Prior art keywords
water tank
tower body
water
cooling
tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202420167872.6U
Other languages
Chinese (zh)
Inventor
田国云
张美英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Niuying Machinery Co ltd
Niu Ying Guangdong Cooling Equipment Co ltd
Original Assignee
Shenzhen Niuying Machinery Co ltd
Niu Ying Guangdong Cooling Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Niuying Machinery Co ltd, Niu Ying Guangdong Cooling Equipment Co ltd filed Critical Shenzhen Niuying Machinery Co ltd
Priority to CN202420167872.6U priority Critical patent/CN221724964U/en
Application granted granted Critical
Publication of CN221724964U publication Critical patent/CN221724964U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Separation Of Particles Using Liquids (AREA)

Abstract

本实用新型公开了一种高效降温的闭式冷却塔,包括水箱和塔体,所述水箱安装在塔体的底部,所述水箱的底部安装有导污斗,所述导污斗的排污口处安装有排渣筒,所述水箱的内侧箱壁上安装有隔板,所述隔板的顶端与所述水箱的内侧壁之间安装有导水挡板,所述隔板的下方设有斜管组,所述斜管组的顶部安装有过滤层,所述水箱的外侧安装有循环泵,所述循环泵的进出泵口上安装有泵进管和排水管,所述排水管的末端延伸到所述塔体内部并安装有喷淋头,所述泵进管的一端连接到所述水箱上,所述塔体的顶部设有排孔。有益效果在于实现水箱内水杂质的过滤和沉淀以及排渣,不间断的进行冷却操作且保持水的干净,提高了冷却效率。

The utility model discloses a closed cooling tower with high efficiency of cooling, comprising a water tank and a tower body, wherein the water tank is installed at the bottom of the tower body, a dirt guide hopper is installed at the bottom of the water tank, a slag discharge cylinder is installed at the sewage outlet of the dirt guide hopper, a partition is installed on the inner wall of the water tank, a water guide baffle is installed between the top of the partition and the inner wall of the water tank, an inclined pipe group is provided below the partition, a filter layer is installed on the top of the inclined pipe group, a circulating pump is installed on the outer side of the water tank, a pump inlet pipe and a drain pipe are installed on the inlet and outlet of the circulating pump, the end of the drain pipe extends to the inside of the tower body and is installed with a spray head, one end of the pump inlet pipe is connected to the water tank, and a discharge hole is provided on the top of the tower body. The beneficial effect is to realize the filtration and precipitation of water impurities in the water tank and the slag discharge, to carry out the cooling operation uninterruptedly and keep the water clean, and to improve the cooling efficiency.

Description

一种高效降温的闭式冷却塔A closed cooling tower with high efficiency

技术领域Technical Field

本实用新型涉及冷却塔装置领域,特别是涉及一种高效降温的闭式冷却塔。The utility model relates to the field of cooling tower devices, in particular to a closed cooling tower with high efficiency in cooling.

背景技术Background Art

闭式冷却塔是将管式换热器置于塔内,通过流通的空气、管外喷淋水与管内循环水的热交换保证降温效果,外界气温较低时,可以停掉喷淋水系统,起到节水效果,虽然其水实现了闭式内部循环,但是其基础散热采用气体散热,气体从外部进入,进入塔身内部时含有较多的尘土和杂质,如果加滤尘网,很快容易堵塞网孔,影响进风效率,如果让尘土进入塔身,尤其在喷淋时,水箱内水必然受到污染,需要清理和更换,影响效率。A closed cooling tower places a tubular heat exchanger inside the tower. The cooling effect is ensured by the heat exchange between the circulating air, the spray water outside the tube and the circulating water inside the tube. When the outside temperature is low, the spray water system can be stopped to save water. Although the water has achieved a closed internal circulation, its basic heat dissipation uses gas heat dissipation. The gas enters from the outside and contains more dust and impurities when entering the tower body. If a dust filter is added, the mesh holes will quickly be blocked, affecting the air intake efficiency. If dust is allowed to enter the tower body, especially during spraying, the water in the water tank will inevitably be contaminated and need to be cleaned and replaced, affecting efficiency.

实用新型内容Utility Model Content

本实用新型的目的就在于为了解决上述问题而提供一种高效降温的闭式冷却塔。The purpose of the utility model is to provide a closed cooling tower with high efficiency in order to solve the above problems.

本实用新型通过以下技术方案来实现上述目的:The utility model achieves the above-mentioned purpose through the following technical solutions:

一种高效降温的闭式冷却塔,包括水箱和塔体,所述塔体上设有若干进风孔,所述水箱安装在所述塔体的底部,所述水箱的底部安装有导污斗,所述导污斗的排污口处安装有排渣筒,所述水箱的内侧箱壁上安装有隔板,所述隔板的顶端与所述水箱的内侧壁之间安装有导水挡板,所述隔板的下方设有斜管组,所述斜管组的顶部安装有过滤层,所述水箱的外侧安装有循环泵,所述循环泵的进泵口和出泵口上分别安装有泵进管和排水管,所述排水管的末端延伸到所述塔体内部并安装有喷淋头,所述泵进管的一端连接到所述水箱上,所述塔体的顶部设有排孔,所述排孔上方安装有引风组件。A closed cooling tower with high efficiency cooling comprises a water tank and a tower body, the tower body is provided with a plurality of air inlet holes, the water tank is installed at the bottom of the tower body, a dirt guide hopper is installed at the bottom of the water tank, a slag discharge cylinder is installed at the dirt discharge port of the dirt guide hopper, a partition is installed on the inner box wall of the water tank, a water guide baffle is installed between the top of the partition and the inner wall of the water tank, an inclined pipe group is provided below the partition, a filter layer is installed on the top of the inclined pipe group, a circulating pump is installed on the outside of the water tank, a pump inlet pipe and a drain pipe are respectively installed on the pump inlet and outlet of the circulating pump, the end of the drain pipe extends to the interior of the tower body and is provided with a spray head, one end of the pump inlet pipe is connected to the water tank, a discharge hole is provided on the top of the tower body, and an air induction component is installed above the discharge hole.

在上述方案中,风从进风孔进入,其中部分风中尘土通过引风组件排出,其他尘土被喷淋头冲落,并通过导水挡板流下,下落的水沿着导水挡板流到隔板的一侧,并通过隔板的底部进入到导水挡板下方的斜管组内,斜管组的顶部安装有过滤层,由于不可避免的随着空气导入杂质尘土,通过斜管沉淀原理进行沉淀,并通过排渣筒进行排出,水箱的外侧安装有循环泵,进泵口和出泵口上分别安装有泵进管和排水管,过滤层上方的水通过循环泵的进泵口引入泵进管,之后到达排水管,排水管末端延伸到塔体内部的喷淋头再将水喷出,从而实现了水箱内水杂质的过滤和沉淀以及排渣,不间断的进行冷却操作且保持水的干净,提高了冷却效率。In the above scheme, wind enters from the air inlet, and part of the dust in the wind is discharged through the induced draft assembly, and the other dust is washed off by the spray head and flows down through the water guide baffle. The falling water flows along the water guide baffle to one side of the partition, and enters the inclined tube group below the water guide baffle through the bottom of the partition. A filter layer is installed on the top of the inclined tube group. Since impurities and dust are inevitably introduced with the air, they are precipitated through the inclined tube sedimentation principle and discharged through the slag discharge barrel. A circulating pump is installed on the outside of the water tank, and a pump inlet pipe and a drain pipe are installed on the pump inlet and the pump outlet respectively. The water above the filter layer is introduced into the pump inlet pipe through the pump inlet of the circulating pump, and then reaches the drain pipe. The end of the drain pipe extends to the spray head inside the tower body to spray water again, thereby realizing the filtration and precipitation of water impurities in the water tank and slag discharge, performing uninterrupted cooling operations and keeping the water clean, thereby improving the cooling efficiency.

进一步的,所述排渣筒的内部转动安装有绞龙轴,所述绞龙轴上安装有绞龙,所述排渣筒的顶部安装有排杂电机,所述绞龙轴的顶端与所述排杂电机连接在一起。Furthermore, an auger shaft is rotatably installed inside the slag discharge barrel, an auger is installed on the auger shaft, a debris discharge motor is installed on the top of the slag discharge barrel, and the top end of the auger shaft is connected to the debris discharge motor.

在上述方案中,绞龙轴和绞龙的组合可以自动将沉淀在排渣筒中的杂质和废物收集和排出,无需手动操作,排杂电机的驱动作用引发绞龙的旋转,从而推动杂质向排渣筒顶部移动,实现了自动排渣的功能。In the above scheme, the combination of the auger shaft and the auger can automatically collect and discharge impurities and waste deposited in the slag discharge barrel without manual operation. The driving action of the impurity discharge motor triggers the rotation of the auger, thereby pushing the impurities to the top of the slag discharge barrel, realizing the function of automatic slag discharge.

进一步的,所述塔体内安装有盘管,所述盘管内设有冷媒。Furthermore, a coil is installed in the tower body, and a refrigerant is arranged in the coil.

在上述方案中,通过在塔体内安装盘管并注入冷媒,可以提高冷却塔的冷却效果。冷媒会在盘管中循环流动,与塔体外部的空气进行热交换,从而使塔体内的温度得到降低。In the above scheme, the cooling effect of the cooling tower can be improved by installing a coil in the tower body and injecting a refrigerant. The refrigerant circulates in the coil and exchanges heat with the air outside the tower body, thereby reducing the temperature inside the tower body.

进一步的,所述塔体内安装有阻水层。Furthermore, a water-blocking layer is installed in the tower body.

在上述方案中,阻水层设于喷淋头上方,喷淋头在进行水喷射时,有时会产生溅射现象,导致水花四溅。通过设置阻水层在喷淋头上方,可以有效减少喷淋过程中的水溅射,防止水花扩散到不需要冷却的区域。In the above scheme, the water blocking layer is arranged above the sprinkler head. When the sprinkler head sprays water, splashing may occur sometimes, causing water to splash everywhere. By arranging the water blocking layer above the sprinkler head, water splashing during the spraying process can be effectively reduced, preventing the water from spreading to areas that do not require cooling.

进一步的,所述导污斗的底部支撑安装有支架。Furthermore, a bracket is installed on the bottom support of the dirt guide hopper.

在上述方案中,通过支架的安装,导污斗的底部可以更轻松地进行维护和清理。支架的提升作用可以使导污斗底部与地面保持一定距离,方便操作人员进行清理、维护和检修工作,提高工作效率和安全性。In the above scheme, the bottom of the sewage hopper can be maintained and cleaned more easily by installing the bracket. The lifting effect of the bracket can keep the bottom of the sewage hopper at a certain distance from the ground, which is convenient for operators to clean, maintain and overhaul, and improve work efficiency and safety.

本实用新型的一种高效降温的闭式冷却塔有益效果在于实现水箱内水杂质的过滤和沉淀以及排渣,不间断的进行冷却操作且保持水的干净,提高了冷却效率。风从进风孔进入,其中部分风中尘土通过引风组件排出,其他尘土被喷淋头冲落,并通过导水挡板流下,下落的水沿着导水挡板流到隔板的一侧,并通过隔板的底部进入到导水挡板下方的斜管组内,斜管组的顶部安装有过滤层,由于不可避免的随着空气导入杂质尘土,通过斜管沉淀原理进行沉淀,并通过排渣筒进行排出,水箱的外侧安装有循环泵,进泵口和出泵口上分别安装有泵进管和排水管,过滤层上方的水通过循环泵的进泵口引入泵进管,之后到达排水管,排水管末端延伸到塔体内部的喷淋头再将水喷出。The utility model has the beneficial effect of realizing the filtration, precipitation and slag discharge of water impurities in the water tank, performing cooling operation uninterruptedly and keeping the water clean, thereby improving the cooling efficiency. Wind enters from the air inlet, wherein part of the dust in the wind is discharged through the air induction assembly, and the other dust is washed off by the spray head and flows down through the water guide baffle, and the falling water flows along the water guide baffle to one side of the partition, and enters the inclined tube group below the water guide baffle through the bottom of the partition, and a filter layer is installed on the top of the inclined tube group. Due to the inevitable introduction of impurities and dust with the air, they are precipitated through the inclined tube precipitation principle and discharged through the slag discharge cylinder, a circulating pump is installed on the outside of the water tank, and a pump inlet pipe and a drain pipe are installed on the pump inlet and the pump outlet respectively, and the water above the filter layer is introduced into the pump inlet pipe through the pump inlet of the circulating pump, and then reaches the drain pipe, and the end of the drain pipe extends to the spray head inside the tower body to spray water out.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

图1是本实用新型所述一种高效降温的闭式冷却塔的结构示意图。FIG1 is a schematic structural diagram of a closed cooling tower for efficient temperature reduction according to the utility model.

附图标记说明如下:The following are the descriptions of the reference numerals:

1、水箱;2、塔体;3、导水挡板;4、隔板;5、斜管组;6、过滤层;7、排渣筒;8、导污斗;9、支架;10、泵进管;11、循环泵;12、进风孔;13、排水管;14、阻水层;15、引风扇叶;16、引风驱动件;17、电机架;18、绞龙;19、喷淋头;20、盘管;21、排杂电机;22、绞龙轴。1. Water tank; 2. Tower body; 3. Water guide baffle; 4. Partition; 5. Inclined tube group; 6. Filter layer; 7. Slag discharge tube; 8. Dirt guide hopper; 9. Bracket; 10. Pump inlet pipe; 11. Circulation pump; 12. Air inlet hole; 13. Drain pipe; 14. Water blocking layer; 15. Induced draft fan blades; 16. Induced draft drive; 17. Motor frame; 18. Auger; 19. Sprinkler head; 20. Coil; 21. Exhaust motor; 22. Auger shaft.

具体实施方式DETAILED DESCRIPTION

下面结合附图对本实用新型作进一步说明:The utility model is further described below in conjunction with the accompanying drawings:

如图1所示,一种高效降温的闭式冷却塔由水箱1和塔体2组成;As shown in FIG1 , a closed cooling tower with high efficiency in cooling is composed of a water tank 1 and a tower body 2;

水箱1为无盖水箱,方便水回流,水箱1安装在塔体2的底部,水箱1的底部安装有导污斗8,导污斗8的排污口处安装有排渣筒7,其主要用于进风孔12进入的杂质尘土排出,避免频繁换水;The water tank 1 is a coverless water tank, which is convenient for water reflux. The water tank 1 is installed at the bottom of the tower body 2. A sewage guide hopper 8 is installed at the bottom of the water tank 1. A slag discharge cylinder 7 is installed at the sewage outlet of the sewage guide hopper 8, which is mainly used to discharge impurities and dust entering the air inlet 12 to avoid frequent water changes.

水箱1的内侧箱壁上安装有隔板4,隔板4的顶端与水箱1的内侧壁之间安装有导水挡板3,下落的水沿着导水挡板3流到隔板4的一侧,并通过隔板4的底部进入到导水挡板3下方的斜管组5内,斜管组5的顶部安装有过滤层6,由于不可避免的随着空气导入杂质尘土,通过斜管沉淀原理进行沉淀,并通过排渣筒7进行排出;A partition 4 is installed on the inner wall of the water tank 1, and a water guide baffle 3 is installed between the top of the partition 4 and the inner wall of the water tank 1. The falling water flows along the water guide baffle 3 to one side of the partition 4, and enters the inclined tube group 5 below the water guide baffle 3 through the bottom of the partition 4. A filter layer 6 is installed on the top of the inclined tube group 5. Since impurities and dust are inevitably introduced with the air, they are precipitated according to the inclined tube sedimentation principle and discharged through the slag discharge tube 7.

水箱1的外侧安装有循环泵11,循环泵11的进出泵口上安装有泵进管10和排水管13,排水管13的末端延伸到塔体2内部并安装有喷淋头19,泵进管10的一端连接到水箱1上,用于将过滤层6上方的水循环导出;A circulation pump 11 is installed on the outside of the water tank 1, and a pump inlet pipe 10 and a drain pipe 13 are installed on the inlet and outlet of the circulation pump 11. The end of the drain pipe 13 extends to the inside of the tower body 2 and is installed with a spray head 19. One end of the pump inlet pipe 10 is connected to the water tank 1 to circulate and drain the water above the filter layer 6;

塔体1的顶部设有排孔,所述排孔上方通过电机架17安装有引风驱动件16,引风驱动件16上连接安装有引风扇叶15。The top of the tower body 1 is provided with rows of holes, and an induced draft driving member 16 is installed above the rows of holes through a motor frame 17 , and an induced draft fan blade 15 is connected and installed on the induced draft driving member 16 .

如图1所示,本实用新型还公开了以下多种更加优化的具体结构:As shown in FIG1 , the present invention also discloses the following more optimized specific structures:

排渣筒7的内部转动安装有绞龙轴22,绞龙轴22上安装有绞龙18,排渣筒7的顶部安装有排杂电机21,绞龙轴22的顶端与排杂电机21连接在一起,实现绞龙轴22的驱动,排渣筒7的侧面顶部设有排渣孔。An auger shaft 22 is rotatably installed inside the slag discharge barrel 7, and the auger 18 is installed on the auger shaft 22. A debris discharge motor 21 is installed on the top of the slag discharge barrel 7. The top of the auger shaft 22 is connected to the debris discharge motor 21 to drive the auger shaft 22. A slag discharge hole is provided on the top of the side of the slag discharge barrel 7.

在上述实施例中,绞龙轴22和绞龙18的组合可以自动将沉淀在排渣筒7中的杂质和废物收集和排出,无需手动操作,排杂电机21的驱动作用引发绞龙18的旋转,从而推动杂质向排渣筒7顶部移动,实现了自动排渣的功能。这有助于保持冷却塔的正常运行和安全性,提高其工作效率和使用寿命。In the above embodiment, the combination of the auger shaft 22 and the auger 18 can automatically collect and discharge the impurities and wastes deposited in the slag discharge barrel 7 without manual operation. The driving action of the impurity discharge motor 21 causes the auger 18 to rotate, thereby pushing the impurities to move to the top of the slag discharge barrel 7, realizing the automatic slag discharge function. This helps to maintain the normal operation and safety of the cooling tower and improve its working efficiency and service life.

塔体2内安装有盘管20,盘管20下方的塔体2上开设有若干个进风孔12。通过在塔体2内安装盘管20并注入冷媒,可以提高冷却塔的冷却效果。冷媒会在盘管20中循环流动,与塔体2外部的空气进行热交换,从而使塔体2内的温度得到降低。A coil 20 is installed in the tower body 2, and a plurality of air inlet holes 12 are provided on the tower body 2 below the coil 20. The cooling effect of the cooling tower can be improved by installing the coil 20 in the tower body 2 and injecting refrigerant. The refrigerant circulates in the coil 20 and exchanges heat with the air outside the tower body 2, thereby reducing the temperature inside the tower body 2.

塔体2内安装有阻水层14,其主要用于减少水溅射。阻水层14设于喷淋头19上方,喷淋头19在进行水喷射时,有时会产生溅射现象,导致水花四溅。通过设置阻水层14在喷淋头上方,可以有效减少喷淋过程中的水溅射,防止水花扩散到不需要冷却的区域。A water-blocking layer 14 is installed in the tower body 2, which is mainly used to reduce water splashing. The water-blocking layer 14 is arranged above the spray head 19. When the spray head 19 sprays water, splashing may sometimes occur, resulting in water splashing. By arranging the water-blocking layer 14 above the spray head, water splashing during the spraying process can be effectively reduced to prevent the water splash from spreading to areas that do not require cooling.

导污斗8的底部支撑安装有支架9。通过支架9的安装,导污斗8的底部可以更轻松地进行维护和清理。支架9的提升作用可以使导污斗8底部与地面保持一定距离,方便操作人员进行清理、维护和检修工作,提高工作效率和安全性。The bottom support of the dirt guide hopper 8 is installed with a bracket 9. By installing the bracket 9, the bottom of the dirt guide hopper 8 can be maintained and cleaned more easily. The lifting effect of the bracket 9 can keep the bottom of the dirt guide hopper 8 at a certain distance from the ground, which is convenient for operators to clean, maintain and overhaul, and improve work efficiency and safety.

上述结构所述的高效降温的闭式冷却塔在使用过程中,风从进风孔12进入,对盘管20内的冷媒进行冷却,其中部分风中尘土排出,其他尘土被喷淋头19冲落,并通过导水挡板3流下,水流从斜管组5的底部进入并实现沉淀,清水通过过滤层6继续通过循环泵11实现循环;During the use of the closed cooling tower with high efficiency cooling described in the above structure, wind enters from the air inlet 12 to cool the refrigerant in the coil 20, wherein part of the dust in the wind is discharged, and the rest of the dust is washed off by the spray head 19 and flows down through the water guide baffle 3, and the water flows in from the bottom of the inclined tube group 5 to achieve sedimentation, and the clean water continues to circulate through the filter layer 6 and the circulating pump 11;

堆积的尘土杂质通过导污斗8导入排渣筒7,在绞龙18的驱动下排出,整个过程无需停机清理杂物和换水,提高冷却效率。The accumulated dust and impurities are introduced into the slag discharge tube 7 through the dirt guide hopper 8 and discharged under the drive of the auger 18. The whole process does not require stopping the machine to clean up the debris and change the water, thereby improving the cooling efficiency.

本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的只是说明本实用新型的原理,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内。Those skilled in the art should understand that the present invention is not limited by the above-mentioned embodiments. The above-mentioned embodiments and the specification only illustrate the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, and these changes and improvements shall fall within the scope of the present invention to be protected.

Claims (6)

1.一种高效降温的闭式冷却塔,其特征在于,包括水箱和塔体,所述塔体上设有若干进风孔,所述水箱安装在所述塔体的底部,所述水箱的底部安装有导污斗,所述导污斗的排污口处安装有排渣筒,所述水箱的内侧箱壁上安装有隔板,所述隔板的顶端与所述水箱的内侧壁之间安装有导水挡板,所述隔板的下方设有斜管组,所述斜管组的顶部安装有过滤层,所述水箱的外侧安装有循环泵,所述循环泵的进泵口和出泵口上分别安装有泵进管和排水管,所述排水管的末端延伸到所述塔体内部并安装有喷淋头,所述泵进管的一端连接到所述水箱上,所述塔体的顶部设有排孔,所述排孔上方安装有引风组件。1. A closed cooling tower with high efficiency cooling, characterized in that it comprises a water tank and a tower body, the tower body is provided with a plurality of air inlet holes, the water tank is mounted on the bottom of the tower body, a sewage guide hopper is mounted on the bottom of the water tank, a slag discharge cylinder is mounted at the sewage outlet of the sewage guide hopper, a partition is mounted on the inner box wall of the water tank, a water guide baffle is mounted between the top of the partition and the inner wall of the water tank, an inclined pipe group is arranged below the partition, a filter layer is mounted on the top of the inclined pipe group, a circulating pump is mounted on the outside of the water tank, a pump inlet pipe and a drain pipe are respectively mounted on the pump inlet and the pump outlet of the circulating pump, the end of the drain pipe extends to the inside of the tower body and is equipped with a spray head, one end of the pump inlet pipe is connected to the water tank, the top of the tower body is provided with a row hole, and an air induced draft component is mounted above the row hole. 2.根据权利要求1所述的一种高效降温的闭式冷却塔,其特征在于,所述排渣筒的内部转动安装有绞龙轴,所述绞龙轴上安装有绞龙,所述排渣筒的顶部安装有排杂电机,所述绞龙轴的顶端与所述排杂电机连接在一起。2. A closed cooling tower with high efficiency cooling according to claim 1, characterized in that an auger shaft is rotatably installed inside the slag discharge barrel, an auger is installed on the auger shaft, a debris discharge motor is installed on the top of the slag discharge barrel, and the top end of the auger shaft is connected to the debris discharge motor. 3.根据权利要求1所述的一种高效降温的闭式冷却塔,其特征在于,所述引风组件包括电机架、引风驱动件和引风扇叶。3. A closed cooling tower with high efficiency in cooling according to claim 1, characterized in that the induced draft assembly comprises a motor frame, an induced draft drive member and induced draft fan blades. 4.根据权利要求1所述的一种高效降温的闭式冷却塔,其特征在于,所述塔体内安装有盘管,所述盘管内设有冷媒。4. A closed cooling tower with high efficiency in cooling according to claim 1, characterized in that a coil is installed in the tower body, and a refrigerant is arranged in the coil. 5.根据权利要求1所述的一种高效降温的闭式冷却塔,其特征在于,所述塔体内安装有阻水层。5. A closed cooling tower with high efficiency in cooling according to claim 1, characterized in that a water blocking layer is installed in the tower body. 6.根据权利要求1所述的一种高效降温的闭式冷却塔,其特征在于,所述导污斗的底部支撑安装有支架。6. A closed cooling tower with high efficiency in cooling according to claim 1, characterized in that a bracket is installed on the bottom support of the dirt guide hopper.
CN202420167872.6U 2024-01-24 2024-01-24 Closed cooling tower of high-efficient cooling Active CN221724964U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202420167872.6U CN221724964U (en) 2024-01-24 2024-01-24 Closed cooling tower of high-efficient cooling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202420167872.6U CN221724964U (en) 2024-01-24 2024-01-24 Closed cooling tower of high-efficient cooling

Publications (1)

Publication Number Publication Date
CN221724964U true CN221724964U (en) 2024-09-17

Family

ID=92688992

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202420167872.6U Active CN221724964U (en) 2024-01-24 2024-01-24 Closed cooling tower of high-efficient cooling

Country Status (1)

Country Link
CN (1) CN221724964U (en)

Similar Documents

Publication Publication Date Title
CN211782866U (en) Closed cooling tower with descaling function
CN207528113U (en) A kind of anti-blocking cooling tower
CN221724964U (en) Closed cooling tower of high-efficient cooling
CN215003029U (en) Closed cooling tower with descaling function
CN212409434U (en) Split type air draft transverse flow open type cooling tower
CN206431568U (en) A kind of special dust-proof easy clean type radiator of industrial production
CN208091254U (en) Industrial cooling tower with filtering capability
CN117085446A (en) Adjustable alloy smelting flue gas purifying and dust removing device and dust removing method thereof
CN210814490U (en) Flue gas purification equipment after gasification of plasma hazardous waste
CN112628210A (en) Slurry pump heat dissipation device
CN211417224U (en) Cooling liquid circulating device
CN209550514U (en) An air-cooled water-cooled dual-purpose casting sand cooling device
CN218507833U (en) Annealing furnace cooling device
CN114145133A (en) Hydraulic walking device of sunflower harvester
CN220437136U (en) Discharging structure of roller-hearth heat treatment furnace
CN221705690U (en) Exhaust device for refrigeration air conditioner
CN218155621U (en) Cooling tower convenient to maintain
CN212068211U (en) Circulating water flow type purification device for industrial workshop waste gas treatment
CN221666683U (en) Water circulation cooling tower
CN222528374U (en) A cooling tower with self-cleaning function
CN221898082U (en) A cooling device for preparing heptafluoropropane
CN218513272U (en) Cooling device of compound oil-immersed self-cooling tank transformer
CN209341879U (en) A kind of tractor radiator with decontamination function
CN113375249B (en) Environmental protection type refrigeration equipment
CN222305331U (en) Desulfurizing tower for environmental protection atmosphere treatment

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant