CN221855520U - A bridge underwater pile foundation construction device - Google Patents
A bridge underwater pile foundation construction device Download PDFInfo
- Publication number
- CN221855520U CN221855520U CN202420045743.XU CN202420045743U CN221855520U CN 221855520 U CN221855520 U CN 221855520U CN 202420045743 U CN202420045743 U CN 202420045743U CN 221855520 U CN221855520 U CN 221855520U
- Authority
- CN
- China
- Prior art keywords
- sleeve
- fixedly connected
- pile foundation
- adjusting box
- worm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 19
- 229910000831 Steel Inorganic materials 0.000 abstract description 26
- 239000010959 steel Substances 0.000 abstract description 26
- 101001121408 Homo sapiens L-amino-acid oxidase Proteins 0.000 description 3
- 102100026388 L-amino-acid oxidase Human genes 0.000 description 3
- 239000004568 cement Substances 0.000 description 3
- 238000007689 inspection Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 230000015572 biosynthetic process Effects 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 101000827703 Homo sapiens Polyphosphoinositide phosphatase Proteins 0.000 description 1
- 102100023591 Polyphosphoinositide phosphatase Human genes 0.000 description 1
- 101100233916 Saccharomyces cerevisiae (strain ATCC 204508 / S288c) KAR5 gene Proteins 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本实用新型涉及桩基施工技术领域,且公开了一种桥梁水下桩基施工装置,包括套筒,套筒内部设置有定位机构,定位机构包括夹持部。通过设置安装板、齿条、辊轮、U型板、伸缩杆和弹簧,利用弹簧的弹力,使辊轮外表面挤压钢筋笼,使两个辊轮对钢筋笼进行夹持定位,辊轮可以沿钢筋笼外表面滚动,便于向套筒内部浇筑混凝土的同时,便于控制辊轮沿钢筋笼外表面向上滚动,防止定位机构影响混凝土外表面的平整度;通过设置转轴、蜗杆、蜗轮和齿轮,转动转轴,转轴带动齿轮转动,齿轮驱动齿条和安装板和辊轮向上移动,通过转动蜗杆,蜗杆驱动蜗轮转动,使蜗轮带动转轴转动,利用蜗轮和蜗杆的自锁性,使齿条位置相对稳定。
The utility model relates to the technical field of pile foundation construction, and discloses an underwater pile foundation construction device for a bridge, including a sleeve, a positioning mechanism is arranged inside the sleeve, and the positioning mechanism includes a clamping part. By arranging a mounting plate, a rack, a roller, a U-shaped plate, a telescopic rod and a spring, the elastic force of the spring is utilized to make the outer surface of the roller squeeze the steel cage, so that the two rollers clamp and position the steel cage, and the rollers can roll along the outer surface of the steel cage, which is convenient for pouring concrete into the sleeve, and at the same time, it is convenient to control the rollers to roll upward along the outer surface of the steel cage, so as to prevent the positioning mechanism from affecting the flatness of the outer surface of the concrete; by arranging a rotating shaft, a worm, a worm wheel and a gear, the rotating shaft is rotated, and the rotating shaft drives the gear to rotate, and the gear drives the rack, the mounting plate and the roller to move upward, and by rotating the worm, the worm drives the worm wheel to rotate, so that the worm wheel drives the rotating shaft to rotate, and the self-locking property of the worm wheel and the worm is utilized to make the position of the rack relatively stable.
Description
技术领域Technical Field
本实用新型涉及桩基施工技术领域,具体为一种桥梁水下桩基施工装置。The utility model relates to the technical field of pile foundation construction, in particular to an underwater pile foundation construction device for a bridge.
背景技术Background Art
桩基工程是一个工程术语,灌注桩的施工分为成孔和成桩两部分 ,因而对桩基的检测便可分为成孔质量检测和成桩质量检测两大部分,而钢护筒工程作为水下桩基基础工程的起始步骤。Pile foundation engineering is an engineering term. The construction of bored piles is divided into two parts: hole drilling and pile formation. Therefore, the inspection of pile foundation can be divided into two parts: hole drilling quality inspection and pile formation quality inspection. Steel casing engineering is the starting step of underwater pile foundation engineering.
中国专利公开了一种桥梁水下桩基施工装置,公开号为CN217204206U,包括套筒和环形板,套筒的中部活动套接设置有环形板,套筒的两侧顶端和底端均螺纹贯穿设置有第一螺纹杆,且第一螺纹杆位于套筒内部的一端设置有夹板,且夹板靠近第一螺纹杆的一侧中部开设有圆槽,圆槽的内部活动设置有滚球。本实用新型通过套筒和环形板的设置,环形板固定设置于浮于睡眠的支架上,将桩基或者钢筋笼置于套筒内部,通过四个夹板固定住,通过转动对应的两个活动环,能够让第二螺纹杆在对应的通槽内部前后或者左右滑动,从而带动套筒移动,从而能够调整桩基或钢筋笼的位置,无需工作人员手扶,不会晃动,有利于减少工作人员的劳动量,同时方便钢筋笼就位。A Chinese patent discloses a bridge underwater pile foundation construction device, with the publication number CN217204206U, including a sleeve and an annular plate, a sleeve with an annular plate movably sleeved in the middle, a first threaded rod threaded through the top and bottom ends of both sides of the sleeve, and a clamping plate is provided at one end of the first threaded rod located inside the sleeve, and a circular groove is provided in the middle of the side of the clamping plate close to the first threaded rod, and a rolling ball is movably provided inside the circular groove. The utility model is provided with a sleeve and an annular plate, the annular plate is fixedly provided on a bracket floating on the sleep side, the pile foundation or steel cage is placed inside the sleeve, and fixed by four clamping plates, and by rotating the corresponding two movable rings, the second threaded rod can slide forward and backward or left and right inside the corresponding through groove, thereby driving the sleeve to move, so that the position of the pile foundation or steel cage can be adjusted, without the need for the staff to hold it by hand, and it will not shake, which is conducive to reducing the workload of the staff and facilitating the placement of the steel cage.
但是还是包括以下缺点:装置通过转动第一螺纹杆,使夹板夹紧钢筋笼,但是向套筒内部灌注水泥时,第一螺纹杆和夹板为影响水泥的浇灌,不利于钢筋笼外侧形成光滑的水泥柱。为此,我们提出了一种桥梁水下桩基施工装置来解决这个问题。However, the following disadvantages are still included: the device rotates the first threaded rod to make the clamping plate clamp the steel cage, but when pouring cement into the sleeve, the first threaded rod and the clamping plate affect the pouring of cement, which is not conducive to forming a smooth cement column outside the steel cage. Therefore, we propose a bridge underwater pile foundation construction device to solve this problem.
实用新型内容Utility Model Content
本实用新型的目的在于提供一种桥梁水下桩基施工装置,以解决上述背景技术中提出的问题。The utility model aims to provide an underwater pile foundation construction device for a bridge, so as to solve the problems raised in the above-mentioned background technology.
为实现上述目的,本实用新型提供如下技术方案:一种桥梁水下桩基施工装置,包括套筒,所述套筒内部设置有定位机构,所述定位机构包括夹持部;To achieve the above-mentioned purpose, the utility model provides the following technical solutions: an underwater bridge pile foundation construction device, comprising a sleeve, a positioning mechanism is arranged inside the sleeve, and the positioning mechanism comprises a clamping part;
所述夹持部包括夹板、连接杆和调节盒,所述夹板、连接杆和调节盒均设置有两个,所述调节盒外表面与连接杆外表面固定连接,所述连接杆远离调节盒的端面与夹板外表面固定连接;The clamping part includes a clamping plate, a connecting rod and an adjusting box, wherein two clamping plates, two connecting rods and two adjusting boxes are provided, the outer surface of the adjusting box is fixedly connected to the outer surface of the connecting rod, and the end surface of the connecting rod away from the adjusting box is fixedly connected to the outer surface of the clamping plate;
所述夹持部下方设置有移动部;A moving part is arranged below the clamping part;
所述移动部包括齿条、安装板、辊轮和伸缩杆,所述齿条底面与安装板顶面固定连接,所述辊轮前后端面通过第一轴承转动贯穿设置有转杆,转杆前后端面均与U型板内壁固定连接。The moving part includes a rack, a mounting plate, a roller and a telescopic rod. The bottom surface of the rack is fixedly connected to the top surface of the mounting plate. The front and rear end surfaces of the roller are rotatably penetrated by a rotating rod through a first bearing. The front and rear end surfaces of the rotating rod are fixedly connected to the inner wall of the U-shaped plate.
进一步改进在于,两个所述调节盒外表面均固定连接有滑杆和螺杆,所述螺杆和滑杆远离调节盒一侧的外表面均滑动贯穿套筒内壁并延伸至套筒外侧,所述螺杆外表面螺纹套设有锥齿轮,所述锥齿轮外表面通过第一轴承座与套筒外表面转动连接,通过设置锥齿轮、螺杆、安装盒和夹板,锥齿环驱动锥齿轮转动,锥齿轮驱动螺杆移动,螺杆带动安装盒移动,使夹板对钢筋笼顶端外表面进行夹持固定。A further improvement is that the outer surfaces of the two adjusting boxes are fixedly connected with sliding rods and screws, and the outer surfaces of the screw and sliding rod away from the adjusting box slide through the inner wall of the sleeve and extend to the outside of the sleeve. The threaded sleeve on the outer surface of the screw is provided with a bevel gear, and the outer surface of the bevel gear is rotatably connected to the outer surface of the sleeve through a first bearing seat. By arranging bevel gears, screws, mounting boxes and splints, the bevel gear ring drives the bevel gear to rotate, the bevel gear drives the screw to move, and the screw drives the mounting box to move, so that the splint clamps and fixes the outer surface of the top end of the steel cage.
进一步改进在于,所述套筒外表面开设有T型滑槽,T型滑槽内壁滑动连接有T型滑环,所述套筒外表面套设有锥齿环,所述锥齿环内壁与T型滑环内壁固定连接,所述锥齿环外表面与锥齿轮外表面啮合连接,通过设置锥齿环,转动锥齿环,使两个锥齿轮同步转动,使两个夹板内壁与套筒内壁之间的距离相同。A further improvement is that a T-shaped groove is provided on the outer surface of the sleeve, a T-shaped sliding ring is slidably connected to the inner wall of the T-shaped sliding groove, a bevel gear ring is sleeved on the outer surface of the sleeve, the inner wall of the bevel gear ring is fixedly connected to the inner wall of the T-shaped sliding ring, and the outer surface of the bevel gear ring is meshingly connected to the outer surface of the bevel gear. By setting the bevel gear ring and rotating the bevel gear ring, the two bevel gears rotate synchronously and the distance between the inner walls of the two splints and the inner wall of the sleeve is made the same.
进一步改进在于,所述伸缩杆外表面与U型板外表面固定连接,所述伸缩杆远离U型板一侧的外表面滑动贯穿安装板外表面并延伸至安装板远离U型板的一侧,通过设置辊轮,辊轮可以沿钢筋笼外表面滚动,便于向套筒内部浇筑混凝土。A further improvement is that the outer surface of the telescopic rod is fixedly connected to the outer surface of the U-shaped plate, and the outer surface of the telescopic rod away from the U-shaped plate slides through the outer surface of the mounting plate and extends to the side of the mounting plate away from the U-shaped plate. By setting a roller, the roller can roll along the outer surface of the steel cage, which facilitates the pouring of concrete into the sleeve.
进一步改进在于,所述伸缩杆外侧套设有弹簧,所述伸缩杆远离U型板的端面固定连接有挡板,所述弹簧一端与挡板外表面固定连接,所述弹簧另一端与安装板外表面固定连接,利用弹簧的弹力,使辊轮外表面挤压钢筋笼。A further improvement is that a spring is sleeved on the outside of the telescopic rod, and the end face of the telescopic rod away from the U-shaped plate is fixedly connected to a baffle, one end of the spring is fixedly connected to the outer surface of the baffle, and the other end of the spring is fixedly connected to the outer surface of the mounting plate, and the elastic force of the spring is used to squeeze the outer surface of the roller to squeeze the steel cage.
进一步改进在于,所述调节盒顶面开设有通孔,所述齿条顶端外表面滑动贯穿通孔并延伸至调节盒上方,所述调节盒前方设置有转轴,所述转轴后端外表面通过第二轴承转动贯穿调节盒正面并延伸至调节盒内侧,所述转轴后的外表面固定套设有齿轮,所述齿轮外表面与齿轮外表面啮合连接,通过设置转轴、齿轮和齿环,转动转轴,转轴带动齿轮转动,齿轮驱动齿条和安装板和辊轮向上移动。A further improvement is that a through hole is provided on the top surface of the adjusting box, and the outer surface of the top end of the rack slides through the through hole and extends to the top of the adjusting box, a rotating shaft is provided in front of the adjusting box, and the outer surface of the rear end of the rotating shaft rotates through the front of the adjusting box and extends to the inside of the adjusting box, and a gear is fixed on the outer surface behind the rotating shaft, and the outer surface of the gear is meshed with the outer surface of the gear, and by setting a rotating shaft, a gear and a gear ring, the rotating shaft is rotated, and the rotating shaft drives the gear to rotate, and the gear drives the rack, the mounting plate and the roller to move upward.
进一步改进在于,所述调节盒正面固定连接有固定板,固定板顶面通过第二轴承座转动连接有蜗杆,所述转轴前端外表面固定套设有蜗轮,所述蜗轮外表面与蜗杆外表面啮合连接,通过转动蜗杆,蜗杆驱动蜗轮转动,使蜗轮带动转轴转动,利用蜗轮和蜗杆的自锁性,使齿条位置相对稳定。A further improvement is that a fixed plate is fixedly connected to the front side of the adjusting box, and a worm is rotatably connected to the top surface of the fixed plate through a second bearing seat. A worm wheel is fixedly sleeved on the outer surface of the front end of the rotating shaft, and the outer surface of the worm wheel is meshingly connected with the outer surface of the worm. By rotating the worm, the worm drives the worm wheel to rotate, and the worm wheel drives the rotating shaft to rotate, and the self-locking property of the worm wheel and the worm is utilized to make the position of the rack relatively stable.
与现有技术相比,本实用新型的有益效果是:该桥梁水下桩基施工装置,通过设置安装板、齿条、辊轮、U型板、伸缩杆和弹簧,利用弹簧的弹力,使辊轮外表面挤压钢筋笼,使两个辊轮对钢筋笼进行夹持定位,辊轮可以沿钢筋笼外表面滚动,便于向套筒内部浇筑混凝土的同时,便于控制辊轮沿钢筋笼外表面向上滚动,防止定位机构影响混凝土外表面的平整度;通过设置转轴、蜗杆、蜗轮和齿轮,转动转轴,转轴带动齿轮转动,齿轮驱动齿条和安装板和辊轮向上移动,通过转动蜗杆,蜗杆驱动蜗轮转动,使蜗轮带动转轴转动,利用蜗轮和蜗杆的自锁性,使齿条位置相对稳定;通过设置夹板、滑杆、螺杆、锥齿轮、锥齿环、连接杆、调节盒和T型滑环,转动锥齿环,锥齿环驱动锥齿轮转动,锥齿轮驱动螺杆移动,螺杆带动安装盒移动,使夹板对钢筋笼顶端外表面进行夹持固定。Compared with the prior art, the utility model has the following beneficial effects: the underwater pile foundation construction device for bridges is provided with a mounting plate, a rack, a roller, a U-shaped plate, a telescopic rod and a spring, and the elastic force of the spring is utilized to make the outer surface of the roller squeeze the steel cage, so that the two rollers clamp and position the steel cage, and the roller can roll along the outer surface of the steel cage, so that it is convenient to pour concrete into the sleeve, and it is convenient to control the roller to roll upward along the outer surface of the steel cage, so as to prevent the positioning mechanism from affecting the flatness of the outer surface of the concrete; by providing a rotating shaft, a worm, a worm wheel and The gear rotates the shaft, the shaft drives the gear to rotate, the gear drives the rack and the mounting plate and the roller to move upward, and the worm drives the worm wheel to rotate by rotating the worm, so that the worm wheel drives the shaft to rotate, and the self-locking property of the worm wheel and the worm is utilized to make the position of the rack relatively stable; by setting the splint, sliding rod, screw, bevel gear, bevel gear ring, connecting rod, adjusting box and T-shaped slip ring, the bevel gear ring is rotated, the bevel gear ring drives the bevel gear to rotate, the bevel gear drives the screw to move, and the screw drives the mounting box to move, so that the splint clamps and fixes the outer surface of the top end of the steel cage.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
图1为本实用新型立体结构剖视图;FIG1 is a sectional view of the three-dimensional structure of the utility model;
图2为本实用新型立体结构示意图;Figure 2 is a schematic diagram of the three-dimensional structure of the utility model;
图3为本实用新型立体结构局部剖视图;FIG3 is a partial cross-sectional view of the three-dimensional structure of the utility model;
图4为图1中A处结构放大图;FIG4 is an enlarged view of the structure at A in FIG1 ;
图5为图1中B处结构放大图。FIG5 is an enlarged view of the structure at point B in FIG1.
图中:1套筒、2定位机构、21夹持部、22移动部、211夹板、212滑杆、213螺杆、214锥齿轮、215锥齿环、216连接杆、217调节盒、218T型滑环、220安装板、221齿轮、222转轴、223齿条、224辊轮、225蜗杆、226蜗轮、227U型板、228伸缩杆、229弹簧。In the figure: 1 sleeve, 2 positioning mechanism, 21 clamping part, 22 moving part, 211 clamping plate, 212 sliding rod, 213 screw, 214 bevel gear, 215 bevel gear ring, 216 connecting rod, 217 adjustment box, 218 T-type slip ring, 220 mounting plate, 221 gear, 222 rotating shaft, 223 rack, 224 roller, 225 worm, 226 worm wheel, 227 U-shaped plate, 228 telescopic rod, 229 spring.
具体实施方式DETAILED DESCRIPTION
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
请参阅图1-图3,本实用新型提供一种技术方案:一种桥梁水下桩基施工装置,包括套筒1,套筒1内部设置有定位机构2,定位机构2包括夹持部21;Please refer to Figures 1 to 3. The utility model provides a technical solution: an underwater bridge pile foundation construction device, comprising a sleeve 1, a positioning mechanism 2 is arranged inside the sleeve 1, and the positioning mechanism 2 includes a clamping portion 21;
夹持部21包括夹板211、连接杆216和调节盒217,夹板211、连接杆216和调节盒217均设置有两个,调节盒217外表面与连接杆216外表面固定连接,连接杆216远离调节盒217的端面与夹板211外表面固定连接,两个调节盒217外表面均固定连接有滑杆212和螺杆213,螺杆213和滑杆212远离调节盒217一侧的外表面均滑动贯穿套筒1内壁并延伸至套筒1外侧,螺杆213外表面螺纹套设有锥齿轮214,锥齿轮214外表面通过第一轴承座与套筒1外表面转动连接;The clamping part 21 includes a clamping plate 211, a connecting rod 216 and an adjusting box 217. The clamping plate 211, the connecting rod 216 and the adjusting box 217 are all provided with two. The outer surface of the adjusting box 217 is fixedly connected to the outer surface of the connecting rod 216. The end surface of the connecting rod 216 away from the adjusting box 217 is fixedly connected to the outer surface of the clamping plate 211. The outer surfaces of the two adjusting boxes 217 are fixedly connected with a sliding rod 212 and a screw 213. The outer surfaces of the screw 213 and the sliding rod 212 away from the adjusting box 217 are slidably penetrated through the inner wall of the sleeve 1 and extend to the outside of the sleeve 1. The outer surface of the screw 213 is threadedly sleeved with a bevel gear 214. The outer surface of the bevel gear 214 is rotatably connected to the outer surface of the sleeve 1 through a first bearing seat.
套筒1外表面开设有T型滑槽,T型滑槽内壁滑动连接有T型滑环218,套筒1外表面套设有锥齿环215,锥齿环215内壁与T型滑环218内壁固定连接,锥齿环215外表面与锥齿轮214外表面啮合连接,通过设置夹板211、滑杆212、螺杆213、锥齿轮214、锥齿环215、连接杆216、调节盒217和T型滑环218,转动锥齿环214,锥齿环214驱动锥齿轮214转动,锥齿轮214驱动螺杆213移动,螺杆213带动安装盒217移动,使夹板211对钢筋笼顶端外表面进行夹持固定;A T-shaped slide groove is provided on the outer surface of the sleeve 1, and a T-shaped slide ring 218 is slidably connected to the inner wall of the T-shaped slide groove. A bevel gear ring 215 is sleeved on the outer surface of the sleeve 1, and the inner wall of the bevel gear ring 215 is fixedly connected to the inner wall of the T-shaped slide ring 218. The outer surface of the bevel gear ring 215 is meshedly connected to the outer surface of the bevel gear 214. By arranging a clamping plate 211, a sliding rod 212, a screw rod 213, a bevel gear 214, a bevel gear ring 215, a connecting rod 216, an adjusting box 217 and a T-shaped slide ring 218, the bevel gear ring 214 is rotated, the bevel gear ring 214 drives the bevel gear 214 to rotate, the bevel gear 214 drives the screw rod 213 to move, and the screw rod 213 drives the installation box 217 to move, so that the clamping plate 211 clamps and fixes the outer surface of the top end of the steel cage;
夹持部21下方设置有移动部22;A moving portion 22 is provided below the clamping portion 21;
移动部22包括齿条223、安装板220、辊轮224和伸缩杆228,齿条223底面与安装板220顶面固定连接,辊轮224前后端面通过第一轴承转动贯穿设置有转杆,转杆前后端面均与U型板227内壁固定连接,伸缩杆228外表面与U型板227外表面固定连接,伸缩杆228远离U型板227一侧的外表面滑动贯穿安装板220外表面并延伸至安装板220远离U型板227的一侧;The moving part 22 includes a rack 223, a mounting plate 220, a roller 224 and a telescopic rod 228. The bottom surface of the rack 223 is fixedly connected to the top surface of the mounting plate 220. The front and rear end surfaces of the roller 224 are rotatably penetrated by a rotating rod through a first bearing. The front and rear end surfaces of the rotating rod are both fixedly connected to the inner wall of the U-shaped plate 227. The outer surface of the telescopic rod 228 is fixedly connected to the outer surface of the U-shaped plate 227. The outer surface of the telescopic rod 228 away from the U-shaped plate 227 slides through the outer surface of the mounting plate 220 and extends to the side of the mounting plate 220 away from the U-shaped plate 227.
实施例二Embodiment 2
请参阅图1-图5,在实施例一的基础上,伸缩杆228外侧套设有弹簧229,伸缩杆228远离U型板227的端面固定连接有挡板,弹簧229一端与挡板外表面固定连接,弹簧229另一端与安装板220外表面固定连接,通过设置安装板220、齿条223、辊轮224、U型板227、伸缩杆228和弹簧229,利用弹簧229的弹力,使辊轮224外表面挤压钢筋笼,使两个辊轮224对钢筋笼进行夹持定位,辊轮224可以沿钢筋笼外表面滚动,便于向套筒1内部浇筑混凝土的同时,便于控制辊轮224沿钢筋笼外表面向上滚动,防止定位机构2影响混凝土外表面的平整度;Please refer to Figures 1 to 5. On the basis of the first embodiment, a spring 229 is sleeved on the outer side of the telescopic rod 228. The end face of the telescopic rod 228 away from the U-shaped plate 227 is fixedly connected with a baffle. One end of the spring 229 is fixedly connected to the outer surface of the baffle, and the other end of the spring 229 is fixedly connected to the outer surface of the mounting plate 220. By arranging the mounting plate 220, the rack 223, the roller 224, the U-shaped plate 227, the telescopic rod 228 and the spring 229, the elastic force of the spring 229 is utilized to make the outer surface of the roller 224 squeeze the steel cage, so that the two rollers 224 clamp and position the steel cage. The roller 224 can roll along the outer surface of the steel cage, which is convenient for pouring concrete into the sleeve 1, and at the same time, it is convenient to control the roller 224 to roll upward along the outer surface of the steel cage, so as to prevent the positioning mechanism 2 from affecting the flatness of the outer surface of the concrete.
调节盒217顶面开设有通孔,齿条223顶端外表面滑动贯穿通孔并延伸至调节盒217上方,调节盒217前方设置有转轴222,转轴222后端外表面通过第二轴承转动贯穿调节盒217正面并延伸至调节盒217内侧,调节盒217正面固定连接有固定板,固定板顶面通过第二轴承座转动连接有蜗杆225,转轴222前端外表面固定套设有蜗轮226,蜗轮226外表面与蜗杆225外表面啮合连接;A through hole is provided on the top surface of the adjusting box 217, and the outer surface of the top end of the rack 223 slides through the through hole and extends to the top of the adjusting box 217. A rotating shaft 222 is provided in front of the adjusting box 217. The outer surface of the rear end of the rotating shaft 222 rotates through the front of the adjusting box 217 through the second bearing and extends to the inside of the adjusting box 217. A fixing plate is fixedly connected to the front of the adjusting box 217, and a worm 225 is rotatably connected to the top surface of the fixing plate through the second bearing seat. A worm wheel 226 is fixedly sleeved on the outer surface of the front end of the rotating shaft 222, and the outer surface of the worm wheel 226 is meshed with the outer surface of the worm 225.
转轴222后的外表面固定套设有齿轮221,齿轮221外表面与齿轮221外表面啮合连接,通过设置转轴222、蜗杆225、蜗轮226和齿轮221,转动转轴222,转轴222带动齿轮221转动,齿轮221驱动齿条223和安装板220和辊轮224向上移动,通过转动蜗杆225,蜗杆225驱动蜗轮226转动,使蜗轮226带动转轴222转动,利用蜗轮226和蜗杆225的自锁性,使齿条223位置相对稳定。A gear 221 is fixedly sleeved on the outer surface behind the rotating shaft 222, and the outer surface of the gear 221 is meshed with the outer surface of the gear 221. By setting the rotating shaft 222, the worm 225, the worm wheel 226 and the gear 221, the rotating shaft 222 is rotated, the rotating shaft 222 drives the gear 221 to rotate, and the gear 221 drives the rack 223, the mounting plate 220 and the roller 224 to move upward. By rotating the worm 225, the worm 225 drives the worm wheel 226 to rotate, so that the worm wheel 226 drives the rotating shaft 222 to rotate, and the self-locking property of the worm wheel 226 and the worm 225 is utilized to make the position of the rack 223 relatively stable.
使用时,转动锥齿环215,锥齿环215驱动两个锥齿轮214转动,锥齿轮214驱动螺杆213移动,螺杆213带动安装盒217、连接杆216和夹板211移动,使夹板211对钢筋笼顶端外表面进行夹持固定,通过安装盒217带动齿条223、安装板220、伸缩杆228和辊轮224移动,利用弹簧229的弹力,使辊轮224外表面挤压钢筋笼,混凝土向套筒1内部浇筑时,转动蜗杆225,蜗杆225驱动蜗轮226转动,使蜗轮226带动转轴222和齿轮221同步转动,齿轮221驱动齿条223和安装板220和辊轮224向上移动,使辊轮224沿钢筋笼外表面向上移动。When in use, the bevel gear ring 215 is rotated, and the bevel gear ring 215 drives the two bevel gears 214 to rotate, and the bevel gear 214 drives the screw 213 to move, and the screw 213 drives the installation box 217, the connecting rod 216 and the clamping plate 211 to move, so that the clamping plate 211 clamps and fixes the outer surface of the top end of the steel cage, and drives the rack 223, the mounting plate 220, the telescopic rod 228 and the roller 224 to move through the installation box 217, and utilizes the elastic force of the spring 229 to make the outer surface of the roller 224 squeeze the steel cage. When concrete is poured into the sleeve 1, the worm 225 is rotated, and the worm 225 drives the worm wheel 226 to rotate, so that the worm wheel 226 drives the rotating shaft 222 and the gear 221 to rotate synchronously, and the gear 221 drives the rack 223, the mounting plate 220 and the roller 224 to move upward, so that the roller 224 moves upward along the outer surface of the steel cage.
尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202420045743.XU CN221855520U (en) | 2024-01-09 | 2024-01-09 | A bridge underwater pile foundation construction device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202420045743.XU CN221855520U (en) | 2024-01-09 | 2024-01-09 | A bridge underwater pile foundation construction device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN221855520U true CN221855520U (en) | 2024-10-18 |
Family
ID=93041838
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202420045743.XU Active CN221855520U (en) | 2024-01-09 | 2024-01-09 | A bridge underwater pile foundation construction device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN221855520U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119859992A (en) * | 2025-02-12 | 2025-04-22 | 中建港航局集团有限公司 | Pile foundation structure of wharf |
| CN120739468A (en) * | 2025-09-03 | 2025-10-03 | 四川路桥盛通建筑工程有限公司 | Pile machine drilling positioning device for building foundation construction |
-
2024
- 2024-01-09 CN CN202420045743.XU patent/CN221855520U/en active Active
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119859992A (en) * | 2025-02-12 | 2025-04-22 | 中建港航局集团有限公司 | Pile foundation structure of wharf |
| CN119859992B (en) * | 2025-02-12 | 2025-09-30 | 中建港航局集团有限公司 | Pile foundation structure of wharf |
| CN120739468A (en) * | 2025-09-03 | 2025-10-03 | 四川路桥盛通建筑工程有限公司 | Pile machine drilling positioning device for building foundation construction |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN221855520U (en) | A bridge underwater pile foundation construction device | |
| CN220462993U (en) | Automatic sheet turning equipment | |
| CN218318672U (en) | An easy-to-install feed cover shaft | |
| CN216941818U (en) | Spreading roller of film laminating machine | |
| CN217652296U (en) | Assembled hanging flower basket for construction | |
| CN220891631U (en) | An adjustable teaching projector | |
| CN217480879U (en) | Reinforcing device for post-cast part of laminated slab | |
| CN218375259U (en) | Basic mold fixing fixture | |
| CN219196780U (en) | Concrete prefabricated component board seam adjustment structure | |
| CN217580503U (en) | Template is pour in escape canal with adjustable | |
| CN220246695U (en) | Aqueduct box girder vibrating device | |
| CN221850153U (en) | An adjustable angle deflection frame for spiral loop | |
| CN220247611U (en) | Building templates quick connecting device | |
| CN222726944U (en) | Die fixing device for building pouring | |
| CN223084148U (en) | Auxiliary device for splicing door, window and partition profiles | |
| CN216705883U (en) | Dummy bar storage device | |
| CN219890465U (en) | Measuring instrument for bridge construction | |
| CN221778909U (en) | A wall brick plastering machine | |
| CN219837564U (en) | Spiral steel pipe outer wall grinding device | |
| CN220259421U (en) | Cutting device for pile foundation reinforcement head | |
| CN217759996U (en) | Building cast-in-place concrete floor steel construction template | |
| CN221682493U (en) | Template supporting structure | |
| CN218762527U (en) | Assembled for building dress measuring instrument support | |
| CN217033343U (en) | Cofferdam reaction frame device for construction of deepwater bridge substructure | |
| CN220217798U (en) | A riser grinding device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |