CN221855256U - A foldable construction access road on the coast - Google Patents

A foldable construction access road on the coast Download PDF

Info

Publication number
CN221855256U
CN221855256U CN202420351886.3U CN202420351886U CN221855256U CN 221855256 U CN221855256 U CN 221855256U CN 202420351886 U CN202420351886 U CN 202420351886U CN 221855256 U CN221855256 U CN 221855256U
Authority
CN
China
Prior art keywords
platform
coast
clamping
connecting beam
guardrail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202420351886.3U
Other languages
Chinese (zh)
Inventor
王强
吴国强
林皆良
刘玉虎
包江
赖泽华
袁国庆
范仰中
李建波
李佳峻
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC Shanghai Dredging Co Ltd.
Original Assignee
CCCC Shanghai Dredging Co Ltd.
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC Shanghai Dredging Co Ltd. filed Critical CCCC Shanghai Dredging Co Ltd.
Priority to CN202420351886.3U priority Critical patent/CN221855256U/en
Application granted granted Critical
Publication of CN221855256U publication Critical patent/CN221855256U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

A coast folding type construction channel comprises a connecting beam, wherein a platform is fixed at the upper end of the connecting beam, a plurality of clamping seats are arranged on the left and right sides of the platform along the length direction, and guardrails are rotationally connected with the clamping seats; the left guardrail and the right guardrail are folded in a horizontal state and locked by bolts in a vertical state; the left edge, the right edge and the lower end of the corresponding connecting beam of the platform are provided with a plurality of clamping grooves along the length direction, and the clamping grooves are spliced and locked with the upright posts driven into the bank. The coast folding type construction passageway provided by the utility model is convenient to detach and install quickly, and is safe and reliable.

Description

Coast folding construction passageway
Technical Field
The utility model relates to a construction pavement, in particular to a coast folding construction pavement.
Background
When carrying out seaside, shore pile foundation construction, the construction passageway provides very big convenience for pile foundation construction's operating personnel, because the frequent transfer of construction passageway needs, and the passageway that current construction is commonly used exists the installation and demolishs difficulty, and upright welded guardrail is fragile in the hoist and mount in-process, leads to characteristics such as the life cycle is short of passageway.
Disclosure of Invention
The utility model aims to solve the technical problem of providing a coast folding type construction passageway, which is characterized in that the whole folded passageway is hoisted to a specific position through a welded hoisting ring to install the passageway, the folding guardrails on two sides can be unfolded after the supporting and the installation of the passageway are completed, and the folding type construction passageway is convenient to detach in the later period and is not easy to damage.
In order to solve the technical problems, the utility model adopts the following technical scheme:
A coast folding type construction channel comprises a connecting beam, wherein a platform is fixed at the upper end of the connecting beam, a plurality of clamping seats are arranged on the left and right sides of the platform along the length direction, and guardrails are rotationally connected with the clamping seats; the left guardrail and the right guardrail are folded in a horizontal state and locked by bolts in a vertical state; the left edge, the right edge and the lower end of the corresponding connecting beam of the platform are provided with a plurality of clamping grooves along the length direction, and the clamping grooves are spliced and locked with the upright posts driven into the bank.
Three groups of bolt holes are transversely arranged on the outer side of each clamping groove, the three groups of bolt holes are arranged in a right-angled triangle shape, and the corresponding clamping grooves are in a right trapezoid shape matched with the three groups of bolt holes.
The left and right sides of the platform are welded with hanging rings.
The left guardrail and the right guardrail are staggered by a certain distance.
The utility model provides a coast folding type construction channel, which has the following technical effects:
1) The guardrails on the two sides of the platform are staggered by a certain distance, and the guardrails can be rotatably arranged on the platform, so that the guardrails can be folded conveniently; in the process of installing the device, the guardrail is kept folded to avoid damage to the guardrail in the process of installing; after the channel is installed, the guardrails on two sides are unfolded, and the guardrails are fixed through square clamping seats and bolts, so that protection is provided.
2) The clamping groove at the bottom of the channel is provided with a bolt hole to be connected with the upright post, and the upright post at the bottom can be properly adjusted according to the on-site environmental condition and stress mode, so that the channel can be vertically installed and can be inclined at a certain angle. Flexibility is improved. In addition, the clamping groove structure is convenient for quick disassembly after the use of the temporary way is finished, and then the temporary way is hoisted and transferred to a place.
Drawings
The utility model is further illustrated by the following examples in conjunction with the accompanying drawings:
fig. 1 is a schematic view of a folded state of the present utility model.
Fig. 2 is a top view of the folded state of the present utility model.
Fig. 3 is a front view of the folded state of the present utility model.
Fig. 4 is a schematic structural view of the working state of the present utility model.
Fig. 5 is a front view of the present utility model in operation.
In the figure: the device comprises a connecting beam 1, a platform 2, guardrails 3, clamping seats 4, clamping grooves 5, hanging rings 6 and stand columns 7.
Detailed Description
As shown in fig. 1-2, a coast folding type construction passageway comprises connecting beams 1 which are arranged left and right along the length direction, wherein the connecting beams 1 are processed by adopting i-steel. The upper ends of the two connecting beams 1 are welded with a platform 2, and the platform 2 is formed by processing steel plates. The platform 2 is provided with a plurality of clamping seats 4 at intervals along the length direction by bolts, the clamping seats 4 are shaped like a Chinese character 'ji', and the outer side surface of each clamping seat 4 is horizontally provided with a bolt hole. The corresponding guard rail 3 is arranged in the clamping seat 4 and can rotate freely. The folding state and the vertical state can be maintained, and when in the vertical state, the guardrail 3 is required to be tightly propped against the inner wall of the clamping seat 4 by screwing in the bolts, so that the purpose of locking and limiting is achieved, and the guardrail 3 is kept in the vertical state.
In addition, a clamping groove 5 is welded at the bottom of the connecting beam 1 along the length direction, a bolt hole is formed in the clamping groove 5, and the clamping groove 5 can be connected with the upper end of a stand column 7 inserted into the land of the shore through a bolt.
Preferably, the three groups of bolt holes in the clamping groove 5 are arranged in a right triangle, and when the bolts are screwed into the two vertical bolt holes of the clamping groove 5, the upright post 7 is vertical to the platform 2 as shown in fig. 4; when the oblique installation is required, the bolts are screwed into the two holes in the oblique direction of the clamping groove 5. So that the included angle between the upright post 7 and the platform 2 is larger than 90 degrees, and the platform 2 is obliquely installed. The inclined installation mode is particularly suitable for bank slope installation.
Working principle and process: during installation, the guardrail 3 is folded, the lifting ring 6 is hooked by using lifting equipment, the whole folded channel is lifted to a specific position, and the clamping groove 5 is clamped with the post 7 driven in advance by the bank and is locked by using a bolt. And then the guardrails 3 with two folded sides are unfolded, and the guardrails 3 are vertically screwed into the bolts for locking.

Claims (4)

1. The utility model provides a coast folding construction passageway which characterized in that: the novel guardrail comprises a connecting beam (1), wherein a platform (2) is fixed at the upper end of the connecting beam (1), a plurality of clamping seats (4) are arranged on the left and right sides of the platform (2) along the length direction, and the guardrail (3) is rotationally connected with the clamping seats (4); the left and right guardrails (3) are folded in a horizontal state and locked by bolts in a vertical state; the left and right edges of the platform (2) and the lower ends of the corresponding connecting beams (1) are provided with a plurality of clamping grooves (5) along the length direction, and the clamping grooves (5) are spliced and locked with upright posts (7) driven into the bank.
2. A coast folding construction aisle according to claim 1, characterized in that: three groups of bolt holes are transversely arranged on the outer side of each clamping groove (5), the three groups of bolt holes are arranged in a right-angled triangle shape, and the shape of the corresponding clamping groove (5) is a right trapezoid matched with the three groups of bolt holes.
3. A coast folding construction aisle according to claim 1, characterized in that: the left and right sides of the platform (2) are welded with hanging rings (6).
4. A coast folding construction aisle according to claim 1, characterized in that: the left and right guardrails (3) are staggered by a certain distance.
CN202420351886.3U 2024-02-26 2024-02-26 A foldable construction access road on the coast Active CN221855256U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202420351886.3U CN221855256U (en) 2024-02-26 2024-02-26 A foldable construction access road on the coast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202420351886.3U CN221855256U (en) 2024-02-26 2024-02-26 A foldable construction access road on the coast

Publications (1)

Publication Number Publication Date
CN221855256U true CN221855256U (en) 2024-10-18

Family

ID=93035835

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202420351886.3U Active CN221855256U (en) 2024-02-26 2024-02-26 A foldable construction access road on the coast

Country Status (1)

Country Link
CN (1) CN221855256U (en)

Similar Documents

Publication Publication Date Title
CN104963301B (en) The dilatory translation downward putting device and method removed for pier top beam section and bridge pier
CN217839714U (en) Adjustable railway pier top hanging fence installation device
CN113846827A (en) Jacking platform suitable for foundation ditch
CN219411929U (en) Steel construction slip construction limb protection device
CN221053297U (en) I-steel anchoring device for suspension type ladder cage shelving platform for vertical shaft
CN112832691A (en) Oil derrick reinforced structure
CN217998886U (en) Narrow space climbing platform
CN112227694A (en) An integrated climbing frame system and its assembly method
CN217508096U (en) Easily install electric power circuit modularization crossing structure
CN215631492U (en) Detachable elevator shaft protection support frame
CN210977265U (en) A turnable unitized lattice tower crane foundation lifting device
CN210973666U (en) Simple lifting device for upright post construction cylinder of antiaircraft gun billboard
CN215210937U (en) Integrated pile stabilizing platform
CN220884718U (en) Simple crawling ladder applicable to connecting platform and barge under different tide level conditions
CN221741957U (en) Elevator well scaffold system
CN214402508U (en) Guard rail structure for temporary use in building construction
CN119735130B (en) A double-support structure for repairing and replacing damaged photovoltaic load-bearing cable supports and its application method
CN220226326U (en) Building construction faces limit protection architecture
CN218293508U (en) Geology drilling platform on water
CN223753813U (en) A detachable concrete pier base protective railing
CN215164753U (en) A assembled guardrail for high mound top construction
CN221373191U (en) Assembled tower footing safety barrier
CN216764072U (en) Vertical hoisting device
CN221256139U (en) Hanging die fixing system for water collecting well and elevator pit
CN223034004U (en) Top operation platform of steel pipe pile construction tool section

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant