CN221809285U - A fire protection pipe joint installation angle positioning device - Google Patents
A fire protection pipe joint installation angle positioning device Download PDFInfo
- Publication number
- CN221809285U CN221809285U CN202323613396.0U CN202323613396U CN221809285U CN 221809285 U CN221809285 U CN 221809285U CN 202323613396 U CN202323613396 U CN 202323613396U CN 221809285 U CN221809285 U CN 221809285U
- Authority
- CN
- China
- Prior art keywords
- sleeve
- angle
- positioning device
- pipe joint
- fire protection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 title claims abstract description 42
- 230000007246 mechanism Effects 0.000 claims abstract description 20
- 229910000831 Steel Inorganic materials 0.000 claims description 13
- 239000010959 steel Substances 0.000 claims description 13
- 230000008602 contraction Effects 0.000 claims description 4
- 230000003014 reinforcing effect Effects 0.000 claims description 3
- 239000012780 transparent material Substances 0.000 claims description 3
- 238000000034 method Methods 0.000 abstract description 8
- 230000008569 process Effects 0.000 abstract description 4
- 238000010276 construction Methods 0.000 description 5
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 5
- 239000002184 metal Substances 0.000 description 3
- 230000009471 action Effects 0.000 description 2
- 238000011010 flushing procedure Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 238000003032 molecular docking Methods 0.000 description 2
- 230000000007 visual effect Effects 0.000 description 2
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Landscapes
- Joints Allowing Movement (AREA)
Abstract
本申请公开了一种消防管道接头安装角度定位装置,包括用于可拆卸固定套设在消防管道上的套管,所述套管上分别转动连接有角度指示盘和定位机构,所述定位机构包括可转动套设在消防管道上的转环,所述转环上固定安装有升降机构,所述升降机构上分别固定设置有用于与接头端面贴平的定位板和用于与所述角度指示盘贴合的指针。本实用新型能够对管道接头的空间偏转角度进行精确定位,使得在管道安装过程中预留的管道接头都能够按照图纸规定的角度进行定位和固定,从而解决预留接头之间存在位置或者角度错位的问题。
The present application discloses a fire protection pipe joint installation angle positioning device, including a sleeve for detachably fixing on the fire protection pipe, the sleeve is rotatably connected with an angle indicator disk and a positioning mechanism, the positioning mechanism includes a swivel rotatably mounted on the fire protection pipe, the swivel is fixedly mounted with a lifting mechanism, and the lifting mechanism is fixedly provided with a positioning plate for being flush with the end face of the joint and a pointer for being aligned with the angle indicator disk. The utility model can accurately position the spatial deflection angle of the pipe joint, so that the reserved pipe joints in the process of pipe installation can be positioned and fixed according to the angle specified in the drawing, thereby solving the problem of position or angle misalignment between the reserved joints.
Description
技术领域Technical Field
本实用新型涉及建筑安装技术领域,尤其涉及建筑管道安装的辅助定位装置技术领域,具体涉及一种消防管道接头安装角度定位装置。The utility model relates to the technical field of building installation, in particular to the technical field of auxiliary positioning devices for building pipeline installation, and specifically to a fire protection pipeline joint installation angle positioning device.
背景技术Background Art
建筑物内必不可少的会安装消防管道,其中管道安装最为密集,最为复杂的区域为地下室或者地下车库的顶部,安装在地下车库顶部的管道包含消防管道,给水管道和下水管道等,在进行建筑安装之前会有详细的管道位置排布和安装的图纸,但是由于管道较多,不同口径的管道之间的得放层次也有要求,因此,对于如何将不同区域,不同位置的管道通过弯头(弯头也称为接头)进行可靠的密闭性连接是管道安装的最大难点。Fire-fighting pipes are inevitably installed in buildings. The most densely installed and complex areas are basements or the tops of underground garages. The pipes installed on the tops of underground garages include fire-fighting pipes, water supply pipes, and sewer pipes. Before the building installation, there will be detailed drawings of the pipe location and installation. However, due to the large number of pipes, there are also requirements for the placement of pipes of different diameters. Therefore, how to reliably and airtightly connect pipes in different areas and positions through elbows (elbows are also called joints) is the biggest difficulty in pipe installation.
通过关键字“管道安装”对现有技术进行检索,获得相关现有技术两篇。The prior art was searched by the keyword "pipeline installation" and two relevant prior arts were obtained.
现有技术1:公开/公布号为CN107606314A的中国发明公开了一种管道安装组件,通过半圆环管拼接后构成上下两个整体装配用通孔将管道进行安装,但并不能解决管道之间的空间定位安装的问题。Prior art 1: A Chinese invention with a publication number of CN107606314A discloses a pipe installation assembly, which is formed by splicing semicircular ring pipes to form upper and lower integral assembly through holes for installing pipes, but it cannot solve the problem of spatial positioning and installation between pipes.
现有技术2:公开/公布号为CN111963770A的中国发明公开了一种管道定位装置,用于解决现有给排水工程中,管道施工一般是通过人工来对管道的高度及位置进行矫正,然后再通过定位装置来对其进行固定,这种方式在施工时会耗费较大的人力和物力,且工作效率较低的问题。Prior art 2: A Chinese invention with a publication number of CN111963770A discloses a pipeline positioning device for solving the problem that in existing water supply and drainage projects, pipeline construction is generally carried out by manually correcting the height and position of the pipeline, and then fixing it with a positioning device. This method consumes a lot of manpower and material resources during construction and has low work efficiency.
本申请着重解决给排水管道,消防管道在安装过程中,相邻两根位于非同一水平面的管道之间的接头空间定位的问题,避免需要相互连接的两个接头之间的轴线或者角度错位导致无法安装的问题。The present application focuses on solving the problem of spatial positioning of joints between two adjacent pipes located in non-same horizontal planes during the installation of water supply and drainage pipes and fire protection pipes, so as to avoid the problem of inability to install due to axial or angular misalignment between two joints that need to be connected to each other.
实用新型内容Utility Model Content
为了解决现有技术中针对消防和给排水大口径金属管道安装过程中,处于非同一水平面或者纵向面的管道接头难以定位或者对准的问题,本申请提供一种消防管道接头安装角度定位装置,用于将管道接头按照预设或者图纸规定的角度进行精准定位,解决需要连接的两个接头之间因定位不准引起的角度偏斜或者位置错位导致难以安装的问题。In order to solve the problem in the prior art that pipe joints in different horizontal or longitudinal planes are difficult to position or align during the installation of large-diameter metal pipes for fire protection and water supply and drainage, the present application provides a fire protection pipe joint installation angle positioning device, which is used to accurately position the pipe joint according to a preset angle or angle specified in the drawing, thereby solving the problem of difficulty in installation caused by angle deviation or position misalignment between two joints to be connected due to inaccurate positioning.
为了充分的了解本实用新型在管道安装过程中的技术创新和良好的实用性,现就管道接头安装过程中存在的问题进行简要阐述如下:In order to fully understand the technical innovation and good practicality of the utility model in the process of pipeline installation, the problems existing in the process of pipeline joint installation are briefly described as follows:
消防管道,给排水管道通常是大口径金属管道,在进行安装时,必不可少的需要辅助装置进行支撑和定位。管道的排布和安装是根据设计图纸的规范进行的,但由于金属管道的安装是采用吊顶式安装,需要将管道悬吊于建筑物的顶部并进行固定和密闭性连接。针对管道的固定是依赖于带膨胀螺栓的吊架实现,但对于管道之间的连接则需要接头实现,这里提及的接头是指具有一定弯曲角度的管道,通常称为‘弯头’,接头的内径与管道的外径相适应并通过螺纹连接,由于接头能够相对于管道旋转或者随着未固定的管道转动,因此,接头的空间角度并不能有效的固定,一旦固定管道后,在连接接头时角度存在偏差时,则需要重新连接接头或者松脱管道调整角度,但无论采用何种方式,付出的人力劳动和时间成本都是巨大的。Fire protection pipes and water supply and drainage pipes are usually large-diameter metal pipes. When installing, auxiliary devices are indispensable for support and positioning. The arrangement and installation of pipes are carried out according to the specifications of the design drawings, but because the installation of metal pipes is ceiling-mounted, the pipes need to be suspended from the top of the building and fixed and airtightly connected. The fixation of pipes is achieved by hangers with expansion bolts, but the connection between pipes requires joints. The joints mentioned here refer to pipes with a certain bending angle, usually called "elbows". The inner diameter of the joint is adapted to the outer diameter of the pipe and is connected by threads. Since the joint can rotate relative to the pipe or rotate with the unfixed pipe, the spatial angle of the joint cannot be effectively fixed. Once the pipe is fixed, if there is an angle deviation when connecting the joint, it is necessary to reconnect the joint or loosen the pipe to adjust the angle. However, no matter which method is used, the human labor and time costs are huge.
现有技术中,为了解决这一问题采用的方式是顺序安装,即将需要安装的管路按照图纸的要求逐一、顺序安装,避免相邻接头连接时,因角度或者位置存在空间误差而无法连接的问题;但是,顺序安装会带来新的问题,其一,是效率低,不能实现不同区域的同步施工;其二,顺序安装时会出现接头连接的误差叠加,安装的长度越长,越会导致管道安装位置偏离预设位置或者图纸规划的位置;尤其是在多层管道需要叠加安装时尤为明显。In the prior art, the method used to solve this problem is sequential installation, that is, the pipelines to be installed are installed one by one and sequentially according to the requirements of the drawings, so as to avoid the problem that adjacent joints cannot be connected due to spatial errors in angles or positions. However, sequential installation will bring new problems. First, it is inefficient and cannot achieve synchronous construction in different areas. Second, errors in joint connections will be superimposed during sequential installation. The longer the installation length, the more likely it is that the pipeline installation position will deviate from the preset position or the position planned in the drawings. This is particularly obvious when multiple layers of pipelines need to be installed in a stacked manner.
综上,在进行管道安装时,只要能够精确的确定管道接头预留的空间角度,即可解决管道存在对接误差的问题,能够实现多区域同时施工,大大提升管道安装的效率。In summary, when installing pipelines, as long as the space angle reserved for the pipeline joints can be accurately determined, the problem of pipeline docking errors can be solved, and construction in multiple areas can be achieved simultaneously, greatly improving the efficiency of pipeline installation.
为了达到上述目的,本申请所采用的技术方案为:In order to achieve the above purpose, the technical solution adopted in this application is:
一种消防管道接头安装角度定位装置,包括用于可拆卸固定套设在消防管道上的套管,所述套管上分别转动连接有角度指示盘和定位机构,所述定位机构包括可转动套设在消防管道上的转环,所述转环上固定安装有升降机构,所述升降机构上分别固定设置有用于与接头端面贴平的定位板和用于与所述角度指示盘贴合的指针。A fire pipe joint installation angle positioning device comprises a sleeve for detachably fixing on the fire pipe, the sleeve is rotatably connected with an angle indicating disk and a positioning mechanism, the positioning mechanism comprises a swivel rotatably mounted on the fire pipe, the swivel is fixedly mounted with a lifting mechanism, and the lifting mechanism is fixedly provided with a positioning plate for being flush with the end face of the joint and a pointer for being in contact with the angle indicating disk.
为了更加直观的确定接头的空间偏转角度,优选地,所述角度指示盘包括转动设置在套管上的中空盘体,所述中空盘体外壳体采用透明材质,中空盘体内部固定设置有双面的角度表盘,以及通过柔性绳索悬吊在所述中空盘体内部的对准角度表盘零刻度线的第一钢球,以及可以在所述中空盘体内自由滚动的第二钢珠。In order to more intuitively determine the spatial deflection angle of the joint, preferably, the angle indicating disk includes a hollow disk body rotatably arranged on the sleeve, the outer shell of the hollow disk body is made of transparent material, a double-sided angle dial is fixedly arranged inside the hollow disk body, and a first steel ball aligned with the zero scale line of the angle dial is suspended inside the hollow disk body by a flexible rope, and a second steel ball can roll freely in the hollow disk body.
为了方便套管的固定,优选地,所述套管远离所述定位板的一端沿轴向设置有多条收缩缝,所述收缩缝将所述套管分割成多片呈圆周阵列分布的尾片,所述尾片从端面向套管的一侧延伸厚度逐渐增加并在外侧壁形成弧形斜面,所述套管上靠近所述尾片的圆周侧壁上设置有用于与帽体可拆卸固定连接的螺纹,所述帽体内壁具有与所述弧形斜面贴合并将所述尾片压紧在消防管道外侧壁的收敛段。In order to facilitate the fixation of the sleeve, preferably, a plurality of shrinkage seams are axially arranged at one end of the sleeve away from the positioning plate, and the shrinkage seams divide the sleeve into a plurality of tail pieces distributed in a circular array, and the thickness of the tail piece gradually increases from the end surface to one side of the sleeve and forms an arc-shaped inclined surface on the outer wall, and a thread for detachably fixed connection with the cap body is arranged on the circumferential side wall of the sleeve close to the tail piece, and the inner wall of the cap body has a convergent section which fits with the arc-shaped inclined surface and presses the tail piece against the outer wall of the fire protection pipe.
优选地,所述帽体外侧壁上固定设置有多个沿径向设置的把手。Preferably, a plurality of radially arranged handles are fixedly provided on the outer side wall of the cap body.
优选地,所述升降机构包括固定设置在转环上的立柱,所述立柱的相对侧均设置有滑槽,以及滑动套设在所述立柱上的U型滑座,所述U型滑座的相对侧分别设置有用于与接头端面贴平的定位板和用于与所述角度指示盘贴合的指针。Preferably, the lifting mechanism includes a column fixedly mounted on a swivel, with slide grooves being arranged on opposite sides of the column, and a U-shaped slide slidably mounted on the column, with a positioning plate for being flush with the end face of the joint and a pointer for being fitted with the angle indicator plate being arranged on opposite sides of the U-shaped slide.
优选地,所述U型滑座螺纹连接有用于调节所述U型滑座与所述立柱相对位置的调节螺杆。Preferably, the U-shaped slide is threadedly connected with an adjusting screw for adjusting the relative position of the U-shaped slide and the column.
优选地,所述转环与套管之间还嵌入安装有多个滚珠。Preferably, a plurality of balls are embedded and installed between the rotating ring and the sleeve.
优选地,所述定位板与U型滑座之间还固定设置有至少一块加强筋。Preferably, at least one reinforcing rib is fixedly disposed between the positioning plate and the U-shaped slide seat.
优选地,所述转环上设置有用于固定所述转环与套管之间相对位置的锁紧螺杆。Preferably, a locking screw for fixing the relative position between the swivel and the sleeve is provided on the swivel.
有益效果:Beneficial effects:
本实用新型能够对管道接头的空间偏转角度进行精确定位,使得在管道安装过程中预留的管道接头都能够按照图纸规定的角度进行定位和固定,从而解决预留接头之间存在位置或者角度错位的问题。The utility model can accurately locate the spatial deflection angle of the pipe joint, so that the reserved pipe joints in the pipeline installation process can be positioned and fixed according to the angle specified in the drawing, thereby solving the problem of position or angle misalignment between the reserved joints.
本实用新型通过对管道接头的空间角度定位解决接头之间对接错位的问题,使得能够对不同区域的管道进行同时施工安装,无需采用现有的顺序安装,大大提升了建筑管道的安装效率。The utility model solves the problem of misalignment between joints by spatially angularly positioning the pipe joints, so that pipes in different areas can be constructed and installed simultaneously without the need for the existing sequential installation, thereby greatly improving the installation efficiency of building pipes.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
为了更清楚地说明本申请实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本申请的一些实施例,对于本领域技术人员来讲,在不付出创造性劳动性的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For those skilled in the art, other drawings can be obtained based on these drawings without paying any creative labor.
图1是本实用新型结构轴测图。Fig. 1 is an axonometric view of the structure of the utility model.
图2是图1另一视觉的结构轴测图。FIG. 2 is an axonometric view of the structure of FIG. 1 in another visual sense.
图3是图1的俯视图。FIG. 3 is a top view of FIG. 1 .
图4是图3中沿剖切符号A-A的剖视图。Fig. 4 is a sectional view along the cutting mark A-A in Fig. 3 .
图5是图3中沿剖切符号B-B的剖视图。Fig. 5 is a cross-sectional view along the cutting mark B-B in Fig. 3 .
图6是本实用新型的结构爆炸图。FIG. 6 is an exploded view of the structure of the present invention.
图7是图6反向视觉结构爆炸图。FIG. 7 is an exploded diagram of the reverse visual structure of FIG. 6 .
图中:1-消防管道;2-帽体;21-把手;22-收敛段;3-角度指示盘;31-第一钢珠;32-第二钢珠;33-角度表盘;4-转环;5-立柱;51-滚珠;6-U型滑座;61-指针;7-调节螺杆;8-锁紧螺杆;9-套管;91-尾片;92-螺纹;10-加强筋;11-定位板;12-接头。In the figure: 1-firefighting pipe; 2-cap body; 21-handle; 22-convergence section; 3-angle indicator plate; 31-first steel ball; 32-second steel ball; 33-angle dial; 4-swivel; 5-column; 51-ball; 6-U-shaped slide; 61-pointer; 7-adjusting screw; 8-locking screw; 9-sleeve; 91-tail piece; 92-thread; 10-reinforcement rib; 11-positioning plate; 12-connector.
具体实施方式DETAILED DESCRIPTION
为使本申请实施例的目的、技术方案和优点更加清楚,下面将结合本申请实施例中的附图,对本申请实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本申请一部分实施例,而不是全部的实施例。通常在此处附图中描述和示出的本申请实施例的组件可以以各种不同的配置来布置和设计。In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, rather than all the embodiments. The components of the embodiments of the present application described and shown in the drawings here can be arranged and designed in various different configurations.
因此,以下对在附图中提供的本申请的实施例的详细描述并非旨在限制要求保护的本申请的范围,而是仅仅表示本申请的选定实施例。基于本申请中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本申请保护的范围。Therefore, the following detailed description of the embodiments of the present application provided in the accompanying drawings is not intended to limit the scope of the present application for protection, but merely represents selected embodiments of the present application. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present application.
应注意到:相似的标号和字母在下面的附图中表示类似项,因此,一旦某一项在一个附图中被定义,则在随后的附图中不需要对其进行进一步定义和解释。It should be noted that similar reference numerals and letters denote similar items in the following drawings, and therefore, once an item is defined in one drawing, it does not require further definition and explanation in the subsequent drawings.
在本申请的描述中,需要说明的是,若出现术语“中心”、“上”、“下”、“左”、“右”、“竖直”、“水平”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,或者是该申请产品使用时惯常摆放的方位或位置关系,仅是为了便于描述本申请和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本申请的限制。此外,本申请的描述中若出现术语“第一”、“第二”等仅用于区分描述,而不能理解为指示或暗示相对重要性。In the description of this application, it should be noted that if the terms "center", "up", "down", "left", "right", "vertical", "horizontal", "inside", "outside", etc. appear, the orientation or position relationship indicated is based on the orientation or position relationship shown in the drawings, or the orientation or position relationship in which the product of the application is usually placed when in use. It is only for the convenience of describing this application and simplifying the description, and does not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on this application. In addition, if the terms "first", "second", etc. appear in the description of this application, they are only used to distinguish the description and cannot be understood as indicating or implying relative importance.
此外,本申请的描述中若出现术语“水平”、“竖直”等术语并不表示要求部件绝对水平或悬垂,而是可以稍微倾斜。如“水平”仅仅是指其方向相对“竖直”而言更加水平,并不是表示该结构一定要完全水平,而是可以稍微倾斜。In addition, if the terms "horizontal" or "vertical" appear in the description of this application, it does not mean that the components are required to be absolutely horizontal or suspended, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted.
在本申请的描述中,还需要说明的是,除非另有明确的规定和限定,若出现术语“设置”、“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本申请中的具体含义。In the description of this application, it should also be noted that, unless otherwise clearly specified and limited, the terms "set", "install", "connect", and "connect" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal connection of two components. For ordinary technicians in this field, the specific meanings of the above terms in this application can be understood according to specific circumstances.
实施例1:Embodiment 1:
参见说明书附图1和图2所示的一种消防管道接头安装角度定位装置,包括用于可拆卸固定套设在消防管道1上的套管9,所述套管9上分别转动连接有角度指示盘3和定位机构,所述定位机构包括可转动套设在消防管道1上的转环4,所述转环4上固定安装有升降机构,所述升降机构上分别固定设置有用于与接头12端面贴平的定位板11和用于与所述角度指示盘3贴合的指针61。Referring to Figures 1 and 2 of the specification, a fire pipe joint installation angle positioning device is shown, including a sleeve 9 for detachably fixedly sleeved on the fire pipe 1, and the sleeve 9 is rotatably connected with an angle indicating disk 3 and a positioning mechanism, and the positioning mechanism includes a swivel 4 rotatably sleeved on the fire pipe 1, and a lifting mechanism is fixedly installed on the swivel 4, and a positioning plate 11 for flushing with the end surface of the joint 12 and a pointer 61 for fitting with the angle indicating disk 3 are fixedly provided on the lifting mechanism.
工作及结构原理:Working and structural principle:
本实用新型对接头12定位的应用场景有两种,一种是管道1是固定的,在固定的管道1上安装接头12并保证接头12的另一连接端按照预设的空间角度进行固定;另一种则是管道1是活动的,将接头12固定连接在管道1上并保证接头12的另一连接端按照预设的空间角度进行固定。There are two application scenarios for positioning the joint 12 of the utility model. One is that the pipeline 1 is fixed, and the joint 12 is installed on the fixed pipeline 1 and the other connection end of the joint 12 is fixed according to a preset spatial angle; the other is that the pipeline 1 is movable, and the joint 12 is fixedly connected to the pipeline 1 and the other connection end of the joint 12 is fixed according to a preset spatial angle.
首先,以活动管道1安装接头12为例进行说明:由于管道1尚未固定,且管道1是回转体结构,因此,接头12与管道1固定连接后,接头12会随着管道1转动而变换角度,针对这一安装场景,先将管道1进行常规固定,避免管道1转动或者滚动,固定的位置应按照施工图纸进行;然后,将本实施例提供的角度定位装置按照如图1或图2所示方式安装在管道1上并进行固定,转动角度指示盘3,使得角度指示盘3的O刻度线保持在竖直方向,然后将接头12安装在管道1的端头,但无需拧紧,此时只是预安装用于角度定位;值得说明的是,目视查看角度指示盘3的0刻度线是否在竖直方向可以采用现有的水准气泡结构。再调整升降机构,使得定位板11与接头12的另一连接端端面贴合,同时转动接头12和转环4,直到指针61的位置对应角度指示盘3的角度与预设的角度一致为准,譬如接头12的偏转角度为25°,那么只需要同步转动接头12和转环4,使得指针61与角度指示盘3上的25°齐平即可。此时接头12的另一连接端端面轴线与竖直平面的夹角即为25°。完成上述定位后,为了保证正式安装接头12时依旧是当前角度,需要用标记笔在接头12和管道1上划线,优先划两条线,在进行紧固安装时,只要保证标记的两条线对齐,则可以保证接头12的空间角度为预设的准确角度,从而就避免了角度错位无法对接的问题。完成标记后,即可先后取下接头12和角度定位装置即可。First, the installation of the joint 12 on the movable pipe 1 is taken as an example for explanation: since the pipe 1 has not been fixed yet and the pipe 1 is a rotating body structure, after the joint 12 is fixedly connected to the pipe 1, the angle of the joint 12 will change as the pipe 1 rotates. For this installation scenario, the pipe 1 is first conventionally fixed to prevent the pipe 1 from rotating or rolling, and the fixed position should be carried out according to the construction drawings; then, the angle positioning device provided in this embodiment is installed on the pipe 1 and fixed in the manner shown in Figure 1 or Figure 2, and the angle indicator disk 3 is rotated so that the O scale line of the angle indicator disk 3 remains in the vertical direction, and then the joint 12 is installed on the end of the pipe 1, but there is no need to tighten it. At this time, it is just pre-installed for angle positioning; it is worth noting that the existing level bubble structure can be used to visually check whether the 0 scale line of the angle indicator disk 3 is in the vertical direction. Then adjust the lifting mechanism so that the positioning plate 11 fits with the end face of the other connecting end of the connector 12, and rotate the connector 12 and the swivel 4 at the same time until the position of the pointer 61 corresponds to the angle of the angle indicator disk 3 and is consistent with the preset angle. For example, if the deflection angle of the connector 12 is 25°, then you only need to rotate the connector 12 and the swivel 4 synchronously so that the pointer 61 is flush with the 25° on the angle indicator disk 3. At this time, the angle between the axis of the end face of the other connecting end of the connector 12 and the vertical plane is 25°. After completing the above positioning, in order to ensure that the current angle is still maintained when the connector 12 is officially installed, it is necessary to use a marking pen to draw lines on the connector 12 and the pipe 1, preferably two lines. When tightening and installing, as long as the two marked lines are aligned, the spatial angle of the connector 12 can be guaranteed to be the preset accurate angle, thereby avoiding the problem of angle misalignment and inability to dock. After completing the marking, the connector 12 and the angle positioning device can be removed one after another.
其次,针对固定的管道1的安装而言,譬如,需要安装接头12的管道1的另一端已经进行了紧固连接,那么此时则可直接将本实施例提供的角度定位装置安装在管道1上,并按照上述方法进行定位标记,再依次取下接头12和角度定位装置即可。上述整个过程只需要单人操作即可完成,非常方便实用,免去了在对接相邻像个接头12出现角度错位无法连接,需要采用顺序连接导致效率低下的问题。Secondly, for the installation of the fixed pipe 1, for example, the other end of the pipe 1 to which the joint 12 is to be installed has been fastened, then the angle positioning device provided in this embodiment can be directly installed on the pipe 1, and the positioning mark is made according to the above method, and then the joint 12 and the angle positioning device are removed in sequence. The above whole process can be completed by a single person, which is very convenient and practical, and avoids the problem of angle misalignment and inability to connect adjacent joints 12 when docking, and the need to use sequential connection, resulting in low efficiency.
实施例2:Embodiment 2:
为了更加直观的确定角度指示盘3自身的0刻度是否与竖直方向对齐,以便于精确定位接头12的空间偏转角度,本实施例中,所述角度指示盘3包括转动设置在套管9上的中空盘体,所述中空盘体外壳体采用透明材质,中空盘体内部固定设置有双面的角度表盘33,以及通过柔性绳索悬吊在所述中空盘体内部的对准角度表盘33零刻度线的第一钢球31,以及可以在所述中空盘体内自由滚动的第二钢珠32。In order to more intuitively determine whether the 0 scale of the angle indicator disk 3 itself is aligned with the vertical direction, so as to accurately locate the spatial deflection angle of the joint 12, in this embodiment, the angle indicator disk 3 includes a hollow disk body rotatably set on the sleeve 9, the outer shell of the hollow disk body is made of transparent material, and a double-sided angle dial 33 is fixedly arranged inside the hollow disk body, and a first steel ball 31 aligned with the zero scale line of the angle dial 33 is suspended inside the hollow disk body by a flexible rope, and a second steel ball 32 that can roll freely in the hollow disk body.
具体参见图3-图5所示,由于第一钢球31被细绳悬吊于12点钟方向,及0刻度线上方,当0刻度线没有处于竖直状态时,0刻度线与第一钢球31的悬吊细绳会存在一个空间角度a,a的角度越大,说明0刻度线与竖直方向的偏差越大,当悬吊第一钢球31的细绳与0刻度线重合时,则说明此时角度表盘33的0刻度线处于竖直状态。同时,观察第二钢球32是否处于180°的位置,以便于角度校正。由于角度指示盘3是圆形的,第二钢球32在重力的作用下会自然的处于最下方的位置,从而使得操作人员能够快速,直观的掌握角度指示盘3所处的角度状态。Specifically referring to Figures 3 to 5, since the first steel ball 31 is suspended by a thin rope at the 12 o'clock direction and above the 0 scale line, when the 0 scale line is not in a vertical state, there will be a spatial angle a between the 0 scale line and the suspension rope of the first steel ball 31. The larger the angle a is, the greater the deviation between the 0 scale line and the vertical direction is. When the thin rope suspending the first steel ball 31 coincides with the 0 scale line, it means that the 0 scale line of the angle dial 33 is in a vertical state at this time. At the same time, observe whether the second steel ball 32 is at the 180° position to facilitate angle correction. Since the angle indicator disk 3 is circular, the second steel ball 32 will naturally be at the bottom position under the action of gravity, so that the operator can quickly and intuitively grasp the angle state of the angle indicator disk 3.
实施例3:Embodiment 3:
本实施例是在上述任一实施例的基础上进行进一步的结构优化,为了方便套管9的固定,本实施例中,所述套管9远离所述定位板11的一端沿轴向设置有多条收缩缝,所述收缩缝将所述套管9分割成多片呈圆周阵列分布的尾片91,所述尾片91从端面向套管9的一侧延伸厚度逐渐增加并在外侧壁形成弧形斜面,所述套管9上靠近所述尾片91的圆周侧壁上设置有用于与帽体2可拆卸固定连接的螺纹92,所述帽体2内壁具有与所述弧形斜面贴合并将所述尾片91压紧在消防管道1外侧壁的收敛段22。参见说明书附图6-图7所示,随着帽体2与套管9之间的紧固,在收敛段22对尾片91的弧形斜面作用下会不断的将尾片91沿径向方向挤压,使得尾片91紧紧的贴合在套管9的圆周侧壁上,从而便于快速的拆装。This embodiment is a further structural optimization based on any of the above embodiments. In order to facilitate the fixing of the sleeve 9, in this embodiment, the sleeve 9 is provided with a plurality of contraction seams along the axial direction at one end away from the positioning plate 11. The contraction seams divide the sleeve 9 into a plurality of tail pieces 91 distributed in a circumferential array. The tail piece 91 gradually increases in thickness from the end surface to one side of the sleeve 9 and forms an arc-shaped inclined surface on the outer wall. The sleeve 9 is provided with a thread 92 for detachably fixing and connecting with the cap body 2 on the circumferential side wall close to the tail piece 91. The inner wall of the cap body 2 has a convergence section 22 that fits with the arc-shaped inclined surface and presses the tail piece 91 against the outer wall of the fire protection pipe 1. As shown in Figures 6-7 of the specification, as the cap body 2 and the sleeve 9 are tightened, the tail piece 91 will be continuously squeezed in the radial direction under the action of the convergence section 22 on the arc-shaped inclined surface of the tail piece 91, so that the tail piece 91 is tightly fitted on the circumferential side wall of the sleeve 9, thereby facilitating quick disassembly and assembly.
为了方便对帽体2的拆装和紧固,所述帽体2外侧壁上固定设置有多个沿径向设置的把手21,在进行拆装时,只需要握住把手21旋拧帽体2即可。In order to facilitate the disassembly, assembly and fastening of the cap body 2 , a plurality of radially arranged handles 21 are fixedly provided on the outer side wall of the cap body 2 . When disassembling or assembling, it is only necessary to hold the handles 21 and screw the cap body 2 .
本实施例中,所述升降机构包括固定设置在转环4上的立柱5,所述立柱5的相对侧均设置有滑槽51,以及滑动套设在所述立柱5上的U型滑座6,所述U型滑座6的相对侧分别设置有用于与接头12端面贴平的定位板11和用于与所述角度指示盘3贴合的指针61。In this embodiment, the lifting mechanism includes a column 5 fixedly mounted on a swivel 4, and a slide groove 51 is provided on opposite sides of the column 5, and a U-shaped slide 6 is slidably mounted on the column 5, and a positioning plate 11 for flushing with the end surface of the joint 12 and a pointer 61 for fitting with the angle indicator plate 3 are respectively provided on opposite sides of the U-shaped slide 6.
本实施例中,所述U型滑座6螺纹连接有用于调节所述U型滑座6与所述立柱5相对位置的调节螺杆7。In this embodiment, the U-shaped slide 6 is threadedly connected with an adjusting screw 7 for adjusting the relative position of the U-shaped slide 6 and the column 5 .
本实施例中,所述转环4与套管9之间还嵌入安装有多个滚珠51。In this embodiment, a plurality of balls 51 are embedded and installed between the rotating ring 4 and the sleeve 9 .
本实施例中,所述定位板11与U型滑座6之间还固定设置有至少一块加强筋10。In this embodiment, at least one reinforcing rib 10 is fixedly disposed between the positioning plate 11 and the U-shaped sliding seat 6 .
本实施例中,所述转环4上设置有用于固定所述转环4与套管9之间相对位置的锁紧螺杆8。In this embodiment, a locking screw 8 for fixing the relative position between the swivel 4 and the sleeve 9 is provided on the swivel 4 .
以上所述仅为本申请的优选实施例而已,并不用于限制本申请,对于本领域的技术人员来说,本申请可以有各种更改和变化。凡在本申请的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本申请的保护范围之内。The above description is only the preferred embodiment of the present application and is not intended to limit the present application. For those skilled in the art, the present application may have various modifications and variations. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application shall be included in the protection scope of the present application.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202323613396.0U CN221809285U (en) | 2023-12-28 | 2023-12-28 | A fire protection pipe joint installation angle positioning device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202323613396.0U CN221809285U (en) | 2023-12-28 | 2023-12-28 | A fire protection pipe joint installation angle positioning device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN221809285U true CN221809285U (en) | 2024-10-08 |
Family
ID=92917895
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202323613396.0U Active CN221809285U (en) | 2023-12-28 | 2023-12-28 | A fire protection pipe joint installation angle positioning device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN221809285U (en) |
-
2023
- 2023-12-28 CN CN202323613396.0U patent/CN221809285U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106885516B (en) | The device of measurement docking pipeline section relative position | |
| CN106271360A (en) | Caliber metal pipeline butt junction location device | |
| CN221809285U (en) | A fire protection pipe joint installation angle positioning device | |
| CN204450500U (en) | a pipe liner | |
| CN219074765U (en) | Auxiliary welding device for cylindrical part | |
| CN207945395U (en) | A rotatable and adjustable U-shaped pipe | |
| CN210051340U (en) | Appurtenance is used in installation of municipal drainage pipe | |
| CN214310060U (en) | Test device for measuring anti-leakage performance of bent metal corrugated pipe | |
| CN209559182U (en) | An unpowered measuring device for pipeline space attitude | |
| CN221839192U (en) | Inner plug structure for connecting pipeline opening | |
| CN208280188U (en) | Waterstop posting | |
| CN104565530B (en) | A method for installing a composite elbow section of a pressure pipe in a hydropower station and a method for obtaining the rotational installation angle of the composite elbow section | |
| CN219274148U (en) | A thermal control instrument tube bending device | |
| CN205604706U (en) | Connect joint Assembly of steel pipe and adopt this joint Assembly's scaffold frame | |
| CN217233442U (en) | Novel connecting device for coiled tubing pipe arranger and detection equipment | |
| CN106595541A (en) | Measuring device and measuring method thereof | |
| CN215371494U (en) | Four-way joint for supporting and connecting | |
| CN223395196U (en) | A scratch-resistant pipe clamping and screwing tool | |
| CN220581899U (en) | Novel environment-friendly gas pipe | |
| CN219563726U (en) | Pipeline wall hole positioner | |
| CN214770094U (en) | Pipeline aligning device | |
| CN206509686U (en) | Vertical shaft interior conduit welds rotating device | |
| CN217518177U (en) | Sleeve pipe locator suitable for different diameters | |
| CN219444944U (en) | Portable assembled pipeline assembly tool | |
| CN206832242U (en) | a calibration ruler |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |