 111 spaced apart along the main transverse beams 121.

在另一种实施例中,所述吊挂平台2包括水平框架22和竖向吊架21,所述竖向吊架21的两端分别与所述水平框架22和所述钢架体1固定连接。In another embodiment, the hanging platform 2 includes a horizontal frame 22 and a vertical hanger 21, and two ends of the vertical hanger 21 are fixedly connected to the horizontal frame 22 and the steel frame body 1 respectively.

进一步地,所述竖直部11和所述竖向吊架21上分别设置有钢直梯8,所述钢直梯8作为竖向通道,便于施工人员在贝雷梁10与所述钢架体1之间以及所述钢架体1和所述吊挂平台2之间通行。Furthermore, a steel ladder 8 is provided on the vertical portion 11 and the vertical hanger 21 , respectively. The steel ladder 8 serves as a vertical passage to facilitate construction workers to pass between the Bailey beam 10 and the steel frame 1 and between the steel frame 1 and the hanging platform 2 .

为保障施工人员的安全,所述水平部12、所述定位框5和所述水平框架22上均设置有脚手板6和防护栏杆7。In order to ensure the safety of construction workers, scaffolding boards 6 and guardrails 7 are provided on the horizontal portion 12 , the positioning frame 5 and the horizontal frame 22 .

利用所述多功能导向架进行钢栈桥用钢管桩4、桩顶分配梁14和桩间连接系3施工的方法包括:The method for constructing the steel pipe piles 4, pile top distribution beams 14 and inter-pile connection systems 3 for a steel trestle using the multifunctional guide frame includes:

S1、安装所述多功能导向架;将所述钢架体1和所述定位框5通过所述连接件9与贝雷梁10相连,并在贝雷梁10与所述钢架体1之间架设所述钢直梯8,作为贝雷梁10到所述钢架体1的竖向通道;在所述钢架体1和所述定位框5上铺设脚手板6和防护栏杆7。S1. Install the multifunctional guide frame; connect the steel frame 1 and the positioning frame 5 to the Bailey beam 10 through the connecting piece 9, and set up the steel ladder 8 between the Bailey beam 10 and the steel frame 1 as a vertical passage from the Bailey beam 10 to the steel frame 1; lay scaffolding boards 6 and guardrails 7 on the steel frame 1 and the positioning frame 5.

S2、钢管桩插打、接桩:所述多功能导向架作为钢管桩4导向架及接桩平台使用,伸长两个所述定位框5的开口处的伸缩杆15,钢管桩4运输至桩位旁后,使用履带吊通过振动锤及钢丝绳直接起吊钢管桩4,将钢管桩4缓慢移入导向架,通过GPS系统进行初步平面定位,初步定位完成后,通过所述定位装置16对钢管桩4进行精确调位,需要接桩的可以在所述多功能导向架上进行对位、焊接,按照设计要求将钢管桩4插打至设计标高位置。S2. Driving and connecting steel pipe piles: the multifunctional guide frame is used as a guide frame and a connecting platform for steel pipe piles 4. The telescopic rods 15 at the openings of the two positioning frames 5 are extended. After the steel pipe piles 4 are transported to the pile position, the steel pipe piles 4 are directly lifted by a crawler crane through a vibrating hammer and a steel wire rope, and the steel pipe piles 4 are slowly moved into the guide frame. Preliminary plane positioning is performed through the GPS system. After the preliminary positioning is completed, the steel pipe piles 4 are accurately adjusted through the positioning device 16. If piles need to be connected, they can be aligned and welded on the multifunctional guide frame, and the steel pipe piles 4 are driven to the designed elevation position according to the design requirements.

S3、桩顶分配梁4及桩间连接系3安装:所述多功能导向架作为桩顶分配梁14及桩间连接系3安装平台使用,缩回两个所述定位框5的开口处的伸缩杆15,此时两个所述定位框5之间形成桩顶分配梁14及桩间连接系3下放操作空间;同时,在所述钢架体1的下放设置所述吊挂平台2,并设置对应的钢直梯8;在所述吊挂平台2上铺设脚手板6和防护栏杆7。采用履带吊整体吊装桩顶分配梁14及桩间连接系3,吊装到位后分别在所述定位架5和所述吊挂平台2上进行桩顶分配梁14及桩间连接系3的安装。S3, installation of the pile top distribution beam 4 and the pile connection system 3: the multifunctional guide frame is used as the installation platform of the pile top distribution beam 14 and the pile connection system 3, and the telescopic rod 15 at the opening of the two positioning frames 5 is retracted. At this time, the lowering operation space of the pile top distribution beam 14 and the pile connection system 3 is formed between the two positioning frames 5; at the same time, the hanging platform 2 is set under the steel frame 1, and the corresponding steel ladder 8 is set; the scaffolding board 6 and the guardrail 7 are laid on the hanging platform 2. The pile top distribution beam 14 and the pile connection system 3 are hoisted as a whole by a crawler crane, and the pile top distribution beam 14 and the pile connection system 3 are installed on the positioning frame 5 and the hanging platform 2 respectively after the hoisting is in place.

S4、拆除所述多功能导向架,进行钢栈桥上部结构施工:拆除所述连接件9与贝雷梁10的连接,利用履带吊整体吊装拆除所述多功能导向架,进行钢栈桥上部结构施工。S4, dismantling the multifunctional guide frame and carrying out the construction of the upper structure of the steel trestle: dismantling the connection between the connecting piece 9 and the Bailey beam 10, using a crawler crane to hoist and dismantle the multifunctional guide frame as a whole, and carrying out the construction of the upper structure of the steel trestle.

尽管本实用新型的实施方案已公开如上,但其并不仅仅限于说明书和实施方式中所列运用,它完全可以被适用于各种适合本实用新型的领域,对于熟悉本领域的人员而言,可容易地实现另外的修改,因此在不背离权利要求及等同范围所限定的一般概念下,本实用新型并不限于特定的细节和这里示出与描述的图例。Although the implementation scheme of the utility model has been disclosed as above, it is not limited to the applications listed in the specification and implementation modes. It can be fully applied to various fields suitable for the utility model. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the utility model is not limited to the specific details and the illustrations shown and described herein.

Claims (7)

1. A multi-functional guide frame, characterized by comprising:
The steel frame body is of an L-shaped frame structure and comprises a vertical part and a horizontal part; a connecting piece is fixedly arranged on one side, far away from the horizontal part, of the vertical part;
The two positioning frames are respectively and fixedly arranged at two ends of one side of the horizontal part far away from the vertical part; the positioning frame is of a C-shaped frame structure, a telescopic rod is arranged at the opening of the positioning frame, and the length of the telescopic rod is adjusted to open or close the opening of the positioning frame; the openings of the two positioning frames are oppositely arranged; a positioning device is arranged in the positioning frame and used for positioning the steel pipe pile;
the hanging platform is fixedly arranged at the bottom of the steel frame body.
2. The multi-purpose guide frame of claim 1, wherein the positioning frame comprises a plurality of main beams and a plurality of cross beams, wherein the main beams and the cross beams are vertically cross-connected and form an open slot at one side; the two telescopic rods are respectively arranged at the opening part and the middle part of the opening groove and are parallel to the main beam; when the two telescopic rods extend, the two telescopic rods and the cross beams on two sides of the telescopic rods are encircled to form a guide channel of the steel pipe pile.
3. The multifunctional guide frame according to claim 2, wherein the positioning device comprises four gussets symmetrically arranged about the center of the guide channel, and a vertical support is fixedly arranged on one side of each gusset facing the center of the guide channel, and a guide wheel is rotatably connected to the vertical support.
4. The multi-functional guide frame of claim 1, wherein the steel frame body further comprises a plurality of diagonal rods arranged at intervals along the longitudinal direction of the steel frame body, and two ends of each diagonal rod are fixedly connected with the vertical portion and the horizontal portion respectively.
5. The multifunctional guide frame according to claim 1, wherein the hanging platform comprises a horizontal frame and a vertical hanging bracket, and two ends of the vertical hanging bracket are fixedly connected with the horizontal frame and the steel frame body respectively.
6. The multi-purpose guide frame of claim 5, wherein the vertical portion and the vertical hanger are each provided with a straight steel ladder.
7. The multi-purpose guide of claim 5, wherein the horizontal portion, the positioning frame, and the horizontal frame are each provided with a scaffold board and a guard rail.
CN202420496358.7U 2024-03-14 2024-03-14 A multifunctional guide frame Active CN221919409U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202420496358.7U CN221919409U (en) 2024-03-14 2024-03-14 A multifunctional guide frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202420496358.7U CN221919409U (en) 2024-03-14 2024-03-14 A multifunctional guide frame

Publications (1)

Publication Number Publication Date
CN221919409U true CN221919409U (en) 2024-10-29

Family

ID=93200550

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202420496358.7U Active CN221919409U (en) 2024-03-14 2024-03-14 A multifunctional guide frame

Country Status (1)

Country Link
CN (1) CN221919409U (en)

Similar Documents

Publication Publication Date Title
CN212534174U (en) Raft foundation steel bar supporting tool
CN111997043A (en) Segmented reinforcement cage and diaphragm wall construction method under low-clearance high-voltage line
WO2020103351A1 (en) Bailey support system applied to crossed protection of complicated pipe cable and construction method therefor
CN104652288A (en) Construction system of cast-in-situ large-tonnage box girder for soft soil foundation and construction method
CN213204915U (en) Overweight overhanging suspended component supporting system of super high-rise residential conversion layer
CN203307733U (en) Construction platform system of concrete pier of viaduct
CN221919409U (en) A multifunctional guide frame
CN109537887A (en) High Large Cantilever combined type anchor consolidates the construction method of formwork system
CN204475195U (en) The construction system of the cast-in-place large-tonnage box beam of soft foundation
CN203821248U (en) Steel pipe arch main arch assembling supporting system
CN216640303U (en) Foldable T roof beam hogging moment construction operation is with hanging basket
CN110847289A (en) Ultra-deep large-span circular water intake pump house roof support and construction method thereof
CN217078829U (en) Position structure of bridge pile foundation and subway tunnel
CN205934962U (en) A system of sliding for underground pipe gallery cast -in -situ construction
CN215669490U (en) Cantilever type tubular pile hanging and striking positioning support
CN215887884U (en) Be applied to bailey frame steel trestle of deep basal pit construction
CN116856389A (en) A construction method for large-diameter and ultra-long cast-in-place piles in limited space
CN101435270A (en) High layer post subsection butt-joint operating method
CN210636798U (en) Creeping formwork structure applied to vertical wall and frame column of wind tunnel corner section
CN211548699U (en) Superelevation console mode scaffold on people in hyperbolic cooling tower
CN210685313U (en) Safe convenient house steel connection structure
CN210216415U (en) Positioning device for bridge pile foundation steel casing in deepwater and rapid stream area
CN217580151U (en) Multifunctional assembled positioning system
CN217104669U (en) Combined transfer platform of temporary construction trestle
CN214459662U (en) A construction work platform for double column pier

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant