CN221741933U - Adjustable construction frame for water conservancy construction - Google Patents
Adjustable construction frame for water conservancy construction Download PDFInfo
- Publication number
- CN221741933U CN221741933U CN202323309537.XU CN202323309537U CN221741933U CN 221741933 U CN221741933 U CN 221741933U CN 202323309537 U CN202323309537 U CN 202323309537U CN 221741933 U CN221741933 U CN 221741933U
- Authority
- CN
- China
- Prior art keywords
- scaffold
- construction
- frame
- water conservancy
- telescopic link
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 168
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 28
- 238000003466 welding Methods 0.000 claims abstract 2
- 230000006978 adaptation Effects 0.000 claims 1
- 230000000694 effects Effects 0.000 abstract description 9
- 230000002457 bidirectional effect Effects 0.000 abstract description 8
- 238000010008 shearing Methods 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 7
- 230000009286 beneficial effect Effects 0.000 description 2
- 101000827703 Homo sapiens Polyphosphoinositide phosphatase Proteins 0.000 description 1
- 102100023591 Polyphosphoinositide phosphatase Human genes 0.000 description 1
- 101100012902 Saccharomyces cerevisiae (strain ATCC 204508 / S288c) FIG2 gene Proteins 0.000 description 1
- 101100233916 Saccharomyces cerevisiae (strain ATCC 204508 / S288c) KAR5 gene Proteins 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000010720 hydraulic oil Substances 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Landscapes
- Movable Scaffolding (AREA)
Abstract
Description
技术领域Technical Field
本实用新型涉及施工架技术领域,具体为一种水利施工用可调节施工架。The utility model relates to the technical field of construction frames, in particular to an adjustable construction frame for water conservancy construction.
背景技术Background Art
施工架是水利施工过程中常用的一种设备,常见的施工架通常是由钢管与支撑板构成,其主要作用是为施工人员提供一个可正常施工作用的平台,抬升施工人员的高度,方便其在高处进行施工作。The construction frame is a commonly used equipment in the process of water conservancy construction. The common construction frame is usually composed of steel pipes and support plates. Its main function is to provide a platform for construction workers to carry out normal construction work, to raise the height of construction workers, and to facilitate their construction work at high places.
在中国实用新型专利申请公开说明书CN219298744U中公开的建筑施工架,虽然,能够根据施工人员的人数进行支撑面积的调整,可以收纳,但是,该建筑施工架,存在调节时一般只能达到上下调节,无法向两端进行调节,导致调节范围小、万向轮可能导致施工架在用过程中发生移动、护栏的高低有影响使用、不能供多数人使用的缺点。The construction scaffold disclosed in the Chinese utility model patent application disclosure CN219298744U can adjust the support area according to the number of construction workers and can be stored. However, the construction scaffold can generally only be adjusted up and down, and cannot be adjusted to both ends, resulting in a small adjustment range, the universal wheels may cause the construction scaffold to move during use, the height of the guardrail affects the use, and it cannot be used by most people.
实用新型内容Utility Model Content
(一)解决的技术问题1. Technical issues to be solved
针对现有技术的不足,本实用新型提供了一种水利施工用可调节施工架,解决了上述背景技术中提出的问题。In view of the deficiencies in the prior art, the utility model provides an adjustable construction frame for water conservancy construction, which solves the problems raised in the above-mentioned background technology.
(二)技术方案(II) Technical solution
为实现以上目的,本实用新型通过以下技术方案予以实现:一种水利施工用可调节施工架,包括底座、升降机、第一施工架,第二施工架,所述底座的内部开设有第一通孔,第一通孔的内部设置有适配于第一通孔内径的螺柱,螺柱的底部设置有防滑块,升降机内部设置有第一横梁、第二横梁、剪架,第一横梁、第二横梁焊接在剪架内部,剪架的一端设置有滚轮,第一横梁一侧设置有第一卡扣,第一卡扣内部开设有第二通孔,第二通孔的内部转动连接有第一插销,第一卡扣的内部通过第一插销转动连接有液压油缸,第一施工架的上表面设置有第一伸缩杆,第一伸缩杆的顶部设置有第一护栏,第一施工架的内部设置有第一双向伸缩杆,第一双向伸缩杆的两端设置有第一延伸施工架,第一施工架的外表面设置有第二伸缩杆,第二施工架的外表面设置有第三伸缩杆,第三伸缩杆的顶部设置有第二护栏,第二施工架的内部设置有第二双向伸缩杆,第二双向伸缩杆的两端设置有第二延伸施工架。To achieve the above purpose, the utility model is implemented through the following technical solutions: an adjustable construction frame for water conservancy construction, including a base, a lift, a first construction frame, and a second construction frame. The base is provided with a first through hole, the first through hole is provided with a stud adapted to the inner diameter of the first through hole, and the bottom of the stud is provided with an anti-sliding block. The lift is provided with a first beam, a second beam, and a shear frame. The first beam and the second beam are welded inside the shear frame, and a roller is provided at one end of the shear frame. A first buckle is provided on one side of the first beam, and a second through hole is provided inside the first buckle. The second through hole is rotated inside. A first pin is connected, and the interior of the first buckle is rotatably connected to a hydraulic cylinder through the first pin. A first telescopic rod is arranged on the upper surface of the first construction frame, and a first guardrail is arranged on the top of the first telescopic rod. A first two-way telescopic rod is arranged inside the first construction frame, and first extension construction frames are arranged at both ends of the first two-way telescopic rod. A second telescopic rod is arranged on the outer surface of the first construction frame, and a third telescopic rod is arranged on the outer surface of the second construction frame, and a second guardrail is arranged on the top of the third telescopic rod. A second two-way telescopic rod is arranged inside the second construction frame, and second extension construction frames are arranged at both ends of the second two-way telescopic rod.
可选的,所述底座的底部设置有支撑腿,支撑腿的内部设置有车轮,支撑腿、车轮的数量将均为四个,均匀的分布在底座的底部。Optionally, support legs are provided at the bottom of the base, and wheels are provided inside the support legs. The number of the support legs and wheels is four each, which are evenly distributed at the bottom of the base.
可选的,所述升降机的内部开设有滚轮槽,滚轮卡在滚轮槽内部,液压油缸内部设置有活塞,第二横梁一侧设置有第二卡扣,第二卡扣内部开设有第三通孔,第三通孔的内部转动连接有第二插销,第二卡扣的内部通过第二插销转动连接活塞。Optionally, a roller groove is opened inside the elevator, the roller is clamped inside the roller groove, a piston is arranged inside the hydraulic cylinder, a second buckle is arranged on one side of the second cross beam, a third through hole is opened inside the second buckle, a second pin is rotatably connected inside the third through hole, and the inside of the second buckle is rotatably connected to the piston through the second pin.
可选的,所述液压油缸靠近第一卡扣的一端设置有液压管,液压管另一端套接有液压泵,液压泵套接液压管的同侧设置有电机。Optionally, a hydraulic pipe is provided at one end of the hydraulic cylinder close to the first buckle, a hydraulic pump is sleeved on the other end of the hydraulic pipe, and a motor is provided on the same side as the hydraulic pump sleeved on the hydraulic pipe.
可选的,第一施工架设置在升降机的顶部,第一施工架的内部开设有第一滑槽,第一延伸施工架卡在第一滑槽的内部,第一延伸施工架的上表面设置有第四伸缩杆,第四伸缩杆的顶部设置有第一L型护栏。Optionally, the first construction frame is arranged on the top of the elevator, a first slide groove is opened inside the first construction frame, the first extension construction frame is stuck inside the first slide groove, a fourth telescopic rod is arranged on the upper surface of the first extension construction frame, and a first L-shaped guardrail is arranged on the top of the fourth telescopic rod.
可选的,所述第二施工架的底部设置在第二伸缩架的顶部,第二施工架的内部开设有第二滑槽,第二延伸施工架卡在第二滑槽的内部,第二延伸施工架的上表面设置有第五伸缩杆,第五伸缩杆的顶部设置有第二L型护栏。Optionally, the bottom of the second construction frame is arranged on the top of the second telescopic frame, a second slide groove is opened inside the second construction frame, the second extension construction frame is stuck inside the second slide groove, a fifth telescopic rod is arranged on the upper surface of the second extension construction frame, and a second L-shaped guardrail is arranged on the top of the fifth telescopic rod.
可选的,所述第二施工架的一侧设置有挂梯,挂梯的一端设置有挂耳,挂耳套接在五伸缩杆的外表面。Optionally, a hanging ladder is provided on one side of the second construction frame, and a hanging ear is provided at one end of the hanging ladder, and the hanging ear is sleeved on the outer surface of the five telescopic rods.
可选的,所述第一施工架的一侧设置有磁吸板,磁吸板的外表面磁吸有控制器。Optionally, a magnetic plate is provided on one side of the first construction frame, and a controller is magnetically attracted to the outer surface of the magnetic plate.
(三)有益效果(III) Beneficial effects
本实用新型提供了一种水利施工用可调节施工架,具备以下有益效果:The utility model provides an adjustable construction frame for water conservancy construction, which has the following beneficial effects:
1、该水利施工用可调节施工架,通过第一双向伸缩杆、第一延伸施工架、第二双向伸缩杆、第二延伸施工架、控制器的设置,使该水利施工用可调节施工架具备了存在调节时,可以使施工架向两端调节长度的效果,通过一双向伸缩杆、第一延伸施工架、第二双向伸缩杆、第二延伸施工架、控制器的配合设置,在使用的过程中可以通过控制器,使第一延伸施工架、第二延伸施工架向左右两端调节,从而起到了调节施工架左右两端长度的作用,达到了施工架向两端调节长度的效果的目的。1. The adjustable construction frame for water conservancy construction has the effect of adjusting the length of the construction frame to both ends when it is adjusted through the arrangement of the first two-way telescopic rod, the first extension construction frame, the second two-way telescopic rod, the second extension construction frame, and the controller. Through the coordinated arrangement of the two-way telescopic rod, the first extension construction frame, the second two-way telescopic rod, the second extension construction frame, and the controller, the first extension construction frame and the second extension construction frame can be adjusted to the left and right ends through the controller during use, thereby playing a role in adjusting the length of the left and right ends of the construction frame, and achieving the purpose of adjusting the length of the construction frame to both ends.
2、该水利施工用可调节施工架,通过螺柱、防滑块的设置,使该水利施工用可调节施工架具备了固定施工架的效果,通过螺柱、防滑块的配合设置,在使用的过程中可以将施工架固定在地面,防止施工架发生移动,从而起到了固定施工架的作用,达到了防止施工架在使用过程中发生移动的目的。2. The adjustable construction frame for water conservancy construction has the effect of fixing the construction frame through the setting of studs and anti-sliding blocks. Through the coordinated setting of the studs and anti-sliding blocks, the construction frame can be fixed to the ground during use to prevent the construction frame from moving, thereby playing the role of fixing the construction frame and achieving the purpose of preventing the construction frame from moving during use.
3、该水利施工用可调节施工架,通过第一伸缩杆、第三伸缩杆、第四伸缩杆、第五伸缩杆、第一护栏、第二护栏、第一L型护栏、第二L型护栏、控制器的设置,使该水利施工用可调节施工架具备了可以调节护栏高低的效果,通过第一伸缩杆、第三伸缩杆、第四伸缩杆、第五伸缩杆、第一护栏、第二护栏、第一L型护栏、第二L型护栏、控制器的配合设置,在使用的过程中可以通过控制器调节第一伸缩杆、第三伸缩杆、第四伸缩杆、第五伸缩杆,从而起到了调节护栏的高低,方便工人施工的作用,达到了调节护栏高低的目的。3. The adjustable construction frame for water conservancy construction has the effect of adjusting the height of the guardrail through the setting of the first telescopic rod, the third telescopic rod, the fourth telescopic rod, the fifth telescopic rod, the first guardrail, the second guardrail, the first L-shaped guardrail, the second L-shaped guardrail, and the controller. Through the coordinated setting of the first telescopic rod, the third telescopic rod, the fourth telescopic rod, the fifth telescopic rod, the first guardrail, the second guardrail, the first L-shaped guardrail, the second L-shaped guardrail, and the controller, the first telescopic rod, the third telescopic rod, the fourth telescopic rod, and the fifth telescopic rod can be adjusted by the controller during use, thereby playing a role in adjusting the height of the guardrail, facilitating the construction of workers, and achieving the purpose of adjusting the height of the guardrail.
4、该水利施工用可调节施工架,通过第一施工架、第二施工架、第一延伸施工架、第二伸施工架、第一双向伸缩杆、第二双向伸缩杆、控制器的设置,使该水利施工用可调节施工架具备了能供多数人使用的效果,通过一施工架、第二施工架、第一延伸施工架、第二伸施工架、第一双向伸缩杆、第二双向伸缩杆、控制器的配合设置,在使用的过程中可以通过控制器将第一延伸施工架、第二延伸施工架延伸出供更多的工人使用,从而起到了提高施工架的使用效率的作用,达到了供多数人使用的目的。4. The adjustable construction frame for water conservancy construction, through the arrangement of the first construction frame, the second construction frame, the first extended construction frame, the second extended construction frame, the first two-way telescopic rod, the second two-way telescopic rod, and the controller, enables the adjustable construction frame for water conservancy construction to have the effect of being used by most people. Through the coordinated arrangement of the first construction frame, the second construction frame, the first extended construction frame, the second extended construction frame, the first two-way telescopic rod, the second two-way telescopic rod, and the controller, during use, the first extended construction frame and the second extended construction frame can be extended by the controller for use by more workers, thereby improving the use efficiency of the construction frame and achieving the purpose of being used by most people.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
图1为本实用新型结构立体示意图;Figure 1 is a schematic three-dimensional diagram of the structure of the utility model;
图2为本实用新型正视图的结构示意图;FIG2 is a schematic diagram of the structure of the front view of the utility model;
图3为本实用新型底座的结构立体示意图;FIG3 is a schematic diagram of the structure of the base of the utility model;
图4为本实用新型升降机的结构立体示意图;FIG4 is a schematic diagram of the structure of the utility model lift;
图5为本实用新型第二施工架局部剖视图的结构示意图;Fig. 5 is a schematic structural diagram of a partial cross-sectional view of a second construction frame of the utility model;
图6为本实用新型挂梯局部放大图的结构示意图;FIG6 is a structural schematic diagram of a partial enlarged view of the hanging ladder of the utility model;
图7为本实用新型第一施工架局部剖视图的结构示意图。FIG. 7 is a schematic structural diagram of a partial cross-sectional view of the first construction frame of the utility model.
图中:1、底座;2、螺柱;3、防滑块;4、磁吸板;5、控制器;6、升降机;7、车轮;8、支撑腿;9、第一伸缩杆;10、第一施工架;11、第一延伸施工架;12、第一L型护栏;13、第二伸缩杆;14、第二延伸施工架;15、第二施工架;16、第二L型护栏;17、第二护栏;18、第三伸缩杆;19、第五伸缩杆;20、挂耳;21、挂梯;22、第四伸缩杆;23、剪架;24、液压油缸;25、第一卡扣;26、液压管;27、滚轮;28、第二卡扣;29、滚轮槽;30、第二横梁;31、活塞;32、电机;33、液压泵;34、第一横梁;35、第二双向伸缩杆;36、第一双向伸缩杆。In the figure: 1. base; 2. stud; 3. anti-sliding block; 4. magnetic plate; 5. controller; 6. lift; 7. wheel; 8. supporting leg; 9. first telescopic rod; 10. first construction frame; 11. first extended construction frame; 12. first L-shaped guardrail; 13. second telescopic rod; 14. second extended construction frame; 15. second construction frame; 16. second L-shaped guardrail; 17. second guardrail; 18. third telescopic rod; 19. fifth telescopic rod; 20. hanging ear; 21. hanging ladder; 22. fourth telescopic rod; 23. scissors frame; 24. hydraulic cylinder; 25. first buckle; 26. hydraulic pipe; 27. roller; 28. second buckle; 29. roller groove; 30. second beam; 31. piston; 32. motor; 33. hydraulic pump; 34. first beam; 35. second two-way telescopic rod; 36. first two-way telescopic rod.
具体实施方式DETAILED DESCRIPTION
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.
实施例1Example 1
一种水利施工用可调节施工架,包括底座1、升降机6、第一施工架10,第二施工架15,其特征在于:所述底座1的内部开设有第一通孔,第一通孔的内部设置有适配于第一通孔内径的螺柱2,螺柱2的底部设置有防滑块3,升降机6内部设置有第一横梁34、第二横梁30、剪架23,第一横梁34、第二横梁30焊接在剪架23内部,剪架23的一端设置有滚轮27,第一横梁34一侧设置有第一卡扣25,第一卡扣25内部开设有第二通孔,第二通孔的内部转动连接有第一插销,第一卡扣25的内部通过第一插销转动连接有液压油缸24,第一施工架10的内部设置有第一双向伸缩杆36,第一双向伸缩杆36的两端设置有第一延伸施工架11,第二施工架15的内部设置有第二双向伸缩杆35,第二双向伸缩杆35的两端设置有第二延伸施工架14,底座1的底部设置有支撑腿8,支撑腿8的内部设置有车轮7,支撑腿8、车轮7的数量将均为四个,均匀的分布在底座1的底部,升降机6的内部开设有滚轮槽29,滚轮27卡在滚轮槽29内部,液压油缸24内部设置有活塞31,第二横梁30一侧设置有第二卡扣28,第二卡扣28内部开设有第三通孔,第三通孔的内部转动连接有第二插销,第二卡扣28的内部通过第二插销转动连接活塞31,液压油缸24靠近第一卡扣25的一端设置有液压管26,液压管26另一端套接有液压泵33,液压泵33套接液压管26的同侧设置有电机32。An adjustable construction frame for water conservancy construction, comprising a base 1, a lift 6, a first construction frame 10, and a second construction frame 15, characterized in that: a first through hole is provided inside the base 1, a stud 2 adapted to the inner diameter of the first through hole is provided inside the first through hole, an anti-sliding block 3 is provided at the bottom of the stud 2, a first crossbeam 34, a second crossbeam 30, and a shear frame 23 are provided inside the lift 6, the first crossbeam 34 and the second crossbeam 30 are welded inside the shear frame 23, a roller 27 is provided at one end of the shear frame 23, a first buckle 25 is provided on one side of the first crossbeam 34, a second through hole is provided inside the first buckle 25, a first latch is rotatably connected inside the second through hole, a hydraulic cylinder 24 is rotatably connected inside the first latch 25, a first bidirectional telescopic rod 36 is provided inside the first construction frame 10, and first extension construction frames 11 are provided at both ends of the first bidirectional telescopic rod 36, A second two-way telescopic rod 35 is arranged inside the second construction frame 15, and second extension construction frames 14 are arranged at both ends of the second two-way telescopic rod 35. A support leg 8 is arranged at the bottom of the base 1, and a wheel 7 is arranged inside the support leg 8. The number of the support leg 8 and the wheel 7 will be four, which are evenly distributed at the bottom of the base 1. A roller groove 29 is opened inside the lift 6, and the roller 27 is stuck inside the roller groove 29. A piston 31 is arranged inside the hydraulic cylinder 24. A second buckle 28 is arranged on one side of the second cross beam 30, and a third through hole is opened inside the second buckle 28. The inside of the third through hole is rotatably connected with a second latch, and the inside of the second buckle 28 is rotatably connected with the piston 31 through the second latch. A hydraulic pipe 26 is arranged at one end of the hydraulic cylinder 24 close to the first buckle 25, and a hydraulic pump 33 is sleeved on the other end of the hydraulic pipe 26. A motor 32 is arranged on the same side as the hydraulic pump 33 sleeved with the hydraulic pipe 26.
为了实现该水利施工用可调节施工架具备了存在调节时,可以使施工架向两端调节长度、固定施工架的效果,如附图1-7所示,本申请采用如下结构,通过控制器5、第一双向伸缩杆36、第一延伸施工架11、第二双向伸缩杆35、第二延伸施工架14、螺柱2、防滑块3的配合,在使用过程中先将该水利施工用可调节施工架移动到施工位置,当确定好施工位置后,通过旋转螺柱2,将防滑块3紧紧的与地面贴合,从而防止施工架整体发生移动,给施工者带来危险,然后通过控制器5启动电机32,电机32通过旋转产生转矩从而带动液压泵33工作,液压泵33将电机32输出的机械能转化为液体能量,将液压油通过液压管26供给液压油缸24,液压油缸24内部活塞31会向上移动,从而推动与活塞31插梢转动连接的第二卡扣28,第二横梁30向上移动,使带有滚轮27的剪架23沿滚轮槽29方向移动,剪架23向内收缩、升高,进而使第一施工架10向上移动,将第一施工架10调到合适高度,通过控制器5启动第二伸缩杆13,将第二施工架15升高到合适位置,最后通过控制器5启动第一施工架10中的第一双向伸缩杆36以及第二施工架15中的第二双向伸缩杆35、使第一双向伸缩杆36将第一延伸施工架11从第一滑槽中推出,第二双向伸缩杆35将第二延伸施工架14从第二滑槽中推出,从而实现了该水利施工用可调节施工架具备了存在调节时,可以使施工架向两端调节长度、固定施工架的效果。In order to realize that the adjustable construction frame for water conservancy construction has the effect of being able to adjust the length of the construction frame at both ends and fix the construction frame when it is adjusted, as shown in Figures 1-7, the present application adopts the following structure, through the cooperation of the controller 5, the first two-way telescopic rod 36, the first extended construction frame 11, the second two-way telescopic rod 35, the second extended construction frame 14, the stud 2, and the anti-sliding block 3, during use, the adjustable construction frame for water conservancy construction is first moved to the construction position, and when the construction position is determined, the anti-sliding block 3 is tightly fitted to the ground by rotating the stud 2, thereby preventing the construction frame from moving as a whole and posing a danger to the construction workers, and then the motor 32 is started through the controller 5, and the motor 32 generates torque by rotation, thereby driving the hydraulic pump 33 to work, and the hydraulic pump 33 converts the mechanical energy output by the motor 32 into liquid energy, and supplies the hydraulic oil to the hydraulic cylinder 24 through the hydraulic pipe 26. The hydraulic cylinder 24 The internal piston 31 will move upward, thereby pushing the second buckle 28 rotatably connected to the piston 31 plug pin, and the second crossbeam 30 moves upward, so that the shear frame 23 with the roller 27 moves along the roller groove 29 direction, and the shear frame 23 shrinks inward and rises, thereby moving the first construction frame 10 upward, adjusting the first construction frame 10 to a suitable height, and starting the second telescopic rod 13 through the controller 5 to raise the second construction frame 15 to a suitable position, and finally starting the first bidirectional telescopic rod 36 in the first construction frame 10 and the second bidirectional telescopic rod 35 in the second construction frame 15 through the controller 5, so that the first bidirectional telescopic rod 36 pushes the first extended construction frame 11 out of the first slide groove, and the second bidirectional telescopic rod 35 pushes the second extended construction frame 14 out of the second slide groove, thereby achieving the adjustable construction frame for water conservancy construction having the effect of adjusting the length of the construction frame to both ends and fixing the construction frame when there is adjustment.
一种水利施工用可调节施工架,第一施工架10的上表面设置有第一伸缩杆9,第一伸缩杆9的顶部设置有第一护栏,第一施工架10的外表面设置有第二伸缩杆13,第二施工架15的外表面设置有第三伸缩杆18,第三伸缩杆18的顶部设置有第二护栏17,第一施工架10设置在升降机6的顶部,第一施工架10的内部开设有第一滑槽,第一延伸施工架11卡在第一滑槽的内部,第一延伸施工架11的上表面设置有第四伸缩杆22,第四伸缩杆22的顶部设置有第一L型护栏12,第二施工架15的底部设置在第二伸缩架的顶部,第二施工架15的内部开设有第二滑槽,第二延伸施工架14卡在第二滑槽的内部,第二延伸施工架14的上表面设置有第五伸缩杆19,第五伸缩杆19的顶部设置有第二L型护栏16,第二施工架15的一侧设置有挂梯21,挂梯21的一端设置有挂耳20,挂耳20套接在五伸缩杆的外表面,第一施工架10的一侧设置有磁吸板4,磁吸板4的外表面磁吸有控制器5。An adjustable construction frame for water conservancy construction, wherein a first telescopic rod 9 is arranged on the upper surface of a first construction frame 10, a first guardrail is arranged on the top of the first telescopic rod 9, a second telescopic rod 13 is arranged on the outer surface of the first construction frame 10, a third telescopic rod 18 is arranged on the outer surface of the second construction frame 15, a second guardrail 17 is arranged on the top of the third telescopic rod 18, the first construction frame 10 is arranged on the top of the elevator 6, a first chute is opened inside the first construction frame 10, a first extension construction frame 11 is stuck inside the first chute, a fourth telescopic rod 22 is arranged on the upper surface of the first extension construction frame 11, and the fourth telescopic rod 22 A first L-shaped guardrail 12 is arranged on the top of the second construction frame 15, a bottom of the second construction frame 15 is arranged on the top of the second telescopic frame, a second slide groove is opened inside the second construction frame 15, a second extended construction frame 14 is stuck inside the second slide groove, a fifth telescopic rod 19 is arranged on the upper surface of the second extended construction frame 14, a second L-shaped guardrail 16 is arranged on the top of the fifth telescopic rod 19, a hanging ladder 21 is arranged on one side of the second construction frame 15, a hanging ear 20 is arranged at one end of the hanging ladder 21, and the hanging ear 20 is sleeved on the outer surface of the fifth telescopic rod, a magnetic plate 4 is arranged on one side of the first construction frame 10, and a controller 5 is magnetically attracted to the outer surface of the magnetic plate 4.
为了实现该水利施工用可调节施工架具备了调节护栏高低,供多数施工人员使用,提高使用效率的效果,如附图1-7所示,本申请采用如下结构,通过第一伸缩杆9、第三伸缩杆18、第四伸缩杆22、第五伸缩杆19、第一护栏、第二护栏17、第一L型护栏12、第二L型护栏16、第一施工架10、第二施工架15、第一延伸施工架11、第二延伸施工架14、控制器5的配合,在使用过程中,当施工人员的是身高较矮或者较高时,通过控制器5启动第一伸缩杆9、第四伸缩杆22,将第一护栏、第一L型护栏12的高度降低或者升高,防止因为护栏影响施工人员的正常施工,当需要多数人工人员同时施工时,将挂梯21通过挂耳20套在第五伸缩杆19的外表面,是工人员通过挂梯21进入第二施工架15,同时通过控制器5启动,第三伸缩杆18、第五伸缩杆19,将第二护栏17、第二L型护栏16升高或者降低,最后通过控制器5启动第一施工架10中的第一双向伸缩杆36以及第二施工架15中的第二双向伸缩杆35、使第一双向伸缩杆36将第一延伸施工架11从第一滑槽中推出,第二双向伸缩杆35将第二延伸施工架14从第二滑槽中推出,增加施工架的使用面积,供更多手工人员使用,从而实现了该水利施工用可调节施工架具备了调节护栏高低,供多数施工人员使用,提高使用效率的效果。In order to realize the adjustable construction frame for water conservancy construction with the function of adjusting the height of the guardrail for use by most construction workers and improve the efficiency of use, as shown in Figures 1-7, the present application adopts the following structure, through the cooperation of the first telescopic rod 9, the third telescopic rod 18, the fourth telescopic rod 22, the fifth telescopic rod 19, the first guardrail, the second guardrail 17, the first L-shaped guardrail 12, the second L-shaped guardrail 16, the first construction frame 10, the second construction frame 15, the first extended construction frame 11, the second extended construction frame 14, and the controller 5, during use, when the construction workers are shorter or taller, the first telescopic rod 9 and the fourth telescopic rod 22 are started by the controller 5 to lower or raise the height of the first guardrail and the first L-shaped guardrail 12 to prevent the guardrail from affecting the normal construction of the construction workers. When most manual workers are required at the same time During construction, the hanging ladder 21 is put on the outer surface of the fifth telescopic rod 19 through the hanging ear 20, and the workers enter the second construction frame 15 through the hanging ladder 21. At the same time, the third telescopic rod 18 and the fifth telescopic rod 19 are started by the controller 5 to raise or lower the second guardrail 17 and the second L-shaped guardrail 16. Finally, the first two-way telescopic rod 36 in the first construction frame 10 and the second two-way telescopic rod 35 in the second construction frame 15 are started by the controller 5, so that the first two-way telescopic rod 36 pushes the first extended construction frame 11 out of the first slide groove, and the second two-way telescopic rod 35 pushes the second extended construction frame 14 out of the second slide groove, thereby increasing the use area of the construction frame for more manual workers to use, thereby achieving the effect that the adjustable construction frame for water conservancy construction has the function of adjusting the height of the guardrail, which can be used by most construction workers and improve the use efficiency.
以上所述,仅为本实用新型较佳的具体实施方式,但本实用新型的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本实用新型揭露的技术范围内,根据本实用新型的技术方案及其实用新型构思加以等同替换或改变,都应涵盖在本实用新型的保护范围之内。The above description is only a preferred specific implementation manner of the present invention, but the protection scope of the present invention is not limited thereto. Any technician familiar with the technical field can make equivalent substitutions or changes within the technical scope disclosed by the present invention according to the technical scheme and the utility model concept of the present invention, which should be covered by the protection scope of the present invention.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202323309537.XU CN221741933U (en) | 2023-12-06 | 2023-12-06 | Adjustable construction frame for water conservancy construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202323309537.XU CN221741933U (en) | 2023-12-06 | 2023-12-06 | Adjustable construction frame for water conservancy construction |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN221741933U true CN221741933U (en) | 2024-09-20 |
Family
ID=92749191
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202323309537.XU Active CN221741933U (en) | 2023-12-06 | 2023-12-06 | Adjustable construction frame for water conservancy construction |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN221741933U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118911398A (en) * | 2024-10-11 | 2024-11-08 | 舟山中远海运重工有限公司 | Assembled working platform special for building large structures such as ships |
-
2023
- 2023-12-06 CN CN202323309537.XU patent/CN221741933U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN118911398A (en) * | 2024-10-11 | 2024-11-08 | 舟山中远海运重工有限公司 | Assembled working platform special for building large structures such as ships |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201056828Y (en) | Liftable worktable for building construction | |
| CN206745901U (en) | A kind of lifting type basketball stands being moved easily | |
| CN221741933U (en) | Adjustable construction frame for water conservancy construction | |
| CN206288889U (en) | A kind of novel building hanging device | |
| CN211974240U (en) | A climbing frame with automatic lifting adjustment function | |
| CN219063780U (en) | A kind of boiler equipment with safety maintenance platform structure | |
| CN220979418U (en) | Lifting platform for movable drill floor calandria robot | |
| CN207511796U (en) | A kind of adjustable height for construction moves ladder | |
| CN208995091U (en) | A kind of communication construction is ascended a height auxiliary device | |
| CN205617764U (en) | Folding safe gardens scaffold frame of extension work area | |
| CN210712584U (en) | A movable support bracket for road and bridge construction | |
| CN210508313U (en) | But height-adjusting's stable form engineering construction scaffold | |
| CN202055127U (en) | Hydraulic track lifting and lining tool with variable lifting-lining ratio | |
| CN220245491U (en) | Functional foot rest | |
| CN219509120U (en) | A safe high-rise building climbing frame | |
| CN206673433U (en) | High-voltage board integrated installation device | |
| CN218757461U (en) | Building engineering pile driver equipment | |
| CN221972943U (en) | A scaffold with high safety | |
| CN221219594U (en) | Movable scaffold | |
| CN211342739U (en) | Crawler crane machine shed ladder stand | |
| CN220012063U (en) | Can be according to hanging flower basket of depth of water height-adjusting | |
| CN222435814U (en) | A construction scaffold | |
| CN219691030U (en) | Lifting type construction platform for building construction | |
| CN219031700U (en) | A device for house repair | |
| CN217732563U (en) | A lifting device for decoration and decoration for preventing material from falling |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20241128 Address after: 044600 Huanghe West Street, Ruicheng County, Yuncheng City, Shanxi Province Patentee after: SHAANXI XIJIAN GROUP CO.,LTD. Country or region after: China Address before: No. 528 Laodong West Road, Yuhua District, Changsha City, Hunan Province 410000 Patentee before: Wang Ruoshui Country or region before: China |