CN221855443U - A drainage gate for dike engineering - Google Patents

A drainage gate for dike engineering Download PDF

Info

Publication number
CN221855443U
CN221855443U CN202323473659.2U CN202323473659U CN221855443U CN 221855443 U CN221855443 U CN 221855443U CN 202323473659 U CN202323473659 U CN 202323473659U CN 221855443 U CN221855443 U CN 221855443U
Authority
CN
China
Prior art keywords
gate
rotating shaft
filter screen
gate body
supporting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202323473659.2U
Other languages
Chinese (zh)
Inventor
盛方斌
胡坚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Danyang Yangtze River Embankment Engineering Management Office
Original Assignee
Danyang Yangtze River Embankment Engineering Management Office
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Danyang Yangtze River Embankment Engineering Management Office filed Critical Danyang Yangtze River Embankment Engineering Management Office
Priority to CN202323473659.2U priority Critical patent/CN221855443U/en
Application granted granted Critical
Publication of CN221855443U publication Critical patent/CN221855443U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Filtration Of Liquid (AREA)

Abstract

本实用新型公开了一种堤防工程排水闸板,具体涉及排水闸板技术领域,包括安装在堤防工程中的闸体,所述闸体内部后侧设有闸门,所述闸体顶部设有带动闸门升降的升降机构,所述升降机构包括设在闸体顶部的两个第一支撑板,两个所述第一支撑板之间通过轴承活动连接有第一转轴,所述闸体内部前侧设有对河水中垃圾进行过滤的滤网,所述闸体顶部设有对滤网进行拆卸和安装的拆卸机构,所述滤网前侧设有对垃圾进行清理的清理机构。本实用新型通过第一连接绳带动闸门升降,能够延长本实用新型的使用寿命,提高了闸门在使用时的稳定性,还通过拆卸机构对滤网进行替换,以避免造成堵塞影响排水。

The utility model discloses a drainage gate for dike engineering, specifically relates to the technical field of drainage gates, including a gate body installed in the dike engineering, a gate is provided at the rear side of the gate body, a lifting mechanism for driving the gate to be lifted and lowered is provided at the top of the gate body, the lifting mechanism includes two first support plates provided at the top of the gate body, a first rotating shaft is movably connected between the two first support plates through a bearing, a filter screen for filtering garbage in the river water is provided at the front side of the gate body, a disassembly mechanism for disassembling and installing the filter screen is provided at the top of the gate body, and a cleaning mechanism for cleaning garbage is provided at the front side of the filter screen. The utility model drives the gate to be lifted and lowered by a first connecting rope, which can extend the service life of the utility model, improve the stability of the gate when in use, and replace the filter screen through the disassembly mechanism to avoid blockage affecting drainage.

Description

一种堤防工程排水闸板A drainage gate for dike engineering

技术领域Technical Field

本实用新型涉及排水闸板技术领域,具体涉及一种堤防工程排水闸板。The utility model relates to the technical field of drainage gate plates, in particular to a drainage gate plate for a dike project.

背景技术Background Art

堤防工程是指沿河、渠、湖、海岸或行洪区、分洪区、围垦区的边缘修筑的挡水建筑物,而排水闸板是修建在河道和渠道上利用闸门控制流量和调节水位的低水头水工建筑物,关闭闸门可以拦洪、挡潮或抬高上游水位,以满足灌溉、发电、航运、水产、环保、工业和生活用水等需要;开启闸门,可以宣泄洪水、涝水、弃水或废水,也可对下游河道或渠道供水,在水利工程中,水闸作为挡水、泄水或取水的建筑物,应用广泛。A levee project refers to a water-retaining structure built along the edge of a river, canal, lake, coast, or floodway, flood diversion area, or reclamation area, while a drainage sluice gate is a low-head hydraulic structure built on rivers and channels that uses gates to control flow and regulate water levels. Closing the gates can block floods, tides, or raise upstream water levels to meet the needs of irrigation, power generation, shipping, aquatic products, environmental protection, industry, and domestic water use; opening the gates can discharge floods, waterlogging, abandoned water, or wastewater, and can also supply water to downstream rivers or channels. In water conservancy projects, sluices are widely used as structures for retaining, discharging, or taking in water.

例如申请号为202120265108.9的中国专利申请中提供的一种水利水电堤防工程用排水闸板,包括闸体、拨片和卡珠,所述闸体的一侧设置有丝杆,所述闸体的顶部设置有电机,所述闸体的表面焊接有连接板,所述连接板的一侧连接有操作器,所述操作器的内部连接有固定轴,所述固定轴的一端焊接有检修板,该技术方案中的过滤网的外壁尺寸与闸门的开口端内壁尺寸相匹配,且过滤网通过连接弹簧与闸门之间构成弹性联动结构,并且过滤网与闸门的连接处夹角呈90°,当闸门升起时,过滤网通过连接弹簧的弹性弹出闸门的内部,过滤网会对水流上的垃圾等进行过滤,当完全闸门升起时,水流上的垃圾停留在挡板的表面,再对挡板表面的垃圾进行清理,以便于达到清理垃圾的作用。For example, a drainage gate for water conservancy and hydropower embankment projects provided in the Chinese patent application with application number 202120265108.9 includes a gate body, a paddle and a card bead. A screw rod is provided on one side of the gate body, and a motor is provided on the top of the gate body. A connecting plate is welded on the surface of the gate body, and an operator is connected to one side of the connecting plate. A fixed shaft is connected to the inside of the operator, and an inspection plate is welded to one end of the fixed shaft. The outer wall size of the filter screen in this technical solution matches the inner wall size of the opening end of the gate, and the filter screen forms an elastic linkage structure with the gate through a connecting spring, and the angle between the filter screen and the gate is 90°. When the gate is raised, the filter screen pops out of the inside of the gate through the elasticity of the connecting spring, and the filter screen will filter the garbage on the water flow. When the gate is fully raised, the garbage on the water flow stays on the surface of the baffle, and then the garbage on the surface of the baffle is cleaned up to achieve the effect of cleaning garbage.

然而,该技术方案中仍然存在以下问题:由于闸板在使用时一般是浸泡在水下,多余水流从闸板顶部排走,该现有技术中的丝杆会与河水长时间直接接触,丝杆受到河水长时间的侵蚀,丝杆容易生锈,生锈的丝杆会影响闸板正常升降,防护效果相对较差。However, the following problems still exist in this technical solution: since the gate plate is generally immersed in water when in use, excess water flows away from the top of the gate plate, and the screw rod in the prior art will be in direct contact with the river water for a long time. The screw rod is corroded by the river water for a long time and is prone to rust. The rusty screw rod will affect the normal lifting and lowering of the gate plate, and the protective effect is relatively poor.

实用新型内容Utility Model Content

本实用新型的目的是提供一种堤防工程排水闸板,通过第一连接绳带动闸门升降,能够延长本实用新型的使用寿命,提高了闸门在使用时的稳定性,还通过拆卸机构对滤网进行替换,以避免造成堵塞影响排水,以解决技术中的上述不足之处。The purpose of the utility model is to provide a drainage gate plate for a dike project, which can extend the service life of the utility model by driving the gate to rise and fall through a first connecting rope, improve the stability of the gate when in use, and replace the filter screen through a disassembly mechanism to avoid blockage and affect drainage, so as to solve the above-mentioned deficiencies in the technology.

为了实现上述目的,本实用新型提供如下技术方案:一种堤防工程排水闸板,包括安装在堤防工程中的闸体,所述闸体内部后侧设有闸门,所述闸体顶部设有带动闸门升降的升降机构;In order to achieve the above-mentioned purpose, the utility model provides the following technical solutions: a drainage gate plate for dike engineering, comprising a gate body installed in the dike engineering, a gate is arranged at the rear side of the gate body, and a lifting mechanism for driving the gate to be lifted and lowered is arranged at the top of the gate body;

所述升降机构包括设在闸体顶部的两个第一支撑板,两个所述第一支撑板之间通过轴承活动连接有第一转轴,所述第一转轴两端均贯穿设有第一转辊,所述第一转辊外部缠绕有第一连接绳,所述第一连接绳底部延伸入闸体内部,所述闸门顶部固定设有两个第一连接环,位于同一侧的所述第一连接环顶部与第一连接绳底端固定连接,所述第一转轴一端贯穿第一支撑板并延伸出第一支撑板一侧,延伸出所述第一支撑板一侧的第一转轴一端固定设有第一电机,所述第一电机通过支架与闸体顶部固定连接,所述闸体内部两侧均开设有滑槽,所述闸门两侧分别位于两个滑槽内部并能够在滑槽内部上下滑动,用于带动闸门升降。The lifting mechanism includes two first support plates arranged on the top of the gate body, a first rotating shaft is movably connected between the two first support plates through a bearing, first rotating rollers are penetrated at both ends of the first rotating shaft, a first connecting rope is wrapped around the outside of the first rotating roller, and the bottom of the first connecting rope extends into the gate body, two first connecting rings are fixedly provided on the top of the gate, the top of the first connecting ring on the same side is fixedly connected to the bottom end of the first connecting rope, one end of the first rotating shaft penetrates the first support plate and extends out of one side of the first support plate, and a first motor is fixedly provided at one end of the first rotating shaft extending out of one side of the first support plate, and the first motor is fixedly connected to the top of the gate body through a bracket, and sliding grooves are opened on both sides of the gate body, and the two sides of the gate are respectively located in the two sliding grooves and can slide up and down in the sliding grooves, so as to drive the gate to rise and fall.

优选的,所述闸体内部前侧设有对河水中垃圾进行过滤的滤网,所述闸体顶部设有对滤网进行拆卸和安装的拆卸机构,所述拆卸机构包括插接在闸体内部前侧的连接框,所述滤网位于连接框底部,所述连接框顶部贯穿闸体并延伸出闸体顶部,所述连接框顶部固定设有连接板,所述连接板两侧均开设有第一螺纹孔,所述闸体顶部两侧均开设有第二螺纹孔,相连通的所述第一螺纹孔和第二螺纹孔内部螺纹连接有同一个螺栓,用于对滤网进行拆卸和安装。Preferably, a filter screen for filtering garbage in the river water is provided on the front side of the gate body, and a disassembly mechanism for disassembling and installing the filter screen is provided on the top of the gate body. The disassembly mechanism includes a connecting frame plugged into the front side of the gate body, the filter screen is located at the bottom of the connecting frame, the top of the connecting frame penetrates the gate body and extends out of the top of the gate body, a connecting plate is fixed to the top of the connecting frame, first threaded holes are provided on both sides of the connecting plate, and second threaded holes are provided on both sides of the top of the gate body. The first threaded holes and the second threaded holes that are connected are internally threadedly connected with the same bolt for disassembling and installing the filter screen.

优选的,所述滤网前侧设有对垃圾进行清理的清理机构,所述清理机构包括设在滤网底部前侧的收集箱,所述收集箱底部开设有多个通孔,所述闸体顶部前侧固定设有两个第二支撑板,两个所述第二支撑板之间通过轴承活动连接有第二转轴,所述第二转轴两端贯穿设有第二转辊,所述第二转辊外部缠绕有第二连接绳,所述收集箱顶部两侧固定设有第二连接环,位于同一侧的所述第二连接绳底端与第二连接环顶部固定连接,所述第二转轴一端贯穿第二支撑板并延伸出第二支撑板一侧,延伸出所述第二支撑板一侧的第二转轴一端固定设有第二电机,所述第二电机通过支架与第二支撑板侧壁固定连接,用于对垃圾进行清理。Preferably, a cleaning mechanism for cleaning garbage is provided on the front side of the filter, and the cleaning mechanism includes a collecting box arranged on the front side of the bottom of the filter, a plurality of through holes are opened at the bottom of the collecting box, two second support plates are fixedly provided on the front side of the top of the gate body, a second rotating shaft is movably connected between the two second support plates through bearings, second rotating shaft has second rollers passing through both ends, a second connecting rope is wrapped around the outside of the second roller, second connecting rings are fixedly provided on both sides of the top of the collecting box, the bottom end of the second connecting rope on the same side is fixedly connected to the top of the second connecting ring, one end of the second rotating shaft passes through the second support plate and extends out of one side of the second support plate, a second motor is fixedly provided on one end of the second rotating shaft extending out of one side of the second support plate, and the second motor is fixedly connected to the side wall of the second support plate through a bracket for cleaning garbage.

优选的,所述第二连接绳和第一连接绳均采用剑麻植物编织而成,该麻绳在水中长久浸泡也不会腐烂,特别是不怕海水,而且湿透水后强度更大,所有船用(特别是出海的)缆绳都是用这种绳。Preferably, the second connecting rope and the first connecting rope are both woven from sisal plants, which will not rot even if soaked in water for a long time, are especially not afraid of seawater, and are stronger after being soaked in water. All ship cables (especially those used at sea) are made of this type of rope.

在上述技术方案中,本实用新型提供的技术效果和优点:In the above technical solution, the technical effects and advantages provided by the utility model are:

需要将闸门升起时,启动第一电机,第一电机能够带动第一转轴转动,第一转轴转动能够带动第一转辊转动,第一转辊转动能够对第一连接绳进行收卷,利用第一连接绳带动闸门升起进行开闸放水,相对现有技术中使用丝杆带动闸门升降的方式来看,本实用新型通过第一连接绳带动闸门升降,能够延长本实用新型的使用寿命,提高了闸门在使用时的稳定性;When the gate needs to be raised, the first motor is started, the first motor can drive the first shaft to rotate, the rotation of the first shaft can drive the first roller to rotate, the rotation of the first roller can reel in the first connecting rope, and the first connecting rope is used to drive the gate to rise to open the gate and release water. Compared with the method of using a screw rod to drive the gate to rise and fall in the prior art, the utility model drives the gate to rise and fall by the first connecting rope, which can extend the service life of the utility model and improve the stability of the gate when in use;

需要定期对滤网进行替换时,以避免造成堵塞影响排水,转动螺栓,将螺栓从第二螺纹孔内部转出,然后拉动连接板,利用连接板带动连接框移动,将连接框从闸体内部拉出,就能够对滤网进行替换,从而能够避免造成堵塞而影响正常排水。When the filter needs to be replaced regularly to avoid blockage and affect drainage, turn the bolt and turn it out from the second threaded hole, then pull the connecting plate, use the connecting plate to drive the connecting frame to move, pull the connecting frame out from the gate body, and the filter can be replaced, thus avoiding blockage and affecting normal drainage.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

为了更清楚地说明本申请实施例或现有技术中的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型中记载的一些实施例,对于本领域普通技术人员来讲,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present utility model. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.

图1为本实用新型的前视图;Figure 1 is a front view of the utility model;

图2为本实用新型的后视图;Figure 2 is a rear view of the utility model;

图3为本实用新型的升降机构的结构示意图;FIG3 is a schematic structural diagram of a lifting mechanism of the present invention;

图4为本实用新型的拆卸机构的结构示意图;FIG4 is a schematic structural diagram of a disassembly mechanism of the present invention;

图5为本实用新型的清理机构的结构示意图。FIG. 5 is a schematic structural diagram of the cleaning mechanism of the present invention.

附图标记说明:Description of reference numerals:

1闸体、2闸门;1 gate body, 2 gates;

3升降机构、301第一支撑板、302第一转轴、303第一转辊、304第一连接绳、305第一连接环、306滑槽、307第一电机;3 lifting mechanism, 301 first support plate, 302 first rotating shaft, 303 first rotating roller, 304 first connecting rope, 305 first connecting ring, 306 sliding groove, 307 first motor;

4滤网;4 filters;

5拆卸机构、501连接框、502连接板、503第一螺纹孔、504第二螺纹孔、505螺栓;5 disassembly mechanism, 501 connection frame, 502 connection plate, 503 first threaded hole, 504 second threaded hole, 505 bolt;

6清理机构、601收集箱、602通孔、603第二支撑板、604第二转轴、605第二转辊、606第二连接绳、607第二连接环、608第二电机。6 cleaning mechanism, 601 collecting box, 602 through hole, 603 second supporting plate, 604 second rotating shaft, 605 second rotating roller, 606 second connecting rope, 607 second connecting ring, 608 second motor.

实施方式Implementation

为了使本领域的技术人员更好地理解本实用新型的技术方案,下面将结合附图对本实用新型作进一步的详细介绍。In order to enable those skilled in the art to better understand the technical solution of the present invention, the present invention will be further described in detail below in conjunction with the accompanying drawings.

本实用新型提供了如图1-5所示的一种堤防工程排水闸板,包括安装在堤防工程中的闸体1,所述闸体1内部后侧设有闸门2,所述闸体1顶部设有带动闸门2升降的升降机构3;The utility model provides a dike engineering drainage gate as shown in Figures 1-5, comprising a gate body 1 installed in the dike engineering, a gate 2 is provided at the rear side of the gate body 1, and a lifting mechanism 3 is provided on the top of the gate body 1 to drive the gate 2 to rise and fall;

如图3所示,所述升降机构3包括设在闸体1顶部的两个第一支撑板301,两个所述第一支撑板301之间通过轴承活动连接有第一转轴302,所述第一转轴302两端均贯穿设有第一转辊303,所述第一转辊303外部缠绕有第一连接绳304,所述第一连接绳304底部延伸入闸体1内部,所述闸门2顶部固定设有两个第一连接环305,位于同一侧的所述第一连接环305顶部与第一连接绳304底端固定连接,所述第一转轴302一端贯穿第一支撑板301并延伸出第一支撑板301一侧,延伸出所述第一支撑板301一侧的第一转轴302一端固定设有第一电机307,所述第一电机307通过支架与闸体1顶部固定连接,所述闸体1内部两侧均开设有滑槽306,所述闸门2两侧分别位于两个滑槽306内部并能够在滑槽306内部上下滑动;As shown in FIG3 , the lifting mechanism 3 comprises two first support plates 301 arranged at the top of the gate body 1, a first rotating shaft 302 is movably connected between the two first support plates 301 through a bearing, first rollers 303 are penetrated at both ends of the first rotating shaft 302, a first connecting rope 304 is wound around the outside of the first rotating roller 303, the bottom of the first connecting rope 304 extends into the gate body 1, two first connecting rings 305 are fixedly arranged on the top of the gate 2, the top of the first connecting ring 305 located on the same side is fixedly connected to the bottom end of the first connecting rope 304, one end of the first rotating shaft 302 penetrates the first support plate 301 and extends out of one side of the first support plate 301, one end of the first rotating shaft 302 extending out of one side of the first support plate 301 is fixedly provided with a first motor 307, the first motor 307 is fixedly connected to the top of the gate body 1 through a bracket, slide grooves 306 are opened on both sides of the gate body 1, the two sides of the gate 2 are respectively located in the two slide grooves 306 and can slide up and down in the slide grooves 306;

需要将闸门2升起时,启动第一电机307,第一电机307能够带动第一转轴302转动,第一转轴302转动能够带动第一转辊303转动,第一转辊303转动能够对第一连接绳304进行收卷,利用第一连接绳304带动闸门2升起进行开闸放水,闸门2能够在滑槽306内部上下滑动对闸门2进行限位,相对现有技术中使用丝杆带动闸门2升降的方式来看,本实用新型通过第一连接绳304带动闸门2升降,能够延长本实用新型的使用寿命,提高了闸门2在使用时的稳定性。When the gate 2 needs to be raised, the first motor 307 is started, and the first motor 307 can drive the first rotating shaft 302 to rotate. The rotation of the first rotating shaft 302 can drive the first rotating roller 303 to rotate. The rotation of the first rotating roller 303 can reel in the first connecting rope 304. The first connecting rope 304 is used to drive the gate 2 to rise to open the gate and release water. The gate 2 can slide up and down inside the slide groove 306 to limit the gate 2. Compared with the prior art method of using a screw rod to drive the gate 2 to rise and fall, the utility model drives the gate 2 to rise and fall by the first connecting rope 304, which can extend the service life of the utility model and improve the stability of the gate 2 when in use.

如图4所示,所述闸体1内部前侧设有对河水中垃圾进行过滤的滤网4,所述闸体1顶部设有对滤网4进行拆卸和安装的拆卸机构5,所述拆卸机构5包括插接在闸体1内部前侧的连接框501,所述滤网4位于连接框501底部,所述连接框501顶部贯穿闸体1并延伸出闸体1顶部,所述连接框501顶部固定设有连接板502,所述连接板502两侧均开设有第一螺纹孔503,所述闸体1顶部两侧均开设有第二螺纹孔504,相连通的所述第一螺纹孔503和第二螺纹孔504内部螺纹连接有同一个螺栓505;As shown in FIG4 , a filter screen 4 for filtering garbage in the river water is provided on the front side of the gate body 1, and a disassembly mechanism 5 for disassembling and installing the filter screen 4 is provided on the top of the gate body 1. The disassembly mechanism 5 includes a connection frame 501 plugged into the front side of the gate body 1, the filter screen 4 is located at the bottom of the connection frame 501, the top of the connection frame 501 penetrates the gate body 1 and extends out of the top of the gate body 1, a connection plate 502 is fixedly provided on the top of the connection frame 501, first threaded holes 503 are provided on both sides of the connection plate 502, and second threaded holes 504 are provided on both sides of the top of the gate body 1, and the first threaded holes 503 and the second threaded holes 504 that are connected are internally threadedly connected with the same bolt 505;

定期对滤网4进行替换的过程中,转动螺栓505,将螺栓505从第二螺纹孔504内部转出,然后拉动连接板502,利用连接板502带动连接框501移动,将连接框501从闸体1内部拉出,就能够对滤网4进行替换,以避免造成堵塞影响排水,将新的滤网4插接在闸体1内部即可。During the process of regularly replacing the filter 4, turn the bolt 505 to turn it out from the second threaded hole 504, then pull the connecting plate 502, use the connecting plate 502 to drive the connecting frame 501 to move, and pull the connecting frame 501 out from the gate body 1. In this way, the filter 4 can be replaced to avoid blockage that affects drainage, and the new filter 4 can be inserted into the gate body 1.

如图5所示,所述滤网4前侧设有对垃圾进行清理的清理机构6,所述清理机构6包括设在滤网4底部前侧的收集箱601,所述收集箱601底部开设有多个通孔602,所述闸体1顶部前侧固定设有两个第二支撑板603,两个所述第二支撑板603之间通过轴承活动连接有第二转轴604,所述第二转轴604两端贯穿设有第二转辊605,所述第二转辊605外部缠绕有第二连接绳606,所述收集箱601顶部两侧固定设有第二连接环607,位于同一侧的所述第二连接绳606底端与第二连接环607顶部固定连接,所述第二转轴604一端贯穿第二支撑板603并延伸出第二支撑板603一侧,延伸出所述第二支撑板603一侧的第二转轴604一端固定设有第二电机608,所述第二电机608通过支架与第二支撑板603侧壁固定连接;As shown in FIG5 , a cleaning mechanism 6 for cleaning garbage is provided at the front side of the filter screen 4, and the cleaning mechanism 6 includes a collection box 601 provided at the front side of the bottom of the filter screen 4, and a plurality of through holes 602 are provided at the bottom of the collection box 601, and two second support plates 603 are fixedly provided at the front side of the top of the gate body 1, and a second rotating shaft 604 is movably connected between the two second support plates 603 through a bearing, and second rotating rollers 605 are penetrated at both ends of the second rotating shaft 604, and a second connecting rope 606 is wound around the outside of the second rotating roller 605, and second connecting rings 607 are fixedly provided at both sides of the top of the collection box 601, and the bottom end of the second connecting rope 606 located on the same side is fixedly connected to the top of the second connecting ring 607, one end of the second rotating shaft 604 penetrates the second supporting plate 603 and extends out of one side of the second supporting plate 603, and one end of the second rotating shaft 604 extending out of one side of the second supporting plate 603 is fixedly provided with a second motor 608, and the second motor 608 is fixedly connected to the side wall of the second supporting plate 603 through a bracket;

如图3、5所示、所述第二连接绳606和第一连接绳304均采用剑麻植物编织而成,该麻绳在水中长久浸泡也不会腐烂,特别是不怕海水,而且湿透水后强度更大,所有船用特别是出海的缆绳都是用这种绳;As shown in FIGS. 3 and 5 , the second connecting rope 606 and the first connecting rope 304 are both woven from sisal plants. The sisal rope will not rot even if it is soaked in water for a long time, especially it is not afraid of seawater, and it has greater strength after being soaked in water. All ships, especially cables for going out to sea, use this rope;

滤网4能够对河水中的垃圾进行过滤,启动第二电机608,第二电机608能够带动第二转轴604转动,第二转轴604转动能够带动第二转辊605转动,第二转辊605带动第二连接绳606进行收卷,利用第二连接绳606拉动收集箱601向上移动,收集箱601向上移动能够将河水中的垃圾收进收集箱601内部,水通过收集箱601底部的通孔602排出,当收集箱601上升到闸体1顶部时,对收集箱601内部的垃圾进行清理。The filter 4 can filter the garbage in the river water, and the second motor 608 is started. The second motor 608 can drive the second rotating shaft 604 to rotate. The rotation of the second rotating shaft 604 can drive the second roller 605 to rotate. The second roller 605 drives the second connecting rope 606 to reel up. The second connecting rope 606 is used to pull the collecting box 601 upward. The upward movement of the collecting box 601 can collect the garbage in the river water into the collecting box 601, and the water is discharged through the through hole 602 at the bottom of the collecting box 601. When the collecting box 601 rises to the top of the gate body 1, the garbage inside the collecting box 601 is cleaned.

以上只通过说明的方式描述了本实用新型的某些示范性实施例,毋庸置疑,对于本领域的普通技术人员,在不偏离本实用新型的精神和范围的情况下,可以用各种不同的方式对所描述的实施例进行修正。因此,上述附图和描述在本质上是说明性的,不应理解为对本实用新型权利要求保护范围的限制。The above only describes some exemplary embodiments of the present invention by way of illustration. It is undoubted that those skilled in the art can modify the described embodiments in various ways without departing from the spirit and scope of the present invention. Therefore, the above drawings and descriptions are illustrative in nature and should not be construed as limiting the scope of protection of the claims of the present invention.

Claims (7)

1. The utility model provides a dyke engineering drainage flashboard, includes the floodgate body (1) of installing in the dyke engineering, its characterized in that: the rear side of the inside of the gate body (1) is provided with a gate (2), and the top of the gate body (1) is provided with a lifting mechanism (3) for driving the gate (2) to lift;
The lifting mechanism (3) comprises two first support plates (301) arranged at the top of the gate body (1), the two first support plates (301) are movably connected with a first rotating shaft (302) through bearings, two ends of the first rotating shaft (302) are respectively provided with a first rotating roller (303) in a penetrating mode, first connecting ropes (304) are wound outside the first rotating rollers (303), the bottoms of the first connecting ropes (304) extend into the gate body (1), two first connecting rings (305) are fixedly arranged at the top of the gate (2), and the tops of the first connecting rings (305) located on the same side are fixedly connected with the bottom ends of the first connecting ropes (304);
The front side inside the floodgate body (1) is equipped with the filter screen (4) that filters rubbish in the river, floodgate body (1) top is equipped with dismantles and installs detaching mechanism (5) of filter screen (4).
2. A dike engineering drainage gate as claimed in claim 1 wherein: one end of the first rotating shaft (302) penetrates through the first supporting plate (301) and extends out of one side of the first supporting plate (301), one end of the first rotating shaft (302) extending out of one side of the first supporting plate (301) is fixedly provided with a first motor (307), and the first motor (307) is fixedly connected with the top of the brake body (1) through a bracket.
3. A dike engineering drainage gate as claimed in claim 1 wherein: slide grooves (306) are formed in two sides of the inside of the gate body (1), and two sides of the gate (2) are respectively located in the two slide grooves (306) and can slide up and down in the slide grooves (306).
4. A dike engineering drainage gate as claimed in claim 1 wherein: the utility model discloses a floodgate body, including dismantling mechanism (5), including grafting at the inside front side of floodgate body (1) connecting frame (501), filter screen (4) are located connecting frame (501) bottom, connecting frame (501) top runs through floodgate body (1) and extends floodgate body (1) top, connecting frame (501) top is fixed to be equipped with connecting plate (502), first screw hole (503) have all been seted up to connecting plate (502) both sides, second screw hole (504) have all been seted up to floodgate body (1) top both sides, are linked together first screw hole (503) and second screw hole (504) internal thread connection have same bolt (505).
5. A dike engineering drainage gate as claimed in claim 1 wherein: a cleaning mechanism (6) for cleaning garbage is arranged at the front side of the filter screen (4);
The cleaning mechanism (6) comprises a collection box (601) arranged at the front side of the bottom of the filter screen (4), a plurality of through holes (602) are formed in the bottom of the collection box (601), two second support plates (603) are fixedly arranged at the front side of the top of the brake body (1), second rotating shafts (604) are movably connected between the second support plates (603) through bearings, second rotating rollers (605) are arranged at two ends of each second rotating shaft in a penetrating mode, second connecting ropes (606) are wound outside the second rotating rollers (605), second connecting rings (607) are fixedly arranged at two sides of the top of the collection box (601), and the bottoms of the second connecting ropes (606) and the tops of the second connecting rings (607) are fixedly connected at the same side.
6. The dike engineering drainage flashboard of claim 5, wherein: one end of the second rotating shaft (604) penetrates through the second supporting plate (603) and extends out of one side of the second supporting plate (603), a second motor (608) is fixedly arranged at one end of the second rotating shaft (604) extending out of one side of the second supporting plate (603), and the second motor (608) is fixedly connected with the side wall of the second supporting plate (603) through a bracket.
7. The dike engineering drainage flashboard of claim 5, wherein: the second connecting rope (606) and the first connecting rope (304) are woven by sisal hemp plants.
CN202323473659.2U 2023-12-20 2023-12-20 A drainage gate for dike engineering Active CN221855443U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202323473659.2U CN221855443U (en) 2023-12-20 2023-12-20 A drainage gate for dike engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202323473659.2U CN221855443U (en) 2023-12-20 2023-12-20 A drainage gate for dike engineering

Publications (1)

Publication Number Publication Date
CN221855443U true CN221855443U (en) 2024-10-18

Family

ID=93055286

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202323473659.2U Active CN221855443U (en) 2023-12-20 2023-12-20 A drainage gate for dike engineering

Country Status (1)

Country Link
CN (1) CN221855443U (en)

Similar Documents

Publication Publication Date Title
CN211036895U (en) River dam water-retaining gate
CN101215831A (en) Water area floating object cleaning device
CN211523145U (en) Self-driven floating garbage cleaning device for water facing side of rubber dam
CN110644432A (en) River course is repaiied and is prevented river course flood prevention device for engineering
CN110284466A (en) A kind of river group bonding gate and its water control method
CN214168974U (en) Hydraulic engineering gate cleaning device
CN221855443U (en) A drainage gate for dike engineering
CN207469204U (en) A water conservancy project river cleaning device
CN219080235U (en) A water discharge gate for removing impurities and preventing blockage
CN218346105U (en) Sluice for hydraulic engineering
CN111519588A (en) Intelligent lifting intercepting device for medium and small river channels
CN218454387U (en) Split type energy-saving water gate
CN116446348B (en) Water conservancy hydropower station water blocking dam with sediment separation function
CN217948972U (en) Drainage gate for water conservancy and hydropower embankment engineering
CN217810880U (en) River course floater collection river sluice
CN217733953U (en) Be used for sluice water retaining surface pasture and water cleaning device
CN221721765U (en) Anti-silting protection device for water conservancy dam
CN211621489U (en) River sluice for hydraulic engineering
CN112144480A (en) Gravity opening and closing double-leaf hydraulic gate
CN207812405U (en) A kind of hydraulic engineering filter pipe being convenient to clean
CN221919283U (en) A river flood control gate
CN221663599U (en) A flood control structure of a dam
CN221645728U (en) A flood control and drainage structure for water conservancy projects
CN221741184U (en) A gate device for water utilization
CN217174644U (en) Hydraulic engineering river sluice convenient to change

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant