CN221796747U - High-efficient wallboard hoist device - Google Patents
High-efficient wallboard hoist device Download PDFInfo
- Publication number
- CN221796747U CN221796747U CN202420495253.XU CN202420495253U CN221796747U CN 221796747 U CN221796747 U CN 221796747U CN 202420495253 U CN202420495253 U CN 202420495253U CN 221796747 U CN221796747 U CN 221796747U
- Authority
- CN
- China
- Prior art keywords
- rod
- hinged
- wall panel
- clamping
- lifting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000006835 compression Effects 0.000 claims description 15
- 238000007906 compression Methods 0.000 claims description 15
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 4
- 238000010276 construction Methods 0.000 description 3
- 101100233916 Saccharomyces cerevisiae (strain ATCC 204508 / S288c) KAR5 gene Proteins 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本实用新型公开了一种高效墙板吊装装置,其包括水平设置的横梁,在所述横梁的两端均铰接有夹杆,在其中一个所述夹杆上铰接有铰接杆,所述铰接杆的另一端与中间杆铰接,所述中间杆的另一端与操作杆铰接,所述操作杆为L形,所述操作杆与另一个所述夹杆铰接,在所述横梁的底端固定安装有兜底板;本实用新型的有益效果:本实用新型结构简单,设计专用的吊装工具,使得吊装时只需将墙板放置在吊装工具上,即能根据自身受力实现墙板的自动夹紧,完成吊装中只需操作杆即可使墙板放松卸料,吊装效率高,值得推广使用。
The utility model discloses an efficient wall panel lifting device, which comprises a horizontally arranged cross beam, clamping rods are hinged at both ends of the cross beam, a hinged rod is hinged on one of the clamping rods, the other end of the hinged rod is hinged to an intermediate rod, the other end of the intermediate rod is hinged to an operating rod, the operating rod is L-shaped, the operating rod is hinged to another clamping rod, and a bottom plate is fixedly installed at the bottom end of the cross beam; the beneficial effects of the utility model: the utility model has a simple structure and a special lifting tool is designed, so that when lifting, the wall panel only needs to be placed on the lifting tool, and the wall panel can be automatically clamped according to its own force, and when the lifting is completed, the wall panel can be loosened and unloaded by only operating the rod, the lifting efficiency is high, and it is worthy of popularization and use.
Description
技术领域:Technical field:
本实用新型涉及墙板吊装技术领域,尤其涉及一种高效墙板吊装装置。The utility model relates to the technical field of wall panel hoisting, in particular to a high-efficiency wall panel hoisting device.
背景技术:Background technology:
装配式建筑是指把传统建造方式中的大量现场作业工作转移到工厂进行,在工厂加工制作好建筑用构件和配件(如楼板、墙板、楼梯、阳台等),运输到建筑施工现场,通过可靠的连接方式在现场装配安装而成的建筑;在施工现场,墙板吊装通常使用电葫芦和钢丝绳进行作业,吊装时需用人工用钢丝绳捆绑墙板,需要人工拆解钢丝绳进行卸料,工作效率低下。Prefabricated buildings refer to buildings that transfer a large amount of on-site work in traditional construction methods to factories, where building components and accessories (such as floor slabs, wall panels, stairs, balconies, etc.) are processed and manufactured in the factory, transported to the construction site, and assembled and installed on site through reliable connection methods. At the construction site, wall panels are usually hoisted using electric hoists and wire ropes. During hoisting, the wall panels need to be manually tied with wire ropes, and the wire ropes need to be manually disassembled for unloading, resulting in low work efficiency.
实用新型内容:Utility model content:
本实用新型的目的在于提供一种高效墙板吊装装置,来解决现有技术中吊装墙板需要频繁捆绑和拆解钢丝绳、工作效率低下的技术问题。The utility model aims to provide an efficient wall panel hoisting device to solve the technical problem in the prior art that the hoisting of wall panels requires frequent bundling and disassembly of steel wire ropes and the work efficiency is low.
本实用新型的内容:一种高效墙板吊装装置,其包括水平设置的横梁,在所述横梁的两端均铰接有夹杆,在其中一个所述夹杆上铰接有铰接杆,所述铰接杆的另一端与中间杆铰接,所述中间杆的另一端与操作杆铰接,所述操作杆为L形,所述操作杆与另一个所述夹杆铰接,在所述横梁的底端固定安装有兜底板。The content of the utility model: A high-efficiency wall panel lifting device, which includes a horizontally arranged crossbeam, with clamping rods hinged at both ends of the crossbeam, a hinged rod hinged on one of the clamping rods, the other end of the hinged rod is hinged to an intermediate rod, the other end of the intermediate rod is hinged to an operating rod, the operating rod is L-shaped, the operating rod is hinged to the other clamping rod, and a bottom plate is fixedly installed at the bottom end of the crossbeam.
进一步的,所述夹杆包括竖向设置的直杆段,在所述直杆段的顶端倾斜向内的固定连接有斜杆段,所述斜杆段的顶端与所述横梁铰接。Furthermore, the clamping rod comprises a vertically arranged straight rod section, a top end of the straight rod section is fixedly connected with an oblique rod section obliquely inward, and the top end of the oblique rod section is hinged to the crossbeam.
进一步的,在所述兜底板上安装有防滑橡胶。Furthermore, anti-skid rubber is installed on the bottom plate.
进一步的,在所述横梁上螺接有螺杆,在所述螺杆上与所述螺杆相垂直的设置有弹性压柱组件,所述弹性压柱组件用于向墙板施加弹性压紧力。Furthermore, a screw rod is screwed onto the cross beam, and an elastic pressure column assembly is arranged on the screw rod perpendicular to the screw rod, and the elastic pressure column assembly is used to apply an elastic pressing force to the wall panel.
进一步的,所述弹性压柱组件包括立柱,在所述立柱上开设有螺纹通孔,在所述螺纹通孔内螺接有螺柱,在所述螺柱的底端连接有压簧,所述压簧的另一端与压紧柱相连接,所述压紧柱的末端为半球形。Furthermore, the elastic pressure column assembly includes a column, a threaded through hole is opened on the column, a stud is threaded in the threaded through hole, a compression spring is connected to the bottom end of the stud, the other end of the compression spring is connected to the clamping column, and the end of the clamping column is hemispherical.
本实用新型的有益效果:本实用新型结构简单,设计专用的吊装工具,使得吊装时只需将墙板放置在吊装工具上,即能根据自身受力实现墙板的自动夹紧,完成吊装中只需操作杆即可使墙板放松卸料,吊装效率高,值得推广使用。The beneficial effects of the utility model: the utility model has a simple structure and a special lifting tool is designed, so that when lifting, the wall panel only needs to be placed on the lifting tool, and the wall panel can be automatically clamped according to its own force. When the lifting is completed, the wall panel can be loosened and unloaded by operating the lever. The lifting efficiency is high and it is worthy of popularization and use.
附图说明:Description of the drawings:
图1为本实用新型的立体图;Fig. 1 is a perspective view of the utility model;
图2为本实用新型的主视图;Figure 2 is a front view of the utility model;
图3为本实用新型弹性压柱组件的剖面视图;FIG3 is a cross-sectional view of the elastic pressure column assembly of the utility model;
图中,横梁1、吊环2、夹杆3、直杆段3-1、斜杆段3-2、兜底板4、铰接杆5、中间杆6、操作杆7、防滑橡胶8、螺杆9、立柱10、螺柱11、压簧12、压紧柱13。In the figure, the cross beam 1, the lifting ring 2, the clamping rod 3, the straight rod section 3-1, the inclined rod section 3-2, the bottom plate 4, the hinged rod 5, the middle rod 6, the operating rod 7, the anti-slip rubber 8, the screw rod 9, the column 10, the stud 11, the compression spring 12, and the clamping column 13.
具体实施方式:Specific implementation method:
实施例1:Embodiment 1:
如图1、图2所示,一种高效墙板吊装装置,其包括水平设置的横梁1,在所述横梁1的两端均铰接有夹杆3,在其中一个所述夹杆3上铰接有铰接杆5,所述铰接杆5的另一端与中间杆6铰接,所述中间杆6的另一端与操作杆7铰接,所述操作杆7为L形,所述操作杆7与另一个所述夹杆3铰接,在所述横梁1的底端固定安装有兜底板4;所述夹杆3包括竖向设置的直杆段3-1,在所述直杆段3-1的顶端倾斜向内的固定连接有斜杆段3-2,所述斜杆段3-2的顶端与所述横梁1铰接;为了墙板在吊装过程中发生打滑,在所述兜底板4上安装有防滑橡胶8。As shown in Figures 1 and 2, an efficient wall panel lifting device includes a horizontally arranged crossbeam 1, at both ends of which clamping rods 3 are hinged, a hinged rod 5 is hinged on one of the clamping rods 3, the other end of the hinged rod 5 is hinged to an intermediate rod 6, the other end of the intermediate rod 6 is hinged to an operating rod 7, the operating rod 7 is L-shaped, the operating rod 7 is hinged to another clamping rod 3, and a bottom plate 4 is fixedly installed at the bottom end of the crossbeam 1; the clamping rod 3 includes a vertically arranged straight rod section 3-1, and an inclined rod section 3-2 is fixedly connected to the top of the straight rod section 3-1 in an inclined inward direction, and the top of the inclined rod section 3-2 is hinged to the crossbeam 1; in order to prevent the wall panel from slipping during the lifting process, an anti-slip rubber 8 is installed on the bottom plate 4.
工作时,只需将墙板放置在兜底板4上即可,然后起吊,由于墙板对兜底板4施加压力,使得夹杆3向内旋转将墙板夹紧,拆卸墙板时,只需向内扳动操作杆7即可将夹杆3张开,即完成墙板的拆卸。When working, it is only necessary to place the wall panel on the bottom plate 4 and then lift it. Since the wall panel applies pressure to the bottom plate 4, the clamping rod 3 rotates inward to clamp the wall panel. When removing the wall panel, it is only necessary to pull the operating rod 7 inward to open the clamping rod 3, thus completing the removal of the wall panel.
实施例2:Embodiment 2:
为了防止墙板在吊装过程中发生掉落的危险事故,如图2至图3所示,在所述横梁1上螺接有螺杆9,在所述螺杆9上与所述螺杆9相垂直的设置有弹性压柱组件,所述弹性压柱组件用于向墙板施加弹性压紧力;所述弹性压柱组件包括立柱10,在所述立柱10上开设有螺纹通孔,在所述螺纹通孔内螺接有螺柱11,在所述螺柱11的底端连接有压簧12,所述压簧12的另一端与压紧柱13相连接,所述压紧柱13的末端为半球形。In order to prevent the dangerous accident of the wall panel falling during the lifting process, as shown in Figures 2 to 3, a screw rod 9 is screwed on the cross beam 1, and an elastic pressure column assembly is arranged on the screw rod 9 perpendicular to the screw rod 9, and the elastic pressure column assembly is used to apply an elastic pressing force to the wall panel; the elastic pressure column assembly includes a column 10, a threaded through hole is opened on the column 10, a stud 11 is screwed in the threaded through hole, a compression spring 12 is connected to the bottom end of the stud 11, and the other end of the compression spring 12 is connected to a compression column 13, and the end of the compression column 13 is hemispherical.
具体工作时,首先将墙板放置在兜底板4上即可,然后起吊,由于墙板对兜底板4施加压力,使得夹杆3向内旋转将墙板夹紧,然后旋拧螺杆9,使压紧柱13朝下,将墙板压紧,拆卸墙板时,反向旋拧螺杆9使压紧柱13朝上,最后向内扳动操作杆7即可将夹杆3张开,即完成拆卸。During the specific work, first place the wall panel on the bottom plate 4, and then lift it. Since the wall panel applies pressure to the bottom plate 4, the clamping rod 3 rotates inward to clamp the wall panel, and then the screw 9 is screwed to make the clamping column 13 face downward to press the wall panel. When removing the wall panel, the screw 9 is screwed in the opposite direction to make the clamping column 13 face upward, and finally the operating rod 7 is pulled inward to open the clamping rod 3, and the disassembly is completed.
以上仅为本实用新型的较佳实例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above are only preferred examples of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202420495253.XU CN221796747U (en) | 2024-03-14 | 2024-03-14 | High-efficient wallboard hoist device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202420495253.XU CN221796747U (en) | 2024-03-14 | 2024-03-14 | High-efficient wallboard hoist device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN221796747U true CN221796747U (en) | 2024-10-01 |
Family
ID=92882260
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202420495253.XU Active CN221796747U (en) | 2024-03-14 | 2024-03-14 | High-efficient wallboard hoist device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN221796747U (en) |
-
2024
- 2024-03-14 CN CN202420495253.XU patent/CN221796747U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN207878699U (en) | A kind of assembly concrete shear wall structure | |
| CN221796747U (en) | High-efficient wallboard hoist device | |
| CN1372059A (en) | Method for integral jacking roof of reinforced concrete pile single storey industry workshop | |
| CN114809582B (en) | I-steel suspension bracket of hanging basket without counterweight and construction method | |
| CN206942120U (en) | A kind of pre-embedded device of builder's jack | |
| CN204702407U (en) | For lifting the hanger of steel plate | |
| CN212223633U (en) | Electric climbing hanging basket for high-position small-space operation | |
| CN116409703A (en) | High pier column large-span prestressed beam safe erection lifting appliance and use method | |
| CN205170254U (en) | Tripod hoisting accessory | |
| CN201605579U (en) | Tubular pile trade steel cage hoist device | |
| CN221343703U (en) | An installation crane | |
| CN221917093U (en) | Assembled wall positioner | |
| CN113003385A (en) | High-efficient lifting device of concrete pipe | |
| CN115162616A (en) | A kind of concrete prefabricated column and its turning and hoisting method | |
| CN206562780U (en) | Precast stair hoisting appliance | |
| CN221894518U (en) | A lifting device for assembled building construction | |
| CN222809111U (en) | Hoisting device for assembled building | |
| CN218468422U (en) | Water pipe top-mounted frame | |
| CN207122132U (en) | A kind of building template | |
| CN221761502U (en) | Steel structure supporting frame | |
| CN207265540U (en) | A kind of tangent tower overhead line lifter | |
| CN217679670U (en) | Splicing device for assembled wallboard | |
| CN223963149U (en) | ALC panel hoisting device | |
| CN212176627U (en) | Capping device for constructional engineering | |
| CN221837724U (en) | Bearing beam structure is built in room |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |