CN221896295U - A wall crack repairing device for civil construction - Google Patents
A wall crack repairing device for civil construction Download PDFInfo
- Publication number
- CN221896295U CN221896295U CN202420381115.9U CN202420381115U CN221896295U CN 221896295 U CN221896295 U CN 221896295U CN 202420381115 U CN202420381115 U CN 202420381115U CN 221896295 U CN221896295 U CN 221896295U
- Authority
- CN
- China
- Prior art keywords
- wall
- support plate
- storage box
- civil construction
- rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims description 28
- 238000003860 storage Methods 0.000 claims abstract description 49
- 230000008439 repair process Effects 0.000 claims abstract description 19
- 238000004140 cleaning Methods 0.000 claims abstract description 8
- 238000003756 stirring Methods 0.000 claims abstract description 8
- 230000007246 mechanism Effects 0.000 claims description 15
- 238000001556 precipitation Methods 0.000 abstract description 2
- 238000004062 sedimentation Methods 0.000 abstract description 2
- 238000007711 solidification Methods 0.000 abstract description 2
- 230000008023 solidification Effects 0.000 abstract description 2
- 230000009471 action Effects 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 230000005540 biological transmission Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 101001121408 Homo sapiens L-amino-acid oxidase Proteins 0.000 description 1
- 102100026388 L-amino-acid oxidase Human genes 0.000 description 1
- 101100012902 Saccharomyces cerevisiae (strain ATCC 204508 / S288c) FIG2 gene Proteins 0.000 description 1
- 101100233916 Saccharomyces cerevisiae (strain ATCC 204508 / S288c) KAR5 gene Proteins 0.000 description 1
- 239000011449 brick Substances 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 239000002244 precipitate Substances 0.000 description 1
- 238000005507 spraying Methods 0.000 description 1
Landscapes
- Working Measures On Existing Buildindgs (AREA)
Abstract
Description
技术领域Technical Field
本实用新型涉及土建施工技术领域,尤其涉及一种土建施工用墙体裂缝修补装置。The utility model relates to the technical field of civil construction, in particular to a wall crack repairing device for civil construction.
背景技术Background Art
建筑施工是指工程建设实施阶段的生产活动,是各类建筑物的建造过程,也可以说是把设计图纸上的各种线条,在指定的地点,变成实物的过程。它包括基础工程施工、主体结构施工、屋面工程施工、装饰工程施工等。施工作业的场所称为“建筑施工现场”或叫“施工现场”,也叫工地,墙体裂缝是建筑结构的墙体部分产生的开裂现象,按照材料自身材质的不同,可以分为混凝土墙体裂缝、砖砌体墙体裂缝、新型隔墙板裂缝和不同材质墙体产生的裂缝。Construction refers to the production activities in the implementation stage of engineering construction. It is the construction process of various buildings. It can also be said to be the process of turning various lines on the design drawings into physical objects at designated locations. It includes foundation engineering construction, main structure construction, roofing engineering construction, decoration engineering construction, etc. The place where the construction work is done is called "construction site" or "construction site", also called construction site. Wall cracks are cracks in the wall part of the building structure. According to the different materials of the materials themselves, they can be divided into concrete wall cracks, brick wall cracks, new partition board cracks and cracks in walls of different materials.
现有的墙体裂缝修补装置在对墙体修补时,其修补用的混凝土长时间放置会出现沉淀和凝固现象,影响使用,且盛放的混凝土存储箱容易粘黏上混凝土,后期不方便进行清理,所以我们提出一种土建施工用墙体裂缝修补装置。When the existing wall crack repair device is used to repair the wall, the concrete used for repair will precipitate and solidify after being placed for a long time, affecting its use. In addition, the concrete storage box is easily stuck with concrete, which is inconvenient to clean later. Therefore, we propose a wall crack repair device for civil construction.
实用新型内容Utility Model Content
本实用新型的目的是为了解决现有的墙体裂缝修补装置在对墙体修补时,其修补用的混凝土长时间放置会出现沉淀和凝固现象,影响使用,且盛放的混凝土存储箱容易粘黏上混凝土,后期不方便进行清理的缺点,而提出的一种土建施工用墙体裂缝修补装置。The utility model aims to solve the shortcomings of the existing wall crack repair device, that is, when repairing a wall, the concrete used for repairing will be precipitated and solidified after being placed for a long time, which affects the use, and the storage box for containing the concrete is easy to stick to the concrete, which is inconvenient to clean later. A wall crack repair device for civil construction is proposed to solve the shortcomings.
为了实现上述目的,本实用新型采用了如下技术方案:In order to achieve the above purpose, the utility model adopts the following technical solutions:
一种土建施工用墙体裂缝修补装置,包括底座,所述底座的底部转动连接有四个对称设置的转轮,所述底座的顶部固定安装有第一支撑板与第二支撑板,所述第一支撑板与第二支撑板之间转动连接有同一个定位轴,所述定位轴上转动套设有存储箱,定位轴上固定安装有多个搅拌棒,所述第二支撑板的左侧固定安装有安装板,所述安装板的左侧固定安装有连接盒,所述连接盒与存储箱转动连接,连接盒与安装板的固定连接,能够对存储箱的旋转位置进行固定,所述定位轴上设有清洁机构,所述第一支撑板的左侧固定安装有第一电机,所述第一电机的输出轴上固定安装有主动杆,所述主动杆与存储箱传动连接,所述第二支撑板的右侧滑动连接有升降板,所述升降板的顶部安装有喷头,所述连接盒的底部内壁上安装有泵体,所述泵体的排出口上安装有导管,存储箱内的混凝土通过泵体与导管进行导出,并通过喷头进行喷出,并作用在墙体上,导管与喷头连接,所述第二支撑板上设有升降机构,所述升降机构与升降板连接,存储箱的左侧安装有进料口。A wall crack repair device for civil construction comprises a base, the bottom of the base is rotatably connected with four symmetrically arranged rotating wheels, the top of the base is fixedly installed with a first support plate and a second support plate, the first support plate and the second support plate are rotatably connected with the same positioning shaft, a storage box is rotatably sleeved on the positioning shaft, a plurality of stirring rods are fixedly installed on the positioning shaft, a mounting plate is fixedly installed on the left side of the second support plate, a connecting box is fixedly installed on the left side of the mounting plate, the connecting box is rotatably connected to the storage box, the connecting box is fixedly connected to the mounting plate, and the rotating position of the storage box can be fixed, and the positioning shaft is provided with a Cleaning mechanism, a first motor is fixedly installed on the left side of the first support plate, an active rod is fixedly installed on the output shaft of the first motor, the active rod is drivingly connected to the storage box, a lifting plate is slidably connected to the right side of the second support plate, a nozzle is installed on the top of the lifting plate, a pump body is installed on the bottom inner wall of the connecting box, a conduit is installed on the discharge port of the pump body, concrete in the storage box is discharged through the pump body and the conduit, and is sprayed out through the nozzle and acts on the wall, the conduit is connected to the nozzle, a lifting mechanism is provided on the second support plate, the lifting mechanism is connected to the lifting plate, and a feed port is installed on the left side of the storage box.
优选的,所述清洁机构包括两个刮板,定位轴上固定安装有四个对称设置的支撑杆,支撑杆上滑动连接有顶杆,刮板与对应的两个顶杆固定连接,支撑杆与顶杆的设置,能够通过刮板作用在存储箱的内壁上,在存储箱与定位轴形成相对转动时,转动的存储箱与刮板之间进行转动,进而能够对存储箱的内壁进行清理。Preferably, the cleaning mechanism includes two scrapers, four symmetrically arranged support rods are fixedly mounted on the positioning shaft, and top rods are slidably connected to the support rods. The scraper is fixedly connected to the corresponding two top rods. The arrangement of the support rods and the top rods can act on the inner wall of the storage box through the scraper. When the storage box and the positioning shaft form a relative rotation, the rotating storage box rotates with the scraper, thereby cleaning the inner wall of the storage box.
优选的,所述支撑杆上开设有滑动槽,滑动槽与顶杆滑动连接,滑动槽的内壁上固定安装有顶簧,顶簧的一端与顶杆固定连接,滑动槽与顶杆的滑动连接,使得顶杆能够形成相对移动,并在顶簧的作用下带动刮板与存储箱内壁接触。Preferably, a sliding groove is provided on the support rod, the sliding groove is slidably connected to the push rod, a top spring is fixedly installed on the inner wall of the sliding groove, one end of the top spring is fixedly connected to the push rod, and the sliding connection between the sliding groove and the push rod enables the push rod to form relative movement and drive the scraper to contact the inner wall of the storage box under the action of the top spring.
优选的,所述主动杆的一端固定安装有主动齿轮,存储箱的外侧固定安装有外齿环,主动齿轮与外齿环相互啮合,转动的主动杆通过主动齿轮与外齿环的相互啮合带动存储箱进行旋转。Preferably, a driving gear is fixedly mounted on one end of the active rod, an outer gear ring is fixedly mounted on the outer side of the storage box, the driving gear and the outer gear ring are meshed with each other, and the rotating active rod drives the storage box to rotate through the mutual meshing of the driving gear and the outer gear ring.
优选的,所述主动杆上固定套设有第一皮带轮,定位轴上固定套设有第二皮带轮,第一皮带轮与第二皮带轮上传动连接有同一个皮带,转动的主动杆通过第一皮带轮、第二皮带轮和皮带的传动连接,从而能够带动定位轴进行转动。Preferably, a first pulley is provided on the fixed sleeve of the active rod, and a second pulley is provided on the fixed sleeve of the positioning shaft. The first pulley and the second pulley are connected to each other with the same belt. The rotating active rod is connected to the first pulley, the second pulley and the belt, thereby driving the positioning shaft to rotate.
优选的,所述升降机构包括螺杆,第二支撑板的一侧开设有移动槽,螺杆转动安装在移动槽的内壁上,移动槽的内壁上滑动连接有滑块,螺杆与滑块螺纹连接,滑块与升降板固定连接,第二支撑板的顶部固定安装有第二电机,第二电机的输出轴与螺杆固定连接,第二电机的输出轴带动螺杆进行转动,转动的螺杆通过与滑块的螺纹连接,从而能够带动升降板进行升降,从而能够对不同高度的墙体注入混凝土。Preferably, the lifting mechanism includes a screw, a moving groove is opened on one side of the second support plate, the screw is rotatably installed on the inner wall of the moving groove, a slider is slidably connected to the inner wall of the moving groove, the screw is threadedly connected to the slider, the slider is fixedly connected to the lifting plate, a second motor is fixedly installed on the top of the second support plate, the output shaft of the second motor is fixedly connected to the screw, the output shaft of the second motor drives the screw to rotate, the rotating screw is threadedly connected to the slider, thereby driving the lifting plate to rise and fall, so that concrete can be injected into walls of different heights.
优选的,所述连接盒的底部嵌装固定有下料管,下料管上设有阀门,下料管的设置能够对存储箱内的混凝土进行排出,并通过阀门进行控制。Preferably, a feed pipe is embedded and fixed at the bottom of the connection box, and a valve is provided on the feed pipe. The setting of the feed pipe can discharge the concrete in the storage box and control it through the valve.
与现有技术相比,本实用新型的优点在于:Compared with the prior art, the advantages of the utility model are:
(1)本方案由于设置了第一皮带轮、第二皮带轮和皮带的传动连接,且主动齿轮与外齿环的相互啮合,使得转动的主动杆能够带动存储箱与定位轴之间反向转动,进而能够通过搅拌棒对存储箱进行搅拌混合,同时还通过刮板对存储箱的内壁进行清理;(1) In this solution, since the first pulley, the second pulley and the belt are connected in transmission, and the driving gear and the outer gear ring are meshed with each other, the rotating active rod can drive the storage box and the positioning shaft to rotate in the opposite direction, and then the storage box can be stirred and mixed by the stirring rod, and the inner wall of the storage box can be cleaned by the scraper;
(2)由于螺杆与滑块的螺纹连接,使得第二电机的输出轴能够带动升降板进行升降,进而能够带动喷头对不同高度的墙体进行修补。(2) Due to the threaded connection between the screw rod and the slider, the output shaft of the second motor can drive the lifting plate to move up and down, thereby driving the nozzle to repair walls of different heights.
本实用新型操作简单,使用方便,能够便于对墙体修补用的混凝土搅拌,使其保持均匀状态,并能够防止沉淀,同时还能持续对混凝土存储箱的内壁进行清理,且也能够对不同高度的墙体进行修补,便于人们使用。The utility model is simple to operate and easy to use. It can facilitate the mixing of concrete for wall repair to keep it in a uniform state and prevent sedimentation. At the same time, it can continuously clean the inner wall of the concrete storage box and can also repair walls of different heights, which is convenient for people to use.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
图1为本实用新型提出的一种土建施工用墙体裂缝修补装置的立体结构示意图;FIG1 is a schematic diagram of the three-dimensional structure of a wall crack repairing device for civil construction proposed by the present invention;
图2为本实用新型提出的一种土建施工用墙体裂缝修补装置的正视剖面结构示意图;FIG2 is a schematic diagram of a front cross-sectional structure of a wall crack repairing device for civil construction proposed by the present invention;
图3为本实用新型提出的一种土建施工用墙体裂缝修补装置的A部分结构示意图。FIG3 is a schematic structural diagram of part A of a wall crack repair device for civil construction proposed by the present invention.
图中:1、底座;2、转轮;3、第一支撑板;4、第二支撑板;5、存储箱;6、安装板;7、连接盒;8、定位轴;9、搅拌棒;10、泵体;11、导管;12、升降板;13、喷头;14、第二电机;15、移动槽;16、螺杆;17、滑块;18、下料管;19、第一电机;20、主动杆;21、主动齿轮;22、外齿环;23、第一皮带轮;24、第二皮带轮;25、皮带;26、支撑杆;27、顶杆;28、刮板;29、滑动槽;30、顶簧。In the figure: 1. base; 2. rotating wheel; 3. first support plate; 4. second support plate; 5. storage box; 6. mounting plate; 7. connecting box; 8. positioning shaft; 9. stirring rod; 10. pump body; 11. conduit; 12. lifting plate; 13. nozzle; 14. second motor; 15. moving groove; 16. screw; 17. slider; 18. feeding pipe; 19. first motor; 20. active rod; 21. active gear; 22. outer gear ring; 23. first pulley; 24. second pulley; 25. belt; 26. support rod; 27. push rod; 28. scraper; 29. sliding groove; 30. top spring.
具体实施方式DETAILED DESCRIPTION
下面将结合本实施例中的附图,对本实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实施例一部分实施例,而不是全部的实施例。The technical solution in this embodiment will be clearly and completely described below in conjunction with the drawings in this embodiment. Obviously, the described embodiment is only a part of the embodiment, rather than all of the embodiments.
实施例Example
参照图1-3,一种土建施工用墙体裂缝修补装置,包括底座1,底座1的底部转动连接有四个对称设置的转轮2,底座1的顶部固定安装有第一支撑板3与第二支撑板4,第一支撑板3与第二支撑板4之间转动连接有同一个定位轴8,定位轴8上转动套设有内侧壁为圆柱形结构的存储箱5,其中存储箱5的左侧内壁上嵌装固定有一个与定位轴8外侧固定套装的密封轴承,定位轴8上固定安装有多个搅拌棒9,第二支撑板4的左侧固定安装有安装板6,安装板6的左侧固定安装有连接盒7,连接盒7和安装板6均转动套装在定位轴8外侧,连接盒7与存储箱5的内侧转动安装,连接盒7与安装板6的固定连接,能够对存储箱5的旋转位置进行固定,定位轴8上设有清洁机构,第一支撑板3的左侧固定安装有第一电机19,第一电机19的输出轴上固定安装有主动杆20,主动杆20与存储箱5传动连接,第二支撑板4的右侧滑动连接有升降板12,升降板12的顶部安装有喷头13,连接盒7的底部内壁上安装有泵体10,泵体10的排出口上安装有导管11,存储箱5内的混凝土通过泵体10与导管11进行导出,并通过喷头13进行喷出,并作用在墙体上,导管11与喷头13连接,第二支撑板4上设有升降机构,升降机构与升降板12连接,存储箱5的左侧安装有进料口。Referring to Figures 1-3, a wall crack repair device for civil construction includes a base 1, the bottom of the base 1 is rotatably connected to four symmetrically arranged wheels 2, the top of the base 1 is fixedly installed with a first support plate 3 and a second support plate 4, the first support plate 3 and the second support plate 4 are rotatably connected with the same positioning shaft 8, the positioning shaft 8 is rotatably sleeved with a storage box 5 with an inner wall of a cylindrical structure, wherein a sealed bearing fixedly sleeved with the outer side of the positioning shaft 8 is embedded and fixed on the left inner wall of the storage box 5, a plurality of stirring rods 9 are fixedly installed on the positioning shaft 8, a mounting plate 6 is fixedly installed on the left side of the second support plate 4, a connecting box 7 is fixedly installed on the left side of the mounting plate 6, the connecting box 7 and the mounting plate 6 are both rotatably sleeved on the outer side of the positioning shaft 8, the connecting box 7 is rotatably installed on the inner side of the storage box 5, and the connecting box 7 is fixedly sleeved with the mounting plate 6. The fixed connection of the plate 6 can fix the rotational position of the storage box 5. A cleaning mechanism is provided on the positioning shaft 8. A first motor 19 is fixedly installed on the left side of the first support plate 3. An active rod 20 is fixedly installed on the output shaft of the first motor 19. The active rod 20 is transmission-connected to the storage box 5. A lifting plate 12 is slidingly connected to the right side of the second support plate 4. A nozzle 13 is installed on the top of the lifting plate 12. A pump body 10 is installed on the bottom inner wall of the connecting box 7. A conduit 11 is installed on the discharge port of the pump body 10. The concrete in the storage box 5 is discharged through the pump body 10 and the conduit 11, and is sprayed out through the nozzle 13 and acts on the wall. The conduit 11 is connected to the nozzle 13. A lifting mechanism is provided on the second support plate 4. The lifting mechanism is connected to the lifting plate 12. A feed port is installed on the left side of the storage box 5.
本实施例中,清洁机构包括两个刮板28,定位轴8上固定安装有四个对称设置的支撑杆26,支撑杆26上滑动连接有顶杆27,刮板28与对应的两个顶杆27固定连接,支撑杆26与顶杆27的设置,能够通过刮板28作用在存储箱5的内壁上,在存储箱5与定位轴8形成相对转动时,转动的存储箱5与刮板28之间进行转动,进而能够对存储箱5的内壁进行清理,其中支撑杆26上开设有滑动槽29,滑动槽29与顶杆27滑动连接,滑动槽29的内壁上固定安装有顶簧30,顶簧30的一端与顶杆27固定连接,滑动槽29与顶杆27的滑动连接,使得顶杆27能够形成相对移动,并在顶簧30的作用下带动刮板28与存储箱5内壁接触,主动杆20的一端固定安装有主动齿轮21,存储箱5的外侧固定安装有外齿环22,主动齿轮21与外齿环22相互啮合,转动的主动杆20通过主动齿轮21与外齿环22的相互啮合带动存储箱5进行旋转。In this embodiment, the cleaning mechanism includes two scrapers 28, four symmetrically arranged support rods 26 are fixedly installed on the positioning shaft 8, and a push rod 27 is slidably connected to the support rod 26. The scraper 28 is fixedly connected to the corresponding two push rods 27. The arrangement of the support rod 26 and the push rod 27 can act on the inner wall of the storage box 5 through the scraper 28. When the storage box 5 and the positioning shaft 8 form a relative rotation, the rotating storage box 5 rotates with the scraper 28, so that the inner wall of the storage box 5 can be cleaned. The support rod 26 is provided with a sliding groove 29, and the sliding groove 29 and the push rod 27 are fixedly connected. 7 sliding connection, a top spring 30 is fixedly installed on the inner wall of the sliding groove 29, one end of the top spring 30 is fixedly connected to the top rod 27, the sliding connection between the sliding groove 29 and the top rod 27 enables the top rod 27 to form relative movement, and under the action of the top spring 30, the scraper 28 is driven to contact the inner wall of the storage box 5, a driving gear 21 is fixedly installed on one end of the active rod 20, an outer gear ring 22 is fixedly installed on the outer side of the storage box 5, the driving gear 21 and the outer gear ring 22 are meshed with each other, and the rotating active rod 20 drives the storage box 5 to rotate through the mutual meshing of the driving gear 21 and the outer gear ring 22.
本实施例中,主动杆20上固定套设有第一皮带轮23,定位轴8上固定套设有第二皮带轮24,第一皮带轮23与第二皮带轮24上传动连接有同一个皮带25,转动的主动杆20通过第一皮带轮23、第二皮带轮24和皮带25的传动连接,从而能够带动定位轴8进行转动。In this embodiment, a first pulley 23 is fixedly provided on the active rod 20, and a second pulley 24 is fixedly provided on the positioning shaft 8. The first pulley 23 and the second pulley 24 are connected to each other with a belt 25. The rotating active rod 20 is connected to the first pulley 23, the second pulley 24 and the belt 25, thereby driving the positioning shaft 8 to rotate.
本实施例中,升降机构包括螺杆16,第二支撑板4的一侧开设有移动槽15,螺杆16转动安装在移动槽15的内壁上,移动槽15的内壁上滑动连接有滑块17,螺杆16与滑块17螺纹连接,其中滑块17的顶部开设有一个与螺杆16螺纹套装的螺纹孔,且滑块17的前侧和后侧分别与移动槽15的前侧内壁和后侧内壁滑动接触,滑块17与升降板12固定连接,第二支撑板4的顶部固定安装有第二电机14,第二电机14的输出轴与螺杆16固定连接,第二电机14的输出轴带动螺杆16进行转动,转动的螺杆16通过与滑块17的螺纹连接,从而能够带动升降板12进行升降,从而能够对不同高度的墙体注入混凝土。In this embodiment, the lifting mechanism includes a screw 16, a moving groove 15 is opened on one side of the second support plate 4, the screw 16 is rotatably installed on the inner wall of the moving groove 15, and a slider 17 is slidably connected to the inner wall of the moving groove 15, the screw 16 is threadedly connected to the slider 17, wherein the top of the slider 17 is opened with a threaded hole threadedly fitted with the screw 16, and the front and rear sides of the slider 17 are respectively in sliding contact with the front inner wall and the rear inner wall of the moving groove 15, the slider 17 is fixedly connected to the lifting plate 12, and the second motor 14 is fixedly installed on the top of the second support plate 4, the output shaft of the second motor 14 is fixedly connected to the screw 16, and the output shaft of the second motor 14 drives the screw 16 to rotate, and the rotating screw 16 is threadedly connected to the slider 17, thereby driving the lifting plate 12 to rise and fall, so that concrete can be injected into walls of different heights.
本实施例中,连接盒7的底部嵌装固定有下料管18,下料管18上设有阀门,下料管18的设置能够对存储箱5内的混凝土进行排出,并通过阀门进行控制。In this embodiment, a discharge pipe 18 is embedded and fixed at the bottom of the connection box 7, and a valve is provided on the discharge pipe 18. The setting of the discharge pipe 18 can discharge the concrete in the storage box 5 and control it through the valve.
工作原理:工作时,将装置移动到需要修补的墙体边,通过泵体10将存储箱5内的混凝土进行抽取,并通过导管11与喷头13进行喷出,从而对墙体进行修补,当需要调节喷出的高度时,启动第二电机14开关,第二电机14的输出轴带动螺杆16转动,螺杆16通过与滑块17的螺纹连接,从而能够带动升降板12进行升降,升降板12带动喷头13进行高度调节,再启动第一电机19开关,第一电机19的输出轴带动主动杆20转动,转动的主动杆20通过主动齿轮21与外齿环22的相互啮合带动存储箱5进行旋转,同时转动的主动杆20通过第一皮带轮23、第二皮带轮24和皮带25的传动连接,从而能够带动定位轴8进行反向转动,当定位轴8与存储箱5反向转动时,刮板28与存储箱5之间就会形成反向转动,刮板28在顶杆27与顶簧30的作用下对存储箱5的内壁进行清理,同时搅拌棒9的设置能够对存储箱5内的混凝土进行搅拌,防止出现凝固或者沉淀。Working principle: When working, the device is moved to the side of the wall that needs to be repaired, and the concrete in the storage box 5 is extracted through the pump body 10, and sprayed out through the guide tube 11 and the nozzle 13, so as to repair the wall. When the spraying height needs to be adjusted, the second motor 14 switch is started, and the output shaft of the second motor 14 drives the screw 16 to rotate. The screw 16 is connected with the slider 17 by a thread, so that it can drive the lifting plate 12 to move up and down, and the lifting plate 12 drives the nozzle 13 to adjust the height, and then the first motor 19 switch is started, and the output shaft of the first motor 19 drives the active rod 20 to rotate. The rotating active rod 20 drives the storage box 5 to rotate through the mutual engagement of the active gear 21 and the outer gear ring 22. At the same time, the rotating active rod 20 is connected through the transmission of the first pulley 23, the second pulley 24 and the belt 25, so as to drive the positioning shaft 8 to rotate in the opposite direction. When the positioning shaft 8 and the storage box 5 rotate in the opposite direction, the scraper 28 and the storage box 5 will form a reverse rotation. The scraper 28 cleans the inner wall of the storage box 5 under the action of the top rod 27 and the top spring 30. At the same time, the setting of the stirring rod 9 can stir the concrete in the storage box 5 to prevent solidification or precipitation.
以上所述,仅为本实施例较佳的具体实施方式,但本实施例的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实施例揭露的技术范围内,根据本实施例的技术方案及其实用新型构思加以等同替换或改变,都应涵盖在本实施例的保护范围之内。The above is only a preferred specific implementation of this embodiment, but the protection scope of this embodiment is not limited to this. Any technician familiar with the technical field can make equivalent replacements or changes based on the technical solution and utility model concept of this embodiment within the technical scope disclosed in this embodiment, which should be covered by the protection scope of this embodiment.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202420381115.9U CN221896295U (en) | 2024-02-29 | 2024-02-29 | A wall crack repairing device for civil construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202420381115.9U CN221896295U (en) | 2024-02-29 | 2024-02-29 | A wall crack repairing device for civil construction |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN221896295U true CN221896295U (en) | 2024-10-25 |
Family
ID=93128618
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202420381115.9U Active CN221896295U (en) | 2024-02-29 | 2024-02-29 | A wall crack repairing device for civil construction |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN221896295U (en) |
-
2024
- 2024-02-29 CN CN202420381115.9U patent/CN221896295U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104493810A (en) | Robot | |
| CN112610004A (en) | Wall masonry auxiliary device | |
| CN221896295U (en) | A wall crack repairing device for civil construction | |
| CN217098315U (en) | A cement mixing device for hydraulic engineering | |
| CN111330496A (en) | Mixer is used in grout | |
| CN115262922A (en) | Wall whitewashing device for building engineering | |
| CN219993156U (en) | Building construction concrete pouring device | |
| CN221989065U (en) | Scribing device for road bridge municipal construction | |
| CN221951944U (en) | A lime silo cleaning device | |
| CN217773666U (en) | High-efficient dust collector of green building construction | |
| CN216884578U (en) | Automatic concrete mixing device | |
| CN218406283U (en) | Wall whitewashing device | |
| CN218233046U (en) | A well-mixed grouting equipment for road construction | |
| CN217268616U (en) | Interior decoration construction wall plastering device | |
| CN214401346U (en) | Concrete pavement maintenance device | |
| CN218083438U (en) | Concrete mixing device for building construction | |
| CN221717347U (en) | A clean production equipment for concrete production | |
| CN217916021U (en) | Concrete processing equipment | |
| CN217621384U (en) | Concrete mixing device | |
| CN218090865U (en) | A grouting device for water conservancy construction | |
| CN221567165U (en) | Foundation grouting device | |
| CN217916025U (en) | A mortar mixing device for recycled concrete production and processing | |
| CN223196914U (en) | Grouting device for water conservancy project construction | |
| CN222501081U (en) | Concrete conveying pump hopper | |
| CN223269568U (en) | Automatic scraping device for gypsum self-leveling |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |