CN221721344U - A connection node between Bailey beam and concrete pipe column bolt top distribution beam - Google Patents

A connection node between Bailey beam and concrete pipe column bolt top distribution beam Download PDF

Info

Publication number
CN221721344U
CN221721344U CN202323614730.4U CN202323614730U CN221721344U CN 221721344 U CN221721344 U CN 221721344U CN 202323614730 U CN202323614730 U CN 202323614730U CN 221721344 U CN221721344 U CN 221721344U
Authority
CN
China
Prior art keywords
bailey
connecting plate
fixing
bolt
pillow
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202323614730.4U
Other languages
Chinese (zh)
Inventor
魏旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lv Gang
Original Assignee
Sixian Xuguang Foundation Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixian Xuguang Foundation Engineering Co ltd filed Critical Sixian Xuguang Foundation Engineering Co ltd
Priority to CN202323614730.4U priority Critical patent/CN221721344U/en
Application granted granted Critical
Publication of CN221721344U publication Critical patent/CN221721344U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a connection node of a bailey beam and a concrete column bolt top distribution beam, which comprises two groups of concrete columns, and a pile top distribution beam and a bailey beam which are arranged above the concrete columns: the pile top distribution beam is positioned below the beret beam, the top of the pile top distribution beam is provided with a pillow beam, two symmetrical support side plates are welded on two sides of the pillow beam, a first fixing bolt is arranged on the bottom plate of the pillow beam, the utility model fixes the fixing plate on the top of the pillow beam by fixing the pillow beam on the top of the pile top distribution beam, the first connecting plate and the second connecting plate are fixed through the bolts and the nuts, so that the I-steel passes through the clamping grooves, the I-steel is fixed through the bolts and the nuts, the purpose that the bailey beam and the distribution beam at the top of the steel pipe column can be connected through the connecting assembly, the bailey beam and the distribution beam are prevented from being connected unstably, the collapse of a steel trestle is prevented, and the stability of the steel trestle is improved can be achieved.

Description

一种贝雷梁与砼管柱栓顶分配梁的连接节点A connection node between Bailey beam and concrete pipe column bolt top distribution beam

技术领域Technical Field

本实用新型属于贝雷梁与分配梁连接技术领域,特别是涉及一种贝雷梁与砼管柱栓顶分配梁的连接节点。The utility model belongs to the technical field of connecting Bailey beams and distribution beams, in particular to a connection node between a Bailey beam and a concrete pipe column bolt top distribution beam.

背景技术Background Art

贝雷梁钢栈桥是较为常见的大型桥梁工程临时设施,既是稳定的水上通道,又能作为施工平台的一部分,用于辅助桥梁主墩的施工,钢栈桥大多采用钢管桩基础形式,以连接系和桩顶分配梁将钢管桩连接成整体,然后铺设贝雷梁,最后铺设桥面板及护栏等附属结构成桥。Bailey beam steel trestles are relatively common temporary facilities in large bridge projects. They are not only stable water passages, but also can be used as part of the construction platform to assist in the construction of the main piers of the bridge. Most steel trestles use steel pipe pile foundations, which are connected into a whole by connecting ties and distribution beams on the top of the piles. Then the Bailey beams are laid, and finally the bridge deck, guardrails and other ancillary structures are laid to form a bridge.

目前钢栈桥施工大多采用钢管柱和贝雷梁进行铺设,贝雷梁架设在钢管柱顶部的分配梁上时,需要对贝雷梁和分配梁进行连接,贝雷梁和分配梁连接不稳定,是导致钢栈桥失稳倒塌的重要原因之一,因此需要一种贝雷梁与砼管柱栓顶分配梁的连接节点,可以通过连接组件对贝雷梁和钢管柱顶部的分配梁进行连接,避免贝雷梁与分配梁连接不稳定,防止钢栈桥失稳发生倒塌,提高了钢栈桥的稳定度。At present, most steel trestles are constructed by laying steel pipe columns and Bailey beams. When the Bailey beam is erected on the distribution beam on the top of the steel pipe column, the Bailey beam and the distribution beam need to be connected. The unstable connection between the Bailey beam and the distribution beam is one of the important reasons for the instability and collapse of the steel trestles. Therefore, a connection node between the Bailey beam and the distribution beam bolted on the top of the concrete pipe column is needed. The Bailey beam and the distribution beam on the top of the steel pipe column can be connected by a connecting component to avoid the unstable connection between the Bailey beam and the distribution beam, prevent the steel trestles from instability and collapse, and improve the stability of the steel trestles.

实用新型内容Utility Model Content

本实用新型的目的是提供一种贝雷梁与砼管柱栓顶分配梁的连接节点,具有可以通过连接组件对贝雷梁和钢管柱顶部的分配梁进行连接,避免贝雷梁与分配梁连接不稳定,防止钢栈桥失稳发生倒塌,提高了钢栈桥稳定度的目的,以解决上述背景技术问题。The purpose of the utility model is to provide a connection node between a Bailey beam and a distribution beam bolted on top of a concrete pipe column, which can connect the Bailey beam and the distribution beam on the top of the steel pipe column through a connection component, thereby avoiding unstable connection between the Bailey beam and the distribution beam, preventing the steel trestle from becoming unstable and collapsing, and improving the stability of the steel trestle, so as to solve the above-mentioned background technical problems.

本实用新型解决上述技术问题的技术方案如下:一种贝雷梁与砼管柱栓顶分配梁的连接节点,其包括两组砼管柱和设置在砼管柱上方的桩顶分配梁和贝雷梁:所述桩顶分配梁位于贝雷梁的下方,所述贝雷梁包括贝雷梁横架和贝雷梁竖架,所述桩顶分配梁的顶部设置有枕头梁,所述枕头梁的两侧均焊接有两个对称的支撑侧板,所述枕头梁的底板设置有固定栓一,所述固定栓一贯穿至桩顶分配梁的底部并与桩顶分配梁固定连接,所述枕头梁的顶部设置有两个对称的固定板,所述固定板的顶部焊接有两个对称的连接板一,所述固定板的上方设置有固定架,所述固定架的底部焊接有连接板二,所述固定架的正面开设有卡槽,所述连接板二与连接板一相适配,所述连接板一的正面贯穿设置三个相同的螺栓,所述螺栓贯穿连接板一和连接板二至连接板一的背面,所述螺栓的表面螺纹连接有螺帽,所述螺帽位于连接板一的背面,所述卡槽的内腔设置有工字钢,所述工字钢的顶部设置有两个钢垫板,所述钢垫板的顶部贯穿设置有螺栓,所述螺栓贯穿至工字钢的底部并螺纹连接有螺帽。The technical solution of the utility model for solving the above technical problems is as follows: a connection node between a Bailey beam and a concrete pipe column bolt top distribution beam, which includes two groups of concrete pipe columns and a pile top distribution beam and a Bailey beam arranged above the concrete pipe column: the pile top distribution beam is located below the Bailey beam, the Bailey beam includes a Bailey beam cross frame and a Bailey beam vertical frame, a pillow beam is arranged on the top of the pile top distribution beam, two symmetrical supporting side plates are welded on both sides of the pillow beam, a fixing bolt 1 is arranged on the bottom plate of the pillow beam, the fixing bolt 1 penetrates to the bottom of the pile top distribution beam and is fixedly connected to the pile top distribution beam, and two symmetrical fixing plates are arranged on the top of the pillow beam, and the top of the fixing plate Two symmetrical connecting plates 1 are welded, a fixing frame is arranged above the fixing plate, a connecting plate 2 is welded to the bottom of the fixing frame, a slot is opened on the front of the fixing frame, the connecting plate 2 is adapted to the connecting plate 1, three identical bolts are penetrated through the front of the connecting plate 1, the bolts penetrate through the connecting plate 1 and the connecting plate 2 to the back of the connecting plate 1, nuts are threadedly connected to the surfaces of the bolts, the nuts are located on the back of the connecting plate 1, an I-beam is arranged in the inner cavity of the slot, two steel pads are arranged on the top of the I-beam, bolts are penetrated on the top of the steel pad, the bolts penetrate to the bottom of the I-beam and are threadedly connected with nuts.

优选的,所述桩顶分配梁的顶部贯穿设置有分配梁,所述分配梁贯穿至桩顶分配梁的底部并与砼管柱固定连接。Preferably, a distribution beam is provided through the top of the pile top distribution beam, and the distribution beam passes through to the bottom of the pile top distribution beam and is fixedly connected to the concrete pipe column.

优选的,所述固定板的顶部贯穿设置有多排螺栓,所述螺栓贯穿固定板与枕头梁的上翼板至枕头梁上翼板的底部,所述螺栓的表面螺纹连接有螺帽,所述螺帽位于枕头梁上翼板的底部。Preferably, multiple rows of bolts are provided through the top of the fixing plate, and the bolts penetrate the fixing plate and the upper wing plate of the pillow beam to the bottom of the upper wing plate of the pillow beam. Nuts are threadedly connected to the surfaces of the bolts, and the nuts are located at the bottom of the upper wing plate of the pillow beam.

优选的,所述钢垫板为矩形,所述钢垫板的背面与固定架的正面相贴合,所述支撑侧板为倒三角形。Preferably, the steel pad is rectangular, the back side of the steel pad is in contact with the front side of the fixing frame, and the supporting side plate is an inverted triangle.

优选的,所述工字钢与卡槽相适配,所述工字钢贴合在贝雷梁横架底部贝雷梁竖架的顶部。Preferably, the I-beam is adapted to the slot, and the I-beam is attached to the bottom of the Bailey beam horizontal frame and the top of the Bailey beam vertical frame.

1、本实用新型的有益效果是:本实用新型通过将枕头梁固定在桩顶分配梁的顶部,将固定板固定在枕头梁的顶部,通过螺栓和螺帽对连接板一与连接板二进行固定,使工字钢穿过卡槽,通过螺栓和螺帽对工字钢进行固定,即可达到可以通过连接组件对贝雷梁和钢管柱顶部的分配梁进行连接,避免贝雷梁与分配梁连接不稳定,防止钢栈桥失稳发生倒塌,提高了钢栈桥稳定度的目的。1. The beneficial effects of the utility model are as follows: the utility model fixes the pillow beam to the top of the pile top distribution beam, fixes the fixing plate to the top of the pillow beam, fixes the connecting plate one and the connecting plate two by bolts and nuts, passes the I-beam through the slot, and fixes the I-beam by bolts and nuts, so as to achieve the purpose of connecting the Bailey beam and the distribution beam on the top of the steel pipe column through the connecting assembly, avoiding the unstable connection between the Bailey beam and the distribution beam, preventing the steel trestle from becoming unstable and collapsing, and improving the stability of the steel trestle.

2、本实用新型通过钢垫板的设置,方便使用者对工字钢进行定位,避免螺栓贴合在固定架的表面,导致使用者需要对工字钢位置调整后才能对螺栓进行拆除,提高了工字钢拆装的便利性,方便使用者对工字钢进行拆卸更换。2. The utility model facilitates the user to position the I-beam by setting the steel pad, avoids the bolts from sticking to the surface of the fixing frame, which causes the user to adjust the position of the I-beam before removing the bolts, improves the convenience of disassembly and assembly of the I-beam, and facilitates the user to disassemble and replace the I-beam.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

其中:in:

图1为本实用新型一种实施例的立体示意图;FIG1 is a perspective schematic diagram of an embodiment of the utility model;

图2为本实用新型一种实施例连接组件的立体示意图;FIG2 is a perspective schematic diagram of a connecting assembly according to an embodiment of the present invention;

图3为本实用新型一种实施例连接组件的立体拆分示意图;FIG3 is a three-dimensional disassembled schematic diagram of a connecting assembly according to an embodiment of the present utility model;

图4为本实用新型一种实施例的正视示意图FIG. 4 is a front view schematic diagram of an embodiment of the utility model

图5为本实用新型一种实施例图4中A点的局部放大图。FIG5 is a partial enlarged view of point A in FIG4 of an embodiment of the utility model.

附图中,各标号所代表的部件列表如下:In the accompanying drawings, the components represented by the reference numerals are listed as follows:

1、砼管柱,2、桩顶分配梁,3、贝雷梁,31、贝雷梁横架,32、贝雷梁竖架,41、枕头梁,42、支撑侧板,43、固定栓一,51、固定板,52、连接板一,61、固定架,62、连接板二,63、卡槽,71、螺栓,72、螺帽,8、工字钢,9、钢垫板,10、分配梁。1. Concrete pipe column, 2. Pile top distribution beam, 3. Bailey beam, 31. Bailey beam horizontal frame, 32. Bailey beam vertical frame, 41. Pillow beam, 42. Support side plate, 43. Fixing bolt 1, 51. Fixing plate, 52. Connecting plate 1, 61. Fixing frame, 62. Connecting plate 2, 63. Slot, 71. Bolt, 72. Nut, 8. I-beam, 9. Steel pad, 10. Distribution beam.

具体实施方式DETAILED DESCRIPTION

在下文中,将参照附图描述本实用新型的贝雷梁与砼管柱栓顶分配梁的连接节点的实施例。Hereinafter, an embodiment of a connection node between a Bailey beam and a concrete pipe column bolt top distribution beam of the utility model will be described with reference to the accompanying drawings.

实施例一:Embodiment 1:

图1-5示出本实用新型一种实施例的贝雷梁与砼管柱栓顶分配梁的连接节点,其包括:两组砼管柱1和设置在砼管柱1上方的桩顶分配梁2和贝雷梁3:桩顶分配梁2位于贝雷梁3的下方,贝雷梁3包括贝雷梁横架31和贝雷梁竖架32,桩顶分配梁2的顶部贯穿设置有分配梁10,分配梁10贯穿至桩顶分配梁2的底部并与砼管柱1固定连接,桩顶分配梁2的顶部设置有枕头梁41,枕头梁41的两侧均焊接有两个对称的支撑侧板42,枕头梁41的底板设置有固定栓一43,固定栓一43贯穿至桩顶分配梁2的底部并与桩顶分配梁2固定连接,枕头梁41的顶部设置有两个对称的固定板51,固定板51的顶部焊接有两个对称的连接板一52,固定板51的上方设置有固定架61,固定架61的底部焊接有连接板二62,固定架61的正面开设有卡槽63,连接板二62与连接板一52相适配,连接板一52的正面贯穿设置三个相同的螺栓71,螺栓71贯穿连接板一52和连接板二62至连接板一52的背面,螺栓71的表面螺纹连接有螺帽72,螺帽72位于连接板一52的背面,卡槽63的内腔设置有工字钢8,工字钢8的顶部设置有两个钢垫板9,钢垫板9为矩形,钢垫板9的背面与固定架61的正面相贴合,支撑侧板42为倒三角形,通过钢垫板9的设置,方便使用者对工字钢8进行定位,避免螺栓71贴合在固定架61的表面,导致使用者需要对工字钢8位置调整后才能对螺栓71进行拆除,提高了工字钢8拆装的便利性,方便使用者对工字钢8进行拆卸更换,钢垫板9的顶部贯穿设置有螺栓71,螺栓71贯穿至工字钢8的底部并螺纹连接有螺帽72。Figures 1-5 show the connection node between the Bailey beam and the top distribution beam of the concrete pipe column of an embodiment of the utility model, which includes: two groups of concrete pipe columns 1 and the pile top distribution beam 2 and Bailey beam 3 arranged above the concrete pipe column 1: the pile top distribution beam 2 is located below the Bailey beam 3, the Bailey beam 3 includes a Bailey beam cross frame 31 and a Bailey beam vertical frame 32, the top of the pile top distribution beam 2 is penetrated by a distribution beam 10, the distribution beam 10 penetrates to the bottom of the pile top distribution beam 2 and is fixedly connected to the concrete pipe column 1, and the top of the pile top distribution beam 2 is arranged There is a pillow beam 41, and two symmetrical supporting side plates 42 are welded on both sides of the pillow beam 41. The bottom plate of the pillow beam 41 is provided with a fixing bolt 43, and the fixing bolt 43 penetrates to the bottom of the pile top distribution beam 2 and is fixedly connected to the pile top distribution beam 2. The top of the pillow beam 41 is provided with two symmetrical fixing plates 51, and the top of the fixing plate 51 is welded with two symmetrical connecting plates 1 52. A fixing frame 61 is provided above the fixing plate 51, and a connecting plate 2 62 is welded at the bottom of the fixing frame 61. The fixing frame 61 A card slot 63 is provided on the front side of the connecting plate 52, the connecting plate 62 is adapted to the connecting plate 1 52, three identical bolts 71 are set through the front side of the connecting plate 1 52, the bolts 71 pass through the connecting plate 1 52 and the connecting plate 2 62 to the back side of the connecting plate 1 52, the surface of the bolt 71 is threadedly connected with a nut 72, the nut 72 is located on the back side of the connecting plate 1 52, the inner cavity of the card slot 63 is provided with an I-beam 8, and two steel pads 9 are provided on the top of the I-beam 8. The steel pads 9 are rectangular, and the back side of the steel pads 9 is connected to the fixing frame. The front of the I-beam 61 fits together, and the supporting side plate 42 is an inverted triangle. The arrangement of the steel pad 9 makes it convenient for the user to position the I-beam 8, thereby preventing the bolt 71 from fitting onto the surface of the fixing frame 61, which requires the user to adjust the position of the I-beam 8 before removing the bolt 71. This improves the convenience of disassembly and assembly of the I-beam 8 and makes it convenient for the user to disassemble and replace the I-beam 8. A bolt 71 is arranged through the top of the steel pad 9, and the bolt 71 passes through the bottom of the I-beam 8 and is threadedly connected with a nut 72.

实施例二:Embodiment 2:

图1-5示出本实用新型一种实施例的贝雷梁与砼管柱栓顶分配梁的连接节点,其包括:两组砼管柱1和设置在砼管柱1上方的桩顶分配梁2和贝雷梁3:桩顶分配梁2位于贝雷梁3的下方,贝雷梁3包括贝雷梁横架31和贝雷梁竖架32,桩顶分配梁2的顶部设置有枕头梁41,枕头梁41的两侧均焊接有两个对称的支撑侧板42,枕头梁41的底板设置有固定栓一43,固定栓一43贯穿至桩顶分配梁2的底部并与桩顶分配梁2固定连接,枕头梁41的顶部设置有两个对称的固定板51,固定板51的顶部贯穿设置有多排螺栓71,螺栓71贯穿固定板51与枕头梁41的上翼板至枕头梁41上翼板的底部,螺栓71的表面螺纹连接有螺帽72,螺帽72位于枕头梁41上翼板的底部,固定板51的顶部焊接有两个对称的连接板一52,固定板51的上方设置有固定架61,固定架61的底部焊接有连接板二62,固定架61的正面开设有卡槽63,连接板二62与连接板一52相适配,连接板一52的正面贯穿设置三个相同的螺栓71,螺栓71贯穿连接板一52和连接板二62至连接板一52的背面,螺栓71的表面螺纹连接有螺帽72,螺帽72位于连接板一52的背面,卡槽63的内腔设置有工字钢8,工字钢8与卡槽63相适配,工字钢8贴合在贝雷梁横架31底部贝雷梁竖架32的顶部,工字钢8的顶部设置有两个钢垫板9,钢垫板9的顶部贯穿设置有螺栓71,螺栓71贯穿至工字钢8的底部并螺纹连接有螺帽72。Fig. 1-5 shows the connection node of Bailey beam and concrete pipe column bolt top distribution beam of one embodiment of the utility model, which comprises: two groups of concrete pipe columns 1 and pile top distribution beam 2 and Bailey beam 3 arranged above the concrete pipe column 1: the pile top distribution beam 2 is located below the Bailey beam 3, the Bailey beam 3 comprises a Bailey beam cross frame 31 and a Bailey beam vertical frame 32, a pillow beam 41 is arranged on the top of the pile top distribution beam 2, two symmetrical supporting side plates 42 are welded on both sides of the pillow beam 41, a fixing bolt 43 is arranged on the bottom plate of the pillow beam 41, the fixing bolt 43 penetrates to the bottom of the pile top distribution beam 2 and is fixedly connected with the pile top distribution beam 2, two symmetrical fixing plates 51 are arranged on the top of the fixing plate 51, a plurality of rows of bolts 71 are penetrated on the top of the fixing plate 51, the bolts 71 penetrate the fixing plate 51 and the upper wing plate of the pillow beam 41 to the bottom of the upper wing plate of the pillow beam 41, a nut 72 is threadedly connected on the surface of the bolt 71, and the nut 72 is located on the pillow beam At the bottom of the upper wing plate 41, two symmetrical connecting plates 1 52 are welded to the top of the fixing plate 51, a fixing frame 61 is arranged above the fixing plate 51, and a connecting plate 2 62 is welded to the bottom of the fixing frame 61, a card slot 63 is opened on the front of the fixing frame 61, and the connecting plate 2 62 is adapted to the connecting plate 1 52, and three identical bolts 71 are penetrated through the front of the connecting plate 1 52, and the bolts 71 penetrate through the connecting plate 1 52 and the connecting plate 2 62 to the back of the connecting plate 1 52, and the surface of the bolt 71 is threadedly connected with a nut 72, and the nut 72 is located on the back of the connecting plate 1 52, and the inner cavity of the card slot 63 is provided with an I-beam 8, and the I-beam 8 is adapted to the card slot 63, and the I-beam 8 is attached to the top of the Bailey beam vertical frame 32 at the bottom of the Bailey beam horizontal frame 31, and two steel pads 9 are arranged on the top of the I-beam 8, and the top of the steel pad 9 is penetrated with bolts 71, and the bolts 71 penetrate to the bottom of the I-beam 8 and are threadedly connected with nuts 72.

工作原理:本实用新型使用时,使用者通过分配梁10将桩顶分配梁2固定在砼管柱1的顶部,通过固定栓一43将枕头梁41固定在桩顶分配梁2的顶部,通过螺栓71和螺帽72将固定板51固定在枕头梁41的顶部,使连接板二62与连接板一52相适配,通过螺栓71和螺帽72对连接板二62和连接板一52进行固定,使工字钢8穿过卡槽63,将钢垫板9放置在工字钢8顶部合适的位置,通过螺栓71和螺帽72对钢垫板9和工字钢8进行固定,即可对贝雷梁3和桩顶分配梁2进行连接固定,通过钢垫板9的设置,方便使用者对工字钢8进行定位,避免螺栓71贴合在固定架61的表面,导致使用者需要对工字钢8位置调整后才能对螺栓71进行拆除,提高了工字钢8拆装的便利性,方便使用者对工字钢8进行拆卸更换。Working principle: When the utility model is used, the user fixes the pile top distribution beam 2 to the top of the concrete pipe column 1 through the distribution beam 10, fixes the pillow beam 41 to the top of the pile top distribution beam 2 through the fixing bolt 1 43, fixes the fixing plate 51 to the top of the pillow beam 41 through the bolt 71 and the nut 72, makes the connecting plate 2 62 fit with the connecting plate 1 52, fixes the connecting plate 2 62 and the connecting plate 1 52 through the bolt 71 and the nut 72, makes the I-beam 8 pass through the slot 63, and puts the steel pad 9 By placing it at a suitable position on the top of the I-beam 8, the steel pad 9 and the I-beam 8 are fixed by bolts 71 and nuts 72, so that the Bailey beam 3 and the pile top distribution beam 2 can be connected and fixed. The setting of the steel pad 9 makes it convenient for the user to position the I-beam 8, and avoids the bolt 71 being attached to the surface of the fixing frame 61, which causes the user to adjust the position of the I-beam 8 before removing the bolt 71, thereby improving the convenience of disassembly and assembly of the I-beam 8 and facilitating the user to disassemble and replace the I-beam 8.

综上所述:该贝雷梁与砼管柱栓顶分配梁的连接节点,通过将枕头梁41固定在桩顶分配梁2的顶部,将固定板51固定在枕头梁41的顶部,通过螺栓71和螺帽72对连接板一52与连接板二62进行固定,使工字钢8穿过卡槽63,通过螺栓71和螺帽72对工字钢8进行固定,即可达到可以通过连接组件对贝雷梁和钢管柱顶部的分配梁进行连接,避免贝雷梁与分配梁连接不稳定,防止钢栈桥失稳发生倒塌,提高了钢栈桥稳定度的目的。To sum up: the connection node between the Bailey beam and the concrete pipe column bolted top distribution beam is achieved by fixing the pillow beam 41 to the top of the pile top distribution beam 2, fixing the fixing plate 51 to the top of the pillow beam 41, fixing the connecting plate 1 52 and the connecting plate 2 62 by bolts 71 and nuts 72, allowing the I-beam 8 to pass through the slot 63, and fixing the I-beam 8 by bolts 71 and nuts 72, so that the Bailey beam and the distribution beam at the top of the steel pipe column can be connected through the connecting assembly, avoiding unstable connection between the Bailey beam and the distribution beam, preventing the steel trestle from becoming unstable and collapsing, and improving the stability of the steel trestle.

Claims (5)

1.一种贝雷梁与砼管柱栓顶分配梁的连接节点,其特征在于,包括两组砼管柱(1)和设置在砼管柱(1)上方的桩顶分配梁(2)和贝雷梁(3):所述桩顶分配梁(2)位于贝雷梁(3)的下方,所述贝雷梁(3)包括贝雷梁横架(31)和贝雷梁竖架(32),所述桩顶分配梁(2)的顶部设置有枕头梁(41),所述枕头梁(41)的两侧均焊接有两个对称的支撑侧板(42),所述枕头梁(41)的底板设置有固定栓一(43),所述固定栓一(43)贯穿至桩顶分配梁(2)的底部并与桩顶分配梁(2)固定连接,所述枕头梁(41)的顶部设置有两个对称的固定板(51),所述固定板(51)的顶部焊接有两个对称的连接板一(52),所述固定板(51)的上方设置有固定架(61),所述固定架(61)的底部焊接有连接板二(62),所述固定架(61)的正面开设有卡槽(63),所述连接板二(62)与连接板一(52)相适配,所述连接板一(52)的正面贯穿设置三个相同的螺栓(71),所述螺栓(71)贯穿连接板一(52)和连接板二(62)至连接板一(52)的背面,所述螺栓(71)的表面螺纹连接有螺帽(72),所述螺帽(72)位于连接板一(52)的背面,所述卡槽(63)的内腔设置有工字钢(8),所述工字钢(8)的顶部设置有两个钢垫板(9),所述钢垫板(9)的顶部贯穿设置有螺栓(71),所述螺栓(71)贯穿至工字钢(8)的底部并螺纹连接有螺帽(72)。1. A connection node between a Bailey beam and a concrete pipe column bolt top distribution beam, characterized in that it comprises two groups of concrete pipe columns (1) and a pile top distribution beam (2) and a Bailey beam (3) arranged above the concrete pipe column (1): the pile top distribution beam (2) is located below the Bailey beam (3), the Bailey beam (3) comprises a Bailey beam cross frame (31) and a Bailey beam vertical frame (32), a pillow beam (41) is arranged on the top of the pile top distribution beam (2), two symmetrical supporting side plates (42) are welded on both sides of the pillow beam (41), a fixing bolt (43) is arranged on the bottom plate of the pillow beam (41), the fixing bolt (43) penetrates to the bottom of the pile top distribution beam (2) and is fixedly connected to the pile top distribution beam (2), two symmetrical fixing plates (51) are arranged on the top of the pillow beam (41), two symmetrical connecting plates (52) are welded on the top of the fixing plate (51), and the fixing plate ( A fixing frame (61) is arranged above the connecting plate (51), a connecting plate (62) is welded to the bottom of the fixing frame (61), a slot (63) is arranged on the front of the fixing frame (61), the connecting plate (62) is matched with the connecting plate (52), three identical bolts (71) are arranged through the front of the connecting plate (52), the bolts (71) pass through the connecting plate (52) and the connecting plate (62) to the back of the connecting plate (52), a nut (72) is threadedly connected to the surface of the bolt (71), the nut (72) is located on the back of the connecting plate (52), an I-beam (8) is arranged in the inner cavity of the slot (63), two steel pads (9) are arranged on the top of the I-beam (8), a bolt (71) is arranged through the top of the steel pad (9), the bolt (71) passes through the bottom of the I-beam (8) and is threadedly connected to the nut (72). 2.根据权利要求1所述的一种贝雷梁与砼管柱栓顶分配梁的连接节点,其特征在于,所述桩顶分配梁(2)的顶部贯穿设置有分配梁(10),所述分配梁(10)贯穿至桩顶分配梁(2)的底部并与砼管柱(1)固定连接。2. A connection node between a Bailey beam and a concrete pipe column bolt top distribution beam according to claim 1, characterized in that a distribution beam (10) is provided through the top of the pile top distribution beam (2), and the distribution beam (10) passes through to the bottom of the pile top distribution beam (2) and is fixedly connected to the concrete pipe column (1). 3.根据权利要求2所述的一种贝雷梁与砼管柱栓顶分配梁的连接节点,其特征在于,所述固定板(51)的顶部贯穿设置有多排螺栓(71),所述螺栓(71)贯穿固定板(51)与枕头梁(41)的上翼板至枕头梁(41)上翼板的底部,所述螺栓(71)的表面螺纹连接有螺帽(72),所述螺帽(72)位于枕头梁(41)上翼板的底部。3. According to claim 2, a connection node between a Bailey beam and a concrete pipe column bolt top distribution beam is characterized in that a plurality of rows of bolts (71) are provided through the top of the fixing plate (51), and the bolts (71) penetrate the fixing plate (51) and the upper wing plate of the pillow beam (41) to the bottom of the upper wing plate of the pillow beam (41), and a nut (72) is threadedly connected to the surface of the bolt (71), and the nut (72) is located at the bottom of the upper wing plate of the pillow beam (41). 4.根据权利要求3所述的一种贝雷梁与砼管柱栓顶分配梁的连接节点,其特征在于,所述钢垫板(9)为矩形,所述钢垫板(9)的背面与固定架(61)的正面相贴合,所述支撑侧板(42)为倒三角形。4. A connection node between a Bailey beam and a concrete pipe column bolt top distribution beam according to claim 3, characterized in that the steel pad (9) is rectangular, the back side of the steel pad (9) is in contact with the front side of the fixing frame (61), and the supporting side plate (42) is an inverted triangle. 5.根据权利要求4所述的一种贝雷梁与砼管柱栓顶分配梁的连接节点,其特征在于,所述工字钢(8)与卡槽(63)相适配,所述工字钢(8)贴合在贝雷梁横架(31)底部贝雷梁竖架(32)的顶部。5. A connection node between a Bailey beam and a concrete pipe column bolt top distribution beam according to claim 4, characterized in that the I-beam (8) is adapted to the slot (63), and the I-beam (8) is attached to the top of the Bailey beam vertical frame (32) at the bottom of the Bailey beam horizontal frame (31).
CN202323614730.4U 2023-12-28 2023-12-28 A connection node between Bailey beam and concrete pipe column bolt top distribution beam Active CN221721344U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202323614730.4U CN221721344U (en) 2023-12-28 2023-12-28 A connection node between Bailey beam and concrete pipe column bolt top distribution beam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202323614730.4U CN221721344U (en) 2023-12-28 2023-12-28 A connection node between Bailey beam and concrete pipe column bolt top distribution beam

Publications (1)

Publication Number Publication Date
CN221721344U true CN221721344U (en) 2024-09-17

Family

ID=92686200

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202323614730.4U Active CN221721344U (en) 2023-12-28 2023-12-28 A connection node between Bailey beam and concrete pipe column bolt top distribution beam

Country Status (1)

Country Link
CN (1) CN221721344U (en)

Similar Documents

Publication Publication Date Title
CN103104092A (en) Support composite structure of beam and slab
CN206438529U (en) Beam and slab type raft foundation formwork support structure
CN112095495A (en) Bridge underpinning support structure and construction method
CN221721344U (en) A connection node between Bailey beam and concrete pipe column bolt top distribution beam
CN211113217U (en) Curved bracket
CN103255929A (en) Assembly technology of adjustable supporting columns and eight type modularized steel floor slab moulds
CN204780635U (en) Super wide nonprismatic continuous beam 0# piece concreties and relieves construction structures
CN217479961U (en) Independent few support of cross-river variable cross-section cast-in-place box girder
CN205822014U (en) A kind of Hollow High Pier pier top entity section template rigid frame
CN116411709A (en) Cast-in-situ reinforced concrete template engineering aluminum template and wood template mixed construction method
CN202830788U (en) Supporting structure with beam fulcrum below bridge cantilever
CN221972398U (en) A large longitudinal and transverse beam template device for bank slope section
CN102392499A (en) Anti-buckling support air cooling island structure
CN220364867U (en) Double-concrete pier column diagonal bracing type construction platform
CN221692749U (en) A billiard table steel frame support structure
CN221855288U (en) Steel pipe oblique leg support of adjustable difference in height
CN221681608U (en) Bridge seat construction node
CN218933127U (en) Ultra-deep foundation pit permanent-facing combined supporting frame beam-ring frame plate construction device
CN216840807U (en) Post-cast strip temporary back-jacking supporting device
CN222227556U (en) A spliced shock-absorbing steel structure for building
CN218540364U (en) Supporting device for pouring number zero block on V-shaped leg pier of bridge
CN110144927A (en) A kind of device of pre-embedded anchoring bolts group
CN221856315U (en) A fast installation and disassembly support system for post-cast concrete in construction engineering
CN221663442U (en) A combined wooden formwork for cast-in-place simply supported beam inner box
CN221000643U (en) A support structure for the construction of curved side formwork for vase piers

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20250318

Address after: No. 21 Xingfu Street, Fourth District, Shixiang Village, Xiaocun Township, Dingxing County, Baoding City, Hebei Province, China 071000

Patentee after: Lv Gang

Country or region after: China

Address before: 234300 Group 1, Laoxu Village, Dawei Township, Sixian County, Suzhou City, Anhui Province

Patentee before: Sixian Xuguang Foundation Engineering Co.,Ltd.

Country or region before: China