CN221875696U - Production equipment for wide hollow or light medium filled large wallboard and floor slab - Google Patents

Production equipment for wide hollow or light medium filled large wallboard and floor slab Download PDF

Info

Publication number
CN221875696U
CN221875696U CN202420693804.3U CN202420693804U CN221875696U CN 221875696 U CN221875696 U CN 221875696U CN 202420693804 U CN202420693804 U CN 202420693804U CN 221875696 U CN221875696 U CN 221875696U
Authority
CN
China
Prior art keywords
machines
rods
fixedly provided
seats
large wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202420693804.3U
Other languages
Chinese (zh)
Inventor
杨文朝
刘永兵
赵俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Honghou Prefabricated Building Technology Development Group Co ltd
Original Assignee
Shanxi Honghou Prefabricated Building Technology Development Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Honghou Prefabricated Building Technology Development Group Co ltd filed Critical Shanxi Honghou Prefabricated Building Technology Development Group Co ltd
Priority to CN202420693804.3U priority Critical patent/CN221875696U/en
Application granted granted Critical
Publication of CN221875696U publication Critical patent/CN221875696U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开了宽体空心或填充轻质介质大墙板及楼层板的生产设备,包括两个小车机,两个小车机的上方均设置有拔管机,两个拔管机的一侧均设置有顶升机,两个顶升机的一侧均设置有九工位机械手,本实用新型宽体空心或填充轻质介质大墙板及楼层板的生产设备,通过两个拔管机对宽体空心或填充轻质介质大墙板或楼层板进行拔管处理,并将拔下的插管导入到两个小车机上,再经过两个小车机将若干个插管转移到两个顶升机的上方,再通过两个顶升机将若干个插管顶起,然后通过两个九工位机械手将两个顶升机顶起的若干个插管分别抓取到两个最近的输送机,再通过若干个输送机对若干个插管进行输送,从而实现拔管、转移以及运输等功能。

The utility model discloses production equipment for wide-body hollow or light-medium-filled large wall panels and floor panels, comprising two trolley machines, pipe pulling machines are arranged above the two trolley machines, lifting machines are arranged on one side of the two pipe pulling machines, and nine-station manipulators are arranged on one side of the two lifting machines. The utility model production equipment for wide-body hollow or light-medium-filled large wall panels and floor panels uses two pipe pulling machines to pull pipes out of the wide-body hollow or light-medium-filled large wall panels or floor panels, and introduces the pulled-out plug-in pipes onto the two trolley machines, and then transfers a plurality of plug-in pipes to the tops of the two lifting machines through the two trolley machines, and then lifts up the plurality of plug-in pipes through the two lifting machines, and then grabs the plurality of plug-in pipes lifted up by the two lifting machines to two nearest conveyors respectively through two nine-station manipulators, and then transports the plurality of plug-in pipes through a plurality of conveyors, thereby realizing the functions of pipe pulling, transfer and transportation.

Description

宽体空心或填充轻质介质大墙板及楼层板的生产设备Equipment for the production of wide hollow or light medium filled large wall panels and floor panels

技术领域Technical Field

本实用新型涉及宽体空心或填充轻质介质大墙板及楼层板生产技术领域,具体为宽体空心或填充轻质介质大墙板及楼层板的生产设备。The utility model relates to the technical field of production of wide hollow or light medium filled large wall panels and floor panels, in particular to production equipment of wide hollow or light medium filled large wall panels and floor panels.

背景技术Background Art

在宽体空心或填充轻质介质大墙板及楼层板生产过程中,需要使用拔管机将宽体空心或填充轻质介质大墙板及楼层板内的插管拔出,但是现有的工厂通常是经过人工将拔管机拔下的插管进行转移和输送,不仅工作效率低,而且工人的劳动强度大,人力成本高。In the production process of wide hollow or light medium filled large wall panels and floor panels, it is necessary to use a tube pulling machine to pull out the tubes in the wide hollow or light medium filled large wall panels and floor panels. However, existing factories usually transfer and transport the tubes pulled out by the tube pulling machine manually, which not only has low work efficiency, but also has high labor intensity and labor costs for workers.

为解决上述问题,于是在此提出了宽体空心或填充轻质介质大墙板及楼层板的生产设备。In order to solve the above problems, a production device for wide hollow or light medium filled large wall panels and floor panels is proposed.

实用新型内容Utility Model Content

本实用新型的目的在于提供宽体空心或填充轻质介质大墙板及楼层板的生产设备,以解决上述背景技术中提出的问题。The purpose of the utility model is to provide a production device for wide hollow or light medium filled large wall panels and floor panels to solve the problems raised in the above background technology.

为实现上述目的,本实用新型提供如下技术方案:宽体空心或填充轻质介质大墙板及楼层板的生产设备,包括两个小车机,两个所述小车机的上方均设置有拔管机,两个所述拔管机的一侧均设置有顶升机,两个所述顶升机的一侧均设置有九工位机械手,两个所述九工位机械手之间设置有若干个输送机,两个所述拔管机均包括两个安装架,两个所述安装架之间固定设置有第一机架,所述第一机架底端的两侧均固定设置有两个第一轴承座,位于同一端的两个所述第一轴承座之间均转动设置有第一轴杆,两个所述第一轴杆的表面均固定设置有第一齿轮,位于同一侧的两个所述第一齿轮之间均传动设置有链条,两个所述链条之间固定设置有拔管座。To achieve the above-mentioned purpose, the utility model provides the following technical solutions: production equipment for wide-body hollow or light-medium-filled large wall panels and floor panels, including two trolley machines, a pipe pulling machine is arranged above the two trolley machines, a jacking machine is arranged on one side of the two pipe pulling machines, a nine-station manipulator is arranged on one side of the two jacking machines, and a plurality of conveyors are arranged between the two nine-station manipulators. The two pipe pulling machines each include two mounting frames, a first frame is fixedly arranged between the two mounting frames, two first bearing seats are fixedly arranged on both sides of the bottom end of the first frame, a first shaft rod is rotatably arranged between the two first bearing seats located at the same end, a first gear is fixedly arranged on the surface of the two first shaft rods, a chain is transmitted between the two first gears located on the same side, and a pipe pulling seat is fixedly arranged between the two chains.

通过两个拔管机对宽体空心或填充轻质介质大墙板或楼层板进行拔管处理,并将拔下的插管导入到两个小车机上,再经过两个小车机将若干个插管转移到两个顶升机的上方,再通过两个顶升机将若干个插管顶起,然后通过两个九工位机械手将两个顶升机顶起的若干个插管分别抓取到两个最近的输送机,再通过若干个输送机对若干个插管进行输送,从而实现拔管、转移以及运输等功能,相比人工操作,该设备不仅能够提高工作效率,还能够降低人工成本以及工人的劳动强度。Two pipe pulling machines are used to pull out the pipes of wide hollow or light medium filled large wall panels or floor panels, and the pulled out pipes are introduced into two trolleys, and then several pipes are transferred to the top of two jacking machines through the two trolleys, and then several pipes are lifted up by two jacking machines, and then two nine-station manipulators are used to grab several pipes lifted up by the two jacking machines to the two nearest conveyors respectively, and then several pipes are transported by several conveyors, thereby realizing the functions of pipe pulling, transfer and transportation. Compared with manual operation, this equipment can not only improve work efficiency, but also reduce labor costs and labor intensity of workers.

优选的,其中一个所述第一轴承座的外侧固定安装有第一电机,所述第一电机的输出端与其中一个第一轴杆的一端固定连接,通过第一电机驱动第一轴杆转动,进而带动其中两个第一齿轮同步移动,从而带动两个链条同步移动,继而带动拔管座移动,便于对宽体空心或填充轻质介质大墙板或楼层板进行拔管处理。Preferably, a first motor is fixedly mounted on the outer side of one of the first bearing seats, and the output end of the first motor is fixedly connected to one end of one of the first shaft rods. The first shaft rod is driven to rotate by the first motor, thereby driving two of the first gears to move synchronously, thereby driving the two chains to move synchronously, and then driving the pipe pulling seat to move, so as to facilitate the pipe pulling processing of wide hollow or light medium filled large wall panels or floor panels.

优选的,两个所述小车机均包括两个基座,两个所述基座的顶端均固定设置有导轨,两个所述导轨的顶端均滑动设置有两个导向座,四个所述导向座之间的顶部固定设置有安置架,所述安置架顶端的两侧均固定设置有若干个第二轴承座,每正对两个所述第二轴承座之间均转动设置有第二轴杆,若干个所述第二轴杆的表面均固定设置有若干个第一导料轮,通过驱动装置驱动四个导向座沿着两个导轨同步移动,进而便于带动若干个插管移动。Preferably, the two trolley machines each include two bases, guide rails are fixedly provided at the top of the two bases, two guide seats are slidably provided at the top of the two guide rails, a placement frame is fixedly provided at the top between the four guide seats, a plurality of second bearing seats are fixedly provided on both sides of the top of the placement frame, a second shaft rod is rotatably provided between each two of the second bearing seats, a plurality of first guide wheels are fixedly provided on the surface of the plurality of second shaft rods, and the four guide seats are driven by a driving device to move synchronously along the two guide rails, thereby facilitating the movement of a plurality of tubes.

优选的,所述顶升机包括两个第一固定座,两个所述第一固定座的顶端均固定设置有稳固架,两个所述稳固架的顶端均穿插设置有两个导向杆,位于同一侧的两个所述导向杆之间的顶部固定设置有顶料件,通过两个顶料件将若干个插管顶起。Preferably, the lifting machine includes two first fixed seats, the top ends of the two first fixed seats are fixedly provided with a stabilizing frame, the top ends of the two stabilizing frames are interspersed with two guide rods, and the top between the two guide rods on the same side is fixedly provided with a lifting piece, and a plurality of tubes are lifted up by the two lifting pieces.

优选的,两个所述第一固定座之间的一侧固定设置有第二固定座,所述第二固定座的内侧固定安装有气缸,所述气缸的活动端固定连接有移动杆,所述移动杆的两端均转动设置有第一支杆,两个所述第一支杆远离移动杆的一端均转动设置有第二支杆,两个所述第二支杆分别与两个第一固定座相铰接,两个所述第一支杆分别与两个第二支杆的连接处设置有第三支杆,两个所述第三支杆分别与两个顶料件固定连接,通过气缸带动移动杆收缩,进而带动两个第一支杆的一端,在两个第二支杆的配合左右下带动两个第三支杆向上移动,从而带动两个顶料件向上移动,便于将若干个插管顶起。Preferably, a second fixed seat is fixedly provided on one side between the two first fixed seats, a cylinder is fixedly installed on the inner side of the second fixed seat, the movable end of the cylinder is fixedly connected to a moving rod, both ends of the moving rod are rotatably provided with a first support rod, the two first support rods are rotatably provided with a second support rod at one end away from the moving rod, the two second support rods are respectively hinged to the two first fixed seats, and a third support rod is respectively provided at the connection between the two first support rods and the two second support rods, the two third support rods are respectively fixedly connected to the two lifting pieces, and the moving rod is driven to contract by the cylinder, thereby driving one end of the two first support rods, and driving the two third support rods to move upward with the cooperation of the two second support rods, thereby driving the two lifting pieces to move upward, so as to facilitate lifting of several tubes.

优选的,所述九工位机械手包括底座,所述底座的顶端固定设置有机械臂,所述机械臂远离底座的一端设置有九工位夹爪,通过九工位机械手将顶升机顶起的若干个插管进行抓取。Preferably, the nine-station manipulator comprises a base, a mechanical arm is fixedly provided on the top of the base, a nine-station clamp is provided on one end of the mechanical arm away from the base, and the nine-station manipulator is used to grab several tubes lifted by the lifting machine.

优选的,所述输送机包括第二机架,所述第二机架顶端的一侧固定设置有若干个固定板,所述输送机顶端远离固定板的一侧和若干个固定板顶端的中部均设置有第三轴承座,每正对两个所述第三轴承座之间均转动设置有第三轴杆,若干个所述第三轴杆的表面均固定设置有第二导料轮,通过若干个第二导料轮的设置便于对若干个插管进行输送。Preferably, the conveyor includes a second frame, a plurality of fixed plates are fixedly provided on one side of the top of the second frame, a third bearing seat is provided on the side of the top of the conveyor away from the fixed plate and in the middle of the top of the plurality of fixed plates, a third shaft rod is rotatably provided between each two of the third bearing seats, and second guide wheels are fixedly provided on the surfaces of the plurality of third shaft rods, and the provision of the plurality of second guide wheels facilitates the transportation of the plurality of tubes.

优选的,若干个所述第三轴杆的一端均固定设置有第二齿轮,若干个所述固定板顶端的两侧均固定设置有第四轴承座,位于同一侧的两个所述第四轴承座之间均转动设置有第四轴杆,若干个所述第四轴杆的中部均固定设置有第三齿轮,若干个所述第三齿轮分别与若干个第二齿轮啮合连接,每相邻两个所述第四轴杆之间均固定连接有连接座,其中一个所述固定板的一侧固定设置有安装座,所述安装座的中部固定安装有第二电机,所述第二电机的输出端与其中一个第四轴杆的一端固定连接,通过第二电机驱动其中一个第四轴杆转动,进而带动若干个第四轴杆和若干个第三齿轮转动,从而带动若干个第三轴杆和若干个第二导料轮转动,便于对若干个插管进行输送。Preferably, a second gear is fixedly provided at one end of several of the third shaft rods, fourth bearing seats are fixedly provided on both sides of the top of several of the fixing plates, a fourth shaft rod is rotatably provided between two of the fourth bearing seats located on the same side, a third gear is fixedly provided in the middle part of several of the fourth shaft rods, several of the third gears are respectively meshed and connected with several second gears, a connecting seat is fixedly connected between each adjacent two of the fourth shaft rods, a mounting seat is fixedly provided on one side of one of the fixing plates, a second motor is fixedly provided in the middle part of the mounting seat, an output end of the second motor is fixedly connected to one end of one of the fourth shaft rods, and one of the fourth shaft rods is driven to rotate by the second motor, thereby driving a plurality of fourth shaft rods and a plurality of third gears to rotate, thereby driving a plurality of third shaft rods and a plurality of second guide wheels to rotate, so as to facilitate the transportation of a plurality of cannulas.

与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:

通过两个拔管机对宽体空心或填充轻质介质大墙板或楼层板进行拔管处理,并将拔下的插管导入到两个小车机上,再经过两个小车机将若干个插管转移到两个顶升机的上方,再通过两个顶升机将若干个插管顶起,然后通过两个九工位机械手将两个顶升机顶起的若干个插管分别抓取到两个最近的输送机,再通过若干个输送机对若干个插管进行输送,从而实现拔管、转移以及运输等功能,相比人工操作,该设备不仅能够提高工作效率,还能够降低人工成本以及工人的劳动强度。Two pipe pulling machines are used to pull out the pipes of wide hollow or light medium filled large wall panels or floor panels, and the pulled out pipes are introduced into two trolleys, and then several pipes are transferred to the top of two jacking machines through the two trolleys, and then several pipes are lifted up by two jacking machines, and then two nine-station manipulators are used to grab several pipes lifted up by the two jacking machines to the two nearest conveyors respectively, and then several pipes are transported by several conveyors, thereby realizing the functions of pipe pulling, transfer and transportation. Compared with manual operation, this equipment can not only improve work efficiency, but also reduce labor costs and labor intensity of workers.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

图1为本实用新型的正视图;Fig. 1 is a front view of the utility model;

图2为本实用新型的俯视图;Fig. 2 is a top view of the utility model;

图3为本实用新型局部的放大图;Figure 3 is an enlarged view of a part of the utility model;

图4为本实用新型拔管机的结构图;FIG4 is a structural diagram of the tube pulling machine of the present invention;

图5为本实用新型拔管机的结构图;FIG5 is a structural diagram of the tube pulling machine of the present invention;

图6为本实用新型小车机的结构图;Figure 6 is a structural diagram of the trolley machine of the utility model;

图7为本实用新型顶升机的结构图;Figure 7 is a structural diagram of the utility model jacking machine;

图8为本实用新型输送机的结构图。FIG8 is a structural diagram of the conveyor of the present utility model.

图中:1、拔管机;11、安装架;12、第一机架;13、第一轴承座;14、第一轴杆;15、第一齿轮;16、第一电机;17、链条;18、拔管座;2、小车机;21、基座;22、导轨;23、导向座;24、安置架;25、第二轴承座;26、第二轴杆;27、第一导料轮;3、顶升机;31、第一固定座;32、稳固架;33、导向杆;34、顶料件;35、第二固定座;36、气缸;37、移动杆;38、第一支杆;39、第二支杆;310、第三支杆;4、九工位机械手;41、底座;42、机械臂;43、九工位夹爪;5、输送机;51、第二机架;52、固定板;53、第三轴承座;54、第三轴杆;55、第二导料轮;56、第二齿轮;57、第四轴承座;58、连接座;59、第三齿轮;510、安装座;511、第二电机;512、第四轴杆。In the figure: 1. pipe pulling machine; 11. mounting frame; 12. first frame; 13. first bearing seat; 14. first shaft; 15. first gear; 16. first motor; 17. chain; 18. pipe pulling seat; 2. trolley; 21. base; 22. guide rail; 23. guide seat; 24. mounting frame; 25. second bearing seat; 26. second shaft; 27. first guide wheel; 3. lifting machine; 31. first fixed seat; 32. stabilizing frame; 33. guide rod; 34. lifting piece; 35. second fixed seat; 36. Cylinder; 37. Moving rod; 38. First support rod; 39. Second support rod; 310. Third support rod; 4. Nine-station manipulator; 41. Base; 42. Robotic arm; 43. Nine-station clamp; 5. Conveyor; 51. Second frame; 52. Fixed plate; 53. Third bearing seat; 54. Third shaft rod; 55. Second guide wheel; 56. Second gear; 57. Fourth bearing seat; 58. Connecting seat; 59. Third gear; 510. Mounting seat; 511. Second motor; 512. Fourth shaft rod.

具体实施方式DETAILED DESCRIPTION

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述。The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention.

请参阅图1-8,本实用新型提供了宽体空心或填充轻质介质大墙板及楼层板的生产设备,包括两个小车机2,两个小车机2的上方均设置有拔管机1,两个拔管机1的一侧均设置有顶升机3,两个顶升机3的一侧均设置有九工位机械手4,两个九工位机械手4之间设置有若干个输送机5,两个拔管机1均包括两个安装架11,两个安装架11之间固定设置有第一机架12,第一机架12底端的两侧均固定设置有两个第一轴承座13,位于同一端的两个第一轴承座13之间均转动设置有第一轴杆14,两个第一轴杆14的表面均固定设置有第一齿轮15,位于同一侧的两个第一齿轮15之间均传动设置有链条17,两个链条17之间固定设置有拔管座18,通过两个拔管机1对宽体空心或填充轻质介质大墙板或楼层板进行拔管处理,并将拔下的插管导入到两个小车机2上,再经过两个小车机2将若干个插管转移到两个顶升机3的上方,再通过两个顶升机3将若干个插管顶起,然后通过两个九工位机械手4将两个顶升机3顶起的若干个插管分别抓取到两个最近的输送机5,再通过若干个输送机5对若干个插管进行输送,从而实现拔管、转移以及运输等功能,相比人工操作,该设备不仅能够提高工作效率,还能够降低人工成本以及工人的劳动强度。Please refer to Figures 1-8. The utility model provides a production device for wide hollow or filled light medium large wall panels and floor panels, including two trolley machines 2, a pipe pulling machine 1 is arranged above the two trolley machines 2, a jacking machine 3 is arranged on one side of the two pipe pulling machines 1, a nine-station manipulator 4 is arranged on one side of the two jacking machines 3, and a plurality of conveyors 5 are arranged between the two nine-station manipulators 4. The two pipe pulling machines 1 include two mounting frames 11, a first frame 12 is fixedly arranged between the two mounting frames 11, two first bearing seats 13 are fixedly arranged on both sides of the bottom end of the first frame 12, a first shaft rod 14 is rotatably arranged between the two first bearing seats 13 located at the same end, and a first gear 15 is fixedly arranged on the surface of the two first shaft rods 14, and two first gears 15 are fixedly arranged on the surface of the two first shaft rods 14 located on the same side. A chain 17 is provided for transmission between the gears 15, and a pipe pulling seat 18 is fixedly provided between the two chains 17. The wide hollow or light medium filled large wall panels or floor panels are subjected to pipe pulling processing by two pipe pulling machines 1, and the pulled out pipes are introduced into the two trolley machines 2, and then the two trolley machines 2 transfer a number of pipes to the top of the two jacking machines 3, and then the two jacking machines 3 jack up a number of pipes, and then two nine-station manipulators 4 grab a number of pipes jacked by the two jacking machines 3 to the two nearest conveyors 5 respectively, and then the several pipes are transported by the several conveyors 5, so as to realize the functions of pipe pulling, transfer and transportation. Compared with manual operation, the equipment can not only improve work efficiency, but also reduce labor costs and labor intensity of workers.

使用时,其中一个第一轴承座13的外侧固定安装有第一电机16,第一电机16的输出端与其中一个第一轴杆14的一端固定连接,两个小车机2均包括两个基座21,两个基座21的顶端均固定设置有导轨22,两个导轨22的顶端均滑动设置有两个导向座23,四个导向座23之间的顶部固定设置有安置架24,安置架24顶端的两侧均固定设置有若干个第二轴承座25,每正对两个第二轴承座25之间均转动设置有第二轴杆26,若干个第二轴杆26的表面均固定设置有若干个第一导料轮27;When in use, a first motor 16 is fixedly installed on the outer side of one of the first bearing seats 13, and the output end of the first motor 16 is fixedly connected to one end of one of the first shaft rods 14. The two trolley machines 2 each include two bases 21, and the tops of the two bases 21 are fixedly provided with guide rails 22, and the tops of the two guide rails 22 are slidably provided with two guide seats 23, and a placement frame 24 is fixedly provided on the top between the four guide seats 23, and a plurality of second bearing seats 25 are fixedly provided on both sides of the top of the placement frame 24, and a second shaft rod 26 is rotatably provided between each of the two second bearing seats 25, and a plurality of first guide wheels 27 are fixedly provided on the surfaces of the plurality of second shaft rods 26;

通过第一电机16驱动第一轴杆14转动,进而带动其中两个第一齿轮15同步移动,从而带动两个链条17同步移动,继而带动拔管座18移动,便于对宽体空心或填充轻质介质大墙板或楼层板进行拔管处理,通过驱动装置驱动四个导向座23沿着两个导轨22同步移动,进而便于带动若干个插管移动;The first shaft 14 is driven to rotate by the first motor 16, thereby driving the two first gears 15 to move synchronously, thereby driving the two chains 17 to move synchronously, and then driving the tube extraction seat 18 to move, so as to facilitate the tube extraction process of the wide hollow or light medium filled large wall panels or floor panels, and the four guide seats 23 are driven by the driving device to move synchronously along the two guide rails 22, so as to facilitate the movement of a plurality of insertion tubes;

使用时,顶升机3包括两个第一固定座31,两个第一固定座31的顶端均固定设置有稳固架32,两个稳固架32的顶端均穿插设置有两个导向杆33,位于同一侧的两个导向杆33之间的顶部固定设置有顶料件34,两个第一固定座31之间的一侧固定设置有第二固定座35,第二固定座35的内侧固定安装有气缸36,气缸36的活动端固定连接有移动杆37,移动杆37的两端均转动设置有第一支杆38,两个第一支杆38远离移动杆37的一端均转动设置有第二支杆39,两个第二支杆39分别与两个第一固定座31相铰接,两个第一支杆38分别与两个第二支杆39的连接处设置有第三支杆310,两个第三支杆310分别与两个顶料件34固定连接,九工位机械手4包括底座41,底座41的顶端固定设置有机械臂42,机械臂42远离底座41的一端设置有九工位夹爪43,输送机5包括第二机架51,第二机架51顶端的一侧固定设置有若干个固定板52,输送机5顶端远离固定板52的一侧和若干个固定板52顶端的中部均设置有第三轴承座53,每正对两个第三轴承座53之间均转动设置有第三轴杆54,若干个第三轴杆54的表面均固定设置有第二导料轮55,若干个第三轴杆54的一端均固定设置有第二齿轮56,若干个固定板52顶端的两侧均固定设置有第四轴承座57,位于同一侧的两个第四轴承座57之间均转动设置有第四轴杆512,若干个第四轴杆512的中部均固定设置有第三齿轮59,若干个第三齿轮59分别与若干个第二齿轮56啮合连接,每相邻两个第四轴杆512之间均固定连接有连接座58,其中一个固定板52的一侧固定设置有安装座510,安装座510的中部固定安装有第二电机511,第二电机511的输出端与其中一个第四轴杆512的一端固定连接;When in use, the jacking machine 3 includes two first fixed seats 31, the tops of the two first fixed seats 31 are fixedly provided with a stabilizing frame 32, the tops of the two stabilizing frames 32 are interspersed with two guide rods 33, the top between the two guide rods 33 on the same side is fixedly provided with a jacking piece 34, a second fixed seat 35 is fixedly provided on one side between the two first fixed seats 31, a cylinder 36 is fixedly installed on the inner side of the second fixed seat 35, the movable end of the cylinder 36 is fixedly connected to a moving rod 37, and both ends of the moving rod 37 are rotatably provided with a first support rod 38, the two first support rods 38 are rotatably provided with a second support rod 39 at one end away from the moving rod 37, the two second support rods 39 are respectively hinged to the two first fixed seats 31, the two first support rods 38 are respectively provided with a third support rod 310 at the connection between the two second support rods 39, the two third support rods 310 are respectively fixedly connected to the two top material pieces 34, the nine-station manipulator 4 includes a base 41, a mechanical arm 42 is fixedly provided at the top of the base 41, and a nine-station clamp 43 is provided at one end of the mechanical arm 42 away from the base 41, and the conveyor 5 includes a second The frame 51, a plurality of fixed plates 52 are fixedly arranged on one side of the top of the second frame 51, a third bearing seat 53 is arranged on the side of the top of the conveyor 5 away from the fixed plate 52 and in the middle of the top of the plurality of fixed plates 52, a third shaft 54 is rotatably arranged between each of the two third bearing seats 53, a second guide wheel 55 is fixedly arranged on the surface of the plurality of third shafts 54, a second gear 56 is fixedly arranged on one end of the plurality of third shafts 54, and a fourth bearing seat 57 is fixedly arranged on both sides of the top of the plurality of fixed plates 52, which is located at the same A fourth shaft 512 is rotatably arranged between two fourth bearing seats 57 on the side, a third gear 59 is fixedly arranged in the middle of a plurality of fourth shafts 512, a plurality of third gears 59 are respectively meshed and connected with a plurality of second gears 56, a connecting seat 58 is fixedly connected between each two adjacent fourth shafts 512, a mounting seat 510 is fixedly arranged on one side of one of the fixing plates 52, a second motor 511 is fixedly installed in the middle of the mounting seat 510, and an output end of the second motor 511 is fixedly connected to one end of one of the fourth shafts 512;

通过气缸36带动移动杆37收缩,进而带动两个第一支杆38的一端,在两个第二支杆39的配合左右下带动两个第三支杆310向上移动,从而带动两个顶料件34向上移动,便于将若干个插管顶起,通过九工位机械手4将顶升机3顶起的若干个插管进行抓取,通过第二电机511驱动其中一个第四轴杆512转动,进而带动若干个第四轴杆512和若干个第三齿轮59转动,从而带动若干个第三轴杆54和若干个第二导料轮55转动,便于对若干个插管进行输送。The cylinder 36 drives the moving rod 37 to contract, thereby driving one end of the two first support rods 38, and driving the two third support rods 310 to move upward with the cooperation of the two second support rods 39, thereby driving the two jacking members 34 to move upward, so as to facilitate the jacking up of several intubations, and the nine-station manipulator 4 is used to grab the several intubations jacked up by the jacking machine 3, and the second motor 511 drives one of the fourth shaft rods 512 to rotate, thereby driving several fourth shaft rods 512 and several third gears 59 to rotate, thereby driving several third shaft rods 54 and several second guide wheels 55 to rotate, so as to facilitate the transportation of several intubations.

本申请实施例在使用时:通过两个拔管机1对宽体空心或填充轻质介质大墙板或楼层板进行拔管处理,并将拔下的插管导入到两个小车机2上,再经过两个小车机2将若干个插管转移到两个顶升机3的上方,再通过两个顶升机3将若干个插管顶起,然后通过两个九工位机械手4将两个顶升机3顶起的若干个插管分别抓取到两个最近的输送机5,再通过若干个输送机5对若干个插管进行输送,从而实现拔管、转移以及运输等功能,相比人工操作,该设备不仅能够提高工作效率,还能够降低人工成本以及工人的劳动强度,其中通过气缸36带动移动杆37收缩,进而带动两个第一支杆38的一端,在两个第二支杆39的配合左右下带动两个第三支杆310向上移动,从而带动两个顶料件34向上移动,便于将若干个插管顶起,通过第二电机511驱动其中一个第四轴杆512转动,进而带动若干个第四轴杆512和若干个第三齿轮59转动,从而带动若干个第三轴杆54和若干个第二导料轮55转动,便于对若干个插管进行输送。When the embodiment of the present application is in use: two pipe pulling machines 1 are used to pull out the pipes of wide hollow or light medium filled large wall panels or floor panels, and the pulled out pipes are introduced into two trolley machines 2, and then the two trolley machines 2 transfer a number of pipes to the top of two jacking machines 3, and then the two jacking machines 3 jack up a number of pipes, and then two nine-station manipulators 4 grab the several pipes jacked up by the two jacking machines 3 to the two nearest conveyors 5 respectively, and then the several pipes are transported by the several conveyors 5, so as to realize the functions of pipe pulling, transfer and transportation. Compared with manual operation, the equipment can not only improve the work efficiency, but also improve the work efficiency. The working efficiency can be improved, and the labor cost and labor intensity of the workers can be reduced. The cylinder 36 drives the moving rod 37 to contract, and then drives one end of the two first support rods 38, and drives the two third support rods 310 to move upward with the cooperation of the two second support rods 39, thereby driving the two lifting members 34 to move upward, so as to facilitate the lifting of several intubations. The second motor 511 drives one of the fourth shaft rods 512 to rotate, and then drives several fourth shaft rods 512 and several third gears 59 to rotate, thereby driving several third shaft rods 54 and several second guide wheels 55 to rotate, so as to facilitate the transportation of several intubations.

尽管参照前述实施例对本实用新型进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换,凡在本实用新型的精神和原则之内,所做的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art may still modify the technical solutions described in the aforementioned embodiments, or make equivalent substitutions for some of the technical features therein. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention shall be included in the protection scope of the present invention.

Claims (8)

1.宽体空心或填充轻质介质大墙板及楼层板的生产设备,包括两个小车机(2),其特征在于:两个所述小车机(2)的上方均设置有拔管机(1),两个所述拔管机(1)的一侧均设置有顶升机(3),两个所述顶升机(3)的一侧均设置有九工位机械手(4),两个所述九工位机械手(4)之间设置有若干个输送机(5),两个所述拔管机(1)均包括两个安装架(11),两个所述安装架(11)之间固定设置有第一机架(12),所述第一机架(12)底端的两侧均固定设置有两个第一轴承座(13),位于同一端的两个所述第一轴承座(13)之间均转动设置有第一轴杆(14),两个所述第一轴杆(14)的表面均固定设置有第一齿轮(15),位于同一侧的两个所述第一齿轮(15)之间均传动设置有链条(17),两个所述链条(17)之间固定设置有拔管座(18)。1. A production device for wide hollow or light medium-filled large wall panels and floor panels, comprising two trolley machines (2), characterized in that: a pipe pulling machine (1) is arranged above the two trolley machines (2), a jacking machine (3) is arranged on one side of the two pipe pulling machines (1), a nine-station manipulator (4) is arranged on one side of the two jacking machines (3), a plurality of conveyors (5) are arranged between the two nine-station manipulators (4), the two pipe pulling machines (1) each include two mounting frames (11), the two mounting frames A first frame (12) is fixedly arranged between the two ends of the first frame (12), two first bearing seats (13) are fixedly arranged on both sides of the bottom end of the first frame (12), a first shaft (14) is rotatably arranged between the two first bearing seats (13) located at the same end, a first gear (15) is fixedly arranged on the surface of the two first shafts (14), a chain (17) is transmission-arranged between the two first gears (15) located at the same side, and a pipe pulling seat (18) is fixedly arranged between the two chains (17). 2.根据权利要求1所述的宽体空心或填充轻质介质大墙板及楼层板的生产设备,其特征在于:其中一个所述第一轴承座(13)的外侧固定安装有第一电机(16),所述第一电机(16)的输出端与其中一个第一轴杆(14)的一端固定连接。2. The production equipment for wide hollow or filled light medium large wall panels and floor panels according to claim 1 is characterized in that a first motor (16) is fixedly installed on the outer side of one of the first bearing seats (13), and the output end of the first motor (16) is fixedly connected to one end of one of the first shaft rods (14). 3.根据权利要求1所述的宽体空心或填充轻质介质大墙板及楼层板的生产设备,其特征在于:两个所述小车机(2)均包括两个基座(21),两个所述基座(21)的顶端均固定设置有导轨(22),两个所述导轨(22)的顶端均滑动设置有两个导向座(23),四个所述导向座(23)之间的顶部固定设置有安置架(24),所述安置架(24)顶端的两侧均固定设置有若干个第二轴承座(25),每正对两个所述第二轴承座(25)之间均转动设置有第二轴杆(26),若干个所述第二轴杆(26)的表面均固定设置有若干个第一导料轮(27)。3. The production equipment of wide hollow or filled light medium large wall panels and floor panels according to claim 1 is characterized in that: the two trolley machines (2) each include two bases (21), the tops of the two bases (21) are fixedly provided with guide rails (22), the tops of the two guide rails (22) are slidably provided with two guide seats (23), a placement frame (24) is fixedly provided at the top between the four guide seats (23), a plurality of second bearing seats (25) are fixedly provided on both sides of the top of the placement frame (24), a second shaft rod (26) is rotatably provided between each two second bearing seats (25), and a plurality of first guide wheels (27) are fixedly provided on the surfaces of the plurality of second shaft rods (26). 4.根据权利要求1所述的宽体空心或填充轻质介质大墙板及楼层板的生产设备,其特征在于:所述顶升机(3)包括两个第一固定座(31),两个所述第一固定座(31)的顶端均固定设置有稳固架(32),两个所述稳固架(32)的顶端均穿插设置有两个导向杆(33),位于同一侧的两个所述导向杆(33)之间的顶部固定设置有顶料件(34)。4. The production equipment for wide hollow or filled light medium large wall panels and floor panels according to claim 1 is characterized in that: the lifting machine (3) comprises two first fixed seats (31), the top ends of the two first fixed seats (31) are fixedly provided with a stabilizing frame (32), the top ends of the two stabilizing frames (32) are interspersed with two guide rods (33), and a lifting piece (34) is fixedly provided at the top between the two guide rods (33) on the same side. 5.根据权利要求4所述的宽体空心或填充轻质介质大墙板及楼层板的生产设备,其特征在于:两个所述第一固定座(31)之间的一侧固定设置有第二固定座(35),所述第二固定座(35)的内侧固定安装有气缸(36),所述气缸(36)的活动端固定连接有移动杆(37),所述移动杆(37)的两端均转动设置有第一支杆(38),两个所述第一支杆(38)远离移动杆(37)的一端均转动设置有第二支杆(39),两个所述第二支杆(39)分别与两个第一固定座(31)相铰接,两个所述第一支杆(38)分别与两个第二支杆(39)的连接处设置有第三支杆(310),两个所述第三支杆(310)分别与两个顶料件(34)固定连接。5. The production equipment of wide hollow or filled light medium large wall panels and floor panels according to claim 4 is characterized in that: a second fixed seat (35) is fixedly arranged on one side between the two first fixed seats (31), a cylinder (36) is fixedly installed on the inner side of the second fixed seat (35), a movable end of the cylinder (36) is fixedly connected to a moving rod (37), both ends of the moving rod (37) are rotatably arranged with a first support rod (38), the ends of the two first support rods (38) away from the moving rod (37) are rotatably arranged with a second support rod (39), the two second support rods (39) are respectively hinged to the two first fixed seats (31), and a third support rod (310) is respectively arranged at the connection between the two first support rods (38) and the two second support rods (39), and the two third support rods (310) are respectively fixedly connected to the two top material pieces (34). 6.根据权利要求1所述的宽体空心或填充轻质介质大墙板及楼层板的生产设备,其特征在于:所述九工位机械手(4)包括底座(41),所述底座(41)的顶端固定设置有机械臂(42),所述机械臂(42)远离底座(41)的一端设置有九工位夹爪(43)。6. The production equipment for wide hollow or light medium filled large wall panels and floor panels according to claim 1 is characterized in that: the nine-station manipulator (4) includes a base (41), a manipulator arm (42) is fixedly arranged on the top of the base (41), and a nine-station clamp (43) is arranged on the end of the manipulator arm (42) away from the base (41). 7.根据权利要求1所述的宽体空心或填充轻质介质大墙板及楼层板的生产设备,其特征在于:所述输送机(5)包括第二机架(51),所述第二机架(51)顶端的一侧固定设置有若干个固定板(52),所述输送机(5)顶端远离固定板(52)的一侧和若干个固定板(52)顶端的中部均设置有第三轴承座(53),每正对两个所述第三轴承座(53)之间均转动设置有第三轴杆(54),若干个所述第三轴杆(54)的表面均固定设置有第二导料轮(55)。7. The production equipment of wide hollow or filled light medium large wall panels and floor panels according to claim 1 is characterized in that: the conveyor (5) includes a second frame (51), and a plurality of fixed plates (52) are fixedly arranged on one side of the top of the second frame (51), and a third bearing seat (53) is arranged on the side of the top of the conveyor (5) away from the fixed plate (52) and in the middle of the top of the plurality of fixed plates (52), and a third shaft rod (54) is rotatably arranged between each two of the third bearing seats (53), and a second guide wheel (55) is fixedly arranged on the surface of the plurality of third shaft rods (54). 8.根据权利要求7所述的宽体空心或填充轻质介质大墙板及楼层板的生产设备,其特征在于:若干个所述第三轴杆(54)的一端均固定设置有第二齿轮(56),若干个所述固定板(52)顶端的两侧均固定设置有第四轴承座(57),位于同一侧的两个所述第四轴承座(57)之间均转动设置有第四轴杆(512),若干个所述第四轴杆(512)的中部均固定设置有第三齿轮(59),若干个所述第三齿轮(59)分别与若干个第二齿轮(56)啮合连接,每相邻两个所述第四轴杆(512)之间均固定连接有连接座(58),其中一个所述固定板(52)的一侧固定设置有安装座(510),所述安装座(510)的中部固定安装有第二电机(511),所述第二电机(511)的输出端与其中一个第四轴杆(512)的一端固定连接。8. The production equipment of wide hollow or filled light medium large wall panels and floor panels according to claim 7 is characterized in that: a second gear (56) is fixedly provided at one end of a plurality of the third shaft rods (54), fourth bearing seats (57) are fixedly provided on both sides of the top of a plurality of the fixed plates (52), a fourth shaft rod (512) is rotatably provided between two of the fourth bearing seats (57) located on the same side, a third gear (59) is fixedly provided at the middle of a plurality of the fourth shaft rods (512), a plurality of the third gears (59) are respectively meshed and connected with a plurality of the second gears (56), a connecting seat (58) is fixedly connected between each adjacent two of the fourth shaft rods (512), a mounting seat (510) is fixedly provided at one side of one of the fixed plates (52), a second motor (511) is fixedly provided in the middle of the mounting seat (510), and an output end of the second motor (511) is fixedly connected to one end of one of the fourth shaft rods (512).
CN202420693804.3U 2024-04-07 2024-04-07 Production equipment for wide hollow or light medium filled large wallboard and floor slab Active CN221875696U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202420693804.3U CN221875696U (en) 2024-04-07 2024-04-07 Production equipment for wide hollow or light medium filled large wallboard and floor slab

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202420693804.3U CN221875696U (en) 2024-04-07 2024-04-07 Production equipment for wide hollow or light medium filled large wallboard and floor slab

Publications (1)

Publication Number Publication Date
CN221875696U true CN221875696U (en) 2024-10-22

Family

ID=93109530

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202420693804.3U Active CN221875696U (en) 2024-04-07 2024-04-07 Production equipment for wide hollow or light medium filled large wallboard and floor slab

Country Status (1)

Country Link
CN (1) CN221875696U (en)

Similar Documents

Publication Publication Date Title
CN107934543A (en) A kind of frame-type plate conveying equipment
CN216943748U (en) Automatic framing system
CN221875696U (en) Production equipment for wide hollow or light medium filled large wallboard and floor slab
WO2020062786A1 (en) Lifting carrier for cutting die
CN204588639U (en) Comb type lifting machine
CN209871638U (en) Cleaning basket transfer device
CN216835730U (en) Capping transmission device capable of recycling tooling
CN206156341U (en) Glass moving device
CN216580511U (en) Luggage placing device in high-speed rail carriage
CN210392810U (en) A lever-type sugar frame automatic racking device
CN205739266U (en) A kind of band Mantidis arm and automatic mechanism remove brick machine
CN110181205B (en) Steel reinforcement framework sheet welding production line
CN110481675B (en) Integrated form automatic transportation car
CN208843313U (en) A kind of casement automatic docking device
CN209701625U (en) A carrier return line
CN210010283U (en) Load throwing cleaning device for glass plate
CN106241371B (en) A kind of glass lower piece machine
CN221699986U (en) Mechanical structure of multi-position translation lifting transfer machine
CN221234694U (en) Lifting and conveying device for metal processing products
CN220664771U (en) Hydraulic lifting device
CN221916871U (en) A pipe laying machine for water conservancy project construction
CN118004748A (en) Production equipment for wide hollow or light medium filled large wallboard and floor slab
CN221796913U (en) Hydraulic hoister
CN222373707U (en) Steering conveying device
CN216324057U (en) Automatic transfer mechanism of part box

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant