CN221900542U - Power transmission line for building engineering - Google Patents
Power transmission line for building engineering Download PDFInfo
- Publication number
- CN221900542U CN221900542U CN202323472871.7U CN202323472871U CN221900542U CN 221900542 U CN221900542 U CN 221900542U CN 202323472871 U CN202323472871 U CN 202323472871U CN 221900542 U CN221900542 U CN 221900542U
- Authority
- CN
- China
- Prior art keywords
- fixed
- frame
- power transmission
- transmission line
- support plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000005540 biological transmission Effects 0.000 title claims abstract description 28
- 238000010276 construction Methods 0.000 claims abstract description 21
- 230000000149 penetrating effect Effects 0.000 claims 2
- 238000003780 insertion Methods 0.000 abstract description 6
- 230000037431 insertion Effects 0.000 abstract description 6
- 238000012423 maintenance Methods 0.000 abstract description 6
- 238000010586 diagram Methods 0.000 description 5
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 101000827703 Homo sapiens Polyphosphoinositide phosphatase Proteins 0.000 description 1
- 102100023591 Polyphosphoinositide phosphatase Human genes 0.000 description 1
- 101100012902 Saccharomyces cerevisiae (strain ATCC 204508 / S288c) FIG2 gene Proteins 0.000 description 1
- 101100233916 Saccharomyces cerevisiae (strain ATCC 204508 / S288c) KAR5 gene Proteins 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000011017 operating method Methods 0.000 description 1
Landscapes
- Installation Of Indoor Wiring (AREA)
Abstract
本实用新型属于输电支撑设备技术领域,具体涉及一种建筑工程输电线路,包括支撑件和支线件,支撑件包括底座、上支板和导向条,底座水平设置,上支板上竖直滑动安装有上支板,导向条竖直设置在上支板的上方,且导向条在上支板上竖直设置有多条,导向条的底端固定在上支板顶面上,且导向条的一侧竖直端面上竖直固定有多块定位框,支线件包括支臂,支臂的一端固定有滑槽框,且支臂的另一端水平固定有穿线块,滑槽框竖直滑动连接在导向条上,且滑槽框上固定有插框。本实用新型多个方向上的输电线路通过多个支臂支撑,支臂设置在单一水平面上,导致不同方向上的线路交错,容易导致输电线相互打结,不利于后期进行检修方便。
The utility model belongs to the technical field of power transmission support equipment, and specifically relates to a power transmission line for a construction project, including a support member and a branch member, the support member including a base, an upper support plate and a guide bar, the base is horizontally arranged, the upper support plate is vertically slidably installed on the upper support plate, the guide bar is vertically arranged above the upper support plate, and a plurality of guide bars are vertically arranged on the upper support plate, the bottom end of the guide bar is fixed to the top surface of the upper support plate, and a plurality of positioning frames are vertically fixed on the vertical end surface of one side of the guide bar, the branch member includes a support arm, a slide frame is fixed at one end of the support arm, and a threading block is horizontally fixed at the other end of the support arm, the slide frame is vertically slidably connected to the guide bar, and an insertion frame is fixed on the slide frame. The power transmission lines in multiple directions of the utility model are supported by multiple support arms, and the support arms are arranged on a single horizontal plane, resulting in the interlacing of lines in different directions, which easily causes the transmission lines to be tangled with each other, which is not conducive to the convenience of later maintenance.
Description
技术领域Technical Field
本实用新型属于输电支撑设备技术领域,具体涉及一种建筑工程输电线路。The utility model belongs to the technical field of power transmission support equipment, and in particular relates to a power transmission line for a construction project.
背景技术Background Art
在建筑工程施工中,需要供给电能用于后期给施工设备进行供电,建筑施工时需要假设多根输电线缆,用于给不同方位施工的设备进行供电处理,现有的建筑工程电力安装结构,多是直接通过临时支撑杆进行支撑,这就导致通向不同方向的线缆,凌乱缠绕在支撑杆上,导致线缆凌乱后期检修时,不能快速进行找寻。During the construction of construction projects, electric energy needs to be supplied for powering the construction equipment in the later stage. During construction, multiple transmission cables need to be installed to power the equipment in different directions. The existing power installation structures of construction projects are mostly supported directly by temporary support poles. This causes the cables leading to different directions to be tangled on the support poles in a messy manner, which makes it difficult to find them quickly during the later maintenance.
现有公告号为CN215267564U,名称为一种建筑工程电力线路架线装置,包括底座,所述底座的内部设置有活动杆,所述活动杆的顶端焊接固定有安装盒,所述安装盒的内设置有控制装置,所述安装盒的侧壁贯穿固定有多组支臂,每组所述支臂的末端均设置有螺纹头,所述螺纹头外侧活动固定有固定盒,在使用时,无法对线缆进行引导,且而不具有偏转的功能,造成安装的过程的不便。The existing announcement number is CN215267564U, and the name is a power line wiring device for construction projects, including a base, a movable rod is arranged inside the base, a mounting box is welded and fixed to the top of the movable rod, a control device is arranged inside the mounting box, a plurality of groups of arms are fixed through the side wall of the mounting box, a threaded head is arranged at the end of each group of arms, a fixing box is movably fixed to the outside of the threaded head, and when in use, the cable cannot be guided and does not have the function of deflection, causing inconvenience in the installation process.
但是上述对建筑工程输电线路支撑时,通过设置在同一水平线上的多根支臂,分别夹持输电线,从而往不同的方向进行线路的夹持输送支撑,但是多个方向上的输电线路通过多个支臂支撑,支臂设置在单一水平面上,导致不同方向上的线路交错,容易导致输电线相互打结,不利于后期进行检修方便。However, when supporting the transmission lines of the construction project, multiple arms are set on the same horizontal line to clamp the transmission lines respectively, so as to clamp and transport the lines in different directions. However, the transmission lines in multiple directions are supported by multiple arms, and the arms are set on a single horizontal plane, which causes the lines in different directions to be staggered, which easily causes the transmission lines to be tangled, which is not conducive to the convenience of later maintenance.
实用新型内容Utility Model Content
针对现有技术中存在的问题,本实用新型的目的在于提供一种建筑工程输电线路,它可以实现,将线路从支臂一端的穿线块的穿线孔穿出,从而对多层线路分别进行组装,从而避免多个方向上的输电线路通过多个支臂支撑,将多个支臂不设置在单一水平面上,保证不同方向上的线路不会交错,避免输电线相互打结,利于后期进行检修方便。In view of the problems existing in the prior art, the purpose of the utility model is to provide a construction engineering power transmission line, which can realize the line passing through the threading hole of the threading block at one end of the support arm, so as to assemble the multi-layer lines separately, thereby avoiding the transmission lines in multiple directions being supported by multiple support arms, and the multiple support arms are not arranged on a single horizontal plane, so as to ensure that the lines in different directions will not be staggered, avoid the transmission lines from being tangled, and facilitate the later maintenance.
为实现上述目的,本实用新型提供如下技术方案:In order to achieve the above purpose, the utility model provides the following technical solutions:
一种建筑工程输电线路,包括支撑件和支线件,支撑件包括底座、上支板和导向条,底座水平设置,上支板上竖直滑动安装有上支板,导向条竖直设置在上支板的上方,且导向条在上支板上竖直设置有多条,导向条的底端固定在上支板顶面上,且导向条的一侧竖直端面上竖直固定有多块定位框,支线件包括支臂,支臂的一端固定有滑槽框,且支臂的另一端水平固定有穿线块,滑槽框竖直滑动连接在导向条上,且滑槽框上固定有插框,滑槽框的插框中水平插接有插板,且插板插接在导向条的定位框中。A construction engineering power transmission line includes a support member and a branch member, the support member includes a base, an upper support plate and a guide bar, the base is horizontally arranged, the upper support plate is vertically slidably installed on the upper support plate, the guide bar is vertically arranged above the upper support plate, and multiple guide bars are vertically arranged on the upper support plate, the bottom end of the guide bar is fixed to the top surface of the upper support plate, and multiple positioning frames are vertically fixed to a vertical end surface of one side of the guide bar, the branch member includes a support arm, a slide frame is fixed to one end of the support arm, and a threading block is horizontally fixed to the other end of the support arm, the slide frame is vertically slidably connected to the guide bar, and an insertion frame is fixed on the slide frame, a plug-in board is horizontally plugged into the plug-in board of the slide frame, and the plug-in board is plugged into the positioning frame of the guide bar.
进一步的,所述上支板的底面上固定有滑框,且滑框的一端面上水平贯通插接有定位杆,定位杆的外部套设有弹簧,且弹簧的两端分别固定在定位杆的端部和滑框的端面上。Furthermore, a sliding frame is fixed on the bottom surface of the upper support plate, and a positioning rod is horizontally inserted through one end surface of the sliding frame. A spring is sleeved on the outside of the positioning rod, and both ends of the spring are respectively fixed to the end of the positioning rod and the end surface of the sliding frame.
进一步的,所述底座包括底板,且底板的顶面上竖直固定有滑条,且滑条的外侧竖直端面上沿竖直方向水平开设有多个定位孔。Furthermore, the base includes a bottom plate, and a slide bar is vertically fixed on the top surface of the bottom plate, and a plurality of positioning holes are horizontally opened along the vertical direction on the outer vertical end surface of the slide bar.
进一步的,所述滑框的定位杆水平插接在滑条的定位孔中。Furthermore, the positioning rod of the slide frame is horizontally inserted into the positioning hole of the slide bar.
进一步的,所述底板的外侧端面上均竖直固定有下支条,且下支条的下方水平固定有横条。Furthermore, lower support bars are vertically fixed on the outer end surfaces of the bottom plate, and horizontal bars are horizontally fixed below the lower support bars.
进一步的,所述横条的底面中部转动连接有滚轮,且横条的两端竖直螺纹贯通安装有螺杆,且螺杆的底端竖直固定有多根锚杆。Furthermore, a roller is rotatably connected to the middle of the bottom surface of the horizontal bar, and screw rods are installed through vertical threads at both ends of the horizontal bar, and multiple anchor rods are vertically fixed to the bottom ends of the screw rods.
进一步的,所述穿线块的线孔中水平固定有橡胶筒。Furthermore, a rubber tube is horizontally fixed in the wire hole of the threading block.
与现有技术相比,本实用新型的有益效果是:使用中根据建筑施工的线路铺设需求,竖直滑动支线件上的支臂端部的滑槽框,在上支板的导向条竖直滑动,根据铺设线路需求依次滑动多条上支板上的支线件,保持多个支线件在多个导向条上沿竖直方向的高度,然后将线路从支臂一端的穿线块的穿线孔穿出,从而对多层线路分别进行组装,从而避免多个方向上的输电线路通过多个支臂支撑,将多个支臂不设置在单一水平面上,保证不同方向上的线路不会交错,避免输电线相互打结,利于后期进行检修方便。Compared with the prior art, the beneficial effects of the utility model are as follows: during use, according to the line laying requirements of the construction, the slide groove frame at the end of the arm on the vertically sliding branch member slides vertically on the guide bar of the upper support plate, and according to the line laying requirements, multiple branch members on the upper support plate are slid in sequence to maintain the height of the multiple branch members on the multiple guide bars in the vertical direction, and then the lines are passed through the threading holes of the threading block at one end of the arm, so that the multi-layer lines are assembled separately, thereby avoiding the transmission lines in multiple directions from being supported by multiple arms, and the multiple arms are not set on a single horizontal plane, ensuring that the lines in different directions will not be staggered, avoiding the transmission lines from being tangled, and facilitating later maintenance.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
图1为本实用新型的整体结构示意图;Figure 1 is a schematic diagram of the overall structure of the utility model;
图2为本实用新型整体在分解状态下的结构示意图;FIG2 is a schematic diagram of the structure of the utility model as a whole in a disassembled state;
图3为本实用新型支线件在分解状态下的结构示意图;FIG3 is a schematic diagram of the structure of the branch line member of the utility model in a disassembled state;
图4为本实用新型支撑件在分解状态下的结构示意图;FIG4 is a schematic diagram of the structure of the support member of the utility model in a disassembled state;
图5为本实用新型底座在分解状态下的结构示意图。FIG. 5 is a schematic structural diagram of the base of the utility model in a disassembled state.
附图中,各标号所代表的部件列表如下:In the accompanying drawings, the components represented by the reference numerals are listed as follows:
1、支撑件;11、底座;111、底板;112、滑条;113、定位孔;114、下支条;115、横条;116、滚轮;117、螺杆;118、锚杆;12、上支板;13、滑框;131、定位杆;132、弹簧;14、导向条;15、定位框;2、支线件;21、支臂;22、滑槽框;23、插框;24、插板;25、穿线块;26、橡胶筒。1. Support member; 11. Base; 111. Bottom plate; 112. Slide bar; 113. Positioning hole; 114. Lower support bar; 115. Horizontal bar; 116. Roller; 117. Screw; 118. Anchor rod; 12. Upper support plate; 13. Slide frame; 131. Positioning rod; 132. Spring; 14. Guide bar; 15. Positioning frame; 2. Support member; 21. Support arm; 22. Slide slot frame; 23. Insert frame; 24. Insert plate; 25. Threading block; 26. Rubber tube.
具体实施方式DETAILED DESCRIPTION
为了使本实用新型的目的及优点更加清楚明白,以下结合实施例对本实用新型进行具体说明。应当理解,以下文字仅仅用以描述本实用新型的一种或几种具体的实施方式,并不对本实用新型具体请求的保护范围进行严格限定。In order to make the purpose and advantages of the utility model more clear, the utility model is specifically described in combination with the following embodiments. It should be understood that the following text is only used to describe one or several specific implementations of the utility model, and does not strictly limit the protection scope of the specific request of the utility model.
如图1、图2、图3和图4所示,一种建筑工程输电线路,包括支撑件1和支线件2,支撑件1包括底座11、上支板12和导向条14,底座11水平设置,上支板12上竖直滑动安装有上支板12,导向条14竖直设置在上支板12的上方,且导向条14在上支板12上竖直设置有多条,导向条14的底端固定在上支板12顶面上,且导向条14的一侧竖直端面上竖直固定有多块定位框15,支线件2包括支臂21,支臂21的一端固定有滑槽框22,且支臂21的另一端水平固定有穿线块25,滑槽框22竖直滑动连接在导向条14上,且滑槽框22上固定有插框23,滑槽框22的插框23中水平插接有插板24,且插板24插接在导向条14的定位框15中。As shown in Fig. 1, Fig. 2, Fig. 3 and Fig. 4, a construction engineering power transmission line includes a support member 1 and a branch member 2. The support member 1 includes a base 11, an upper support plate 12 and a guide bar 14. The base 11 is horizontally arranged, and the upper support plate 12 is vertically slidably mounted on the upper support plate 12. The guide bar 14 is vertically arranged above the upper support plate 12, and a plurality of guide bars 14 are vertically arranged on the upper support plate 12. The bottom end of the guide bar 14 is fixed to the top surface of the upper support plate 12. A plurality of positioning frames 15 are vertically fixed on a vertical end face of one side of the guide bar 14. The branch member 2 includes a support arm 21. A slide slot frame 22 is fixed at one end of the support arm 21, and a threading block 25 is horizontally fixed at the other end of the support arm 21. The slide slot frame 22 is vertically slidably connected to the guide bar 14, and an insertion frame 23 is fixed on the slide slot frame 22. An insertion plate 24 is horizontally inserted in the insertion frame 23 of the slide slot frame 22, and the insertion plate 24 is inserted in the positioning frame 15 of the guide bar 14.
根据上述结构,使用中根据建筑施工的线路铺设需求,竖直滑动支线件2上的支臂21端部的滑槽框22,在上支板12的导向条14竖直滑动,根据铺设线路需求依次滑动多条上支板12上的支线件2,保持多个支线件2在多个导向条14上沿竖直方向的高度,然后将线路从支臂21一端的穿线块25的穿线孔穿出,从而对多层线路分别进行组装,从而避免多个方向上的输电线路通过多个支臂支撑,将多个支臂不设置在单一水平面上,保证不同方向上的线路不会交错,避免输电线相互打结,利于后期进行检修方便。According to the above structure, during use, according to the line laying requirements of the construction, the slide groove frame 22 at the end of the support arm 21 on the vertically sliding branch member 2 slides vertically on the guide bar 14 of the upper support plate 12, and according to the line laying requirements, multiple branch members 2 on the upper support plate 12 are slid in sequence to maintain the height of the multiple branch members 2 on the multiple guide bars 14 in the vertical direction, and then the line is passed through the threading hole of the threading block 25 at one end of the support arm 21, so that the multi-layer lines are assembled separately, thereby avoiding the transmission lines in multiple directions from being supported by multiple support arms, and the multiple support arms are not set on a single horizontal plane, ensuring that the lines in different directions will not be staggered, avoiding the transmission lines from being tangled with each other, and facilitating later maintenance.
如图4和图5所示,上支板12的底面上固定有滑框13,且滑框13的一端面上水平贯通插接有定位杆131,定位杆131的外部套设有弹簧132,且弹簧132的两端分别固定在定位杆131的端部和滑框13的端面上。As shown in Figures 4 and 5, a sliding frame 13 is fixed to the bottom surface of the upper support plate 12, and a positioning rod 131 is horizontally inserted through one end surface of the sliding frame 13. A spring 132 is sleeved on the outside of the positioning rod 131, and both ends of the spring 132 are respectively fixed to the end of the positioning rod 131 and the end surface of the sliding frame 13.
根据上述结构,拉动滑框13一侧的定位杆131向着外侧移动,使弹簧132产生形变,从而产生形变力,便于拉动定位杆131插入滑框13中,用于限位滑框13。According to the above structure, the positioning rod 131 on one side of the slide frame 13 is pulled outward to deform the spring 132, thereby generating a deformation force, which facilitates pulling the positioning rod 131 to be inserted into the slide frame 13 for limiting the slide frame 13.
如图5所示,底座11包括底板111,且底板111的顶面上竖直固定有滑条112,且滑条112的外侧竖直端面上沿竖直方向水平开设有多个定位孔113。As shown in FIG. 5 , the base 11 includes a bottom plate 111 , and a slide bar 112 is vertically fixed on the top surface of the bottom plate 111 , and a plurality of positioning holes 113 are horizontally opened along the vertical direction on the outer vertical end surface of the slide bar 112 .
根据上述结构,滑条112上开设的定位孔113用于限位支撑滑框13,调节上支板12支撑的高度。According to the above structure, the positioning hole 113 provided on the slide bar 112 is used to limit the support of the slide frame 13 and adjust the height supported by the upper support plate 12 .
如图4和图5所示,滑框13的定位杆131水平插接在滑条112的定位孔113中。As shown in FIG. 4 and FIG. 5 , the positioning rod 131 of the slide frame 13 is horizontally inserted into the positioning hole 113 of the slide bar 112 .
根据上述结构,使用中拉动滑框13一侧的定位杆131向着外侧移动,使弹簧132产生形变,然后竖直滑动滑框13携带上支板12在滑条112上竖直滑动,调节支撑高度后,松开定位杆131在弹簧132形变力作用下,带动定位杆131插入滑条112上开设的定位孔113中,从而方便调节上支板12升降的灵活性。According to the above structure, during use, the positioning rod 131 on one side of the sliding frame 13 is pulled outward to deform the spring 132, and then the sliding frame 13 is vertically slid to carry the upper support plate 12 to slide vertically on the sliding bar 112. After adjusting the support height, the positioning rod 131 is released and under the action of the deformation force of the spring 132, the positioning rod 131 is driven to be inserted into the positioning hole 113 opened on the sliding bar 112, thereby facilitating the adjustment of the flexibility of the lifting and lowering of the upper support plate 12.
如图5所示,底板111的外侧端面上均竖直固定有下支条114,且下支条114的下方水平固定有横条115。As shown in FIG. 5 , lower support bars 114 are vertically fixed on the outer end surfaces of the bottom plate 111 , and horizontal bars 115 are horizontally fixed below the lower support bars 114 .
根据上述结构,使用中利用下支条114支撑横条115用于抬升支撑底板111。According to the above structure, the lower support bar 114 is used to support the horizontal bar 115 to lift the support base plate 111 during use.
如图5所示,横条115的底面中部转动连接有滚轮116,且横条115的两端竖直螺纹贯通安装有螺杆117,且螺杆117的底端竖直固定有多根锚杆118。As shown in FIG. 5 , a roller 116 is rotatably connected to the middle of the bottom surface of the horizontal bar 115 , and screw rods 117 are installed vertically through the two ends of the horizontal bar 115 , and a plurality of anchor rods 118 are vertically fixed to the bottom ends of the screw rods 117 .
根据上述结构,使用中横条115上的滚轮116,方便后期进行移动调节支撑位置,同时到达使用位置时,转动横条115上的螺杆117,竖直向下运动的螺杆117底端多根锚杆118插入地面,保持支撑底座11的稳定性。According to the above structure, the roller 116 on the horizontal bar 115 is used to facilitate the subsequent movement and adjustment of the support position. At the same time, when it reaches the use position, the screw 117 on the horizontal bar 115 is rotated, and multiple anchor rods 118 at the bottom end of the screw 117 moving vertically downward are inserted into the ground to maintain the stability of the support base 11.
如图3所示,穿线块25的线孔中水平固定有橡胶筒26。As shown in FIG. 3 , a rubber tube 26 is horizontally fixed in the thread hole of the threading block 25 .
根据上述结构,穿线块25的线孔中固定的橡胶筒26,用于避免线缆与穿线块25的线孔内壁发生磨损,保持线缆的完整性。According to the above structure, the rubber tube 26 fixed in the wire hole of the threading block 25 is used to prevent the cable from being worn against the inner wall of the wire hole of the threading block 25, thereby maintaining the integrity of the cable.
本实用新型的工作原理为:使用中根据建筑施工的线路铺设需求,竖直滑动支线件2上的支臂21端部的滑槽框22,在上支板12的导向条14竖直滑动,根据铺设线路需求依次滑动多条上支板12上的支线件2,保持多个支线件2在多个导向条14上沿竖直方向的高度,然后将线路从支臂21一端的穿线块25的穿线孔穿出,从而对多层线路分别进行组装。The working principle of the utility model is as follows: during use, according to the line laying requirements of the construction, the slide groove frame 22 at the end of the support arm 21 on the vertically sliding branch member 2 slides vertically on the guide bar 14 of the upper support plate 12, and according to the line laying requirements, multiple branch members 2 on the upper support plate 12 are slid in sequence, and the height of the multiple branch members 2 on the multiple guide bars 14 in the vertical direction is maintained, and then the line is passed through the threading hole of the threading block 25 at one end of the support arm 21, so that the multi-layer lines are assembled separately.
以上所述仅是本实用新型的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以作出若干改进和润饰,这些改进和润饰也应视为本实用新型的保护范围。本实用新型中未具体描述和解释说明的结构、装置以及操作方法,如无特别说明和限定,均按照本领域的常规手段进行实施。The above is only a preferred embodiment of the present invention. It should be noted that, for ordinary technicians in the technical field, several improvements and modifications can be made without departing from the principle of the present invention, and these improvements and modifications should also be regarded as the protection scope of the present invention. The structures, devices and operating methods not specifically described and explained in the present invention shall be implemented according to the conventional means in the field unless otherwise specified and limited.
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202323472871.7U CN221900542U (en) | 2023-12-20 | 2023-12-20 | Power transmission line for building engineering |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202323472871.7U CN221900542U (en) | 2023-12-20 | 2023-12-20 | Power transmission line for building engineering |
Publications (1)
Publication Number | Publication Date |
---|---|
CN221900542U true CN221900542U (en) | 2024-10-25 |
Family
ID=93133830
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202323472871.7U Active CN221900542U (en) | 2023-12-20 | 2023-12-20 | Power transmission line for building engineering |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN221900542U (en) |
-
2023
- 2023-12-20 CN CN202323472871.7U patent/CN221900542U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN221900542U (en) | Power transmission line for building engineering | |
CN206820364U (en) | Special tools for power distribution lines | |
CN212543271U (en) | High-stability spliced cable bridge | |
CN111071854B (en) | A portable power cable pay-off device | |
CN219477554U (en) | A screw type cable tightness adjustment device | |
CN215626554U (en) | Temporary slideway convenient to hoist and mount | |
CN212752974U (en) | Communication cabinet with wiring and arranging mechanism convenient to walk | |
CN221380353U (en) | Electric circuit installs gallows | |
CN218182920U (en) | Temporary stringing supporting structure for electric power engineering construction | |
CN215478995U (en) | Connecting wire finishing device for meeting room electrical equipment | |
CN222602001U (en) | Cable erection device for electromechanical installation of building | |
CN221978515U (en) | Installation equipment for laying power engineering cables | |
CN221900457U (en) | Crossing pulley structure for cable laying support | |
CN212085232U (en) | Grounding connection structure of transformer | |
CN222546963U (en) | A centrally mounted high and low voltage switch distribution cabinet | |
CN220857572U (en) | Bus duct hoisting and installing structure | |
CN216981158U (en) | Can avoid mixed and disorderly low-voltage distribution cabinet of circuit | |
CN221380363U (en) | Indoor ceiling wiring frame | |
CN222127588U (en) | A cable power junction box | |
CN220401305U (en) | Electric power engineering wiring device | |
CN210490258U (en) | Cable erecting device for building electromechanical installation | |
CN221201996U (en) | Fixing clamp of photovoltaic power generation cable arranged side by side | |
CN217334886U (en) | Electric wire and cable winding displacement device convenient to installation | |
CN221880719U (en) | Quick access box for cable on medium-voltage overhead line pole | |
CN217965498U (en) | Adjustable roller carrier for supporting automatic welding equipment special for wind power |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |