CN221878885U - Large-span steel bar truss floor supporting plate hoisting and shaping bracket - Google Patents
Large-span steel bar truss floor supporting plate hoisting and shaping bracket Download PDFInfo
- Publication number
- CN221878885U CN221878885U CN202323552213.9U CN202323552213U CN221878885U CN 221878885 U CN221878885 U CN 221878885U CN 202323552213 U CN202323552213 U CN 202323552213U CN 221878885 U CN221878885 U CN 221878885U
- Authority
- CN
- China
- Prior art keywords
- hoisting
- hanger
- side baffle
- floor deck
- square steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 57
- 239000010959 steel Substances 0.000 title claims abstract description 57
- 238000007493 shaping process Methods 0.000 title claims 6
- 230000001681 protective effect Effects 0.000 abstract description 12
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 12
- 238000000034 method Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 2
- 101100233916 Saccharomyces cerevisiae (strain ATCC 204508 / S288c) KAR5 gene Proteins 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本实用新型涉及一种大跨度钢筋桁架楼承板吊装定型化托架,包括:楼承板、防护吊架、吊装加劲环、吊架横梁和侧挡板;防护吊架包括吊架横梁和吊架纵梁,吊架横梁上端部设置吊装耳板,吊装耳板上设置有吊装加劲环,吊装加劲环内设置有吊绳,吊架横梁中部设置有两个夹具转轴支座,两夹具转轴支座间设置有夹具转轴,夹具转轴上设置有楼承板夹具,楼承板夹具通过夹具转轴自锁转动。本实用新型的有益效果是:楼承板吊装时置于吊架内,使楼承板的四角及各边均可以得到有效的防护,并通过楼承板夹具压住楼承板的两端防止其滑移,以防止桁架板产生相关变形破损情况。
The utility model relates to a standardized bracket for hoisting a large-span steel bar truss floor deck, including: a floor deck, a protective hanger, a hoisting stiffening ring, a hanger beam and a side baffle; the protective hanger includes a hanger beam and a hanger longitudinal beam, a hoisting ear plate is arranged on the upper end of the hanger beam, a hoisting stiffening ring is arranged on the hoisting ear plate, a hoisting rope is arranged inside the hoisting stiffening ring, two clamp shaft supports are arranged in the middle of the hanger beam, a clamp shaft is arranged between the two clamp shaft supports, a floor deck clamp is arranged on the clamp shaft, and the floor deck clamp rotates by self-locking through the clamp shaft. The beneficial effect of the utility model is that the floor deck is placed in the hanger during hoisting, so that the four corners and sides of the floor deck can be effectively protected, and the two ends of the floor deck are pressed by the floor deck clamp to prevent it from slipping, so as to prevent the truss plate from related deformation and damage.
Description
技术领域Technical Field
本实用新型涉及楼承板吊装施工领域,尤其包括大跨度钢筋桁架楼承板吊装定型化托架。The utility model relates to the field of floor deck hoisting construction, in particular to a large-span steel bar truss floor deck hoisting standardized bracket.
背景技术Background Art
随着钢框架结构的施工发展,因其施工速度快、整体刚度强、抗震性能好的优点,钢筋桁架楼承板受到越来越多人的选用,对桁架板的安全性的要求也越来越高。但由于施工过程中存在高空、临边作业,以及受板承载能力及成品质量因素而导致混凝土浇筑漏浆、板变形等,钢框架结构的施工存在大大小小的安全、质量问题。With the development of steel frame construction, steel truss floor decks are increasingly being chosen by more and more people due to their advantages of fast construction speed, strong overall rigidity and good seismic performance, and the requirements for the safety of truss decks are becoming higher and higher. However, due to the existence of high-altitude and edge operations during the construction process, as well as concrete pouring leakage and deck deformation caused by the board's bearing capacity and finished product quality factors, the construction of steel frame structures has safety and quality problems of varying sizes.
传统的施工方式施工时,大跨度钢筋桁架楼承板在运输及吊装过程存在较大的不确定性因素,若吊装过程中发生翘边或者挠曲变形,则会影响后续整个工程的施工质量,故吊装过程中可采取相关的加固措施,以防止桁架板产生相关变形破损情况的出现。When using traditional construction methods, there are large uncertainties in the transportation and hoisting process of large-span steel truss floor decking. If warping or bending deformation occurs during the hoisting process, it will affect the subsequent construction quality of the entire project. Therefore, relevant reinforcement measures can be taken during the hoisting process to prevent the truss plate from causing related deformation and damage.
鉴于此,针对目前大跨度钢筋桁架楼承板吊装作业中存在的一系列问题,亟待发明一种简单有效的大跨度钢筋桁架楼承板吊装定型化托架,从而达到提高大跨度钢筋桁架楼承板的施工质量。In view of this, in view of a series of problems existing in the current hoisting operation of large-span steel truss floor decks, it is urgent to invent a simple and effective large-span steel truss floor deck hoisting standardized bracket, so as to improve the construction quality of large-span steel truss floor decks.
实用新型内容Utility Model Content
本实用新型的目的是克服现有技术中的不足,提供一种大跨度钢筋桁架楼承板吊装定型化托架。The utility model aims to overcome the deficiencies in the prior art and provide a standardized bracket for hoisting a large-span steel bar truss floor deck.
这种大跨度钢筋桁架楼承板吊装定型化托架,包括楼承板、防护吊架、吊装加劲环、吊架横梁和侧挡板;防护吊架包括吊架横梁和吊架纵梁,吊架横梁上端部设置吊装耳板,吊装耳板上设置有吊装加劲环,吊装加劲环内设置有吊绳,吊架横梁中部设置有两个夹具转轴支座,两夹具转轴支座间设置有夹具转轴,夹具转轴上设置有楼承板夹具,楼承板夹具通过夹具转轴自锁转动,用于压在楼承板上方防止其在空中移位。This large-span steel truss floor deck hoisting standardized bracket includes a floor deck, a protective hanger, a hoisting stiffening ring, a hanger beam and a side baffle; the protective hanger includes a hanger beam and a hanger longitudinal beam, a hoisting ear plate is arranged on the upper end of the hanger beam, a hoisting stiffening ring is arranged on the hoisting ear plate, a hoisting rope is arranged in the hoisting stiffening ring, two clamp rotating shaft supports are arranged in the middle of the hanger beam, a clamp rotating shaft is arranged between the two clamp rotating shaft supports, a floor deck clamp is arranged on the clamp rotating shaft, and the floor deck clamp is rotated by self-locking through the clamp rotating shaft, and is used to press on the top of the floor deck to prevent it from shifting in the air.
作为优选,所述防护吊架的吊架纵梁上设置有方钢限位板和固定槽钢,固定槽钢两侧设置有侧挡板左滑槽和侧挡板右滑槽,侧挡板左滑槽和侧挡板右滑槽内均设置有侧挡板,侧挡板两侧分别设有侧挡板滑移块,两个侧挡板滑移块分别在侧挡板左滑槽和侧挡板右滑槽内滑动,固定槽钢两端各设有一道侧挡板,楼承板放置在侧挡板之间。Preferably, a square steel limit plate and a fixed channel steel are provided on the longitudinal beam of the protective hanger, a left side baffle slide groove and a right side baffle slide groove are provided on both sides of the fixed channel steel, side baffles are provided in the left side baffle slide groove and the right side baffle slide groove, side baffles are provided on both sides of the side baffles, side baffle sliding blocks are provided respectively, the two side baffle sliding blocks slide in the left side baffle slide groove and the right side baffle slide groove respectively, a side baffle is provided at each end of the fixed channel steel, and the floor decking is placed between the side baffles.
作为优选,方钢限位板平行于固定槽钢,方钢限位板内设置有活动支撑方钢,方钢限位板和活动支撑方钢通过螺栓固定,楼承板放置在活动支撑方钢上。Preferably, the square steel limit plate is parallel to the fixed channel steel, a movable supporting square steel is arranged inside the square steel limit plate, the square steel limit plate and the movable supporting square steel are fixed by bolts, and the floor deck is placed on the movable supporting square steel.
作为优选,所述防护吊架的吊架纵梁底部四角分别设置有配重块吊杆,配重块吊杆上设置有平衡配重块。Preferably, the four corners of the bottom of the longitudinal beam of the protective hanger are respectively provided with counterweight hangers, and a balancing counterweight is provided on the counterweight hanger.
作为优选,吊架横梁和吊架纵梁连接形成矩形结构,矩形结构两侧的吊架横梁上均设有楼承板夹具,两个楼承板夹具分别压在楼承板的两端。Preferably, the hanger crossbeam and the hanger longitudinal beam are connected to form a rectangular structure, and floor deck clamps are provided on the hanger crossbeams on both sides of the rectangular structure, and the two floor deck clamps are respectively pressed on the two ends of the floor deck.
本实用新型的有益效果是:The beneficial effects of the utility model are:
1)大跨度钢筋桁架楼承板吊装采用定型化托架,楼承板吊装时置于吊架内,使楼承板的四角及各边均可以得到有效的防护,并通过楼承板夹具压住楼承板的两端防止其滑移,以防止桁架板产生相关变形破损情况。1) Standardized brackets are used for the hoisting of large-span steel truss floor decks. The floor decks are placed in the brackets during hoisting, so that the four corners and sides of the floor decks can be effectively protected, and the two ends of the floor decks are pressed by the floor deck clamps to prevent them from slipping, so as to prevent the truss plates from deformation and damage.
2)定型化托架设置了侧挡板及活动支撑方钢,侧挡板间距可调,可用于多种规格的楼承板吊装施工。2) The standardized bracket is equipped with side baffles and movable supporting square steel. The spacing between the side baffles is adjustable and can be used for the hoisting construction of floor decking of various specifications.
3)定型化托架端部设置了楼承板夹具,底部四角设置了配重块吊杆用于安装平衡配重块,保证了楼承板在吊装过程中均处于稳定状态,保证了楼承板的吊装施工质量。3) A floor deck clamp is set at the end of the standardized bracket, and counterweight block hangers are set at the four corners of the bottom for installing balancing counterweight blocks, which ensures that the floor deck is in a stable state during the hoisting process and ensures the hoisting construction quality of the floor deck.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
图1是本实用新型大跨度钢筋桁架楼承板吊装定型化托架三维结构示意图;Figure 1 is a schematic diagram of the three-dimensional structure of a standardized bracket for hoisting a large-span steel truss floor deck according to the utility model;
图2是定型化托架立面图;Fig. 2 is a vertical view of a standardized bracket;
图3是定型化托架三维示意图;FIG3 is a three-dimensional schematic diagram of a stereotyped bracket;
图4是楼承板吊装立面图;Figure 4 is a floor deck hoisting elevation view;
其中:1.楼承板2.防护吊架3.吊装加劲环4.吊架横梁5.夹具转轴支座6.夹具转轴7.平衡配重块8.配重块吊杆9.吊架纵梁10.吊装耳板11.楼承板夹具12.吊绳13.活动支撑方钢14.方钢限位板15.侧挡板右滑槽16.侧挡板17.固定槽钢18.侧挡板左滑槽19.侧挡板滑移块。Among them: 1. Floor decking 2. Protective hanger 3. Lifting stiffening ring 4. Hanger crossbeam 5. Clamp shaft support 6. Clamp shaft 7. Balance counterweight 8. Counterweight hanger rod 9. Hanger longitudinal beam 10. Lifting ear plate 11. Floor decking clamp 12. Lifting rope 13. Movable supporting square steel 14. Square steel limit plate 15. Side baffle right slide 16. Side baffle 17. Fixed channel steel 18. Side baffle left slide 19. Side baffle sliding block.
具体实施方式DETAILED DESCRIPTION
下面结合实施例对本实用新型做进一步描述。下述实施例的说明只是用于帮助理解本实用新型。应当指出,对于本技术领域的普通人员来说,在不脱离本实用新型原理的前提下,还可以对本实用新型进行若干修饰,这些改进和修饰也落入本实用新型权利要求的保护范围内。The utility model is further described below in conjunction with the embodiments. The description of the following embodiments is only used to help understand the utility model. It should be pointed out that for ordinary people in this technical field, the utility model can also be modified in some ways without departing from the principle of the utility model, and these improvements and modifications also fall within the scope of protection of the claims of the utility model.
作为一种实施例,如图1至图4所示,这种大跨度钢筋桁架楼承板吊装定型化托架,包括楼承板1、防护吊架2、吊装加劲环3、吊架横梁4和侧挡板16;防护吊架2包括吊架横梁4和吊架纵梁9,吊架横梁4上端部设置吊装耳板10,吊装耳板10上设置有吊装加劲环3,吊装加劲环3内设置有吊绳12,吊架横梁4中部设置有两个夹具转轴支座5,两夹具转轴支座5间设置有夹具转轴6,夹具转轴6上设置有楼承板夹具11,楼承板夹具11通过夹具转轴6自锁转动,用于压在楼承板1上方防止其在空中移位。As an embodiment, as shown in Figures 1 to 4, this large-span steel truss floor deck hoisting standardized bracket includes a floor deck 1, a protective hanger 2, a hoisting stiffening ring 3, a hanger beam 4 and a side baffle 16; the protective hanger 2 includes a hanger beam 4 and a hanger longitudinal beam 9, a hoisting ear plate 10 is provided at the upper end of the hanger beam 4, a hoisting stiffening ring 3 is provided on the hoisting ear plate 10, a hoisting rope 12 is provided in the hoisting stiffening ring 3, two clamp shaft supports 5 are provided in the middle of the hanger beam 4, a clamp shaft 6 is provided between the two clamp shaft supports 5, a floor deck clamp 11 is provided on the clamp shaft 6, and the floor deck clamp 11 is self-lockingly rotated by the clamp shaft 6, and is used to press above the floor deck 1 to prevent it from shifting in the air.
所述防护吊架2的吊架纵梁9上设置有方钢限位板14和固定槽钢17,固定槽钢17两侧设置有侧挡板左滑槽18和侧挡板右滑槽15,侧挡板左滑槽18和侧挡板右滑槽15内均设置有侧挡板16,侧挡板16两侧分别设有侧挡板滑移块19,两个侧挡板滑移块19分别在侧挡板左滑槽18和侧挡板右滑槽15内滑动,固定槽钢17两端各设有一道侧挡板16,楼承板1放置在侧挡板16之间。侧挡板16间距可调,可用于多种规格的楼承板1吊装施工。A square steel limit plate 14 and a fixed channel steel 17 are provided on the hanger longitudinal beam 9 of the protective hanger 2. A side baffle left slide groove 18 and a side baffle right slide groove 15 are provided on both sides of the fixed channel steel 17. Side baffles 16 are provided in the side baffle left slide groove 18 and the side baffle right slide groove 15. Side baffle sliding blocks 19 are provided on both sides of the side baffle 16. The two side baffle sliding blocks 19 slide in the side baffle left slide groove 18 and the side baffle right slide groove 15 respectively. A side baffle 16 is provided at each end of the fixed channel steel 17. The floor deck 1 is placed between the side baffles 16. The spacing of the side baffles 16 is adjustable, and can be used for the hoisting construction of floor decks 1 of various specifications.
方钢限位板14平行于固定槽钢17,方钢限位板14内设置有活动支撑方钢13,方钢限位板14和活动支撑方钢13通过螺栓固定,楼承板1放置在活动支撑方钢13上。The square steel limit plate 14 is parallel to the fixed channel steel 17 , and a movable supporting square steel 13 is arranged inside the square steel limit plate 14 . The square steel limit plate 14 and the movable supporting square steel 13 are fixed by bolts, and the floor deck 1 is placed on the movable supporting square steel 13 .
所述防护吊架2的吊架纵梁9底部四角分别设置有配重块吊杆8,配重块吊杆8上设置有平衡配重块7,保证了楼承板1在吊装过程中均处于稳定状态,保证了楼承板1的吊装施工质量.The bottom four corners of the hanger longitudinal beam 9 of the protective hanger 2 are respectively provided with counterweight hangers 8, and the counterweight hangers 8 are provided with balancing counterweights 7, which ensure that the floor deck 1 is in a stable state during the hoisting process, and ensure the hoisting construction quality of the floor deck 1.
吊架横梁4和吊架纵梁9连接形成矩形结构,矩形结构两侧的吊架横梁4上均设有楼承板夹具11,两个楼承板夹具11分别压在楼承板1的两端。The hanger cross beam 4 and the hanger longitudinal beam 9 are connected to form a rectangular structure. The hanger cross beams 4 on both sides of the rectangular structure are provided with floor deck clamps 11. The two floor deck clamps 11 are pressed on the two ends of the floor deck 1 respectively.
楼承板1吊装时置于防护吊架2内,使楼承板1的四角及各边均可以得到有效的防护,并通过楼承板夹具11压住楼承板1的两端防止其滑移,以防止桁架板产生相关变形破损情况。When the floor deck 1 is hoisted, it is placed in the protective hanger 2, so that the four corners and sides of the floor deck 1 can be effectively protected, and the two ends of the floor deck 1 are pressed by the floor deck clamp 11 to prevent it from slipping, so as to prevent the truss plate from causing related deformation and damage.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202323552213.9U CN221878885U (en) | 2023-12-25 | 2023-12-25 | Large-span steel bar truss floor supporting plate hoisting and shaping bracket |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202323552213.9U CN221878885U (en) | 2023-12-25 | 2023-12-25 | Large-span steel bar truss floor supporting plate hoisting and shaping bracket |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN221878885U true CN221878885U (en) | 2024-10-22 |
Family
ID=93110053
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202323552213.9U Active CN221878885U (en) | 2023-12-25 | 2023-12-25 | Large-span steel bar truss floor supporting plate hoisting and shaping bracket |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN221878885U (en) |
-
2023
- 2023-12-25 CN CN202323552213.9U patent/CN221878885U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106522997B (en) | A kind of construction trolley and construction method of tunnels and underground engineering middle arch rack | |
| CN204781929U (en) | Convenient intelligent hydraulic pressure jacking die carrier system of standard form shellfish thunder frame of assembling | |
| CN204588444U (en) | Prefabricated superimposed sheet special hanger | |
| CN221878885U (en) | Large-span steel bar truss floor supporting plate hoisting and shaping bracket | |
| CN214740171U (en) | Ancient building wall body hoist and mount migration device | |
| CN211569862U (en) | Prefabricated hoist and mount piece of building convenient to dismouting | |
| CN108726358A (en) | A kind of towering concrete structure main reinforcement batch hanging apparatus and method | |
| CN205421890U (en) | Die carrier bearing beam | |
| CN210139389U (en) | Steel pipe stacking device | |
| CN220376095U (en) | Hoisting device for main cable saddle grid of suspension bridge | |
| CN209618724U (en) | A kind of swing arm tower crane promotion foot guard device certainly | |
| CN202785270U (en) | Overhead hoist for track board bar-mat reinforcement meshes | |
| CN205293607U (en) | Fortune roof beam car dress roof beam is with deposit boom support device temporarily | |
| CN114658006A (en) | Inner supporting member applicable to foundation pit concrete and method for rapidly removing inner supporting member | |
| CN211169608U (en) | Hanging basket prismatic sheet hoisting device | |
| CN115070935A (en) | Prefabricated bridge approach box girder reinforcement binding positioner of high pile pier | |
| CN210029771U (en) | A hybrid multi-layer gantry hanger | |
| CN201296597Y (en) | Welded steel fabric hanger | |
| CN220376148U (en) | Movable door frame for turning king character block pouring operation | |
| CN208965999U (en) | A movable skylight operating platform | |
| CN217812045U (en) | Detachable column wrapping plate | |
| CN219365479U (en) | Portable hoist and mount mounting platform | |
| CN206000188U (en) | Rim of a cup basis steel column installs perpendicularity adjustment holding device | |
| CN212024691U (en) | A forklift hoisting frame | |
| CN218174361U (en) | Safe portable brickwork material lifting device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |