CN221760924U - A sun room connection structure - Google Patents
A sun room connection structure Download PDFInfo
- Publication number
- CN221760924U CN221760924U CN202420307514.0U CN202420307514U CN221760924U CN 221760924 U CN221760924 U CN 221760924U CN 202420307514 U CN202420307514 U CN 202420307514U CN 221760924 U CN221760924 U CN 221760924U
- Authority
- CN
- China
- Prior art keywords
- bolts
- beam assembly
- mounting frame
- mounting
- groove
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 abstract description 33
- 238000010586 diagram Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 4
- 239000011521 glass Substances 0.000 description 2
- 101001121408 Homo sapiens L-amino-acid oxidase Proteins 0.000 description 1
- 101000827703 Homo sapiens Polyphosphoinositide phosphatase Proteins 0.000 description 1
- 102100026388 L-amino-acid oxidase Human genes 0.000 description 1
- 102100023591 Polyphosphoinositide phosphatase Human genes 0.000 description 1
- 101100012902 Saccharomyces cerevisiae (strain ATCC 204508 / S288c) FIG2 gene Proteins 0.000 description 1
- 101100233916 Saccharomyces cerevisiae (strain ATCC 204508 / S288c) KAR5 gene Proteins 0.000 description 1
- 230000000052 comparative effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Landscapes
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
Description
技术领域Technical Field
本实用新型涉及连接结构技术领域,具体为一种阳光房连接结构。The utility model relates to the technical field of connection structures, in particular to a sun room connection structure.
背景技术Background Art
阳光房也称为玻璃房,阳光房采用玻璃与金属框架搭建的全明非传统建筑,以达到享受阳光,亲近自然的目的,在申请号为202020783002.3的中国专利中公开了“一种阳光房型材连接结构,包括第一型材、第二型材、连接件,所述第一型材上设有第一侧槽,所述第二型材上设有第二侧槽,所述连接件包括限位部、连接部;所述限位部安装在第一侧槽内,所述限位部在第一侧槽内向下倾斜时,所述限位部卡在第一侧槽内;所述连接部插入安装到第二侧槽中,所述连接部与第二侧槽的槽壁贴合,在本实用新型中,连接件的两端分别插入到第一侧槽和第二侧槽中,使第一型材和第二型材相连组成框架,框架组成后产生的剪切应力作用在连接件上由连接件承受,避免传统螺钉因承受剪切力产生的问题,保证第一型材、第二型材连接后的稳定性,有效防止阳光房坍塌。”;Sun room is also called glass room. Sun room is a non-traditional building built with glass and metal frame to enjoy the sunshine and get close to nature. In the Chinese patent with application number 202020783002.3, "a sun room profile connection structure is disclosed, including a first profile, a second profile and a connecting piece. The first profile is provided with a first side groove, and the second profile is provided with a second side groove. The connecting piece includes a limiting part and a connecting part; the limiting part is installed in the first side groove, and when the limiting part is tilted downward in the first side groove, the limiting part is stuck in the first side groove; the connecting part is inserted and installed in the second side groove, and the connecting part is in contact with the groove wall of the second side groove. In the utility model, the two ends of the connecting piece are respectively inserted into the first side groove and the second side groove, so that the first profile and the second profile are connected to form a frame. The shear stress generated after the frame is formed acts on the connecting piece and is borne by the connecting piece, avoiding the problem of traditional screws being subjected to shear force, ensuring the stability of the first profile and the second profile after connection, and effectively preventing the collapse of the sun room. ";
该对比文件仅仅解决了现有技术中,单独在立柱上安装横梁、纵梁以及桁架梁时,常需要几个人把纵梁、桁架梁托住悬在半空中,才能把螺钉穿进纵梁、桁架梁与横梁连接的位置,不但人工安装成本高,利用人工托住而悬在半空中的纵梁、桁架梁还可能因工人的疲劳或操作不当等原因滑落,砸伤工人,造成施工事故的问题,未考虑到仅通过卡接的方式对框架进行固定,结构不稳定,使得装置整体在受到外界冲击力时,容易出现坍塌的情况。This comparative document only solves the problem in the prior art that when installing horizontal beams, longitudinal beams and truss beams on columns separately, several people are often needed to hold the longitudinal beams and truss beams suspended in mid-air so that screws can be inserted into the connection positions of the longitudinal beams, truss beams and horizontal beams. Not only is the manual installation cost high, but the longitudinal beams and truss beams suspended in mid-air by manual support may also slide due to worker fatigue or improper operation, injuring workers and causing construction accidents. It does not take into account that the frame is fixed only by clipping, the structure is unstable, and the overall device is prone to collapse when subjected to external impact.
实用新型内容Utility Model Content
本实用新型的目的是提供一种阳光房连接结构,以解决现有技术中的上述不足之处。The purpose of the utility model is to provide a sun room connection structure to solve the above-mentioned deficiencies in the prior art.
为了实现上述目的,本实用新型提供如下技术方案:一种阳光房连接结构,包括立柱,所述立柱上方活动设置有主梁;In order to achieve the above-mentioned purpose, the utility model provides the following technical solutions: a sun room connection structure, comprising a column, a main beam is movably arranged above the column;
前梁组件,所述前梁组件固定安装在立柱顶端,所述前梁组件包括安装框一,所述安装框一活动设置在立柱顶端;A front beam assembly, the front beam assembly is fixedly mounted on the top of the column, the front beam assembly comprises a mounting frame 1, the mounting frame 1 is movably mounted on the top of the column;
后梁组件,所述后梁组件固定安装在主梁右侧,所述后梁组件包括安装框三,所述安装框三活动设置在主梁右侧。A rear beam assembly is fixedly mounted on the right side of the main beam, and the rear beam assembly comprises a mounting frame three, and the mounting frame three is movably arranged on the right side of the main beam.
进一步地,所述前梁组件还包括前梁连接块、安装槽一、螺栓一、安装框二、安装槽二和螺栓二,所述安装框一顶端通过螺钉安装有前梁连接块,所述安装框一左右两侧底部分别开设有安装槽一,两个所述安装槽一内分别螺纹连接有螺栓一,所述前梁连接块右侧通过螺钉安装有安装框二,所述安装框二上下两侧右部分别开设有安装槽二,两个所述安装槽二内分别螺纹连接有螺栓二。Furthermore, the front beam assembly also includes a front beam connecting block, an installation groove 1, a bolt 1, an installation frame 2, an installation groove 2 and a bolt 2. The front beam connecting block is installed on the top of the installation frame 1 by screws, and the bottom of the left and right sides of the installation frame 1 are respectively provided with installation grooves 1, and the two installation grooves 1 are respectively threadedly connected with bolts 1, and the right side of the front beam connecting block is installed with installation frame 2 by screws, and the right parts of the upper and lower sides of the installation frame 2 are respectively provided with installation grooves 2, and the two installation grooves 2 are respectively threadedly connected with bolts 2.
进一步地,所述立柱左右两侧顶部分别开设有连接槽一,两个所述连接槽一内分别开设有与螺栓一尺寸适配的螺纹孔一。Furthermore, a connecting groove 1 is respectively formed at the top of the left and right sides of the column, and a threaded hole 1 which is adapted to the size of the bolt 1 is respectively formed in the two connecting grooves 1.
进一步地,所述主梁上下两侧左端分别开设有连接槽二,两个所述连接槽二内分别开设有与螺栓二尺寸适配的螺纹孔二。Furthermore, two connecting grooves are respectively provided at the left ends of the upper and lower sides of the main beam, and two threaded holes matching the size of the two bolts are respectively provided in the two connecting grooves.
进一步地,所述后梁组件还包括安装槽三、螺栓三和后梁连接块,所述安装框三上下两侧左部分别开设有安装槽三,两个所述安装槽三内分别螺纹连接有螺栓三,所述安装框三右侧通过螺钉安装有后梁连接块。Furthermore, the rear beam assembly also includes an installation groove three, a bolt three and a rear beam connecting block. The installation frame three is respectively provided with installation grooves three on the left sides of the upper and lower sides. The two installation grooves three are respectively threadedly connected with bolts three. The rear beam connecting block is installed on the right side of the installation frame three by screws.
进一步地,所述主梁上下两侧右端分别开设有连接槽三,两个所述连接槽三内分别开设有与螺栓三尺寸适配的螺纹孔三。Furthermore, the right ends of the upper and lower sides of the main beam are respectively provided with connection grooves three, and the two connection grooves three are respectively provided with threaded holes three that are adapted to the size of the bolts three.
与现有技术相比,本实用新型提供的一种阳光房连接结构,Compared with the prior art, the utility model provides a sun room connection structure.
本实用新型通过设计安装了前梁组件,通过其中的安装框一以及安装槽一与连接槽一的配合使用实现立柱与前梁组件的连接,且进一步通过设置的螺栓一对连接处进行固定,且螺栓一仅起到定位作用,并不受力,从而避免出现螺栓一因受力出现脱落的情况,通过其中的安装槽二以及螺栓二与连接槽二的配合使用实现主梁与前梁组件的连接,通过设置的后梁组件中的安装槽三以及螺栓三与连接槽三的配合使用实现主梁与后梁组件的连接。The utility model installs a front beam assembly through design, realizes the connection between the column and the front beam assembly through the installation frame 1 and the cooperation of the installation groove 1 and the connecting groove 1, and further fixes the connection through a pair of bolts, and the bolt 1 only plays a positioning role and is not subjected to force, thereby avoiding the situation that the bolt 1 falls off due to force, realizes the connection between the main beam and the front beam assembly through the installation groove 2 and the cooperation of the bolt 2 and the connecting groove 2, and realizes the connection between the main beam and the rear beam assembly through the installation groove 3 in the rear beam assembly and the cooperation of the bolt 3 and the connecting groove 3.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
为了更清楚地说明本申请实施例或现有技术中的技术方案,下面将对实施例中所需要使用的附图作简单介绍,显而易见地,下面描述中的附图仅仅是本实用新型中记载的一些实施例,对于本领域普通技术人员来讲,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments recorded in the present utility model. For ordinary technicians in this field, other drawings can also be obtained based on these drawings.
图1为本实用新型第一立体结构示意图;FIG1 is a schematic diagram of a first three-dimensional structure of the utility model;
图2为本实用新型立柱的立体结构示意图;FIG2 is a schematic diagram of the three-dimensional structure of the column of the utility model;
图3为本实用新型前梁组件的立体结构示意图;FIG3 is a schematic diagram of the three-dimensional structure of the front beam assembly of the utility model;
图4为本实用新型主梁的立体结构示意图;FIG4 is a schematic diagram of the three-dimensional structure of the main beam of the utility model;
图5为本实用新型后梁组件的立体结构示意图。FIG. 5 is a schematic diagram of the three-dimensional structure of the rear beam assembly of the present invention.
附图标记说明:Description of reference numerals:
1、立柱;2、前梁组件;21、安装框一;22、前梁连接块;23、安装槽一;24、螺栓一;25、安装框二;26、安装槽二;27、螺栓二;3、主梁;4、后梁组件;41、安装框三;42、安装槽三;43、螺栓三;44、后梁连接块;5、连接槽一;6、连接槽二;7、连接槽三。1. Upright column; 2. Front beam assembly; 21. Mounting frame one; 22. Front beam connecting block; 23. Mounting slot one; 24. Bolt one; 25. Mounting frame two; 26. Mounting slot two; 27. Bolt two; 3. Main beam; 4. Rear beam assembly; 41. Mounting frame three; 42. Mounting slot three; 43. Bolt three; 44. Rear beam connecting block; 5. Connecting slot one; 6. Connecting slot two; 7. Connecting slot three.
具体实施方式DETAILED DESCRIPTION
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
请参阅图1-5,一种阳光房连接结构,包括立柱1,立柱1上方活动设置有主梁3;Please refer to Figures 1-5, a sun room connection structure includes a column 1, and a main beam 3 is movably arranged above the column 1;
前梁组件2,前梁组件2固定安装在立柱1顶端,前梁组件2包括安装框一21,安装框一21活动设置在立柱1顶端;A front beam assembly 2, the front beam assembly 2 is fixedly mounted on the top of the column 1, and the front beam assembly 2 includes a mounting frame 21, and the mounting frame 21 is movably mounted on the top of the column 1;
后梁组件4,后梁组件4固定安装在主梁3右侧,后梁组件4包括安装框三41,安装框三41活动设置在主梁3右侧。The rear beam assembly 4 is fixedly mounted on the right side of the main beam 3 . The rear beam assembly 4 comprises a mounting frame three 41 , and the mounting frame three 41 is movably arranged on the right side of the main beam 3 .
前梁组件2还包括前梁连接块22、安装槽一23、螺栓一24、安装框二25、安装槽二26和螺栓二27,安装框一21顶端通过螺钉安装有前梁连接块22,安装框一21左右两侧底部分别开设有安装槽一23,两个安装槽一23内分别螺纹连接有螺栓一24,前梁连接块22右侧通过螺钉安装有安装框二25,安装框二25上下两侧右部分别开设有安装槽二26,两个安装槽二26内分别螺纹连接有螺栓二27;通过设置的前梁组件2使得立柱1与主梁3连接;The front beam assembly 2 also includes a front beam connection block 22, a mounting groove 1 23, a bolt 1 24, a mounting frame 25, a mounting groove 26 and a bolt 27. The front beam connection block 22 is installed on the top of the mounting frame 1 21 by screws. The bottom of the left and right sides of the mounting frame 1 21 are respectively provided with mounting grooves 1 23, and the two mounting grooves 1 23 are respectively threadedly connected with bolts 1 24. The right side of the front beam connection block 22 is installed with a mounting frame 25 by screws. The right parts of the upper and lower sides of the mounting frame 25 are respectively provided with mounting grooves 26, and the two mounting grooves 26 are respectively threadedly connected with bolts 27; the column 1 is connected to the main beam 3 by the provided front beam assembly 2;
立柱1左右两侧顶部分别开设有连接槽一5,两个连接槽一5内分别开设有与螺栓一24尺寸适配的螺纹孔一;通过开设的螺纹孔一使得立柱1与前梁组件2连接;A connection groove 5 is respectively provided on the top of the left and right sides of the column 1, and a threaded hole 1 matching the size of the bolt 24 is respectively provided in the two connection grooves 5; the column 1 is connected to the front beam assembly 2 through the threaded hole 1;
主梁3上下两侧左端分别开设有连接槽二6,两个连接槽二6内分别开设有与螺栓二27尺寸适配的螺纹孔二;通过设置的螺纹孔二使得前梁组件2与主梁3连接;The left ends of the upper and lower sides of the main beam 3 are respectively provided with connecting grooves 6, and the two connecting grooves 6 are respectively provided with threaded holes 2 that match the size of the bolts 27; the front beam assembly 2 is connected to the main beam 3 through the provided threaded holes 2;
后梁组件4还包括安装槽三42、螺栓三43和后梁连接块44,安装框三41上下两侧左部分别开设有安装槽三42,两个安装槽三42内分别螺纹连接有螺栓三43,安装框三41右侧通过螺钉安装有后梁连接块44;通过设置的后梁组件4使得主梁3与后梁组件4连接;The rear beam assembly 4 further includes a mounting groove 3 42, a bolt 3 43 and a rear beam connection block 44. The mounting frame 3 41 has mounting grooves 3 42 respectively formed on the left sides of the upper and lower sides. The two mounting grooves 3 42 are respectively threadedly connected with bolts 3 43. The rear beam connection block 44 is installed on the right side of the mounting frame 3 41 by screws. The rear beam assembly 4 is provided so that the main beam 3 is connected to the rear beam assembly 4.
主梁3上下两侧右端分别开设有连接槽三7,两个连接槽三7内分别开设有与螺栓三43尺寸适配的螺纹孔三;通过设置的螺纹孔三使得主梁3与后梁组件4连接。The right ends of the upper and lower sides of the main beam 3 are respectively provided with connection grooves 3 7, and the two connection grooves 3 7 are respectively provided with threaded holes 3 that are adapted to the size of the bolts 3 43; the main beam 3 is connected to the rear beam assembly 4 through the set threaded holes 3.
同时本说明书中未作详细描述的内容均属于本邻域技术人员公知的现有技术。At the same time, the contents not described in detail in this specification belong to the prior art known to technicians in this field.
工作原理:使用时,将后梁连接块44靠在墙壁上,将安装框一21放置在立柱1上,使得安装槽一23的位置与连接槽一5正对,同时螺栓一24与螺纹孔一正对,将螺栓一24拧紧至螺纹孔一内,从而实现将立柱1和安装框一21连接,将安装框二25放置在主梁3左侧,使得安装槽二26的位置与连接槽二6正对,同时螺栓二27与螺纹孔二正对,将螺栓二27拧紧至螺纹孔二内,从而实现将安装框二25和主梁3连接,将安装框三41放置在主梁3右侧,使得安装槽三42的位置与连接槽三7正对,同时螺栓三43与螺纹孔三正对,将螺栓三43拧紧至螺纹孔三内,从而实现将安装框三41和主梁3连接,进而完成整个装置的安装。Working principle: When in use, place the rear beam connecting block 44 against the wall, place the installation frame 21 on the column 1, so that the position of the installation slot 23 is opposite to the connecting slot 5, and the bolt 24 is opposite to the threaded hole 1, tighten the bolt 24 into the threaded hole 1, so as to connect the column 1 and the installation frame 21, place the installation frame 25 on the left side of the main beam 3, so that the position of the installation slot 26 is opposite to the connecting slot 26, and the bolt 27 is opposite to the threaded hole 2, tighten the bolt 27 into the threaded hole 2, so as to connect the installation frame 25 and the main beam 3, place the installation frame 3 41 on the right side of the main beam 3, so that the position of the installation slot 3 42 is opposite to the connecting slot 3 7, and the bolt 3 43 is opposite to the threaded hole 3, tighten the bolt 3 43 into the threaded hole 3, so as to connect the installation frame 3 41 and the main beam 3, and then complete the installation of the entire device.
需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。同时在本实用新型的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“长度”、“宽度”、“厚度”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”、“顺时针”、“逆时针”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本实用新型和简化描述,而不是指示或暗示所指的设备或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本实用新型的限制。且在本实用新型的附图中,填充图案只是为了区别图层,不做其他任何限定。It should be noted that, in this article, relational terms such as first and second are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply that there is any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that the process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. At the same time, in the description of the present utility model, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise" and the like indicate the orientation or position relationship based on the orientation or position relationship shown in the accompanying drawings, which is only for the convenience of describing the present utility model and simplifying the description, rather than indicating or implying that the equipment or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation to the present utility model. In the drawings of the present invention, the filling patterns are only used to distinguish the layers and no other limitations are given.
尽管已经示出和描述了本实用新型的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本实用新型的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本实用新型的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202420307514.0U CN221760924U (en) | 2024-02-19 | 2024-02-19 | A sun room connection structure |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202420307514.0U CN221760924U (en) | 2024-02-19 | 2024-02-19 | A sun room connection structure |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN221760924U true CN221760924U (en) | 2024-09-24 |
Family
ID=92793632
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202420307514.0U Active CN221760924U (en) | 2024-02-19 | 2024-02-19 | A sun room connection structure |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN221760924U (en) |
-
2024
- 2024-02-19 CN CN202420307514.0U patent/CN221760924U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204934670U (en) | A kind of electric drill auxiliary stand | |
| CN112922173B (en) | A kind of prefabricated steel structure building component and assembly method | |
| CN221760924U (en) | A sun room connection structure | |
| CN206636254U (en) | The runback bit architecture that a kind of Tenon Nodes Three-dimensional marmem is reinforced | |
| CN204343714U (en) | Glass sunlight house | |
| CN105020222A (en) | Section bar connecting piece for plate assembling | |
| CN210067410U (en) | Support device for climbing scaffold | |
| CN214246621U (en) | Novel aluminum-wood connecting structure | |
| CN212689321U (en) | Assembled Jinbang board outer wall | |
| CN209369715U (en) | A kind of oilfield servicing step ladder | |
| CN204878158U (en) | A section bar connecting piece for panel equipment | |
| CN221957021U (en) | Glass curtain wall beam upright post mounting structure | |
| CN218714224U (en) | Pseudo-classic architecture rafter truss structure | |
| CN109594753B (en) | Novel steel structure engineering support | |
| CN223176980U (en) | A hanging glass curtain wall | |
| CN207609202U (en) | A kind of novel high-strength fast installs glass sunlight house | |
| CN214696062U (en) | Platform frame modular structure of green steel construction | |
| CN223034290U (en) | Combined building curtain wall | |
| CN214942222U (en) | Climbing frame equipment convenient to install | |
| CN221682250U (en) | A spliced steel structure beam | |
| CN111663646A (en) | Crossbeam and stand connecting device for assembly type structure | |
| CN219343676U (en) | Assembled curtain wall | |
| CN104405145A (en) | Sunlight room and installation method thereof | |
| CN218176252U (en) | Steel construction factory building wallboard connection structure | |
| CN112443052A (en) | Indoor wall frame connection structure of assembly type building |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |