CN221778954U - A high pile foundation photovoltaic module installation work platform - Google Patents

A high pile foundation photovoltaic module installation work platform Download PDF

Info

Publication number
CN221778954U
CN221778954U CN202323344230.3U CN202323344230U CN221778954U CN 221778954 U CN221778954 U CN 221778954U CN 202323344230 U CN202323344230 U CN 202323344230U CN 221778954 U CN221778954 U CN 221778954U
Authority
CN
China
Prior art keywords
platform
pile foundation
support
longitudinal rod
longitudinal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202323344230.3U
Other languages
Chinese (zh)
Inventor
马国有
刘海旭
李亮
文孟胜
沈亚军
张博宇
李文博
赵艳军
师贤
尉溪桐
常震
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Northwest Engineering Corp Ltd
Original Assignee
PowerChina Northwest Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Northwest Engineering Corp Ltd filed Critical PowerChina Northwest Engineering Corp Ltd
Priority to CN202323344230.3U priority Critical patent/CN221778954U/en
Application granted granted Critical
Publication of CN221778954U publication Critical patent/CN221778954U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy

Landscapes

  • Photovoltaic Devices (AREA)

Abstract

本实用新型涉及电力施工技术领域,具体涉及一种高桩基光伏组件安装作业平台。该平台包括至少两个支撑架,所述至少两个支撑架用于沿横向分别固定在对应的桩基上部;还包括支撑平台,所述支撑平台沿横向横跨布置在至少两个支撑架上,所述支撑平台包括沿纵向依次布置的第一平台、第二平台与第三平台,所述第一平台与第二平台高度相同并用于分置在桩基的两侧,所述第三平台与第一平台在竖向上错落布置。整个安装作业平台安装方便,降低了作业强度并提高了作业效率,同时,利用支撑平台可保证工作人员在桩基间行走稳定,保证安全性。

The utility model relates to the technical field of electric power construction, and specifically to a high pile foundation photovoltaic assembly installation work platform. The platform includes at least two support frames, and the at least two support frames are used to be fixed on the corresponding pile foundation upper parts in the horizontal direction; and also includes a support platform, and the support platform is arranged horizontally across at least two support frames, and the support platform includes a first platform, a second platform and a third platform arranged in sequence in the longitudinal direction, and the first platform and the second platform have the same height and are used to be placed on both sides of the pile foundation, and the third platform and the first platform are staggered in the vertical direction. The entire installation work platform is easy to install, reduces the work intensity and improves the work efficiency. At the same time, the support platform can ensure that the staff can walk stably between the pile foundations and ensure safety.

Description

High pile foundation photovoltaic module installation work platform
Technical Field
The utility model relates to the technical field of electric power construction, in particular to a high pile foundation photovoltaic module installation operation platform.
Background
At present, in the photovoltaic construction engineering industry, due to the restriction of land resources, many projects are developed in forms of agro-light, forest light, lake light, sea light and the like, the pile foundation of the projects is high (generally more than 4 m), and the elevation point of the pile foundation top surface varies along with relief fluctuation. When the photovoltaic module is installed, the photovoltaic support is installed at the top of the pile foundation, the top surface of the photovoltaic support is a photovoltaic installation operation surface, and then the photovoltaic module is installed on the photovoltaic installation operation surface.
In the prior art, because the installation height of the photovoltaic module is higher, workers cannot directly stand on the ground for installation, so that a large-area laying mode of a full scaffold is often adopted to build an installation work platform, but the use scaffold has higher requirements on the use condition, the work site is required to be smooth and stable, and when in actual use, the stability of the scaffold is usually not high because of uneven ground, different soil properties or uneven bearing and other factors, and the potential safety hazard of side turning exists when the photovoltaic module is installed on the scaffold by workers. And in the installation of photovoltaic module, need constantly shift the scaffold frame position, the scaffold frame dead weight itself is heavier, and the turnover is difficult, has increased operation intensity, and operating efficiency is low simultaneously.
Disclosure of utility model
The utility model aims to solve the technical problems of providing a high pile foundation photovoltaic module installation operation platform, the whole installation operation platform is convenient to install, a support frame is only required to be arranged on a corresponding pile foundation, the support frame is erected to form an operation platform for working personnel, the height of the installation operation platform can be adjusted by adjusting the position of the support frame, the influence of site topography change can be effectively reduced without topography limitation, the installation is simple, the operation intensity is reduced, the operation efficiency is improved, meanwhile, the stability of an operation surface can be ensured by utilizing the support platform, the safety is ensured, the working difficulty can be reduced by utilizing the first platform, the second platform and the third platform, and the operation efficiency is improved.
Aiming at the technical problems, the technical scheme provided by the utility model is that the high pile foundation photovoltaic module installation operation platform comprises at least two support frames, wherein the at least two support frames are used for being respectively fixed on the upper parts of corresponding pile foundations along the transverse direction; the pile foundation supporting device comprises a pile foundation, and is characterized by further comprising a supporting platform which transversely spans and is arranged on at least two supporting frames, wherein the supporting platform comprises a first platform, a second platform and a third platform which are longitudinally and sequentially arranged, the first platform and the second platform are identical in height and are used for being arranged on two sides of the pile foundation in a separated mode, and the third platform and the first platform are vertically arranged in a staggered mode.
Further, the support frame comprises a first longitudinal rod and a second longitudinal rod which are longitudinally arranged at intervals, the middle part of the first longitudinal rod is used for being correspondingly arranged with the pile foundation, the first platform and the second platform are respectively and correspondingly arranged on two longitudinal sides of the first longitudinal rod, the second longitudinal rod and the first longitudinal rod are arranged in a staggered mode in height, and the third platform is correspondingly arranged on the second longitudinal rod.
Further, a first vertical rod extending downwards is arranged in the middle of the first vertical rod, and a first inclined support and a second inclined support are connected to the opposite sides of the first vertical rod and the second vertical rod respectively and the lower portion of the first vertical rod.
Further, the second vertical rod is higher than the first vertical rod, a second vertical rod is fixedly connected between the opposite ends of the first vertical rod and the second vertical rod, and the connection part of the second vertical rod and the second vertical rod is fixedly connected with the second inclined support.
Further, the junction of first vertical pole and first vertical pole is provided with first connecting plate, the lower part of first montant is provided with the second connecting plate, all be provided with staple bolt fastening hole on first connecting plate and the second connecting plate, the support frame is through setting up the staple bolt subassembly fixed mounting in corresponding staple bolt fastening hole on the pile foundation.
Further, the first connecting plate comprises an upper connecting plate and a lower connecting plate which are respectively arranged on the upper side and the lower side of the first longitudinal rod.
Further, a plurality of spacing protrusions are arranged on the first longitudinal rod and the second longitudinal rod at intervals, support plates are clamped and fixed between adjacent spacing protrusions, the support plates on two longitudinal sides of the first longitudinal rod respectively form the first platform and the second platform, and the support plates on the second longitudinal rod form the third platform.
Further, the first longitudinal rod and the plurality of limiting protrusions on the second longitudinal rod are all arranged at equal intervals in the longitudinal direction, and the mounting plate is a photovoltaic purline matched with the adjacent spacing protrusions at intervals.
Further, the support frame is made of steel square tubes, and the sizes of the steel square tubes are not smaller than 50mm, 50mm and 5mm; the spacing between adjacent spacing protrusions is 150mm.
Further, the vertical distance between the first platform, the second platform and the third platform and the photovoltaic installation working face is not more than 1.9 meters.
Compared with the prior art, the utility model has the beneficial effects that:
(1) The whole installation operation platform is convenient to install, only the support frame is required to be arranged on the corresponding pile foundation, the support platform is erected on the support frame, the operation platform for working personnel can be built, the position of the support frame is adjusted, the height of the installation operation platform can be adjusted, no terrain limitation exists, the on-site topography change influence can be effectively reduced, the installation and the disassembly are simple, the repeated utilization is realized, the operation intensity is reduced, and the operation efficiency is improved.
Meanwhile, the supporting platform workers can stably walk between pile foundations to ensure safety and reduce construction difficulty, the first platform and the second platform which are arranged on two sides of the pile foundations and have the same height, and the third platform which is different from the first platform in height are utilized, the workers can move to different working surfaces according to different heights and working positions required by the working during working, the working flexibility is improved, the working difficulty is reduced, and the working efficiency is improved.
(2) The first inclined support and the second inclined support are utilized to improve the integral strength of the installation operation platform, and stability and safety are improved.
(3) The junction of second vertical pole and second vertical pole with second bearing diagonal fixed connection makes whole support frame fixed as an organic wholely, improves intensity.
(4) The limiting bulge is arranged, the limiting bulge is utilized to clamp the fixed supporting plate, the loading and unloading of the supporting plate can be facilitated, and the fixing reliability of the supporting plate is ensured.
Drawings
Fig. 1 is a schematic view showing the overall structure of the installation platform according to embodiment 1 of the present utility model fixed to a pile foundation.
Fig. 2 is a front view of the installation platform of embodiment 1 of the present utility model secured to a pile foundation.
Fig. 3 is a rear view of the installation platform of embodiment 1 of the present utility model secured to a pile foundation.
Fig. 4 is a schematic structural view of a hoop assembly according to embodiment 1 of the present utility model.
In the figure: 1. a support frame; 11. a first longitudinal bar; 12. a second longitudinal bar; 13. a first vertical rod; 14. a second vertical rod; 15. a first connection plate; 151. an upper connecting plate; 152. a lower connecting plate; 16. a second connecting plate; 17. a first diagonal brace; 18. a second diagonal brace; 2. the anchor ear assembly; 21. a hoop; 22. a nut; 3. a support platform; 31. a first platform; 32. a second platform; 33. a third platform; 4. a limit protrusion; 5. light Fu Lintiao; 6. pile foundation; 7. photovoltaic installation working surface.
Detailed Description
For the purpose of making the objects, technical solutions and advantages of the embodiments of the present application more clear, the technical solutions of the embodiments of the present application will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present application:
Specific example 1:
As shown in fig. 1, the transverse direction is the longitudinal direction of the support platform 3, and the longitudinal direction is the longitudinal direction of the first vertical pole 11.
Referring to fig. 1 to 4, a high pile foundation photovoltaic module installation work platform (hereinafter referred to as an installation work platform) of the present utility model includes a plurality of support frames 1 corresponding to the number of pile foundations 6, wherein the plurality of support frames 1 are used for being respectively fixed on the upper parts of the corresponding pile foundations 6 along the transverse direction, and further includes a support platform 3, the support platform 3 transversely spans over at least two support frames 1, the support platform 3 includes a first platform 31, a second platform 32 and a third platform 33 which are sequentially arranged along the longitudinal direction, the first platform 31 and the second platform 32 are the same in height and are used for being separated on two sides of the pile foundations 6, and the third platform 33 and the first platform 31 are vertically staggered.
Specifically, as shown in fig. 1 and 2, in this embodiment, the support frame 1 includes a first vertical rod 11 and a second vertical rod 12 that are arranged at intervals in the longitudinal direction, and the middle part of the first vertical rod 11 is correspondingly arranged at the position of the pile foundation 6, so that the two longitudinal ends of the first vertical rod 11 can be separated at two longitudinal sides of the pile foundation 6.
The first platform 31 and the second platform 32 are respectively and correspondingly arranged at two longitudinal sides of the first vertical rod 11, so that the first platform 31 and the second platform 32 are respectively arranged at two longitudinal sides of the pile foundation 6. The second side rail 12 is staggered in height from the first side rail 11, and a third platform 33 is disposed on the second side rail 12.
Preferably, in this embodiment, the first side rail 11 is longer than the second side rail 12, and the second side rail 12 is disposed higher than the first side rail 11, and the third platform 33 is disposed higher than the first platform 31. The total longitudinal lengths of the first platform 31, the second platform 32 and the third platform 33 are matched with the longitudinal length of the photovoltaic installation working face 7, so that workers can conveniently install photovoltaic modules at different positions and different heights. In other embodiments, the height of the second side rail 12 may be lower than the height of the first side rail 11 when the actual demand is met, such that the third platform 33 is lower than the first platform 31.
Preferably, in the present embodiment, a first vertical rod 13 extending downward is disposed at the middle of the first vertical rod 11, and a first diagonal brace 17 and a second diagonal brace 18 are connected to the opposite sides of the first vertical rod 11 and the second vertical rod 12 and the lower part of the first vertical rod 13, respectively. Thus, the first inclined support 17 and the second inclined support 18 are utilized to improve the integral strength of the installation work platform and improve the stability and the safety.
In this embodiment, a second vertical rod 14 is fixedly connected between opposite ends of the first vertical rod 11 and the second vertical rod 12, the second vertical rod 12 is supported by the second vertical rod 14, and a connection portion between the second vertical rod 12 and the second vertical rod 14 is fixedly connected with a second diagonal brace 18. Thus, the whole support frame 1 is fixed into a whole, and the strength is improved.
In this embodiment, a first connecting plate 15 is disposed at the connection between the first vertical rod 11 and the first vertical rod 13, a second connecting plate 16 is disposed at the lower part of the first vertical rod 13, and the second connecting plate 16 is disposed below the first diagonal brace 17, and hoop fastening holes are disposed on the first connecting plate 15 and the second connecting plate 16.
Specifically, as shown in fig. 2, four anchor ear fastening holes are formed in each of the first connecting plate 15 and the second connecting plate 16, and the support frame 1 is fixedly mounted on the pile foundation 6 through anchor ear assemblies 2 arranged in the corresponding anchor ear fastening holes, so that the middle part of the first vertical rod 11 is located at the position of the pile foundation 6. The anchor ear assembly 2 includes an anchor ear 21 as shown in fig. 4 and a nut 22. In other embodiments, the first vertical rod 11 may be provided with a plurality of through holes along the longitudinal interval, a plurality of pile foundation threaded holes are provided on the pile foundation 6, the support frame 1 is fixed on the pile foundation 6 by bolts penetrating through the through holes and screwed into the corresponding pile foundation threaded holes, and meanwhile, the height of the support frame 1 can be adjusted according to the positions of different pile foundation threaded holes.
In this embodiment, the first connecting plate 15 and the second connecting plate 16 are both fixed to the corresponding structures by welding.
Preferably, as shown in fig. 2 and 3, in the present embodiment, the first connecting plate 15 includes an upper connecting plate 151 and a lower connecting plate 152 disposed on upper and lower sides of the first vertical pole 11, respectively. And the opposite sides of the upper connecting plate 151 and the lower connecting plate 152 are welded and fixed on the upper and lower sides of the first vertical rod 11, respectively, so that the connection strength between the first connecting plate 15 and the first vertical rod 11 can be improved, and the safety can be improved.
As shown in fig. 1 and 2, in the present embodiment, a plurality of spacing protrusions 4 are disposed on the first vertical rod 11 and the second vertical rod 12 at intervals, support plates are clamped and fixed between adjacent spacing protrusions 4, the support plates on two sides of the first vertical rod 11 in the longitudinal direction respectively form a first platform 31 and a second platform 32 with the pile foundation 6 as the center, and the support plates on the second vertical rod 12 form a third platform 33. The limiting bulge 4 is arranged, the limiting bulge 4 is utilized to clamp and fix the supporting plate, the loading and unloading of the supporting plate can be facilitated, and the fixing reliability of the supporting plate is ensured.
Preferably, in the present embodiment, the plurality of spacing protrusions 4 on the first vertical rod 11 and the second vertical rod 12 are arranged at equal intervals along the longitudinal direction, and the mounting plate is a photovoltaic purline 5 with an interval adapted to the interval between the adjacent spacing protrusions 4. Thus, the device can be produced in a modularized manner, and is convenient to process and assemble in practice. In other embodiments, threaded holes are formed in the first and second longitudinal bars 11 and 12 at intervals, and the support plate may be fixed to the first and second longitudinal bars 11 and 12 by fastening bolts. In other embodiments, the first platform 31, the second platform 32 and the third platform 33 are all integral plates, and the integral plates are directly attached and fixed at corresponding positions.
In this embodiment, as shown in fig. 1, three pile foundations 6 are arranged at intervals in the transverse direction, one supporting frame 1 is arranged at the upper position of the three pile foundations 6 at equal height, and photovoltaic purlines 5 are laid between the first vertical rods 11 and the second vertical rods 12 of two adjacent supporting frames 1.
In other embodiments, the photovoltaic purlines 5 can be laid between two support frames 1 to form the support platform 3, and the support platform 3 spans the distance between two pile foundations 6, so that when the installation position needs to be changed, the photovoltaic purlines 5 can be detached and movably installed on the other two adjacent support frames 1. In other embodiments, the number of pile foundations 6 may be set according to actual requirements, at this time, the number of supporting frames 1 corresponds to the number of pile foundations 6, and the supporting platform 3 may span 2, 4, 5 intervals between pile foundations 6 according to actual requirements, specifically may be adjusted according to the site, and is not limited herein. In other embodiments, the number of the supporting frames 1 may not correspond to the number of pile foundations 6, and only two supporting frames 1 may be set according to actual requirements, and after the photovoltaic module at one point is installed, the supporting frames 1 are detached and then installed to the next installation point, and the photovoltaic module is continuously installed.
In this embodiment, the support frame 1 is made of a steel square tube, and the size of the steel square tube is not less than 50mm by 5mm according to mechanical property calculation. The spacing between adjacent spacing protrusions 4 is 150mm.
The vertical distance between the first platform 31, the second platform 32 and the third platform 33 and the photovoltaic installation working surface 7 is not more than 1.9 meters, so that the smooth installation of the photovoltaic module by workers can be ensured. In other embodiments, the vertical spacing between the first platform 31, the second platform 32, and the third platform 33 and the photovoltaic installation work surface 7 can be adjusted according to actual requirements, so long as the installation requirements of the staff are ensured.
The application process of the application comprises the following steps:
Referring to fig. 1 and 2, first, the upper parts of pile foundations 6 on a construction site are provided with supporting frames 1, meanwhile, the positions of the supporting frames 1 on the pile foundations 6 are adjusted according to construction requirements, the vertical distance between a supporting platform 3 and a photovoltaic installation working surface 7 is ensured not to be larger than 1.9 m, the supporting frames 1 are positioned at the same horizontal height, and a second vertical rod 12 is arranged on one side of the obliquely upper side of the photovoltaic installation working surface 7 relative to a first vertical rod 11. The support frame 1 is fixedly arranged on the pile foundation 6 through the hoop assembly 2.
From the installation initiation position, lay photovoltaic purlin 5 between adjacent support frame 1, with the tip joint of photovoltaic purlin 5 between adjacent spacing arch 4, accomplish the installation of supporting platform 3, select the length of laying of supporting platform 3 according to actual demand, accomplish the installation of installation work platform. And then the staff stands on the supporting platform 3 to finish the installation of the photovoltaic module.
In summary, the whole installation operation platform of the installation operation platform is convenient to install, the operation platform for working personnel can be built by only arranging the support frame 1 on the corresponding pile foundation 6 and erecting the support platform 3 on the support frame 1, the height of the installation operation platform can be adjusted by adjusting the position of the support frame 1, no terrain limitation exists, the influence of site topography change can be effectively reduced, the installation and the disassembly are simple, the repeated use is realized, the operation intensity is reduced, and the operation efficiency is improved.
Meanwhile, the support platform 3 is utilized, workers can walk stably between pile foundations 6 to work, the safety is guaranteed, the construction difficulty is reduced, the first platform 31 and the second platform 32 which are arranged on two sides of the pile foundations 6 and have the same height, and the third platform 33 which is different from the first platform 31 in height are utilized, the workers can move to different working surfaces according to the required height and different working positions during working, the operation flexibility is improved, the working difficulty is reduced, and the working efficiency is improved.
The above is only a preferred embodiment of the present application, and is not intended to limit the present application, but various modifications and variations can be made to the present application by those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included in the protection scope of the present application.
In the description of the embodiments of the present application, it should be noted that, if the terms "upper," "lower," "horizontal," "inner," and the like indicate an azimuth or a positional relationship based on the azimuth or the positional relationship shown in the drawings, or the azimuth or the positional relationship in which the inventive product is conventionally put in use, it is merely for convenience of describing the present application and simplifying the description, and does not indicate or imply that the apparatus or element to be referred to must have a specific azimuth, be configured and operated in a specific azimuth, and thus should not be construed as limiting the present application. Furthermore, the terms "first," "second," and the like, are used merely to distinguish between descriptions and should not be construed as indicating or implying relative importance.
Furthermore, the term "horizontal" if present does not mean that the component is required to be absolutely horizontal, but may be slightly inclined. As "horizontal" merely means that its direction is more horizontal than "vertical", and does not mean that the structure must be perfectly horizontal, but may be slightly inclined.

Claims (10)

1.一种高桩基光伏组件安装作业平台,其特征在于,包括至少两个支撑架,所述至少两个支撑架用于沿横向分别固定在对应的桩基上部;还包括支撑平台,所述支撑平台沿横向横跨布置在至少两个支撑架上,所述支撑平台包括沿纵向依次布置的第一平台、第二平台与第三平台,所述第一平台与第二平台高度相同并用于分置在桩基的两侧,所述第三平台与第一平台在竖向上错落布置。1. A high pile foundation photovoltaic module installation work platform, characterized in that it includes at least two support frames, and the at least two support frames are used to be fixed on the corresponding pile foundation upper parts in the horizontal direction; it also includes a support platform, and the support platform is arranged horizontally across the at least two support frames, and the support platform includes a first platform, a second platform and a third platform arranged in sequence in the longitudinal direction, the first platform and the second platform have the same height and are used to be placed on both sides of the pile foundation, and the third platform and the first platform are staggered in the vertical direction. 2.根据权利要求1所述的高桩基光伏组件安装作业平台,其特征在于,所述支撑架包括沿纵向间隔布置的第一纵杆与第二纵杆,所述第一纵杆的中部用于与桩基对应布置,所述第一平台与第二平台分别对应布置在第一纵杆的纵向两侧,所述第二纵杆与第一纵杆在高度上错落布置,所述第三平台对应布置在第二纵杆上。2. The high pile foundation photovoltaic component installation work platform according to claim 1 is characterized in that the support frame includes a first longitudinal rod and a second longitudinal rod arranged at intervals along the longitudinal direction, the middle part of the first longitudinal rod is used to be arranged corresponding to the pile foundation, the first platform and the second platform are respectively arranged on both sides of the longitudinal direction of the first longitudinal rod, the second longitudinal rod and the first longitudinal rod are staggered in height, and the third platform is arranged correspondingly on the second longitudinal rod. 3.根据权利要求2所述的高桩基光伏组件安装作业平台,其特征在于,所述第一纵杆的中部设置有向下延伸的第一竖杆,所述第一纵杆与第二纵杆的相背侧分别与第一竖杆的下部连接有第一斜支撑与第二斜支撑。3. The high pile foundation photovoltaic component installation work platform according to claim 2 is characterized in that a first vertical rod extending downward is provided in the middle of the first longitudinal rod, and the first and second longitudinal rods are connected to the lower part of the first vertical rod on opposite sides thereof with a first oblique support and a second oblique support respectively. 4.根据权利要求3所述的高桩基光伏组件安装作业平台,其特征在于,所述第二纵杆高于第一纵杆布置,并且第一纵杆与第二纵杆的相向端之间固定连接有第二竖杆,所述第二纵杆与第二竖杆的连接处与所述第二斜支撑固定连接。4. The high pile foundation photovoltaic component installation work platform according to claim 3 is characterized in that the second longitudinal rod is arranged higher than the first longitudinal rod, and a second vertical rod is fixedly connected between the facing ends of the first longitudinal rod and the second longitudinal rod, and the connection between the second longitudinal rod and the second vertical rod is fixedly connected to the second oblique support. 5.根据权利要求3所述的高桩基光伏组件安装作业平台,其特征在于,所述第一纵杆与第一竖杆的连接处设置有第一连接板,所述第一竖杆的下部设置有第二连接板,所述第一连接板与第二连接板上均设置有抱箍紧固孔,所述支撑架通过设置在对应抱箍紧固孔中的抱箍组件固定安装在桩基上。5. The high pile foundation photovoltaic component installation work platform according to claim 3 is characterized in that a first connecting plate is provided at the connection between the first longitudinal rod and the first vertical rod, a second connecting plate is provided at the lower part of the first vertical rod, and both the first connecting plate and the second connecting plate are provided with clamp fastening holes, and the support frame is fixedly installed on the pile foundation by a clamp assembly arranged in the corresponding clamp fastening hole. 6.根据权利要求5所述的高桩基光伏组件安装作业平台,其特征在于,所述第一连接板包括分别设置在第一纵杆的上下两侧的上部连接板与下部连接板。6. The high pile foundation photovoltaic assembly installation work platform according to claim 5, characterized in that the first connecting plate includes an upper connecting plate and a lower connecting plate respectively arranged on the upper and lower sides of the first longitudinal rod. 7.根据权利要求2所述的高桩基光伏组件安装作业平台,其特征在于,所述第一纵杆与第二纵杆上均设置有间隔布置的多个限位凸起,相邻所述限位凸起间夹紧固定有支撑板,所述第一纵杆上纵向两侧的支撑板分别构成所述第一平台与所述第二平台,所述第二纵杆上的支撑板构成所述第三平台。7. The high-pile foundation photovoltaic component installation work platform according to claim 2 is characterized in that the first longitudinal rod and the second longitudinal rod are both provided with a plurality of spaced-apart limit protrusions, support plates are clamped and fixed between adjacent limit protrusions, the support plates on both longitudinal sides of the first longitudinal rod respectively constitute the first platform and the second platform, and the support plates on the second longitudinal rod constitute the third platform. 8.根据权利要求7所述的高桩基光伏组件安装作业平台,其特征在于,所述第一纵杆与所述第二纵杆上的多个所述限位凸起均沿纵向等间距布置,所述支撑板为与相邻所述限位凸起间距适配的光伏檩条。8. The high pile foundation photovoltaic component installation work platform according to claim 7 is characterized in that the multiple limiting protrusions on the first longitudinal rod and the second longitudinal rod are arranged at equal intervals along the longitudinal direction, and the support plate is a photovoltaic purlin adapted to the spacing between adjacent limiting protrusions. 9.根据权利要求8所述的高桩基光伏组件安装作业平台,其特征在于,所述支撑架采用钢制方管制作,所述钢制方管的尺寸不小于50mm*50mm*5mm;相邻所述限位凸起之间的间距为150mm。9. The high pile foundation photovoltaic component installation work platform according to claim 8 is characterized in that the support frame is made of steel square tube, the size of the steel square tube is not less than 50mm*50mm*5mm; the spacing between adjacent limiting protrusions is 150mm. 10.根据权利要求1所述的高桩基光伏组件安装作业平台,其特征在于,所述第一平台、第二平台以及第三平台距离光伏安装作业面之间的竖向间距均不大于1.9米。10. The high pile foundation photovoltaic component installation work platform according to claim 1, characterized in that the vertical distances between the first platform, the second platform and the third platform and the photovoltaic installation work surface are no more than 1.9 meters.
CN202323344230.3U 2023-12-08 2023-12-08 A high pile foundation photovoltaic module installation work platform Active CN221778954U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202323344230.3U CN221778954U (en) 2023-12-08 2023-12-08 A high pile foundation photovoltaic module installation work platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202323344230.3U CN221778954U (en) 2023-12-08 2023-12-08 A high pile foundation photovoltaic module installation work platform

Publications (1)

Publication Number Publication Date
CN221778954U true CN221778954U (en) 2024-09-27

Family

ID=92824194

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202323344230.3U Active CN221778954U (en) 2023-12-08 2023-12-08 A high pile foundation photovoltaic module installation work platform

Country Status (1)

Country Link
CN (1) CN221778954U (en)

Similar Documents

Publication Publication Date Title
CN114475963B (en) LNG ship liquid dome area containment system installation device and installation method
CN212427537U (en) Assembled steel construction building fixed establishment
JP5956214B2 (en) Foundation structure for the solar cell module support
CN216587872U (en) Supporting device
CN221778954U (en) A high pile foundation photovoltaic module installation work platform
CN110748135B (en) Temporary operation platform system and construction method thereof
CN210405160U (en) Assembled photovoltaic support
CN221256137U (en) Temporary supporting device for floor support plate
CN219909039U (en) Photovoltaic support and assembly installation supporting structure
CN112049415A (en) Construction method of cornice formwork
CN114725859A (en) Tunnel cable installing support
CN204112827U (en) A kind of communications tower
CN223824681U (en) A reusable support frame for steel structure installation
CN223858762U (en) Bridge structure suitable for offshore photovoltaic cable laying
CN220874466U (en) Large-span flexible photovoltaic bracket with fixed inclination angle
CN222161942U (en) Construction operation platform used in limited space of fertilizer tank
CN222513356U (en) Cantilever structure template supporting system for heavy eave intermittent mountain top roof
CN220139469U (en) Photovoltaic support
CN213937344U (en) Photovoltaic board cable laying device
CN221227405U (en) Road photovoltaic power generation system
CN223652170U (en) A flexible photovoltaic support device
CN220645154U (en) Socket type disc buckle type shaping tripod outer protection frame
CN223141881U (en) Cable bridge suitable for flexible photovoltaic support
CN223724128U (en) A photovoltaic module mounting frame
CN223634316U (en) An auxiliary device for installing photovoltaic panel supports and modules.

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant