CN221865412U - Assembled type combined fast-assembling curtain box structure - Google Patents

Assembled type combined fast-assembling curtain box structure Download PDF

Info

Publication number
CN221865412U
CN221865412U CN202420322025.2U CN202420322025U CN221865412U CN 221865412 U CN221865412 U CN 221865412U CN 202420322025 U CN202420322025 U CN 202420322025U CN 221865412 U CN221865412 U CN 221865412U
Authority
CN
China
Prior art keywords
curtain box
fixedly connected
gypsum board
box body
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202420322025.2U
Other languages
Chinese (zh)
Inventor
文土福
张永业
邱卓平
董鑫
张惠富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Grandland Group Co ltd
Original Assignee
Shenzhen Grandland Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Grandland Group Co ltd filed Critical Shenzhen Grandland Group Co ltd
Priority to CN202420322025.2U priority Critical patent/CN221865412U/en
Application granted granted Critical
Publication of CN221865412U publication Critical patent/CN221865412U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Curtains And Furnishings For Windows Or Doors (AREA)

Abstract

The utility model belongs to the technical field of curtain boxes, and particularly relates to an assembled combined quick-assembled curtain box structure which comprises a main keel and gypsum boards, wherein the gypsum boards are fixedly connected to one side of the main keel, lifting structures distributed at equal intervals are arranged at the top ends of the gypsum boards, the gypsum boards are fixedly connected to a ceiling through the lifting structures, aluminum alloy curtain boxes are arranged at the bottom ends of the gypsum boards, each aluminum alloy curtain box comprises a curtain box body and a plurality of mounting pieces distributed at the bottom ends of the gypsum boards at equal intervals, the curtain box body is connected to the bottom ends of the gypsum boards through the mounting pieces in a clamping mode, and each lifting structure comprises a hanging rod. According to the utility model, the corresponding mounting piece is firstly mounted at the bottom end of the gypsum board, then the curtain box body is clamped with the mounting piece, the mounting process can be completed by a single person without the assistance of a plurality of persons, the labor is saved, the curtain box body is prefabricated in a factory, the on-site processing operation is not needed, the mounting is simple and convenient, and the mounting efficiency of workers is improved.

Description

一种装配式组合快装窗帘盒构造A kind of assembled combined quick-install curtain box structure

技术领域Technical Field

本实用新型属窗帘盒技术领域,具体涉及一种装配式组合快装窗帘盒构造。The utility model belongs to the technical field of curtain boxes, and in particular relates to an assembled combined quick-install curtain box structure.

背景技术Background Art

目前室内装修工程窗帘盒制作是不可缺少的一部分,窗帘盒制作复杂的造型,需要根据图纸尺寸规格进行施工现场加工,需用夹板进行造型,现场工艺工序较多,高层及超高层民用建筑顶棚均为A级,夹板为B1级防火,夹板长时间在潮湿的环境下强度会下降甚至会发霉,导致用户体验感下降甚至会出现安全隐患,当前窗帘盒制作工序较多比较复杂,并且现场施工程序多,造成施工现场噪音大,安装工时多,现场施工板材切割灰尘大,产生垃圾较多,而且安装时需要多人进行协助,浪费人力。At present, curtain box production is an indispensable part of interior decoration projects. The complex shape of curtain boxes needs to be processed on site according to the size specifications of the drawings. Plywood is needed for shaping. There are many on-site process steps. The ceilings of high-rise and super-high-rise civil buildings are all Class A, and the plywood is Class B1 fireproof. The strength of the plywood will decrease or even mold in a humid environment for a long time, resulting in a decrease in user experience and even safety hazards. The current curtain box production process is relatively complex, and there are many on-site construction procedures, resulting in high noise on the construction site, many installation hours, large dust from the on-site construction plate cutting, and more garbage. In addition, multiple people are required to assist in the installation, wasting manpower.

实用新型内容Utility Model Content

本实用新型的目的在于提供一种装配式组合快装窗帘盒构造,它在安装过程无需多人协助,单人即可完成,节省人力,窗帘盒无需现场加工操作,安装简单方便,以解决上述背景技术中提出的问题。The purpose of the utility model is to provide an assembled combined quick-install curtain box structure, which does not require the assistance of multiple people during the installation process and can be completed by one person, saving manpower. The curtain box does not require on-site processing and operation, and the installation is simple and convenient, so as to solve the problems raised in the above-mentioned background technology.

为实现上述目的,本实用新型提供如下技术方案:一种装配式组合快装窗帘盒构造,包括主龙骨和石膏板,所述石膏板固定连接在主龙骨的一侧,所述石膏板的顶端设置有等距分布的吊装结构,所述石膏板通过吊装结构固定连接在天花板上,所述石膏板的底端设置有铝合金窗帘盒,所述铝合金窗帘盒包括窗帘盒本体和若干等距分布在石膏板底端的安装件,所述窗帘盒本体通过安装件卡合连接在石膏板的底端。To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an assembled combined quick-install curtain box structure, comprising a main keel and a gypsum board, the gypsum board is fixedly connected to one side of the main keel, the top of the gypsum board is provided with an equidistantly distributed hanging structure, the gypsum board is fixedly connected to the ceiling through the hanging structure, the bottom end of the gypsum board is provided with an aluminum alloy curtain box, the aluminum alloy curtain box comprises a curtain box body and a plurality of mounting parts equidistantly distributed at the bottom end of the gypsum board, the curtain box body is connected to the bottom end of the gypsum board through the mounting parts.

进一步的,所述吊装结构包括吊杆,所述吊杆的底端通过螺母固定连接有L形安装板,所述L形安装板一侧的底部固定连接有垫板,所述垫板通过螺钉与石膏板的一侧固定连接。Furthermore, the hanging structure includes a hanging rod, the bottom end of which is fixedly connected to an L-shaped mounting plate via a nut, the bottom of one side of the L-shaped mounting plate is fixedly connected to a pad, and the pad is fixedly connected to one side of the gypsum board via screws.

进一步的,所述L形安装板的中部设置有螺栓,所述螺栓的一端固定连接有L形连接板,所述L形连接板的底端通过螺钉与石膏板的顶端固定连接。Furthermore, a bolt is provided in the middle of the L-shaped mounting plate, one end of the bolt is fixedly connected to the L-shaped connecting plate, and the bottom end of the L-shaped connecting plate is fixedly connected to the top end of the gypsum board by means of screws.

进一步的,所述窗帘盒本体的两侧均固定连接有沿窗帘盒本体长度方向等距分布的凸板,若干所述凸板分别与若干所述安装件对应设置。Furthermore, both sides of the curtain box body are fixedly connected with convex plates which are equidistantly distributed along the length direction of the curtain box body, and a plurality of the convex plates are respectively arranged corresponding to a plurality of the mounting parts.

进一步的,所述凸板的表面开设有卡槽。Furthermore, a slot is provided on the surface of the convex plate.

进一步的,所述安装件包括基板和支撑板,所述基板和支撑板之间固定连接有斜板,所述基板的中部开设有通孔,所述支撑板的中部开设有通槽,所述通槽的内部固定连接有与卡槽相配合的弹性片。Furthermore, the mounting member includes a base plate and a support plate, an inclined plate is fixedly connected between the base plate and the support plate, a through hole is opened in the middle of the base plate, a through slot is opened in the middle of the support plate, and an elastic sheet matching the card slot is fixedly connected inside the through slot.

进一步的,所述支撑板的一端固定连接有挡条。Furthermore, one end of the support plate is fixedly connected with a blocking bar.

与现有技术相比,本实用新型的有益效果是:先在石膏板的底端安装上相应的安装件,然后将窗帘盒本体与安装件卡接,安装过程无需多人协助,单人即可完成,节省人力,窗帘盒本体在工厂预制,无需现场加工操作,安装简单方便,提高工人安装效率。Compared with the prior art, the beneficial effects of the utility model are: first install the corresponding mounting parts on the bottom end of the gypsum board, and then snap-connect the curtain box body with the mounting parts. The installation process does not require the assistance of multiple people, and can be completed by one person, saving manpower. The curtain box body is prefabricated in the factory and does not require on-site processing and operation. The installation is simple and convenient, which improves the installation efficiency of workers.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

图1为本实用新型的正剖视图;Fig. 1 is a front cross-sectional view of the utility model;

图2为本实用新型图1局部A的放大结构示意图;FIG2 is an enlarged structural schematic diagram of a part A of FIG1 of the present utility model;

图3为本实用新型铝合金窗帘盒的立体结构示意图;FIG3 is a schematic diagram of the three-dimensional structure of the aluminum alloy curtain box of the utility model;

图4为本实用新型安装件的立体结构示意图。FIG. 4 is a schematic diagram of the three-dimensional structure of the mounting member of the utility model.

附图中,各标号所代表的部件列表如下:In the accompanying drawings, the components represented by the reference numerals are listed as follows:

1、主龙骨;2、石膏板;3、吊装结构;31、吊杆;32、L形安装板;33、垫板;34、螺栓;35、L形连接板;4、铝合金窗帘盒;41、窗帘盒本体;42、安装件;421、基板;422、支撑板;423、斜板;424、通孔;425、通槽;426、弹性片;427、挡条;43、凸板;44、卡槽。1. Main keel; 2. Gypsum board; 3. Lifting structure; 31. Hanging rod; 32. L-shaped mounting plate; 33. Pad; 34. Bolt; 35. L-shaped connecting plate; 4. Aluminum alloy curtain box; 41. Curtain box body; 42. Mounting parts; 421. Base plate; 422. Support plate; 423. Inclined plate; 424. Through hole; 425. Through groove; 426. Elastic sheet; 427. Baffle; 43. Convex plate; 44. Slot.

具体实施方式DETAILED DESCRIPTION

为了使本实用新型的目的及优点更加清楚明白,以下结合实施例对本实用新型进行具体说明。应当理解,以下文字仅仅用以描述本实用新型的一种或几种具体的实施方式,并不对本实用新型具体请求的保护范围进行严格限定。In order to make the purpose and advantages of the utility model more clear, the utility model is specifically described in combination with the following embodiments. It should be understood that the following text is only used to describe one or several specific implementations of the utility model, and does not strictly limit the protection scope of the specific request of the utility model.

如图1和3所示,一种装配式组合快装窗帘盒构造,包括主龙骨1和石膏板2,石膏板2固定连接在主龙骨1的一侧,石膏板2的顶端设置有等距分布的吊装结构3,石膏板2通过吊装结构3固定连接在天花板上,石膏板2的底端设置有铝合金窗帘盒4,铝合金窗帘盒4包括窗帘盒本体41和若干等距分布在石膏板2底端的安装件42,窗帘盒本体41通过安装件42卡合连接在石膏板2的底端。As shown in Figures 1 and 3, an assembled combined quick-install curtain box structure includes a main keel 1 and a gypsum board 2. The gypsum board 2 is fixedly connected to one side of the main keel 1. The top of the gypsum board 2 is provided with an equidistantly distributed hanging structure 3. The gypsum board 2 is fixedly connected to the ceiling through the hanging structure 3. The bottom end of the gypsum board 2 is provided with an aluminum alloy curtain box 4. The aluminum alloy curtain box 4 includes a curtain box body 41 and a plurality of mounting parts 42 equidistantly distributed at the bottom end of the gypsum board 2. The curtain box body 41 is connected to the bottom end of the gypsum board 2 by snapping the mounting parts 42.

根据上述结构,在进行安装时,先将主龙骨1通过膨胀螺钉固定安装在目标墙面上,然后将石膏板2的一端与主龙骨1的一侧固定连接,通过吊装结构3将石膏板2吊装在天花板上,然后在石膏板2的底端安装上相应的安装件42,若干安装件42安装完成后,将窗帘盒本体41与安装件42卡接,从而将窗帘盒本体41卡合在石膏板2的底端,窗帘盒本体41在工厂预制,无需现场加工操作,安装简单方便,提高工人安装效率。According to the above structure, during installation, the main keel 1 is first fixedly installed on the target wall surface by expansion screws, and then one end of the gypsum board 2 is fixedly connected to one side of the main keel 1, and the gypsum board 2 is suspended on the ceiling by the hanging structure 3, and then the corresponding mounting parts 42 are installed on the bottom end of the gypsum board 2. After the installation of several mounting parts 42 is completed, the curtain box body 41 is clamped with the mounting parts 42, so that the curtain box body 41 is clamped on the bottom end of the gypsum board 2. The curtain box body 41 is prefabricated in the factory and does not require on-site processing and operation. The installation is simple and convenient, which improves the installation efficiency of workers.

如图2所示,吊装结构3包括吊杆31,吊杆31的底端通过螺母固定连接有L形安装板32,L形安装板32一侧的底部固定连接有垫板33,垫板33通过螺钉与石膏板2的一侧固定连接,L形安装板32的中部设置有螺栓34,螺栓34的一端固定连接有L形连接板35,L形连接板35的底端通过螺钉与石膏板2的顶端固定连接。As shown in Figure 2, the hanging structure 3 includes a hanging rod 31, the bottom end of the hanging rod 31 is fixedly connected to an L-shaped mounting plate 32 by a nut, the bottom of one side of the L-shaped mounting plate 32 is fixedly connected to a pad 33, the pad 33 is fixedly connected to one side of the gypsum board 2 by screws, a bolt 34 is provided in the middle of the L-shaped mounting plate 32, one end of the bolt 34 is fixedly connected to an L-shaped connecting plate 35, and the bottom end of the L-shaped connecting plate 35 is fixedly connected to the top of the gypsum board 2 by screws.

根据上述结构,在安装石膏板2时,将吊杆31固定安装在天花板上,然后将垫板33与石膏板2的一侧固定连接,将L形连接板35与石膏板2的顶端固定连接,从而将石膏板2稳定的吊装在天花板上。According to the above structure, when installing the gypsum board 2, the hanging rod 31 is fixedly installed on the ceiling, and then the pad 33 is fixedly connected to one side of the gypsum board 2, and the L-shaped connecting plate 35 is fixedly connected to the top of the gypsum board 2, so that the gypsum board 2 is stably hung on the ceiling.

如图3和4所示,安装件42包括基板421和支撑板422,基板421和支撑板422之间固定连接有斜板423,基板421的中部开设有通孔424,支撑板422的中部开设有通槽425,通槽425的内部固定连接有与卡槽44相配合的弹性片426,支撑板422的一端固定连接有挡条427。As shown in Figures 3 and 4, the mounting member 42 includes a base plate 421 and a support plate 422, an inclined plate 423 is fixedly connected between the base plate 421 and the support plate 422, a through hole 424 is opened in the middle of the base plate 421, a through groove 425 is opened in the middle of the support plate 422, an elastic sheet 426 matching the card slot 44 is fixedly connected inside the through groove 425, and a blocking bar 427 is fixedly connected to one end of the support plate 422.

根据上述结构,安装铝合金窗帘盒4时,先将若干窗帘盒本体41按照相应的间距尺寸安装在石膏板2的底端,安装时通过螺钉贯穿通孔424将安装件42整体安装在石膏板2的底端。According to the above structure, when installing the aluminum alloy curtain box 4, first install several curtain box bodies 41 at the bottom end of the gypsum board 2 according to the corresponding spacing size, and then install the mounting member 42 as a whole at the bottom end of the gypsum board 2 by screwing through the through hole 424.

如图3所示,窗帘盒本体41的两侧均固定连接有沿窗帘盒本体41长度方向等距分布的凸板43,若干凸板43分别与若干安装件42对应设置,凸板43的表面开设有卡槽44。As shown in FIG3 , both sides of the curtain box body 41 are fixedly connected with convex plates 43 equidistantly distributed along the length direction of the curtain box body 41 , and a plurality of convex plates 43 are respectively arranged corresponding to a plurality of mounting members 42 , and a slot 44 is provided on the surface of the convex plates 43 .

根据上述结构,安装窗帘盒本体41时,将窗帘盒本体41贴紧在石膏板2的底端,然后将窗帘盒本体41向前滑动一段距离,使凸板43滑至相应支撑板422的上方,滑动时凸板43向下挤压弹性片426,当凸板43的一端滑至与挡条427的一侧接触后,弹性片426弹起卡在卡槽44的内部,从而将卡槽44卡合在支撑板422的上方,进而将窗帘盒本体41的位置进行固定。According to the above structure, when installing the curtain box body 41, the curtain box body 41 is pressed against the bottom end of the gypsum board 2, and then the curtain box body 41 is slid forward a certain distance so that the protruding plate 43 slides to the top of the corresponding supporting plate 422. When sliding, the protruding plate 43 presses the elastic sheet 426 downward. When one end of the protruding plate 43 slides to contact one side of the blocking bar 427, the elastic sheet 426 pops up and is stuck in the inside of the card slot 44, thereby locking the card slot 44 on the top of the supporting plate 422, thereby fixing the position of the curtain box body 41.

本实用新型的工作原理为:在安装石膏板2时,将吊杆31固定安装在天花板上,然后将垫板33与石膏板2的一侧固定连接,将L形连接板35与石膏板2的顶端固定连接,从而将石膏板2稳定的吊装在天花板上,安装铝合金窗帘盒4时,先将若干窗帘盒本体41按照相应的间距尺寸安装在石膏板2的底端,安装时通过螺钉贯穿通孔424将安装件42整体安装在石膏板2的底端,安装窗帘盒本体41时,将窗帘盒本体41贴紧在石膏板2的底端,然后将窗帘盒本体41向前滑动一段距离,使凸板43滑至相应支撑板422的上方,滑动时凸板43向下挤压弹性片426,当凸板43的一端滑至与挡条427的一侧接触后,弹性片426弹起卡在卡槽44的内部,从而将卡槽44卡合在支撑板422的上方,进而将窗帘盒本体41的位置进行固定。The working principle of the utility model is as follows: when installing the gypsum board 2, the hanging rod 31 is fixedly installed on the ceiling, and then the pad 33 is fixedly connected to one side of the gypsum board 2, and the L-shaped connecting plate 35 is fixedly connected to the top of the gypsum board 2, so that the gypsum board 2 is stably suspended on the ceiling. When installing the aluminum alloy curtain box 4, a plurality of curtain box bodies 41 are first installed at the bottom end of the gypsum board 2 according to the corresponding spacing size, and the mounting member 42 is installed as a whole on the gypsum board 2 by screws penetrating the through hole 424 during installation. At the bottom end, when installing the curtain box body 41, place the curtain box body 41 close to the bottom end of the gypsum board 2, and then slide the curtain box body 41 forward for a distance so that the convex plate 43 slides to the top of the corresponding support plate 422. When sliding, the convex plate 43 presses the elastic sheet 426 downward. When one end of the convex plate 43 slides to contact one side of the baffle 427, the elastic sheet 426 pops up and is stuck in the inside of the slot 44, thereby locking the slot 44 on the top of the support plate 422, thereby fixing the position of the curtain box body 41.

以上所述仅是本实用新型的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以作出若干改进和润饰,这些改进和润饰也应视为本实用新型的保护范围。本实用新型中未具体描述和解释说明的结构、装置以及操作方法,如无特别说明和限定,均按照本领域的常规手段进行实施。The above is only a preferred embodiment of the present invention. It should be noted that, for ordinary technicians in the technical field, several improvements and modifications can be made without departing from the principle of the present invention, and these improvements and modifications should also be regarded as the protection scope of the present invention. The structures, devices and operating methods not specifically described and explained in the present invention shall be implemented according to the conventional means in the field unless otherwise specified and limited.

Claims (7)

1.一种装配式组合快装窗帘盒构造,包括主龙骨(1)和石膏板(2),其特征在于:所述石膏板(2)固定连接在主龙骨(1)的一侧,所述石膏板(2)的顶端设置有等距分布的吊装结构(3),所述石膏板(2)通过吊装结构(3)固定连接在天花板上,所述石膏板(2)的底端设置有铝合金窗帘盒(4),所述铝合金窗帘盒(4)包括窗帘盒本体(41)和若干等距分布在石膏板(2)底端的安装件(42),所述窗帘盒本体(41)通过安装件(42)卡合连接在石膏板(2)的底端。1. An assembled combined quick-install curtain box structure, comprising a main keel (1) and a gypsum board (2), characterized in that: the gypsum board (2) is fixedly connected to one side of the main keel (1), the top of the gypsum board (2) is provided with an equidistantly distributed hanging structure (3), the gypsum board (2) is fixedly connected to the ceiling through the hanging structure (3), the bottom end of the gypsum board (2) is provided with an aluminum alloy curtain box (4), the aluminum alloy curtain box (4) comprises a curtain box body (41) and a plurality of mounting members (42) equidistantly distributed at the bottom end of the gypsum board (2), the curtain box body (41) is connected to the bottom end of the gypsum board (2) by snapping through the mounting members (42). 2.根据权利要求1所述的一种装配式组合快装窗帘盒构造,其特征在于:所述吊装结构(3)包括吊杆(31),所述吊杆(31)的底端通过螺母固定连接有L形安装板(32),所述L形安装板(32)一侧的底部固定连接有垫板(33),所述垫板(33)通过螺钉与石膏板(2)的一侧固定连接。2. An assembled combined quick-install curtain box structure according to claim 1, characterized in that: the hanging structure (3) includes a hanging rod (31), the bottom end of the hanging rod (31) is fixedly connected to an L-shaped mounting plate (32) through a nut, and the bottom of one side of the L-shaped mounting plate (32) is fixedly connected to a pad (33), and the pad (33) is fixedly connected to one side of the gypsum board (2) through screws. 3.根据权利要求2所述的一种装配式组合快装窗帘盒构造,其特征在于:所述L形安装板(32)的中部设置有螺栓(34),所述螺栓(34)的一端固定连接有L形连接板(35),所述L形连接板(35)的底端通过螺钉与石膏板(2)的顶端固定连接。3. An assembled combined quick-install curtain box structure according to claim 2, characterized in that: a bolt (34) is provided in the middle of the L-shaped mounting plate (32), one end of the bolt (34) is fixedly connected to an L-shaped connecting plate (35), and the bottom end of the L-shaped connecting plate (35) is fixedly connected to the top end of the gypsum board (2) by a screw. 4.根据权利要求3所述的一种装配式组合快装窗帘盒构造,其特征在于:所述窗帘盒本体(41)的两侧均固定连接有沿窗帘盒本体(41)长度方向等距分布的凸板(43),若干所述凸板(43)分别与若干所述安装件(42)对应设置。4. An assembled combined quick-install curtain box structure according to claim 3, characterized in that: both sides of the curtain box body (41) are fixedly connected with convex plates (43) distributed equidistantly along the length direction of the curtain box body (41), and a plurality of the convex plates (43) are respectively arranged corresponding to a plurality of the mounting parts (42). 5.根据权利要求4所述的一种装配式组合快装窗帘盒构造,其特征在于:所述凸板(43)的表面开设有卡槽(44)。5. The assembled combined quick-install curtain box structure according to claim 4, characterized in that a slot (44) is provided on the surface of the convex plate (43). 6.根据权利要求5所述的一种装配式组合快装窗帘盒构造,其特征在于:所述安装件(42)包括基板(421)和支撑板(422),所述基板(421)和支撑板(422)之间固定连接有斜板(423),所述基板(421)的中部开设有通孔(424),所述支撑板(422)的中部开设有通槽(425),所述通槽(425)的内部固定连接有与卡槽(44)相配合的弹性片(426)。6. An assembled combined quick-install curtain box structure according to claim 5, characterized in that: the mounting member (42) comprises a base plate (421) and a support plate (422), an inclined plate (423) is fixedly connected between the base plate (421) and the support plate (422), a through hole (424) is provided in the middle of the base plate (421), a through groove (425) is provided in the middle of the support plate (422), and an elastic sheet (426) matching the card slot (44) is fixedly connected inside the through groove (425). 7.根据权利要求6所述的一种装配式组合快装窗帘盒构造,其特征在于:所述支撑板(422)的一端固定连接有挡条(427)。7. An assembled combined quick-install curtain box structure according to claim 6, characterized in that a stop bar (427) is fixedly connected to one end of the support plate (422).
CN202420322025.2U 2024-02-20 2024-02-20 Assembled type combined fast-assembling curtain box structure Active CN221865412U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202420322025.2U CN221865412U (en) 2024-02-20 2024-02-20 Assembled type combined fast-assembling curtain box structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202420322025.2U CN221865412U (en) 2024-02-20 2024-02-20 Assembled type combined fast-assembling curtain box structure

Publications (1)

Publication Number Publication Date
CN221865412U true CN221865412U (en) 2024-10-22

Family

ID=93089596

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202420322025.2U Active CN221865412U (en) 2024-02-20 2024-02-20 Assembled type combined fast-assembling curtain box structure

Country Status (1)

Country Link
CN (1) CN221865412U (en)

Similar Documents

Publication Publication Date Title
CN210216864U (en) Suspended ceiling falling-level vertical frame installation structure with lamp slot
CN204804142U (en) Triangle fossil fragments connection structure
CN110042997A (en) A kind of wall and its mounting means of fireproof decoration plate
CN215407449U (en) Aluminum mould screw rod system K board reinforcing apparatus
CN113931396A (en) Wall mounting structure is maked somebody a mere figurehead to ready-package that wallboard reutilization can
CN221865412U (en) Assembled type combined fast-assembling curtain box structure
CN201546408U (en) Wall floor mounting and fixing device
CN211286230U (en) A quick installation and disassembly of the ceiling installation structure
CN213774026U (en) Assembled is exterior wallboard fossil fragments for building
CN210622188U (en) Device capable of being disassembled and quickly installed
CN112814303A (en) Assembled wall hanging plate system
CN215802612U (en) Non-detachable ceiling fastener
CN205804710U (en) A kind of universal body of wall top installation component
CN212898115U (en) Windowsill veneer mounting structure of prefabricated assembled window that wafts
CN212026953U (en) Large-scale metal clad sheet mounting structure
CN209837563U (en) A thin metal plate assembled keel device
CN112227575A (en) Convenient architectural decoration curtain of dismantling
CN218933549U (en) Assembled building curtain wall mounting structure
CN203113699U (en) Dry hanging and wet combining fastener for inner/outer-wall heat-preservation composite integrated plate
CN215829905U (en) Connection structure convenient to installation of assembled wallboard
CN213682988U (en) Detachable keel structure for embedded wallboard
CN221095552U (en) Quick connecting and positioning mechanism for dry hanging curtain wall board
CN205976103U (en) Section bar for containment system unit plate block outside assembled
CN211923333U (en) Building outer wall hangs stone material positioner futilely
CN220353326U (en) Plasterboard furred ceiling appurtenance

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant