CN221823237U - A color steel tile connection mechanism - Google Patents

A color steel tile connection mechanism Download PDF

Info

Publication number
CN221823237U
CN221823237U CN202323573219.4U CN202323573219U CN221823237U CN 221823237 U CN221823237 U CN 221823237U CN 202323573219 U CN202323573219 U CN 202323573219U CN 221823237 U CN221823237 U CN 221823237U
Authority
CN
China
Prior art keywords
steel tile
color steel
tile body
support frame
movable plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202323573219.4U
Other languages
Chinese (zh)
Inventor
张文涛
宋雪姣
李振华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Xinpuhui New Building Materials Co ltd
Original Assignee
Anhui Xinpuhui New Building Materials Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Xinpuhui New Building Materials Co ltd filed Critical Anhui Xinpuhui New Building Materials Co ltd
Priority to CN202323573219.4U priority Critical patent/CN221823237U/en
Application granted granted Critical
Publication of CN221823237U publication Critical patent/CN221823237U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model relates to the technical field of color steel tile connection, and discloses a color steel tile connection mechanism which comprises a first color steel tile body and a second color steel tile body which are symmetrically arranged, wherein a first support frame and a second support frame are respectively arranged on the top surfaces of the first color steel tile body and the second color steel tile body, a connection mechanism for connecting the first color steel tile body and the second color steel tile body is arranged on the first support frame and the second support frame, the connection mechanism comprises a movable plate which is in sliding connection with the surface of the first support frame, an adjusting screw is rotatably connected to the top surface of the movable plate, and a plurality of groups of clamping heads are equidistantly arranged on the bottom surface of the movable plate. The color steel tile connecting mechanism solves the problems that the existing color steel tiles are mostly fixed through the open nails or through reserved screw perforation, the installation is troublesome, screw holes are difficult to align accurately, the installation difficulty is improved, and meanwhile, water leakage is very easy to occur due to too many screw holes.

Description

一种彩钢瓦连接机构A color steel tile connection mechanism

技术领域Technical Field

本实用新型涉及彩钢瓦连接技术领域,具体为一种彩钢瓦连接机构。The utility model relates to the technical field of color steel tile connection, in particular to a color steel tile connection mechanism.

背景技术Background Art

彩钢瓦:又称彩色压型瓦,是采用彩色涂层钢板,经辊压冷弯成各种波形的压型板,目前广泛应用于工业与民用建筑、仓库、特种建筑、大跨度钢结构房屋的屋面、墙面以及内外墙装饰等。Color steel tiles: also known as colored corrugated tiles, are made of color-coated steel plates, which are rolled and cold-bent into various corrugated corrugated plates. They are currently widely used in industrial and civil buildings, warehouses, special buildings, roofs, walls, and interior and exterior wall decoration of large-span steel structure houses.

现有的彩钢瓦大多通过明钉锁固定或者通过预留螺钉穿孔固定,安装较为麻烦,螺孔难以准确对齐,提高安装难度,同时过多的螺钉孔极易出现漏水的现象,因此需要一种彩钢瓦连接机构来解决上述问题。Most of the existing color steel tiles are fixed by open nails or through reserved screw holes, which is troublesome to install. The screw holes are difficult to align accurately, which increases the difficulty of installation. At the same time, too many screw holes are prone to water leakage. Therefore, a color steel tile connection mechanism is needed to solve the above problems.

实用新型内容Utility Model Content

(一)解决的技术问题1. Technical issues to be solved

针对现有技术的不足,本实用新型提供了一种彩钢瓦连接机构,解决了现有的彩钢瓦大多通过明钉锁固定或者通过预留螺钉穿孔固定,安装较为麻烦,螺孔难以准确对齐,提高安装难度,同时过多的螺钉孔极易出现漏水现象的问题。In view of the deficiencies in the prior art, the utility model provides a color steel tile connection mechanism, which solves the problem that most of the existing color steel tiles are fixed by exposed nails or by reserved screw holes, which is troublesome to install, the screw holes are difficult to align accurately, and the installation difficulty is increased. At the same time, too many screw holes are prone to water leakage.

(二)技术方案(II) Technical solution

本实用新型解决上述技术问题的技术方案如下:一种彩钢瓦连接机构,包括对称设置的第一彩钢瓦本体和第二彩钢瓦本体,所述第一彩钢瓦本体和第二彩钢瓦本体的顶部表面分别安装有第一支撑架和第二支撑架,所述第一支撑架和第二支撑架上设置有用于连接第一彩钢瓦本体和第二彩钢瓦本体的连接组件;The technical solution of the utility model to solve the above technical problems is as follows: a color steel tile connection mechanism, comprising a first color steel tile body and a second color steel tile body arranged symmetrically, a first support frame and a second support frame are respectively installed on the top surfaces of the first color steel tile body and the second color steel tile body, and a connection component for connecting the first color steel tile body and the second color steel tile body is arranged on the first support frame and the second support frame;

所述连接组件包括滑动连接在第一支撑架表面的移动板,所述移动板的顶部表面转动连接有调节螺杆,所述移动板的底部表面等距安装有多组卡头,所述第一支撑架上且位于卡头的底部安装有锁定块,所述第二支撑架上安装有卡接块,所述卡接块内滑动连接有多组锁定杆,每组所述锁定杆的表面均套设有弹簧,所述卡接块的顶部表面滑动连接有拨动板。The connecting assembly includes a movable plate slidably connected to the surface of the first supporting frame, the top surface of the movable plate is rotatably connected to an adjusting screw, and a plurality of groups of clamps are equidistantly installed on the bottom surface of the movable plate, a locking block is installed on the first supporting frame and at the bottom of the clamp, and a clamping block is installed on the second supporting frame, and a plurality of groups of locking rods are slidably connected in the clamping block, and a spring is sleeved on the surface of each group of the locking rods, and a toggle plate is slidably connected to the top surface of the clamping block.

优选的,所述移动板的两端均安装有限位块,所述第一支撑架的内壁对称开设有两组与限位块相适配的矩形滑槽,所述移动板通过两组限位块滑动连接在第一支撑架上。Preferably, both ends of the movable plate are installed with limit blocks, the inner wall of the first support frame is symmetrically provided with two groups of rectangular sliding grooves adapted to the limit blocks, and the movable plate is slidably connected to the first support frame through the two groups of limit blocks.

优选的,所述移动板的顶部表面安装有转座,所述调节螺杆通过转座转动连接在移动板的顶部,所述调节螺杆的顶端贯穿第一支撑架并延伸至第一支撑架的顶部且延伸段的端头安装有旋钮。Preferably, a swivel seat is installed on the top surface of the movable plate, and the adjusting screw is rotatably connected to the top of the movable plate via the swivel seat. The top end of the adjusting screw passes through the first support frame and extends to the top of the first support frame, and a knob is installed at the end of the extension section.

优选的,所述锁定块的内部开设有多组与锁定杆相适配的卡孔,且每组所述卡孔的顶部均开设有与卡头相适配的通孔,每组所述锁定杆的顶部均开设有与卡头相适配的卡槽。Preferably, the locking block has multiple groups of holes matched with the locking rods, and each group of holes has a through hole matched with the clamping head on the top, and each group of locking rods has a slot matched with the clamping head on the top.

优选的,每组所述锁定杆的端头且位于卡接块内安装有端板,端板的表面安装有连接块,所述卡接块的顶部开设有与连接块相适配的矩形调节槽,所述拨动板通过连接块与端板连接。Preferably, an end plate is installed at the end of each group of locking rods and located in the clamping block, a connecting block is installed on the surface of the end plate, a rectangular adjustment groove adapted to the connecting block is opened on the top of the clamping block, and the toggle plate is connected to the end plate through the connecting block.

本实用新型的有益效果是:The beneficial effects of the utility model are:

1)、该彩钢瓦连接机构,通过设置的连接组件,在对第一彩钢瓦本体和第二彩钢瓦本体进行拼接时,首先将第一彩钢瓦本体和第二彩钢瓦本体对齐后,推动拨动板使其带动锁定杆伸出并进入卡接块的内部,随后转动调节螺杆使得卡头将锁定杆卡接稳固即可保证第一彩钢瓦本体和第二彩钢瓦本体之间连接的稳定性,同时也大大减少了安装孔的设置,有效降低了漏水的概率。1) The color steel tile connection mechanism, through the connection assembly set up, when splicing the first color steel tile body and the second color steel tile body, first align the first color steel tile body and the second color steel tile body, push the toggle plate to drive the locking rod to extend and enter the interior of the clamping block, and then rotate the adjusting screw so that the clamp head clamps the locking rod firmly to ensure the stability of the connection between the first color steel tile body and the second color steel tile body. At the same time, it also greatly reduces the setting of the installation holes, effectively reducing the probability of water leakage.

2)、该彩钢瓦连接机构,通过设置的第一支撑架和第二支撑架将连接组件支撑起来,从而保证第一彩钢瓦本体和第二彩钢瓦本体的排水排杂性能的同时又能保证第一彩钢瓦本体和第二彩钢瓦本体连接的稳定性和紧密性。2) The color steel tile connection mechanism supports the connection assembly by setting up the first support frame and the second support frame, thereby ensuring the drainage and impurity removal performance of the first color steel tile body and the second color steel tile body while ensuring the stability and tightness of the connection between the first color steel tile body and the second color steel tile body.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

图1为本实用新型的俯视图;Fig. 1 is a top view of the utility model;

图2为本实用新型第二彩钢瓦本体的侧视图;Figure 2 is a side view of the second color steel tile body of the utility model;

图3为本实用新型第一彩钢瓦本体的侧视图;Figure 3 is a side view of the first color steel tile body of the utility model;

图4为本实用新型移动板结构示意图;Figure 4 is a schematic diagram of the structure of the movable plate of the utility model;

图5为本实用新型锁定杆安装结构示意图。FIG. 5 is a schematic diagram of the installation structure of the locking rod of the utility model.

图中:1、第一彩钢瓦本体;2、第二彩钢瓦本体;3、第一支撑架;4、第二支撑架;5、连接组件;501、移动板;502、调节螺杆;503、卡头;504、锁定块;505、卡接块;506、锁定杆;507、弹簧;508、拨动板。In the figure: 1. The first color steel tile body; 2. The second color steel tile body; 3. The first support frame; 4. The second support frame; 5. The connecting assembly; 501. The moving plate; 502. The adjusting screw; 503. The clamping head; 504. The locking block; 505. The clamping block; 506. The locking rod; 507. The spring; 508. The toggle plate.

具体实施方式DETAILED DESCRIPTION

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.

实施例一,由图1-5示出,一种彩钢瓦连接机构,包括对称设置的第一彩钢瓦本体1和第二彩钢瓦本体2,第一彩钢瓦本体1和第二彩钢瓦本体2的顶部表面分别安装有第一支撑架3和第二支撑架4,第一支撑架3和第二支撑架4上设置有用于连接第一彩钢瓦本体1和第二彩钢瓦本体2的连接组件5;Embodiment 1, as shown in Figures 1-5, a color steel tile connection mechanism comprises a first color steel tile body 1 and a second color steel tile body 2 which are symmetrically arranged, a first support frame 3 and a second support frame 4 are respectively installed on the top surfaces of the first color steel tile body 1 and the second color steel tile body 2, and a connection component 5 for connecting the first color steel tile body 1 and the second color steel tile body 2 is arranged on the first support frame 3 and the second support frame 4;

连接组件5包括滑动连接在第一支撑架3表面的移动板501,移动板501的顶部表面转动连接有调节螺杆502,移动板501的底部表面等距安装有多组卡头503,第一支撑架3上且位于卡头503的底部安装有锁定块504,第二支撑架4上安装有卡接块505,卡接块505内滑动连接有多组锁定杆506,每组锁定杆506的表面均套设有弹簧507,卡接块505的顶部表面滑动连接有拨动板508。The connecting assembly 5 includes a movable plate 501 slidably connected to the surface of the first supporting frame 3, the top surface of the movable plate 501 is rotatably connected to an adjusting screw 502, a plurality of groups of clamping heads 503 are equidistantly installed on the bottom surface of the movable plate 501, a locking block 504 is installed on the first supporting frame 3 and at the bottom of the clamping head 503, a clamping block 505 is installed on the second supporting frame 4, a plurality of groups of locking rods 506 are slidably connected in the clamping block 505, a spring 507 is sleeved on the surface of each group of locking rods 506, and a toggle plate 508 is slidably connected to the top surface of the clamping block 505.

其中移动板501的两端均安装有限位块,第一支撑架3的内壁对称开设有两组与限位块相适配的矩形滑槽,移动板501通过两组限位块滑动连接在第一支撑架3上,移动板501的顶部表面安装有转座,调节螺杆502通过转座转动连接在移动板501的顶部,调节螺杆502的顶端贯穿第一支撑架3并延伸至第一支撑架3的顶部且延伸段的端头安装有旋钮。Limit blocks are installed at both ends of the movable plate 501, and two groups of rectangular sliding grooves compatible with the limit blocks are symmetrically opened on the inner wall of the first support frame 3. The movable plate 501 is slidably connected to the first support frame 3 through the two groups of limit blocks. A swivel seat is installed on the top surface of the movable plate 501, and the adjusting screw 502 is rotatably connected to the top of the movable plate 501 through the swivel seat. The top end of the adjusting screw 502 passes through the first support frame 3 and extends to the top of the first support frame 3, and a knob is installed at the end of the extension section.

通过设置的该结构推动拨动板508使其带动锁定杆506伸出并进入卡接块505的内部,随后转动调节螺杆502使得卡头503将锁定杆506卡接稳固即可保证第一彩钢瓦本体1和第二彩钢瓦本体2之间连接的稳定性。By setting up this structure, the toggle plate 508 is pushed to drive the locking rod 506 to extend and enter the interior of the clamping block 505, and then the adjusting screw 502 is rotated so that the clamping head 503 clamps the locking rod 506 firmly to ensure the stability of the connection between the first color steel tile body 1 and the second color steel tile body 2.

其中锁定块504的内部开设有多组与锁定杆506相适配的卡孔,且每组卡孔的顶部均开设有与卡头503相适配的通孔,每组锁定杆506的顶部均开设有与卡头503相适配的卡槽。The locking block 504 has multiple groups of holes matched with the locking rod 506 inside, and each group of holes has a through hole matched with the clamping head 503 on the top, and each group of locking rods 506 has a slot matched with the clamping head 503 on the top.

其中每组锁定杆506的端头且位于卡接块505内安装有端板,端板的表面安装有连接块,卡接块505的顶部开设有与连接块相适配的矩形调节槽,拨动板508通过连接块与端板连接,通过设置的该结构能够通过转动调节螺杆502带动移动板501及其表面的卡头503与锁定杆506分离,在弹簧507的作用下使得锁定杆506自动回缩,结构简单。The end of each group of locking rods 506 is equipped with an end plate in the clamping block 505, and a connecting block is installed on the surface of the end plate. A rectangular adjustment groove adapted to the connecting block is provided on the top of the clamping block 505, and the toggle plate 508 is connected to the end plate through the connecting block. This structure can drive the moving plate 501 and the clamping head 503 on its surface to separate from the locking rod 506 by rotating the adjusting screw 502, and the locking rod 506 is automatically retracted under the action of the spring 507, and the structure is simple.

工作原理:在对第一彩钢瓦本体1和第二彩钢瓦本体2进行拼接时,首先将第一彩钢瓦本体1和第二彩钢瓦本体2对齐后,推动拨动板508使其带动锁定杆506伸出并进入卡接块505的内部,随后转动调节螺杆502使得卡头503将锁定杆506卡接稳固即可保证第一彩钢瓦本体1和第二彩钢瓦本体2之间连接的稳定性,同时也大大减少了安装孔的设置,有效降低了漏水的概率,通过设置的第一支撑架3和第二支撑架4将连接组件5支撑起来,从而保证第一彩钢瓦本体1和第二彩钢瓦本体2的排水排杂性能的同时又能保证第一彩钢瓦本体1和第二彩钢瓦本体2连接的稳定性和紧密性。Working principle: When splicing the first color steel tile body 1 and the second color steel tile body 2, first align the first color steel tile body 1 and the second color steel tile body 2, push the toggle plate 508 to drive the locking rod 506 to extend and enter the interior of the clamping block 505, and then rotate the adjusting screw 502 so that the clamping head 503 clamps the locking rod 506 firmly to ensure the stability of the connection between the first color steel tile body 1 and the second color steel tile body 2. At the same time, the setting of the mounting holes is greatly reduced, and the probability of water leakage is effectively reduced. The connecting assembly 5 is supported by the first support frame 3 and the second support frame 4, so as to ensure the drainage and impurity removal performance of the first color steel tile body 1 and the second color steel tile body 2 while ensuring the stability and tightness of the connection between the first color steel tile body 1 and the second color steel tile body 2.

需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在包括所述要素的过程、方法、物品或者设备中还存在另外的相同要素。It should be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.

尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.

Claims (5)

1. Various steel tile coupling mechanism, including first various steel tile body (1) and the various steel tile body (2) of second that the symmetry set up, its characterized in that: the top surfaces of the first color steel tile body (1) and the second color steel tile body (2) are respectively provided with a first supporting frame (3) and a second supporting frame (4), and a connecting component (5) for connecting the first color steel tile body (1) and the second color steel tile body (2) is arranged on the first supporting frame (3) and the second supporting frame (4);
Coupling assembling (5) are including sliding connection at the movable plate (501) on first support frame (3) surface, the top surface of movable plate (501) rotates and is connected with adjusting screw (502), multiunit chuck (503) are installed to the bottom surface equidistance of movable plate (501), locking piece (504) are installed to the bottom that just is located chuck (503) on first support frame (3), install joint piece (505) on second support frame (4), sliding connection has multiunit locking lever (506) in joint piece (505), every group the surface of locking lever (506) all overlaps and is equipped with spring (507), the top surface sliding connection of joint piece (505) has toggle plate (508).
2. The color steel tile connecting mechanism according to claim 1, wherein: limiting blocks are arranged at two ends of the moving plate (501), two groups of rectangular sliding grooves matched with the limiting blocks are symmetrically formed in the inner wall of the first supporting frame (3), and the moving plate (501) is slidably connected to the first supporting frame (3) through the two groups of limiting blocks.
3. The color steel tile connecting mechanism according to claim 1, wherein: the top surface mounting of movable plate (501) has the swivel mount, adjusting screw (502) are rotated through the swivel mount and are connected at the top of movable plate (501), the top of adjusting screw (502) runs through first support frame (3) and extends to the top of first support frame (3) and the knob is installed to the end of extension.
4. The color steel tile connecting mechanism according to claim 1, wherein: the inside of locking piece (504) has seted up multiunit and locking lever (506) looks adaptation card hole, and every group the through-hole with dop (503) looks adaptation is all seted up at the top of card hole, every group locking lever (506) the draw-in groove with dop (503) looks adaptation is all seted up at the top.
5. The color steel tile connecting mechanism according to claim 1, wherein: the end of each locking rod (506) is provided with an end plate in the clamping block (505), the surface of the end plate is provided with a connecting block, the top of the clamping block (505) is provided with a rectangular adjusting groove matched with the connecting block, and the stirring plate (508) is connected with the end plate through the connecting block.
CN202323573219.4U 2023-12-27 2023-12-27 A color steel tile connection mechanism Active CN221823237U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202323573219.4U CN221823237U (en) 2023-12-27 2023-12-27 A color steel tile connection mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202323573219.4U CN221823237U (en) 2023-12-27 2023-12-27 A color steel tile connection mechanism

Publications (1)

Publication Number Publication Date
CN221823237U true CN221823237U (en) 2024-10-11

Family

ID=92961075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202323573219.4U Active CN221823237U (en) 2023-12-27 2023-12-27 A color steel tile connection mechanism

Country Status (1)

Country Link
CN (1) CN221823237U (en)

Similar Documents

Publication Publication Date Title
CN218562710U (en) Assembled board house building roof steel construction
CN110593423A (en) High-efficient heat preservation heat-proof device of building
CN221823237U (en) A color steel tile connection mechanism
CN217106167U (en) A spliced light and thin formwork for prefabricated buildings
CN221502297U (en) A kind of assembled building sealing and waterproof structure
CN218091497U (en) An energy-saving curtain wall with hollow heat insulation function
CN219011994U (en) Assembled wall body locating rack for assembled building
CN217128645U (en) A green and environmentally friendly energy-saving building curtain wall
CN217758965U (en) Combined steel formwork structure for advanced water stop of basement exterior wall
CN214785301U (en) Light fast-assembling wallboard for concrete frame building and wall system constructed by light fast-assembling wallboard
CN214575398U (en) A wall spray humidification device for building construction
CN110453837B (en) Energy-saving and heat-preserving unit curtain wall structure of inter-window wall
CN214144500U (en) Ceramic external wall panel with heat preservation mechanism
CN114232821A (en) Building heat insulation plate made of new material
CN221546520U (en) Prefabricated assembled cooling house
CN217840677U (en) Integrative compound decoration aluminum plate keeps warm
CN221929691U (en) A rooftop distributed photovoltaic fixing device
CN221622045U (en) Curtain shutter processing and positioning device with adjustable turnover angle
CN219491833U (en) Temporary house building structure of easy-to-detach construction site
CN211597300U (en) Glass curtain wall connecting system with decorative strips
CN221372746U (en) Building heat preservation type outer wall assembly
CN220704993U (en) House wallboard connection structure
CN221168342U (en) Square steel joist structure convenient to installation
CN223164244U (en) One-step forming template and reinforcing device for sill coping rabbet
CN220868537U (en) Water batch plate for metal curtain wall

Legal Events

Date Code Title Description
GR01 Patent grant