CN221760917U - Steel construction building connecting device - Google Patents
Steel construction building connecting device Download PDFInfo
- Publication number
- CN221760917U CN221760917U CN202323445614.4U CN202323445614U CN221760917U CN 221760917 U CN221760917 U CN 221760917U CN 202323445614 U CN202323445614 U CN 202323445614U CN 221760917 U CN221760917 U CN 221760917U
- Authority
- CN
- China
- Prior art keywords
- column
- steel
- fixedly connected
- block
- close
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
技术领域Technical Field
本实用新型属于建筑连接技术领域,具体涉及一种钢结构建筑连接装置。The utility model belongs to the technical field of building connection, and in particular relates to a steel structure building connection device.
背景技术Background Art
钢制材料组成的结构,是主要的建筑结构类型之一,结构主要由型钢和钢板等制成的钢梁、钢柱、钢桁架等构件组成,并采用硅烷化、纯锰磷化、水洗烘干、镀锌等除锈防锈工艺,在实际施工过程中需要用到相应的连接方式将不同钢结构连接在一起;The structure composed of steel materials is one of the main types of building structures. The structure is mainly composed of steel beams, steel columns, steel trusses and other components made of steel sections and steel plates, and adopts rust removal and anti-rust processes such as silanization, pure manganese phosphating, water washing and drying, and galvanizing. In the actual construction process, corresponding connection methods are required to connect different steel structures together;
经查公开(公告)号:CN211923037U公开了一种钢结构建筑连接装置,此技术中公开了“包括固定块、方筒、定位块、第一螺丝、第二螺丝和加强筋,所述固定块的侧面均设置有方槽,方槽的内侧中部设置有贯穿固定块的螺纹孔,螺纹孔内的螺纹与第一螺丝的外螺纹相吻合,定位块的左端设置有横向贯穿的通孔,所述第一螺丝从方筒的内部穿过通孔,并且第一螺丝与定位块转动连接,定位块通过第一螺丝和螺纹孔配合与固定块连接,所述方筒的侧面设置有贯穿的凸型槽,加强筋与凸型槽固定连接,方筒的顶端右侧设置有纵向贯穿的第一圆孔,所述第二螺丝穿过第一圆孔与方筒连接,第二螺丝穿过方筒的一端螺装有螺母”等技术方案;具有“通过第一螺丝与固定块可拆卸连接,可以根据方管的角度不同改变方筒在固定块上的固定位置来对方管进行固定,结构简单,适用各个角度的方管的连接,操作简单方便,提高了其使用的实用性”等技术效果;After checking the publication (announcement) number: CN211923037U discloses a steel structure building connection device, which discloses "including a fixing block, a square tube, a positioning block, a first screw, a second screw and a reinforcing rib, the side of the fixing block is provided with a square groove, the inner middle part of the square groove is provided with a threaded hole penetrating the fixing block, the thread in the threaded hole is consistent with the external thread of the first screw, the left end of the positioning block is provided with a transverse through hole, the first screw passes through the through hole from the inside of the square tube, and the first screw is rotatably connected to the positioning block, the positioning block cooperates with the first screw and the threaded hole The square tube is connected to the fixing block, a convex groove is provided on the side of the square tube, the reinforcing rib is fixedly connected to the convex groove, a first circular hole is provided on the right side of the top of the square tube, the second screw passes through the first circular hole to connect with the square tube, and the second screw passes through one end of the square tube and is screwed with a nut. The square tube has the following technical effects: the square tube can be detachably connected to the fixing block through the first screw, and the fixing position of the square tube on the fixing block can be changed according to the different angles of the square tube to fix the square tube. The structure is simple, suitable for connecting square tubes at various angles, and the operation is simple and convenient, which improves the practicality of its use.
但是该设计通过第一螺丝和固定块来进行连接,且螺栓数量容易过多,安装过程冗长,工程量较大,而用螺栓的方式连接完毕后,连接位置难以进行二次调整,若在施工过程中,当需要将安装好的钢材进行位置调整,需要重新拆下再进行安装,费时费力;However, this design uses the first screw and the fixing block for connection, and the number of bolts is likely to be too much, the installation process is lengthy, and the amount of work is large. After the connection is completed by bolts, it is difficult to adjust the connection position for a second time. If the installed steel needs to be adjusted during the construction process, it needs to be disassembled and reinstalled, which is time-consuming and laborious.
为解决上述问题,本申请中提出一种钢结构建筑连接装置。In order to solve the above problems, a steel structure building connection device is proposed in the present application.
实用新型内容Utility Model Content
为解决上述背景技术中提出的问题。本实用新型提供了一种钢结构建筑连接装置具有快速对装置进行安装和拆卸,无需借助专业工具,操作过程简单便捷,节省工作人员时间和精力的特点。In order to solve the problems raised in the above background technology, the utility model provides a steel structure building connection device which has the characteristics of rapid installation and disassembly of the device without the aid of professional tools, simple and convenient operation process, and saving time and energy of the staff.
为实现上述目的,本实用新型提供如下技术方案:一种钢结构建筑连接装置,包括钢柱和设置在所述钢柱一侧的钢梁,还包括安装在所述钢柱和所述钢梁之间的安装组件;To achieve the above-mentioned purpose, the utility model provides the following technical solutions: a steel structure building connection device, comprising a steel column and a steel beam arranged on one side of the steel column, and also comprising an installation component installed between the steel column and the steel beam;
所述安装组件包括固定在所述钢柱靠近所述钢梁一侧的空心柱,所述空心柱的内部底端设置有安装板,所述安装板的上表面固定连接有支撑杆,所述支撑杆远离所述安装板的一端贯穿所述空心柱的内部,并延伸至所述空心柱的外侧,所述支撑杆的外侧壁远离所述钢柱的一侧固定连接有若干组呈等距排列的连接板,所述连接板的下表面均固定连接有呈半圆形结构的卡块,所述钢梁靠近所述空心柱的一侧固定连接有支撑柱,所述支撑柱的内部通过轴承转动连接有双向丝杆,所述双向丝杆的顶端贯穿所述支撑柱的内部,并延伸至所述支撑柱的上方,所述双向丝杆的外侧壁螺纹连接有对称的两组活动块,两组所述活动块靠近所述空心柱的一侧通过铰接座A铰接有连接杆,两组所述连接杆远离所述两组活动块的一端通过铰接座B铰接有嵌块,所述嵌块远离所述连接杆的一端固定连接有移动板,所述移动板靠近所述空心柱的一侧固定连接有插块,所述支撑柱靠近所述插块的一侧开设有孔体,所述空心柱的内部靠近所述插块的一侧开设有若干组呈等距排列的插孔,所述插块的内部开设有与所述卡块相适配的卡槽。The mounting assembly comprises a hollow column fixed to the steel column on one side close to the steel beam, a mounting plate is provided at the inner bottom end of the hollow column, a support rod is fixedly connected to the upper surface of the mounting plate, an end of the support rod away from the mounting plate passes through the interior of the hollow column and extends to the outside of the hollow column, a plurality of groups of equidistantly arranged connecting plates are fixedly connected to the side of the outer wall of the support rod away from the steel column, a block with a semicircular structure is fixedly connected to the lower surface of the connecting plate, a support column is fixedly connected to the side of the steel beam close to the hollow column, a bidirectional screw rod is rotatably connected to the interior of the support column through a bearing, and the top end of the bidirectional screw rod passes through the support The inside of the column and extends to the top of the support column, the outer side wall of the bidirectional screw is threadedly connected with two symmetrical groups of movable blocks, the two groups of movable blocks are hinged with connecting rods through a hinge seat A on one side close to the hollow column, and the two groups of connecting rods are hinged with embedded blocks on one end away from the two groups of movable blocks through a hinge seat B, the embedded block is fixedly connected with a movable plate on one end away from the connecting rod, and the movable plate is fixedly connected with an insert block on one side close to the hollow column, a hole body is provided on one side of the support column close to the insert block, a plurality of groups of equidistantly arranged jacks are provided on the inside of the hollow column close to the insert block, and a card slot matched with the card block is provided inside the insert block.
作为本实用新型一种钢结构建筑连接装置优选的,所述安装板远离所述支撑杆的一侧通过复位弹簧和所述空心柱固定连接。As a preferred embodiment of the steel structure building connection device of the utility model, the side of the mounting plate away from the support rod is fixedly connected to the hollow column through a return spring.
作为本实用新型一种钢结构建筑连接装置优选的,所述支撑杆的外侧壁靠近所述钢柱的一侧对称固定连接有固定块体,所述空心柱的内部靠近所述固定块体的一侧开设有安装槽。As a preferred steel structure building connection device of the utility model, a fixing block is symmetrically fixedly connected to the outer wall of the support rod on one side close to the steel column, and a mounting groove is opened on one side of the interior of the hollow column close to the fixing block.
作为本实用新型一种钢结构建筑连接装置优选的,所述两组所述活动块远离所述连接杆的一端固定连接有滑块,所述支撑柱的内部靠近所述滑块的一侧对称开设有两组滑槽,所述滑块和所述支撑柱通过所述滑槽滑动连接,所述移动板的上下两端对称固定连接有移动块,所述支撑柱的内部靠近两组所述移动块的一侧对称开设有凹槽,所述移动块和所述支撑柱通过所述凹槽滑动连接。As a preferred steel structure building connection device of the utility model, the two groups of movable blocks are fixedly connected with a slider at one end away from the connecting rod, two groups of sliding grooves are symmetrically opened on the inner side of the support column close to the slider, the slider and the support column are slidably connected through the sliding grooves, the upper and lower ends of the movable plate are symmetrically fixedly connected with movable blocks, the inner side of the support column close to the two groups of movable blocks is symmetrically opened with grooves, and the movable block and the support column are slidably connected through the grooves.
作为本实用新型一种钢结构建筑连接装置优选的,还包括安装在所述空心柱一侧的监测组件,所述监测组件包括安装在所述空心柱靠近所述支撑柱一侧的安装盒,所述安装盒的内部固定连接有监控器,所述监控器的上表面固定连接有控制开关,所述控制开关的正上方设置有固定板,所述固定板的上表面固定连接有滑杆,所述滑杆的顶端贯穿所述安装盒的内部,并延伸至所述安装盒的上方,所述滑杆的两侧对称设置有第一弹簧,所述第一弹簧的两端分别固定在所述安装盒和所述固定板之间。As a preferred embodiment of the utility model, a steel structure building connection device further includes a monitoring component installed on one side of the hollow column, the monitoring component includes an installation box installed on the side of the hollow column close to the supporting column, a monitor is fixedly connected to the interior of the installation box, a control switch is fixedly connected to the upper surface of the monitor, a fixing plate is arranged directly above the control switch, a sliding rod is fixedly connected to the upper surface of the fixing plate, the top end of the sliding rod passes through the interior of the installation box and extends to the top of the installation box, first springs are symmetrically arranged on both sides of the sliding rod, and both ends of the first spring are respectively fixed between the installation box and the fixing plate.
作为本实用新型一种钢结构建筑连接装置优选的,所述空心柱的一侧靠近所述安装盒的一侧对称固定连接有滑动杆,所述安装盒的两侧对称固定连接有连接块,所述滑动杆的内部靠近所述连接块的一侧开设有槽体。As a preferred steel structure building connection device of the utility model, a sliding rod is symmetrically fixedly connected to one side of the hollow column close to the installation box, and connecting blocks are symmetrically fixedly connected to both sides of the installation box, and a groove is opened inside the sliding rod close to the connecting block.
与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:
通过设置的安装组件,能够快速对装置进行安装和拆卸,无需借助专业工具,操作过程简单便捷,节省工作人员的时间和精力,通过设置的监测组件,能够对整体装置进行监测,使得工作人员能够及时发生异常出现,解决安全隐患。The installation components can be installed and disassembled quickly without the help of professional tools. The operation process is simple and convenient, saving the staff's time and energy. The monitoring components can monitor the entire device, allowing the staff to detect abnormalities in time and resolve safety hazards.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
附图用来提供对本实用新型的进一步理解,并且构成说明书的一部分,与本实用新型的实施例一起用于解释本实用新型,并不构成对本实用新型的限制。在附图中:The accompanying drawings are used to provide a further understanding of the present invention and constitute a part of the specification. Together with the embodiments of the present invention, they are used to explain the present invention and do not constitute a limitation of the present invention. In the accompanying drawings:
图1为本实用新型整体的结构示意图;FIG1 is a schematic diagram of the overall structure of the utility model;
图2为本实用新型中安装槽的结构示意图;FIG2 is a schematic diagram of the structure of the installation slot in the utility model;
图3为本实用新型中安装组件的结构示意图;FIG3 is a schematic diagram of the structure of the installation assembly in the present utility model;
图4为本实用新型中移动板的结构示意图;FIG4 is a schematic diagram of the structure of the movable plate in the utility model;
图5为本实用新型中安装组件进行安装的结构示意图;FIG5 is a schematic diagram of the structure of the installation assembly in the utility model;
图6为本实用新型中监测组件的结构示意图;FIG6 is a schematic diagram of the structure of the monitoring component in the utility model;
图中:In the figure:
1、钢柱;2、钢梁;1. Steel column; 2. Steel beam;
3、安装组件;31、空心柱;32、安装板;33、复位弹簧;34、支撑杆;35、固定块体;36、安装槽;37、连接板;38、卡块;39、插孔;310、支撑柱;311、双向丝杆;312、活动块;313、滑块;314、滑槽;315、连接杆;316、嵌块;317、移动板;318、移动块;319、凹槽;320、插块;321、卡槽;322、孔体;3. Mounting assembly; 31. Hollow column; 32. Mounting plate; 33. Reset spring; 34. Support rod; 35. Fixed block; 36. Mounting groove; 37. Connecting plate; 38. Block; 39. Socket; 310. Support column; 311. Bidirectional screw rod; 312. Movable block; 313. Slider; 314. Slide; 315. Connecting rod; 316. Insert block; 317. Moving plate; 318. Moving block; 319. Groove; 320. Insert block; 321. Slot; 322. Hole;
4、监测组件;41、滑动杆;42、安装盒;43、连接块;44、槽体;45、监控器;46、控制开关;47、滑杆;48、固定板;49、第一弹簧。4. Monitoring assembly; 41. Sliding rod; 42. Mounting box; 43. Connecting block; 44. Tank body; 45. Monitor; 46. Control switch; 47. Sliding rod; 48. Fixing plate; 49. First spring.
具体实施方式DETAILED DESCRIPTION
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The following will be combined with the drawings in the embodiments of the utility model to clearly and completely describe the technical solutions in the embodiments of the utility model. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments in the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
实施例1Example 1
如图1所示;As shown in Figure 1;
一种钢结构建筑连接装置,包括钢柱1和设置在钢柱1一侧的钢梁2;A steel structure building connection device comprises a steel column 1 and a steel beam 2 arranged on one side of the steel column 1;
本实施方案中:经查公开(公告)号:CN211923037U公开了一种钢结构建筑连接装置,此技术中公开了“包括固定块、方筒、定位块、第一螺丝、第二螺丝和加强筋,所述固定块的侧面均设置有方槽,方槽的内侧中部设置有贯穿固定块的螺纹孔,螺纹孔内的螺纹与第一螺丝的外螺纹相吻合,定位块的左端设置有横向贯穿的通孔,所述第一螺丝从方筒的内部穿过通孔,并且第一螺丝与定位块转动连接,定位块通过第一螺丝和螺纹孔配合与固定块连接,所述方筒的侧面设置有贯穿的凸型槽,加强筋与凸型槽固定连接,方筒的顶端右侧设置有纵向贯穿的第一圆孔,所述第二螺丝穿过第一圆孔与方筒连接,第二螺丝穿过方筒的一端螺装有螺母”等技术方案;具有“通过第一螺丝与固定块可拆卸连接,可以根据方管的角度不同改变方筒在固定块上的固定位置来对方管进行固定,结构简单,适用各个角度的方管的连接,操作简单方便,提高了其使用的实用性”等技术效果;In this embodiment: After checking the public (announcement) number: CN211923037U discloses a steel structure building connection device, which discloses "including a fixing block, a square tube, a positioning block, a first screw, a second screw and a reinforcing rib, the side of the fixing block is provided with a square groove, the inner middle part of the square groove is provided with a threaded hole penetrating the fixing block, the thread in the threaded hole is consistent with the external thread of the first screw, the left end of the positioning block is provided with a transverse through hole, the first screw passes through the through hole from the inside of the square tube, and the first screw is rotatably connected to the positioning block, the positioning block is connected to the first screw and the threaded hole by the first screw and the threaded hole. The hole is matched with the fixing block, the side of the square tube is provided with a penetrating convex groove, the reinforcing rib is fixedly connected with the convex groove, a first circular hole is longitudinally penetrating on the right side of the top of the square tube, the second screw passes through the first circular hole to connect with the square tube, and the second screw passes through one end of the square tube and is screwed with a nut" and other technical solutions; it has "the first screw is detachably connected with the fixing block, the fixing position of the square tube on the fixing block can be changed according to the different angles of the square tube to fix the square tube, the structure is simple, it is suitable for the connection of square tubes at various angles, the operation is simple and convenient, and its practicality is improved" and other technical effects;
为解决此现有技术中存在的技术问题,如上文背景技术公开的“该设计通过第一螺丝和固定块来进行连接,且螺栓数量容易过多,安装过程冗长,工程量较大,而用螺栓的方式连接完毕后,连接位置难以进行二次调整,若在施工过程中,当需要将安装好的钢材进行位置调整,需要重新拆下再进行安装,费时费力”,结合使用而言,此问题显然是现实存在且比较难以解决的问题,鉴此,为解决此技术问题,提出以下改进方案。In order to solve the technical problems existing in this prior art, as disclosed in the background technology above, "the design is connected by a first screw and a fixed block, and the number of bolts is easily too much, the installation process is lengthy, and the amount of work is large. After the connection is completed by bolts, it is difficult to adjust the connection position for a second time. If during the construction process, the installed steel needs to be adjusted in position, it needs to be removed and reinstalled, which is time-consuming and laborious." In terms of use, this problem is obviously a real problem that exists and is difficult to solve. In view of this, in order to solve this technical problem, the following improvement plan is proposed.
进一步而言:More specifically:
如图1至图6所示;As shown in Figures 1 to 6;
结合上述内容:Combining the above:
为了能够快速对装置进行安装和拆卸,无需借助专业工具,操作过程简单便捷,节省工作人员的时间和精力,此钢结构建筑连接装置还包括安装在钢柱1和钢梁2之间的安装组件3,安装组件3包括固定在钢柱1靠近钢梁2一侧的空心柱31,空心柱31的内部底端设置有安装板32,安装板32的上表面固定连接有支撑杆34,支撑杆34远离安装板32的一端贯穿空心柱31的内部,并延伸至空心柱31的外侧,支撑杆34的外侧壁远离钢柱1的一侧固定连接有若干组呈等距排列的连接板37,连接板37的下表面均固定连接有呈半圆形结构的卡块38,钢梁2靠近空心柱31的一侧固定连接有支撑柱310,支撑柱310的内部通过轴承转动连接有双向丝杆311,双向丝杆311的顶端贯穿支撑柱310的内部,并延伸至支撑柱310的上方,双向丝杆311的外侧壁螺纹连接有对称的两组活动块312,两组活动块312靠近空心柱31的一侧通过铰接座A铰接有连接杆315,两组连接杆315远离两组活动块312的一端通过铰接座B铰接有嵌块316,嵌块316远离连接杆315的一端固定连接有移动板317,移动板317靠近空心柱31的一侧固定连接有插块320,支撑柱310靠近插块320的一侧开设有孔体322,空心柱31的内部靠近插块320的一侧开设有若干组呈等距排列的插孔39,插块320的内部开设有与卡块38相适配的卡槽321。In order to be able to quickly install and disassemble the device without the aid of professional tools, the operation process is simple and convenient, saving the time and energy of the staff, this steel structure building connection device also includes a mounting assembly 3 installed between the steel column 1 and the steel beam 2, the mounting assembly 3 includes a hollow column 31 fixed to the side of the steel column 1 close to the steel beam 2, the inner bottom end of the hollow column 31 is provided with a mounting plate 32, the upper surface of the mounting plate 32 is fixedly connected to a support rod 34, the end of the support rod 34 away from the mounting plate 32 passes through the interior of the hollow column 31 and extends to the outside of the hollow column 31, the outer side wall of the support rod 34 is fixedly connected to the side away from the steel column 1 with a plurality of groups of equidistantly arranged connecting plates 37, the lower surface of the connecting plate 37 is fixedly connected with a block 38 with a semicircular structure, the side of the steel beam 2 close to the hollow column 31 is fixedly connected with a support column 310, the interior of the support column 310 is connected by a bearing The two-way screw rod 311 is rotatably connected, and the top of the two-way screw rod 311 passes through the interior of the support column 310 and extends to the top of the support column 310. The outer wall of the two-way screw rod 311 is threadedly connected with two symmetrical groups of movable blocks 312. The two groups of movable blocks 312 are hinged with a connecting rod 315 on the side close to the hollow column 31 through a hinge seat A. The two groups of connecting rods 315 are hinged with an insert block 316 on the end away from the two groups of movable blocks 312 through a hinge seat B. The insert block 316 is fixedly connected with a movable plate 317 on the end away from the connecting rod 315. The movable plate 317 is fixedly connected with an insert block 320 on the side close to the hollow column 31. A hole body 322 is provided on the side of the support column 310 close to the insert block 320. A plurality of groups of equidistantly arranged jacks 39 are provided on the side of the hollow column 31 close to the insert block 320. A card slot 321 adapted to the card block 38 is provided inside the insert block 320.
本实施方案中:转动双向丝杆311带动活动块312在其表面进行相互远离或者相互靠近的方向进行移动,从而通过连接杆315带动嵌块316进行移动,进而带动移动板317在支撑柱310中进行移动,随后插块320朝向支撑柱310内进行移动,此时调节钢梁2和钢柱1之间的位置,将插块320的位置对准插孔39,随后将支撑杆34向上提拉从而通过连接板37带动卡块38向上移动,将双向丝杆311回转从而将插块320通过插孔39移动至空心柱31中,从而将支撑杆34卸力,随后卡块38完全卡合在卡槽321中,从而完成钢柱1和钢梁2的安装。In this embodiment: rotating the bidirectional screw rod 311 drives the movable block 312 to move on its surface in directions away from or close to each other, thereby driving the insert block 316 to move through the connecting rod 315, and then driving the movable plate 317 to move in the support column 310, and then the insert block 320 moves toward the support column 310, at this time, adjust the position between the steel beam 2 and the steel column 1, align the position of the insert block 320 with the socket 39, and then pull the support rod 34 upward to drive the block 38 to move upward through the connecting plate 37, rotate the bidirectional screw rod 311 to move the insert block 320 through the socket 39 to the hollow column 31, thereby unloading the support rod 34, and then the block 38 is completely engaged in the slot 321, thereby completing the installation of the steel column 1 and the steel beam 2.
更进一步而言:Going further:
在一个可选的实施例中,安装板32远离支撑杆34的一侧通过复位弹簧33和空心柱31固定连接。In an optional embodiment, a side of the mounting plate 32 away from the support rod 34 is fixedly connected to the hollow column 31 via a return spring 33 .
本实施例中:通过复位弹簧33能够对安装板32提供一个回弹拉力,能将安装板32自动往下带至原位。In this embodiment, the return spring 33 can provide a rebound pulling force to the mounting plate 32, so that the mounting plate 32 can be automatically brought down to the original position.
更进一步而言:Going further:
在一个可选的实施例中,支撑杆34的外侧壁靠近钢柱1的一侧对称固定连接有固定块体35,空心柱31的内部靠近固定块体35的一侧开设有安装槽36。In an optional embodiment, a fixing block 35 is symmetrically fixedly connected to a side of the outer wall of the support rod 34 close to the steel column 1 , and a mounting groove 36 is provided inside the hollow column 31 close to a side of the fixing block 35 .
本实施例中:支撑杆34的上下移动带动固定块体35在安装槽36中进行滑动,安装槽36对固定块体35的移动进行限位,防止支撑杆34在移动过程中发生位置的偏移。In this embodiment, the up and down movement of the support rod 34 drives the fixed block 35 to slide in the installation groove 36. The installation groove 36 limits the movement of the fixed block 35 to prevent the support rod 34 from being offset during the movement.
更进一步而言:Going further:
在一个可选的实施例中,两组活动块312远离连接杆315的一端固定连接有滑块313,支撑柱310的内部靠近滑块313的一侧对称开设有两组滑槽314,滑块313和支撑柱310通过滑槽314滑动连接,移动板317的上下两端对称固定连接有移动块318,支撑柱310的内部靠近两组移动块318的一侧对称开设有凹槽319,移动块318和支撑柱310通过凹槽319滑动连接。In an optional embodiment, the two groups of movable blocks 312 are fixedly connected with a slider 313 at one end away from the connecting rod 315, and two groups of sliding grooves 314 are symmetrically opened on the inner side of the support column 310 close to the slider 313, and the slider 313 and the support column 310 are slidingly connected through the sliding grooves 314, and the upper and lower ends of the movable plate 317 are symmetrically fixedly connected with movable blocks 318, and the inner side of the support column 310 close to the two groups of movable blocks 318 is symmetrically opened with grooves 319, and the movable blocks 318 and the support column 310 are slidingly connected through the grooves 319.
本实施例中:通过活动块312带动滑块313在滑槽314内进行滑动,滑槽314对滑块313的滑动进一步限位,防止滑块313移动过程中发生偏移,通过移动板317带动移动块318在凹槽319中进行滑动,凹槽319对移动块318的滑动进行限位,防止移动块318的移动发生偏移。In this embodiment: the movable block 312 drives the slider 313 to slide in the slide groove 314, and the slide groove 314 further limits the sliding of the slider 313 to prevent the slider 313 from deviating during the movement. The movable plate 317 drives the movable block 318 to slide in the groove 319, and the groove 319 limits the sliding of the movable block 318 to prevent the movable block 318 from deviating.
更进一步而言:Going further:
为了能够对整体装置进行监测,使得工作人员能够及时发生异常出现,解决安全隐患,此钢结构建筑连接装置还包括安装在空心柱31一侧的监测组件4,监测组件4包括安装在空心柱31靠近支撑柱310一侧的安装盒42,安装盒42的内部固定连接有监控器45,监控器45的上表面固定连接有控制开关46,控制开关46的正上方设置有固定板48,固定板48的上表面固定连接有滑杆47,滑杆47的顶端贯穿安装盒42的内部,并延伸至安装盒42的上方,滑杆47的两侧对称设置有第一弹簧49,第一弹簧49的两端分别固定在安装盒42和固定板48之间。In order to monitor the entire device so that the staff can detect abnormalities in time and solve safety hazards, this steel structure building connection device also includes a monitoring component 4 installed on one side of the hollow column 31. The monitoring component 4 includes an installation box 42 installed on the side of the hollow column 31 close to the support column 310. A monitor 45 is fixedly connected to the interior of the installation box 42. A control switch 46 is fixedly connected to the upper surface of the monitor 45. A fixing plate 48 is provided directly above the control switch 46. A slide bar 47 is fixedly connected to the upper surface of the fixing plate 48. The top end of the slide bar 47 passes through the interior of the installation box 42 and extends to the top of the installation box 42. First springs 49 are symmetrically provided on both sides of the slide bar 47. The two ends of the first spring 49 are respectively fixed between the installation box 42 and the fixing plate 48.
本实施例中:当支撑柱310出现错位偏移时,支撑柱310会触碰到滑杆47,滑杆47受到压力会向下带动固定板48向下移动,固定板48向下拉伸第一弹簧49,随着固定板48向下移动,从而会触碰到控制开关46,从而使监控器45发生警报提示。In this embodiment: when the support column 310 is misaligned, the support column 310 will touch the sliding bar 47, and the sliding bar 47 will be pressed to drive the fixed plate 48 to move downward, and the fixed plate 48 will stretch the first spring 49 downward. As the fixed plate 48 moves downward, it will touch the control switch 46, thereby causing the monitor 45 to sound an alarm.
更进一步而言:Going further:
在一个可选的实施例中,空心柱31的一侧靠近安装盒42的一侧对称固定连接有滑动杆41,安装盒42的两侧对称固定连接有连接块43,滑动杆41的内部靠近连接块43的一侧开设有槽体44。In an optional embodiment, a sliding rod 41 is symmetrically fixedly connected to one side of the hollow column 31 near the installation box 42, and connecting blocks 43 are symmetrically fixedly connected to both sides of the installation box 42. A groove 44 is provided inside the sliding rod 41 near the connecting block 43.
本实施例中:通过连接块43带动安装盒42在槽体44中进行滑动。In this embodiment, the installation box 42 is driven to slide in the groove 44 by the connecting block 43 .
本实用新型的工作原理及使用流程:当需要对钢柱1和钢梁2进行安装时,使用者通过带动双向丝杆311在支撑柱310内进行转动,从而带动两组活动块312在双向丝杆311上进行移动,两组活动块312带动两组滑块313在两组滑槽314内进行滑动,滑槽314对滑块313的滑动进一步限位,防止滑块313移动过程中发生偏移,两组活动块312的移动带动两组连接杆315进行移动,从而带动两组嵌块316进行移动,随后两组嵌块316推动移动板317朝向连接杆315的一侧进行移动,移动板317带动移动块318在凹槽319内进行滑动,凹槽319对移动块318的移动进行限位,移动板317带动插块320朝向支撑柱310内缩入,直至完全缩入后,随后插块320与对应的插孔39对应,然后往上拉动支撑杆34,从而带动多个连接板37以及卡块38向上移动,此时复位弹簧33处于拉伸状态,随后将双向丝杆311进行回转,使得两个活动块312相互靠近,从而带动插块320从支撑柱310中伸出,并穿过对应的插孔39插入空心柱31内,然后松开支撑杆34,此时在复位弹簧33的回拉下,支撑杆34带着连接板37向下移动,从而将卡块38卡合在卡槽321中,即可完成了钢柱1和钢梁2之间的安装,当插块320插入至任意一个插孔39时,随后将安装盒42通过连接块43在槽体44中进行移动,从而将滑杆47移动至支撑柱310的下方,当钢梁2出现错位偏移时,支撑柱310会触碰到滑杆47,此时滑杆47受到压力向下带动固定板48向下移动,固定板48向下拉伸第一弹簧49,固定板48的向下移动从而触碰到控制开关46,从而使监控器45发生警报提示,这样工作人员就能及时知道异常出现,及时解决安全隐患。The working principle and use process of the utility model are as follows: when the steel column 1 and the steel beam 2 need to be installed, the user drives the bidirectional screw rod 311 to rotate in the support column 310, thereby driving the two sets of movable blocks 312 to move on the bidirectional screw rod 311, and the two sets of movable blocks 312 drive the two sets of sliders 313 to slide in the two sets of slide grooves 314, and the slide grooves 314 further limit the sliding of the sliders 313 to prevent the sliders 313 from deviating during the movement process, and the movement of the two sets of movable blocks 312 drives the two sets of connecting rods 315 to move. The two sets of inlay blocks 316 move, and then the two sets of inlay blocks 316 push the moving plate 317 to move toward one side of the connecting rod 315. The moving plate 317 drives the moving block 318 to slide in the groove 319. The groove 319 limits the movement of the moving block 318. The moving plate 317 drives the plug block 320 to retract into the support column 310 until it is fully retracted. Then the plug block 320 corresponds to the corresponding socket 39, and then the support rod 34 is pulled upward, thereby driving multiple connecting plates 37 and the card block 38 upward. The two-way screw rod 311 is then rotated to make the two movable blocks 312 approach each other, thereby driving the plug block 320 to extend from the support column 310 and pass through the corresponding socket 39 to be inserted into the hollow column 31, and then the support rod 34 is released. At this time, under the pullback of the reset spring 33, the support rod 34 moves downward with the connecting plate 37, thereby engaging the card block 38 in the card slot 321, and the installation between the steel column 1 and the steel beam 2 is completed. When the plug block 320 is inserted into any socket 3 9, the installation box 42 is then moved in the slot 44 through the connecting block 43, thereby moving the slide bar 47 to the bottom of the support column 310. When the steel beam 2 is misaligned, the support column 310 will touch the slide bar 47. At this time, the slide bar 47 is pressed downward to drive the fixed plate 48 to move downward, and the fixed plate 48 stretches the first spring 49 downward. The downward movement of the fixed plate 48 touches the control switch 46, thereby causing the monitor 45 to sound an alarm. In this way, the staff can know the abnormality in time and solve the safety hazards in time.
最后应说明的是:以上仅为本实用新型的优选实施例而已,并不用于限制本实用新型,尽管参照前述实施例对本实用新型进行了详细的说明,对于本领域的技术人员来说,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换。凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。Finally, it should be noted that the above are only preferred embodiments of the utility model and are not intended to limit the utility model. Although the utility model is described in detail with reference to the above embodiments, those skilled in the art can still modify the technical solutions described in the above embodiments or replace some of the technical features therein with equivalents. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the utility model shall be included in the protection scope of the utility model.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202323445614.4U CN221760917U (en) | 2023-12-18 | 2023-12-18 | Steel construction building connecting device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202323445614.4U CN221760917U (en) | 2023-12-18 | 2023-12-18 | Steel construction building connecting device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN221760917U true CN221760917U (en) | 2024-09-24 |
Family
ID=92797740
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202323445614.4U Active CN221760917U (en) | 2023-12-18 | 2023-12-18 | Steel construction building connecting device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN221760917U (en) |
-
2023
- 2023-12-18 CN CN202323445614.4U patent/CN221760917U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2018120653A1 (en) | Multifunctional drilling experimental bench rack | |
| CN111070309A (en) | Drilling equipment is used in processing of polymer tubular product | |
| CN211037001U (en) | Detachable deep basal pit fender pile reinforcing apparatus | |
| CN221760917U (en) | Steel construction building connecting device | |
| CN218715399U (en) | Building frame roof beam reinforcing apparatus | |
| CN209891396U (en) | Intercolumnar bearing structure for steel construction | |
| CN205057404U (en) | Adjustable support structure | |
| CN119000345A (en) | Detection device for local load mechanical property of concrete precast slab | |
| CN219100937U (en) | Electric shock prevention device for electric power construction | |
| CN219224382U (en) | Expansion bolt tensile force testing device | |
| CN216195989U (en) | Steel frame beam structure for steel structure factory building | |
| CN213927634U (en) | Wall bracket for repairing wooden ancient architecture | |
| CN214575720U (en) | Building templates connection structure for civil engineering | |
| CN211976306U (en) | Mounting rack for ventilation equipment | |
| CN222295414U (en) | An integrated large-span assembled exquisite steel curtain wall structure | |
| CN218522280U (en) | Steel bar positioning mechanism for building construction | |
| CN218292249U (en) | Steel structure pillar with multiple supporting plates | |
| CN218787918U (en) | Material sampling device | |
| CN219281283U (en) | Assembled support frame for building engineering | |
| CN222333349U (en) | A tightly connected house building reinforcement structure | |
| CN219471632U (en) | Building structure design roof beam reinforced structure | |
| CN214942356U (en) | Building engineering template supports coupling assembling | |
| CN217726948U (en) | Reinforcing bar location bending device that engineering was used is built in room | |
| CN218911853U (en) | A prefabricated light steel structural member for wall connection | |
| CN220285442U (en) | A kind of wind power civil construction steel structure base |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |