CN221810705U - An assembled disc-type scaffolding - Google Patents
An assembled disc-type scaffolding Download PDFInfo
- Publication number
- CN221810705U CN221810705U CN202420039985.8U CN202420039985U CN221810705U CN 221810705 U CN221810705 U CN 221810705U CN 202420039985 U CN202420039985 U CN 202420039985U CN 221810705 U CN221810705 U CN 221810705U
- Authority
- CN
- China
- Prior art keywords
- disc
- plug
- connecting column
- installation
- assembled
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
The utility model discloses an assembled disc-buckle scaffold, which comprises an installation upright rod, a disc fixedly installed on the outer side of the upper end of the installation upright rod, a first support cross rod connected with the outer side of the disc, and further comprises: the second supports the horizontal pole, and it is equally installed in the outside end of disc and is perpendicular type with first support horizontal pole and distribute, and the outside both ends of first support horizontal pole and second support horizontal pole are all fixed mounting has the plug, and wherein the plug is close to the one end middle part of disc and is open-type setting: the second links up the post, and its integration fixed mounting is in the upper end middle part of disc, and the top outside of second links up the post is provided with the ejector pin, the lower extreme outside of ejector pin and installation pole setting is all integrated fixed mounting has the connecting rod. This assembled dish knot formula scaffold frame conveniently carries out assembled concatenation installation to multiunit installation pole setting, is convenient for improve the installation effect, and the volume of installation pole setting is less simultaneously, can reduce area, convenient removal and transportation.
Description
Technical Field
The utility model relates to the technical field of disc-buckle type scaffolds, in particular to an assembled disc-buckle type scaffold.
Background
The disc buckle type scaffold is a disc type scaffold, belongs to a novel scaffold, has the advantages of few structures, convenient construction and disassembly and large bearing capacity, and is widely applied to support designs of bridge engineering such as general viaducts, tunnel engineering, workshops and special workshops at present.
Chinese patent is authorized publication No. CN217812213U a novel disc-buckle scaffold, it includes unable adjustment base and establishes pole setting on the unable adjustment base, the vertical setting of pole setting, the cover is equipped with the slip sleeve in the pole setting, the slip sleeve can be followed the length direction of pole setting removes and can fix in the pole setting, be equipped with the connection pad on the slip sleeve, the connection pad is even to have the horizontal pole. The application can solve the problem that the existing disc-buckling scaffold cannot adjust the position of the cross rod according to actual conditions.
Most prior art solutions suffer from the following drawbacks: the length of the installation upright rod is fixed and longer, so that the whole volume is larger, certain limitation exists in transportation and movement, and the assembly installation effect is poor.
Disclosure of utility model
The utility model aims to provide an assembled disc buckle type scaffold, which aims to solve the problems that the installation upright rod provided in the background technology is fixed in length and longer in length, so that the whole volume is large, certain limitation exists in transportation and movement, and the assembled installation effect is poor.
In order to achieve the above purpose, the present utility model provides the following technical solutions: the utility model provides an assembled dish knot formula scaffold frame, includes the installation pole setting to and integration fixed mounting is in the disc in the installation pole setting upper end outside, and the first support horizontal pole that the disc outside is connected still includes:
The second supports the horizontal pole, and it is equally installed in the outside end of disc and is perpendicular type with first support horizontal pole and distribute, and the outside both ends of first support horizontal pole and second support horizontal pole are all fixed mounting has the plug, and wherein the plug is close to the one end middle part of disc and is open-type setting:
The second links up the post, and its integration fixed mounting is in the upper end middle part of disc, and the top outside of second links up the post is provided with the ejector pin, the lower extreme outside of ejector pin and installation pole setting is all integrated fixed mounting has the connecting rod.
Preferably, the prefabricated jack is arranged in the plug in a penetrating mode, the fixed plug is arranged on the inner side of the plug in a penetrating and inserting mode through the prefabricated jack, and through hole structures matched with the fixed plug are arranged in the disc in an equal angle mode.
Preferably, the diameter of the upper end of the fixed bolt is larger than that of the lower end of the fixed bolt, and the fixed bolt plays a role in fixed installation of the plug, wherein the plug is connected with the disc in a plugging manner.
Preferably, the bottom outside of installation pole setting is provided with first linking post, and the lower extreme outside welded fastening of first linking post has the unable adjustment base that the slope set up, and wherein threaded hole has been seted up in the bottom apex angle department of first linking post, and the diameter size of first linking post equals the diameter size of second linking post.
Preferably, the first linking post and the second linking post are provided with mounting holes in the inside, and the connecting rod is connected with the second linking post and the first linking post in a clamping manner through the mounting holes.
Preferably, the inner wall end of the mounting hole is fixed with positioning blocks at equal angles, and positioning grooves which are matched with the positioning blocks and correspond to each other one by one are formed in the outer wall of the connecting rod.
Preferably, the positioning block is connected with the connecting rod in a clamping manner through the positioning groove and plays a role in positioning and mounting the connecting rod.
Compared with the prior art, the utility model has the beneficial effects that: the assembled disc buckle type scaffold is convenient to assemble, splice and install a plurality of groups of installation upright rods, convenient to improve the installation effect, small in volume, capable of reducing the occupied area and convenient to move and transport;
1. The connecting rod is arranged and is respectively connected with the second connecting column and the first connecting column in a clamping manner through the mounting hole, the vertical rod is installed in a handheld manner, the connecting rod is tightly inserted into the first connecting column and aligned with the positioning groove and the positioning block, the positioning groove and the positioning block can position the connecting rod at the moment, the installation vertical rod is convenient to install accurately, and therefore the installation vertical rod and the disc are convenient to install fixedly;
Furthermore, the connecting rods at the lower ends of the other group of installation vertical rods are inserted into the second connecting columns according to the steps, so that a plurality of groups of installation vertical rods and discs are assembled and spliced, the installation effect is improved, meanwhile, the installation vertical rods are small in size, the occupied area can be reduced, and the movement and the transportation are convenient;
2. The diameter of the upper end of the fixed bolt is larger than that of the lower end of the fixed bolt, the plug is connected with the disc in a plugging mode, after installation of the vertical rod, the plug can be plugged into the outer side of the disc, the prefabricated jack is aligned with a through hole structure formed in the disc, then the fixed bolt is sequentially inserted into the plug and the disc from top to bottom, and the top of the fixed bolt is knocked by a hammer, so that the plug and the disc are tightly combined.
Drawings
FIG. 1 is a schematic diagram of the overall structure of the present utility model;
FIG. 2 is a schematic diagram of the whole explosion structure of the connection of the installation upright (1) and the first connecting column (7);
FIG. 3 is an enlarged schematic view of the structure of FIG. 2A according to the present utility model;
fig. 4 is a schematic diagram of the overall explosion structure of the connection of the disc (2) and the plug (4) of the utility model.
In the figure: 1. installing a vertical rod; 2. a disc; 3. a first support rail; 4. a plug; 5. fixing the bolt; 6. prefabricating jacks; 7. a first adapter column; 8. a fixed base; 9. a threaded hole; 10. a second adapter column; 11. a push rod; 12. a connecting rod; 13. a positioning groove; 14. a mounting hole; 15. a positioning block; 16. and a second support rail.
Detailed Description
The following description of the embodiments of the present utility model will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present utility model, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
Referring to fig. 1-4, the present utility model provides a technical solution: the utility model provides an assembled dish knot formula scaffold frame, including installation pole setting 1, and integration fixed mounting is in the disc 2 in the installation pole setting 1 upper end outside, and the first support horizontal pole 3 of disc 2 outside connection, still include that second support horizontal pole 16 is installed equally in the outside end of disc 2 and is perpendicular type distribution with first support horizontal pole 3, and the equal fixed mounting in outside both ends of first support horizontal pole 3 and second support horizontal pole 16 has plug 4, wherein plug 4 is close to the one end middle part of disc 2 and is open type setting, prefabricated jack 6 has been seted up in the inside run through of plug 4, and the inboard of plug 4 runs through the grafting through prefabricated jack 6 and is provided with fixed bolt 5, wherein the inside equiangular of disc 2 has been seted up with fixed bolt 5 looks adaptation's through-hole structure, the bottom outside of installation pole setting 1 is provided with first linking post 7, and the lower extreme outside welded fastening of first linking post 7 has the unable adjustment base 8 that the slope set up, wherein the bottom apex angle department of first linking post 7 runs through and has seted up threaded hole 9:
Meanwhile, the second connecting column 10 is integrally and fixedly arranged in the middle of the upper end of the disc 2, a push rod 11 is arranged on the outer side of the top of the second connecting column 10, a connecting rod 12 is integrally and fixedly arranged on the outer sides of the lower ends of the push rod 11 and the installation upright 1, mounting holes 14 are formed in the first connecting column 7 and the second connecting column 10, positioning blocks 15 are fixed at the inner wall ends of the mounting holes 14 at equal angles, positioning grooves 13 which are matched with the positioning blocks 15 and correspond to each other one by one are formed in the outer wall of the connecting rod 12, and the assembly type disc buckle scaffold is formed by combination.
When the fabricated disc-buckling scaffold is used, as shown in fig. 1 and 2, firstly, the first linking column 7 is stably placed on a designated plane, a screw is rotationally inserted into the threaded hole 9, the first linking column 7 is conveniently fixed, and as shown in fig. 3, the connecting rod 12 is respectively connected with the second linking column 10 and the first linking column 7 in a clamping manner through the mounting hole 14, the vertical rod 1 is installed by hand, the connecting rod 12 is tightly inserted into the first linking column 7 and the positioning groove 13 is aligned with the positioning block 15, at the moment, the positioning groove 13 and the positioning block 15 can position the connecting rod 12, so that the vertical rod 1 is conveniently and accurately installed, the vertical rod 1 and the disc 2 are conveniently and fixedly installed, then the connecting rod 12 at the lower end of the other group of the vertical rod 1 is conveniently and fixedly installed in the second linking column 10 according to the steps, so that the installation effect is conveniently improved, meanwhile, the volume of the vertical rod 1 is smaller, the occupied area is reduced, the vertical rod 11 is conveniently moved and transported, and finally, the vertical rod 11 is fixedly installed at the top of the vertical rod 1 through the connecting rod 12 and is conveniently contacted with the outer side of the supporting structure 11;
Specifically, as shown in fig. 1 and fig. 4, since the diameter of the upper end of the fixing bolt 5 is larger than that of the lower end of the fixing bolt, the plug 4 is connected with the disc 2 in a plugging manner, after the installation of the installation upright 1 is completed, the plug 4 can be plugged into the outer side of the disc 2, the prefabricated jack 6 is aligned with the through hole structure formed in the disc 2, then the fixing bolt 5 is sequentially inserted into the plug 4 and the disc 2 from top to bottom, the top of the fixing bolt 5 is knocked by a hammer, the plug 4 and the disc 2 are tightly combined, and in the same way, the second support cross rod 16 can be installed, so that the first support cross rod 3 and the second support cross rod 16 can conveniently support and strengthen the installation upright 1, namely the use method of the fabricated disc buckle type scaffold.
Standard parts used in the utility model can be purchased from the market, special-shaped parts can be customized according to the description of the specification and the drawings, the specific connection modes of all parts adopt conventional means such as mature bolts, rivets and welding in the prior art, the machinery, the parts and the equipment adopt conventional modes in the prior art, and the circuit connection adopts conventional connection modes in the prior art, so that details are not described in detail in the specification, and the utility model belongs to the prior art known to the person skilled in the art.
Although the present utility model has been described with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described, or equivalents may be substituted for elements thereof, and any modifications, equivalents, improvements and changes may be made without departing from the spirit and principles of the present utility model.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202420039985.8U CN221810705U (en) | 2024-01-08 | 2024-01-08 | An assembled disc-type scaffolding |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202420039985.8U CN221810705U (en) | 2024-01-08 | 2024-01-08 | An assembled disc-type scaffolding |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN221810705U true CN221810705U (en) | 2024-10-08 |
Family
ID=92915059
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202420039985.8U Expired - Fee Related CN221810705U (en) | 2024-01-08 | 2024-01-08 | An assembled disc-type scaffolding |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN221810705U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119177758A (en) * | 2024-10-25 | 2024-12-24 | 中国三冶集团有限公司 | A kind of joint-type buckled scaffold and construction method |
-
2024
- 2024-01-08 CN CN202420039985.8U patent/CN221810705U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN119177758A (en) * | 2024-10-25 | 2024-12-24 | 中国三冶集团有限公司 | A kind of joint-type buckled scaffold and construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN211873325U (en) | Steel construction prefabricated formula building coupling assembling | |
| CN216974154U (en) | Plate buckle frame support | |
| CN216740588U (en) | Large-span telescopic scaffold | |
| CN216109594U (en) | Construction engineering place construction is with scaffold frame of encorbelmenting of dismouting operation of being convenient for | |
| CN108149909B (en) | Adjustable steel pipe scaffold | |
| CN221878501U (en) | Assembled board house steel construction roof | |
| CN2604485Y (en) | combined scaffold for building | |
| CN221722461U (en) | Tent frame easy to splice | |
| CN220886612U (en) | Assembled elevator steel construction convenient to equipment | |
| CN223281656U (en) | Wind-resistant scaffolding for construction | |
| CN220954542U (en) | Can dismantle scalable elevator shaft operation platform structure | |
| CN220377770U (en) | Finalized assembly type operation platform | |
| CN222478119U (en) | Disc buckle type scaffold connecting structure | |
| CN224002300U (en) | A modular scaffolding structure for garbage pits | |
| CN220353375U (en) | Cantilever scaffold pole setting positioner and cantilever scaffold | |
| CN221920528U (en) | Fence is kept apart in building engineering safety control | |
| CN220673076U (en) | Mounting frame structure for box-type substation | |
| CN222822539U (en) | A steel beam fixing structure | |
| CN223414822U (en) | Truss type connecting piece | |
| CN222275249U (en) | Assembled bridge guardrail | |
| CN220747528U (en) | All-steel raised floor mounting structure | |
| CN223047884U (en) | A link structure of an assembled bridge | |
| CN217678638U (en) | Bridge engineering is with preventing full hall supporting structure that falls | |
| CN212957338U (en) | Easily install long-life balcony guardrail | |
| CN217151259U (en) | Steel pipe supporting structure at building door opening |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20241008 |