CN221697327U - Superimposed sheet steam curing means - Google Patents
Superimposed sheet steam curing means Download PDFInfo
- Publication number
- CN221697327U CN221697327U CN202420202594.3U CN202420202594U CN221697327U CN 221697327 U CN221697327 U CN 221697327U CN 202420202594 U CN202420202594 U CN 202420202594U CN 221697327 U CN221697327 U CN 221697327U
- Authority
- CN
- China
- Prior art keywords
- steam
- heat exchange
- curing
- pipe
- cooling device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 56
- 238000001816 cooling Methods 0.000 claims abstract description 36
- 239000002131 composite material Substances 0.000 claims description 30
- 238000005192 partition Methods 0.000 claims description 26
- 238000004064 recycling Methods 0.000 abstract description 9
- 238000005265 energy consumption Methods 0.000 abstract description 6
- 230000000694 effects Effects 0.000 abstract description 5
- 238000010586 diagram Methods 0.000 description 5
- 239000008236 heating water Substances 0.000 description 4
- 238000011084 recovery Methods 0.000 description 4
- 101001121408 Homo sapiens L-amino-acid oxidase Proteins 0.000 description 2
- 101000827703 Homo sapiens Polyphosphoinositide phosphatase Proteins 0.000 description 2
- 102100026388 L-amino-acid oxidase Human genes 0.000 description 2
- 102100023591 Polyphosphoinositide phosphatase Human genes 0.000 description 2
- 101100012902 Saccharomyces cerevisiae (strain ATCC 204508 / S288c) FIG2 gene Proteins 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 101100233916 Saccharomyces cerevisiae (strain ATCC 204508 / S288c) KAR5 gene Proteins 0.000 description 1
- 238000013475 authorization Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 239000004566 building material Substances 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02E60/10—Energy storage using batteries
Landscapes
- Heating, Cooling, Or Curing Plastics Or The Like In General (AREA)
Abstract
Description
技术领域Technical Field
本实用新型涉及蒸汽养护装置的技术领域,特别是涉及一种叠合板蒸汽养护装置。The utility model relates to the technical field of steam curing devices, in particular to a steam curing device for a laminated plate.
背景技术Background Art
随着建筑行业的快速发展,叠合板作为一种新型的建筑材料,因其施工速度快、节能环保等优点,得到了广泛应用,在对叠合板加工中,需要将叠合板进行蒸汽养护处理,以提高叠合板的固化速度和质量。With the rapid development of the construction industry, composite panels, as a new type of building material, have been widely used due to their advantages such as fast construction speed, energy saving and environmental protection. In the processing of composite panels, the composite panels need to be steam cured to improve the curing speed and quality of the composite panels.
如现有技术授权公告号为CN219650209U的专利中,该实用新型涉及一种叠合板生产用的蒸汽养护室,包括养护室,所述养护室的内部固定连接有数量为五个的蒸汽管,五个所述蒸汽管的正面均设置有数量为三个的出气孔,所述养护室的正面设置有箱门,所述养护室的内部设置有养护组件。As described in the patent with the prior art authorization announcement number CN219650209U, the utility model relates to a steam curing room for the production of composite panels, including a curing room, wherein five steam pipes are fixedly connected to the interior of the curing room, and three air outlets are arranged on the front of the five steam pipes, a door is arranged on the front of the curing room, and a curing component is arranged inside the curing room.
但该养护室使用中发现,该养护室不便于对蒸汽的热量进行回收利用,并且不便于对蒸汽进行冷凝循环使用,增加了叠合板蒸汽养护的能耗,降低了能源利用率。However, during the use of the curing room, it was found that the curing room was not convenient for recycling the heat of the steam and was not convenient for condensing and recycling the steam, which increased the energy consumption of steam curing of the composite panels and reduced the energy utilization rate.
实用新型内容Utility Model Content
为解决上述技术问题,本实用新型提供一种提高蒸汽热量回收利用效果,降低蒸汽发生器将水加热成蒸汽时的能耗,提高工作效率,提高能源利用率的叠合板蒸汽养护装置。In order to solve the above technical problems, the utility model provides a composite plate steam maintenance device which improves the steam heat recovery effect, reduces the energy consumption when the steam generator heats water into steam, improves work efficiency, and improves energy utilization.
本实用新型的一种叠合板蒸汽养护装置,包括养护室和收集罩,收集罩连通设置在养护室顶端;还包括支撑装置、冷却装置、第一输送管、蒸汽发生器、第二输送管和多组喷头,养护室内设置有支撑装置,支撑装置用于将叠合板支撑,第一输送管输入端与收集罩连通,第一输送管输出端与冷却装置连通,冷却装置用于将蒸汽冷却降温,并且冷却装置用于将需要加热的水进行预热处理,蒸汽发生器输出端与第二输送管连通,第二输送管伸入养护室内部,多组喷头均连通设置在第二输送管外侧壁上;通过支撑装置将需要蒸汽养护的叠合板放入养护室内部,将养护室的开口关闭,通过打开蒸汽发生器将水加热后产生蒸汽,蒸汽通过第二输送管输送至多组喷头,使多组喷头将蒸汽排放至养护室内部将叠合板蒸汽养护处理,养护室内的蒸汽通过收集罩收集并通过第一输送管输送至冷却装置内,将需要加入蒸汽发生器内的水首先放入冷却装置内,冷却装置利用水的温度将蒸汽进行降温,并且蒸汽的热交换同时将水进行预热,提高蒸汽热量回收利用效果,降低蒸汽发生器将水加热成蒸汽时的能耗,提高工作效率,蒸汽冷却后产生的冷凝水通过冷却装置收集,之后将冷凝水排放至蒸汽发生器内回收利用,提高能源利用率。The utility model discloses a steam curing device for a composite plate, comprising a curing chamber and a collecting hood, wherein the collecting hood is connected and arranged at the top of the curing chamber; the utility model also comprises a supporting device, a cooling device, a first conveying pipe, a steam generator, a second conveying pipe and a plurality of nozzle groups; a supporting device is arranged in the curing chamber, the supporting device is used to support the composite plate, the input end of the first conveying pipe is connected with the collecting hood, the output end of the first conveying pipe is connected with the cooling device, the cooling device is used to cool the steam, and the cooling device is used to preheat the water to be heated, the output end of the steam generator is connected with the second conveying pipe, the second conveying pipe extends into the interior of the curing chamber, and the plurality of nozzle groups are connected and arranged on the outer side wall of the second conveying pipe; the composite plate to be steam cured is placed into the interior of the curing chamber through the supporting device, and the curing is carried out. The opening of the curing chamber is closed, and steam is generated by heating water by opening the steam generator. The steam is transported to multiple groups of nozzles through the second delivery pipe, so that the multiple groups of nozzles discharge the steam into the curing chamber to steam-cure the composite plate. The steam in the curing chamber is collected by the collecting hood and transported to the cooling device through the first delivery pipe. The water to be added to the steam generator is first placed in the cooling device. The cooling device uses the temperature of the water to cool the steam, and the heat exchange of the steam simultaneously preheats the water, thereby improving the steam heat recovery effect, reducing the energy consumption of the steam generator when heating water into steam, and improving work efficiency. The condensed water generated after the steam is cooled is collected by the cooling device, and then the condensed water is discharged to the steam generator for recycling, thereby improving energy utilization.
优选的,所述冷却装置包括输送装置、箱体、隔板、第一换热箱、多组换热管、第二换热箱、排出管和进水阀,隔板安装在箱体内侧壁上,第一换热箱安装在隔板顶端,第一输送管输出端与第一换热箱连通,多组换热管均连通设置在第一换热箱顶端,多组换热管顶端均与第二换热箱连通,排出管连通设置在第二换热箱顶端,并且排出管与室外相通,隔板中部设置有通孔,第一换热箱通过通孔与隔板下部的箱体内相通,进水阀连通设置在箱体外侧壁上部,输送装置与箱体内连通,输送装置用于将箱体内的水输送至蒸汽发生器内;将水通过进水阀加入隔板上部的箱体内,第一输送管将蒸汽输送至第一换热箱内部,第一换热箱内的蒸汽通过多组换热管向上输送至第二换热箱内部,通过第一换热箱、多组换热管和第二换热箱的热传导将箱体上部的水进行预热处理,同时通过换热将蒸汽进行冷却降温,之后剩余蒸汽通过排出管向外排出,蒸汽冷凝水通过隔板的通孔落至箱体内底部,通过将输送装置开启,使输送装置分别将箱体上部和箱体下部的水输送至蒸汽发生器内部,提高蒸汽冷凝水回收利用便利性,提高水预热处理便利性。Preferably, the cooling device includes a conveying device, a box body, a partition, a first heat exchange box, multiple groups of heat exchange tubes, a second heat exchange box, a discharge pipe and a water inlet valve. The partition is installed on the inner wall of the box body, the first heat exchange box is installed on the top of the partition, the output end of the first conveying pipe is connected with the first heat exchange box, the multiple groups of heat exchange tubes are connected and arranged at the top of the first heat exchange box, the tops of the multiple groups of heat exchange tubes are connected with the second heat exchange box, the discharge pipe is connected and arranged at the top of the second heat exchange box, and the discharge pipe is connected with the outside of the room, a through hole is provided in the middle of the partition, the first heat exchange box is connected with the box body at the lower part of the partition through the through hole, the water inlet valve is connected and arranged on the upper part of the outer wall of the box body, the conveying device is connected with the box body, and the conveying device is used to convey water in the box body to Inside the steam generator; water is added into the box body on the upper part of the partition through the water inlet valve, the first delivery pipe delivers the steam to the inside of the first heat exchange box, the steam in the first heat exchange box is delivered upward to the inside of the second heat exchange box through multiple groups of heat exchange tubes, the water in the upper part of the box is preheated by heat conduction among the first heat exchange box, multiple groups of heat exchange tubes and the second heat exchange box, and the steam is cooled by heat exchange, and then the remaining steam is discharged to the outside through the exhaust pipe, and the steam condensate falls to the bottom of the box through the through holes of the partition, and the delivery device is turned on to make the delivery device deliver the water in the upper and lower parts of the box to the inside of the steam generator respectively, thereby improving the convenience of recycling the steam condensate and improving the convenience of water preheating.
优选的,所述输送装置包括第三输送管、截流阀、第四输送管和泵体,第三输送管输入端与隔板上部的箱体内连通,第三输送管输出端与蒸汽发生器连通,截流阀连通设置在第三输送管上,第四输送管输入端与隔板下部的箱体内连通,第四输送管输出端与蒸汽发生器连通,泵体连通设置在第四输送管上;通过将截流阀开启,使箱体上部的水通过自然流动进入蒸汽发生器内部,通过将泵体开启,使箱体下部的水通过第四输送管输送至蒸汽发生器内部,提高装置使用的便利性。Preferably, the conveying device includes a third conveying pipe, a shut-off valve, a fourth conveying pipe and a pump body, the input end of the third conveying pipe is connected to the box body at the upper part of the partition, the output end of the third conveying pipe is connected to the steam generator, the shut-off valve is connected and arranged on the third conveying pipe, the input end of the fourth conveying pipe is connected to the box body at the lower part of the partition, the output end of the fourth conveying pipe is connected to the steam generator, and the pump body is connected and arranged on the fourth conveying pipe; by opening the shut-off valve, the water in the upper part of the box body flows into the steam generator through natural flow, and by opening the pump body, the water in the lower part of the box body is transported to the steam generator through the fourth conveying pipe, thereby improving the convenience of using the device.
优选的,所述支撑装置包括导轨和格栅,导轨安装在养护室内侧壁上,格栅滑动安装在导轨上;将需要加工的叠合板放置在格栅上,将格栅通过导轨的支撑滑动放入养护室内部,提高叠合板取放操作的便利性,提高装置使用便利性。Preferably, the supporting device includes a guide rail and a grille, the guide rail is installed on the inner wall of the curing chamber, and the grille is slidably installed on the guide rail; the composite plate to be processed is placed on the grille, and the grille is slid into the interior of the curing chamber through the support of the guide rail, thereby improving the convenience of taking and placing the composite plate and improving the convenience of using the device.
优选的,还包括排气罩,排气罩罩装在排出管顶端开口处;通过设置排气罩,提高排出管顶端开口处的防护效果。Preferably, it also includes an exhaust hood, which is installed at the top opening of the exhaust pipe; by setting the exhaust hood, the protective effect of the top opening of the exhaust pipe is improved.
优选的,还包括排水阀,排水阀连通设置在养护室外侧壁下部;通过设置排水阀,提高养护室内底部冷凝水排出的便利性。Preferably, it also includes a drain valve, which is connected to the lower part of the outer wall of the curing room; by arranging the drain valve, the convenience of discharging condensed water at the bottom of the curing room is improved.
优选的,还包括温度传感器,温度传感器连通设置在养护室外侧壁上;提高养护室内的温度监测便利性。Preferably, it also includes a temperature sensor, which is connected and arranged on the outer wall of the curing room to improve the convenience of temperature monitoring in the curing room.
与现有技术相比本实用新型的有益效果为:通过支撑装置将需要蒸汽养护的叠合板放入养护室内部,将养护室的开口关闭,通过打开蒸汽发生器将水加热后产生蒸汽,蒸汽通过第二输送管输送至多组喷头,使多组喷头将蒸汽排放至养护室内部将叠合板蒸汽养护处理,养护室内的蒸汽通过收集罩收集并通过第一输送管输送至冷却装置内,将需要加入蒸汽发生器内的水首先放入冷却装置内,冷却装置利用水的温度将蒸汽进行降温,并且蒸汽的热交换同时将水进行预热,提高蒸汽热量回收利用效果,降低蒸汽发生器将水加热成蒸汽时的能耗,提高工作效率,蒸汽冷却后产生的冷凝水通过冷却装置收集,之后将冷凝水排放至蒸汽发生器内回收利用,提高能源利用率。Compared with the prior art, the utility model has the following beneficial effects: the composite plate that needs steam curing is placed in the curing chamber through the supporting device, the opening of the curing chamber is closed, the steam is generated by heating water by opening the steam generator, the steam is transported to multiple groups of nozzles through the second delivery pipe, so that the multiple groups of nozzles discharge the steam into the curing chamber to steam-cure the composite plate, the steam in the curing chamber is collected by the collecting hood and transported to the cooling device through the first delivery pipe, the water that needs to be added to the steam generator is first placed in the cooling device, the cooling device uses the temperature of the water to cool the steam, and the heat exchange of the steam simultaneously preheats the water, thereby improving the steam heat recovery effect, reducing the energy consumption when the steam generator heats water into steam, and improving work efficiency, the condensed water generated after the steam is cooled is collected by the cooling device, and then the condensed water is discharged to the steam generator for recycling, thereby improving energy utilization.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
图1是本实用新型的轴测结构示意图;Figure 1 is a schematic diagram of the axonometric structure of the utility model;
图2是第二输送管与喷头等连接的轴测结构示意图;FIG2 is an isometric structural diagram of the connection between the second delivery pipe and the nozzle, etc.;
图3是第一输送管与第一换热箱等连接的轴测局部结构示意图;FIG3 is an isometric partial structural diagram of the connection between the first delivery pipe and the first heat exchange box, etc.;
图4是排气罩与排出管等连接的轴测结构示意图;FIG4 is an isometric structural diagram of the connection between the exhaust hood and the exhaust pipe, etc.;
图5是导轨与格栅等连接的轴测结构示意图。FIG. 5 is a schematic diagram of the axonometric structure of the connection between the guide rail and the grille, etc.
附图中标记:1、养护室;2、收集罩;3、第一输送管;4、蒸汽发生器;5、第二输送管;6、喷头;7、箱体;8、隔板;9、第一换热箱;10、换热管;11、第二换热箱;12、排出管;13、进水阀;14、第三输送管;15、截流阀;16、第四输送管;17、泵体;18、导轨;19、格栅;20、排气罩;21、排水阀;22、温度传感器。Markings in the attached drawings: 1. Curing room; 2. Collecting hood; 3. First delivery pipe; 4. Steam generator; 5. Second delivery pipe; 6. Nozzle; 7. Box body; 8. Partition; 9. First heat exchange box; 10. Heat exchange pipe; 11. Second heat exchange box; 12. Discharge pipe; 13. Water inlet valve; 14. Third delivery pipe; 15. Shut-off valve; 16. Fourth delivery pipe; 17. Pump body; 18. Guide rail; 19. Grille; 20. Exhaust hood; 21. Drain valve; 22. Temperature sensor.
具体实施方式DETAILED DESCRIPTION
为了便于理解本实用新型,下面将参照相关附图对本实用新型进行更全面的描述。本实用新型可以以许多不同的形式来实现,并不限于本文所描述的实施例。相反地,提供这些实施例的目的是使对本实用新型的公开内容更加透彻全面。In order to facilitate the understanding of the utility model, the utility model will be described more comprehensively with reference to the relevant drawings below. The utility model can be implemented in many different forms and is not limited to the embodiments described herein. On the contrary, the purpose of providing these embodiments is to make the disclosure of the utility model more thorough and comprehensive.
实施例1Example 1
如图1至图5所示,本实用新型的一种叠合板蒸汽养护装置,包括养护室1和收集罩2,收集罩2连通设置在养护室1顶端;还包括支撑装置、冷却装置、第一输送管3、蒸汽发生器4、第二输送管5和多组喷头6,养护室1内设置有支撑装置,支撑装置用于将叠合板支撑,第一输送管3输入端与收集罩2连通,第一输送管3输出端与冷却装置连通,冷却装置用于将蒸汽冷却降温,并且冷却装置用于将需要加热的水进行预热处理,蒸汽发生器4输出端与第二输送管5连通,第二输送管5伸入养护室1内部,多组喷头6均连通设置在第二输送管5外侧壁上;As shown in Figures 1 to 5, a steam curing device for a laminated plate of the utility model comprises a curing chamber 1 and a collecting hood 2, wherein the collecting hood 2 is connected and arranged at the top of the curing chamber 1; further comprising a supporting device, a cooling device, a first delivery pipe 3, a steam generator 4, a second delivery pipe 5 and a plurality of nozzle groups 6. A supporting device is arranged in the curing chamber 1, and the supporting device is used to support the laminated plate. The input end of the first delivery pipe 3 is connected to the collecting hood 2, and the output end of the first delivery pipe 3 is connected to the cooling device. The cooling device is used to cool the steam, and the cooling device is used to preheat the water to be heated. The output end of the steam generator 4 is connected to the second delivery pipe 5, and the second delivery pipe 5 extends into the interior of the curing chamber 1. The plurality of nozzle groups 6 are all connected and arranged on the outer wall of the second delivery pipe 5.
如图2和图3所示,所述冷却装置包括输送装置、箱体7、隔板8、第一换热箱9、多组换热管10、第二换热箱11、排出管12和进水阀13,隔板8安装在箱体7内侧壁上,第一换热箱9安装在隔板8顶端,第一输送管3输出端与第一换热箱9连通,多组换热管10均连通设置在第一换热箱9顶端,多组换热管10顶端均与第二换热箱11连通,排出管12连通设置在第二换热箱11顶端,并且排出管12与室外相通,隔板8中部设置有通孔,第一换热箱9通过通孔与隔板8下部的箱体7内相通,进水阀13连通设置在箱体7外侧壁上部,输送装置与箱体7内连通,输送装置用于将箱体7内的水输送至蒸汽发生器4内;As shown in Figures 2 and 3, the cooling device includes a conveying device, a box body 7, a partition 8, a first heat exchange box 9, multiple groups of heat exchange tubes 10, a second heat exchange box 11, a discharge pipe 12 and a water inlet valve 13. The partition 8 is installed on the inner wall of the box body 7, the first heat exchange box 9 is installed on the top of the partition 8, the output end of the first conveying pipe 3 is connected with the first heat exchange box 9, the multiple groups of heat exchange tubes 10 are connected and arranged at the top of the first heat exchange box 9, the tops of the multiple groups of heat exchange tubes 10 are connected and arranged at the top of the second heat exchange box 11, the discharge pipe 12 is connected and arranged at the top of the second heat exchange box 11, and the discharge pipe 12 is connected to the outside, a through hole is provided in the middle of the partition 8, the first heat exchange box 9 is connected with the box body 7 at the lower part of the partition 8 through the through hole, the water inlet valve 13 is connected and arranged at the upper part of the outer wall of the box body 7, the conveying device is connected with the box body 7, and the conveying device is used to convey the water in the box body 7 to the steam generator 4;
在本实施例中,通过支撑装置将需要蒸汽养护的叠合板放入养护室1内部,将养护室1的开口关闭,通过打开蒸汽发生器4将水加热后产生蒸汽,蒸汽通过第二输送管5输送至多组喷头6,使多组喷头6将蒸汽排放至养护室1内部将叠合板蒸汽养护处理,养护室1内的蒸汽通过收集罩2收集并通过第一输送管3输送至冷却装置内,将需要加入蒸汽发生器4内的水首先放入冷却装置内,冷却装置利用水的温度将蒸汽进行降温,并且蒸汽的热交换同时将水进行预热,提高蒸汽热量回收利用效果,降低蒸汽发生器4将水加热成蒸汽时的能耗,提高工作效率,蒸汽冷却后产生的冷凝水通过冷却装置收集,之后将冷凝水排放至蒸汽发生器4内回收利用,提高能源利用率。In this embodiment, the composite board that needs steam curing is placed in the curing chamber 1 through the support device, the opening of the curing chamber 1 is closed, and the steam generator 4 is opened to heat the water to generate steam. The steam is transported to the multiple groups of nozzles 6 through the second delivery pipe 5, so that the multiple groups of nozzles 6 discharge the steam into the curing chamber 1 to steam-cure the composite board. The steam in the curing chamber 1 is collected by the collecting hood 2 and transported to the cooling device through the first delivery pipe 3. The water that needs to be added to the steam generator 4 is first placed in the cooling device. The cooling device uses the temperature of the water to cool the steam, and the heat exchange of the steam simultaneously preheats the water, thereby improving the steam heat recovery effect, reducing the energy consumption when the steam generator 4 heats the water into steam, and improving the work efficiency. The condensed water generated after the steam is cooled is collected by the cooling device, and then the condensed water is discharged to the steam generator 4 for recycling, thereby improving the energy utilization rate.
实施例2Example 2
在实施例1的基础之上,如图2所示,本实用新型的一种叠合板蒸汽养护装置,所述输送装置包括第三输送管14、截流阀15、第四输送管16和泵体17,第三输送管14输入端与隔板8上部的箱体7内连通,第三输送管14输出端与蒸汽发生器4连通,截流阀15连通设置在第三输送管14上,第四输送管16输入端与隔板8下部的箱体7内连通,第四输送管16输出端与蒸汽发生器4连通,泵体17连通设置在第四输送管16上;On the basis of Example 1, as shown in FIG2, a steam curing device for a composite plate of the utility model is provided, wherein the conveying device comprises a third conveying pipe 14, a shut-off valve 15, a fourth conveying pipe 16 and a pump body 17, wherein the input end of the third conveying pipe 14 is communicated with the box body 7 at the upper part of the partition 8, the output end of the third conveying pipe 14 is communicated with the steam generator 4, the shut-off valve 15 is communicated and arranged on the third conveying pipe 14, the input end of the fourth conveying pipe 16 is communicated with the box body 7 at the lower part of the partition 8, the output end of the fourth conveying pipe 16 is communicated with the steam generator 4, and the pump body 17 is communicated and arranged on the fourth conveying pipe 16;
如图4所示,所述支撑装置包括导轨18和格栅19,导轨18安装在养护室1内侧壁上,格栅19滑动安装在导轨18上;As shown in FIG4 , the support device includes a guide rail 18 and a grille 19 . The guide rail 18 is mounted on the inner wall of the curing chamber 1 , and the grille 19 is slidably mounted on the guide rail 18 .
如图4所示,还包括排气罩20,排气罩20罩装在排出管12顶端开口处;As shown in FIG. 4 , it also includes an exhaust hood 20, which is mounted at the top opening of the exhaust pipe 12;
如图1所示,还包括排水阀21,排水阀21连通设置在养护室1外侧壁下部;As shown in FIG1 , it also includes a drain valve 21 , which is connected and arranged at the lower part of the outer wall of the curing room 1 ;
如图1所示,还包括温度传感器22,温度传感器22连通设置在养护室1外侧壁上;As shown in FIG1 , a temperature sensor 22 is also included, and the temperature sensor 22 is connected and arranged on the outer wall of the curing room 1;
在本实施例中,将水通过进水阀13加入隔板8上部的箱体7内,第一输送管3将蒸汽输送至第一换热箱9内部,第一换热箱9内的蒸汽通过多组换热管10向上输送至第二换热箱11内部,通过第一换热箱9、多组换热管10和第二换热箱11的热传导将箱体7上部的水进行预热处理,同时通过换热将蒸汽进行冷却降温,之后剩余蒸汽通过排出管12向外排出,蒸汽冷凝水通过隔板8的通孔落至箱体7内底部,通过将输送装置开启,使输送装置分别将箱体7上部和箱体7下部的水输送至蒸汽发生器4内部,提高蒸汽冷凝水回收利用便利性,提高水预热处理便利性,通过将截流阀15开启,使箱体7上部的水通过自然流动进入蒸汽发生器4内部,通过将泵体17开启,使箱体7下部的水通过第四输送管16输送至蒸汽发生器4内部,提高装置使用的便利性。In this embodiment, water is added into the box body 7 above the partition 8 through the water inlet valve 13, the first delivery pipe 3 delivers steam to the inside of the first heat exchange box 9, and the steam in the first heat exchange box 9 is delivered upward to the inside of the second heat exchange box 11 through the multiple groups of heat exchange tubes 10. The water in the upper part of the box body 7 is preheated by heat conduction among the first heat exchange box 9, the multiple groups of heat exchange tubes 10 and the second heat exchange box 11, and the steam is cooled by heat exchange. Then, the remaining steam is discharged outward through the discharge pipe 12, and the steam condensed water falls to the bottom of the box body 7 through the through hole of the partition 8. By opening the delivery device, the delivery device delivers the water in the upper part and the lower part of the box body 7 to the inside of the steam generator 4 respectively, thereby improving the convenience of recycling the steam condensed water and improving the convenience of water preheating treatment. By opening the shut-off valve 15, the water in the upper part of the box body 7 enters the inside of the steam generator 4 through natural flow. By opening the pump body 17, the water in the lower part of the box body 7 is delivered to the inside of the steam generator 4 through the fourth delivery pipe 16, thereby improving the convenience of using the device.
本实用新型的一种叠合板蒸汽养护装置,其在工作时,通过支撑装置将需要蒸汽养护的叠合板放入养护室1内部,将养护室1的开口关闭,通过打开蒸汽发生器4将水加热后产生蒸汽,蒸汽通过第二输送管5输送至多组喷头6,使多组喷头6将蒸汽排放至养护室1内部将叠合板蒸汽养护处理,养护室1内的蒸汽通过收集罩2收集并通过第一输送管3输送至冷却装置内,将需要加入蒸汽发生器4内的水首先放入冷却装置内,冷却装置利用水的温度将蒸汽进行降温,并且通过蒸汽的热交换同时将水进行预热,蒸汽冷却后产生的冷凝水通过冷却装置收集,之后将冷凝水排放至蒸汽发生器4内回收利用。The utility model discloses a steam curing device for composite plates. When the device is in operation, the composite plates that need steam curing are placed in a curing chamber 1 through a supporting device, the opening of the curing chamber 1 is closed, and steam is generated by heating water by opening a steam generator 4. The steam is transported to a plurality of nozzle groups 6 through a second delivery pipe 5, so that the plurality of nozzle groups 6 discharge the steam into the curing chamber 1 to perform steam curing on the composite plates. The steam in the curing chamber 1 is collected by a collecting hood 2 and transported to a cooling device through a first delivery pipe 3. Water that needs to be added to the steam generator 4 is first placed in the cooling device. The cooling device cools the steam by using the temperature of the water and preheats the water by heat exchange of the steam at the same time. Condensed water generated after the steam is cooled is collected by the cooling device, and then the condensed water is discharged to the steam generator 4 for recycling.
本实用新型的一种叠合板蒸汽养护装置的蒸汽发生器4、泵体17和温度传感器22为市面上采购,本行业内技术人员只需按照其附带的使用说明书进行安装和操作即可,而无需本领域的技术人员付出创造性劳动。The steam generator 4, pump body 17 and temperature sensor 22 of the composite plate steam curing device of the utility model are purchased on the market, and technicians in the industry only need to install and operate them according to the accompanying instruction manual without the need for creative work by technicians in this field.
以上所述仅是本实用新型的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型技术原理的前提下,还可以做出若干改进和变型,这些改进和变型也应视为本实用新型的保护范围。The above is only a preferred embodiment of the present invention. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the technical principle of the present invention. These improvements and modifications should also be regarded as the protection scope of the present invention.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202420202594.3U CN221697327U (en) | 2024-01-26 | 2024-01-26 | Superimposed sheet steam curing means |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202420202594.3U CN221697327U (en) | 2024-01-26 | 2024-01-26 | Superimposed sheet steam curing means |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN221697327U true CN221697327U (en) | 2024-09-13 |
Family
ID=92640907
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202420202594.3U Active CN221697327U (en) | 2024-01-26 | 2024-01-26 | Superimposed sheet steam curing means |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN221697327U (en) |
-
2024
- 2024-01-26 CN CN202420202594.3U patent/CN221697327U/en active Active
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206207959U (en) | A kind of energy saving biomass particle drying plant | |
| CN221697327U (en) | Superimposed sheet steam curing means | |
| CN112546661B (en) | Slag flushing channel chimney and cooling tower steam combined fog dispersal device and method | |
| CN215373216U (en) | Hot air drying case of epoxy board production usefulness | |
| CN213335377U (en) | Compounding machine oven | |
| CN211339632U (en) | A kind of exhaust gas heat exchange device for stainless steel belt annealing furnace body | |
| CN219211006U (en) | Plastic sheet cleaning and drying device | |
| CN208856928U (en) | A kind of sewage cooling processing unit | |
| CN218380391U (en) | Heat recovery device for drying equipment | |
| CN219399344U (en) | Waste gas recovery system of feed production equipment | |
| CN219656552U (en) | Dedusting condensing device | |
| CN218026274U (en) | Stainless steel strip syllogic solution heat treatment equipment | |
| CN207207409U (en) | A kind of printing machine energy-conserving and environment-protective drying device | |
| CN212205386U (en) | Wood drying kiln with air preheating device | |
| CN209352939U (en) | Heat energy recovery equipment for filter tank of blast furnace water slag system | |
| CN114251929B (en) | Cloth drying device that textile processing used | |
| CN206131029U (en) | Automobile coating radiation area heating furnace waste heat recovery device | |
| CN205255738U (en) | Hot air exchanger of printing machine | |
| CN209352938U (en) | Heat energy recovery system for filter tank of blast furnace water slag system | |
| CN207685420U (en) | A kind of scutcher with functions/drying | |
| CN102692058A (en) | Solar steam jet-type water-cooling air cleaning system | |
| CN219368412U (en) | A quick cooling device | |
| CN207487359U (en) | Dryer | |
| CN222165608U (en) | A heat recovery device for drying the barrel of an injection molding machine | |
| CN223036901U (en) | A furnace heating and furnace body preheating device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |