CN221683888U - Pipe fitting for overhauling explosion pipe - Google Patents

Pipe fitting for overhauling explosion pipe Download PDF

Info

Publication number
CN221683888U
CN221683888U CN202323537639.7U CN202323537639U CN221683888U CN 221683888 U CN221683888 U CN 221683888U CN 202323537639 U CN202323537639 U CN 202323537639U CN 221683888 U CN221683888 U CN 221683888U
Authority
CN
China
Prior art keywords
pipe
prefabricated
gland flange
pipeline
socket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202323537639.7U
Other languages
Chinese (zh)
Inventor
杨建辉
寇伟龙
余洪琼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Honghua Industrial Co ltd
Original Assignee
Sichuan Honghua Industrial Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Honghua Industrial Co ltd filed Critical Sichuan Honghua Industrial Co ltd
Priority to CN202323537639.7U priority Critical patent/CN221683888U/en
Application granted granted Critical
Publication of CN221683888U publication Critical patent/CN221683888U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Non-Disconnectible Joints And Screw-Threaded Joints (AREA)

Abstract

The application belongs to the technical field of pipeline overhaul, and particularly relates to a pipe fitting for overhauling a pipe explosion. This pipe fitting includes: the device comprises a first gland flange, a second gland flange and a prefabricated pipeline; the first gland flange is used for being sleeved on the left side section of the pipeline to be overhauled, and the second gland flange is used for being sleeved on the right side section of the pipeline to be overhauled; and two ends of the prefabricated pipeline are respectively and hermetically connected with two ends of the first gland flange and the second gland flange. The pipe fitting can be overhauled when the water supply pipeline is detonated, and can carry out construction operation with water to finish quick repair.

Description

一种检修爆管用管件A pipe fitting for repairing burst pipe

技术领域Technical Field

本申请属于管线检修技术领域,具体涉及一种检修爆管用管件。The present application belongs to the technical field of pipeline maintenance, and specifically relates to a pipe fitting for repairing burst pipes.

背景技术Background Art

实际生产过程中,由于施工等原因可能造成供水管道爆管,为避免爆管对生产用水带来的影响,需要及时对该段管道进行检修。检修过程中,可能出现管道上游阀门存在通道有漏的情况,需要带水检修。In the actual production process, the water supply pipeline may burst due to construction and other reasons. In order to avoid the impact of the burst on the production water, the pipeline needs to be repaired in time. During the repair process, there may be leakage in the upstream valve of the pipeline, which requires water repair.

实用新型内容Utility Model Content

本申请目的是提供一种检修爆管用管件,解决现有技术中如何实现带水检修的问题。The purpose of the present application is to provide a pipe fitting for repairing burst pipes, so as to solve the problem of how to realize water-carrying repair in the prior art.

实现本申请目的的技术方案:Technical solution to achieve the purpose of this application:

本申请实施例提供了一种检修爆管用管件,所述管件,包括:第一压盖法兰、第二压盖法兰和预制管道;The embodiment of the present application provides a pipe fitting for repairing a burst pipe, the pipe fitting comprising: a first gland flange, a second gland flange and a prefabricated pipe;

第一压盖法兰用于套入待检修管道的左侧段,第二压盖法兰用于套入所述待检修管道的右侧段;The first gland flange is used to be inserted into the left section of the pipeline to be repaired, and the second gland flange is used to be inserted into the right section of the pipeline to be repaired;

预制管道的两端分别与第一压盖法兰和第二压盖法兰的两端密封连接。The two ends of the prefabricated pipeline are respectively sealed and connected to the two ends of the first gland flange and the second gland flange.

可选的,所述管件,还包括:第一预制承插口和第二预制承插口;Optionally, the pipe fitting further comprises: a first prefabricated socket and a second prefabricated socket;

第一预制承插口用于套入所述待检修管道的左侧并通过螺栓与第一压盖法兰相连;所述待检修管道的左侧段连接第一预制承插口的出水口;The first prefabricated socket is used to be inserted into the left side of the pipeline to be repaired and connected to the first gland flange through bolts; the left section of the pipeline to be repaired is connected to the water outlet of the first prefabricated socket;

第二预制承插口用于套入所述待检修管道的右侧并通过螺栓与第二压盖法兰相连;所述待检修管道的右侧段连接第二预制承插口的出水口;The second prefabricated socket is used to be inserted into the right side of the pipeline to be repaired and connected to the second gland flange through bolts; the right side section of the pipeline to be repaired is connected to the water outlet of the second prefabricated socket;

预制管道的两端通过焊接的方式与第一预制承插口和第二预制承插口连接。The two ends of the prefabricated pipe are connected to the first prefabricated socket and the second prefabricated socket by welding.

可选的,第一预制承插口的出水孔直径和第二预制承插口的出水孔直径均不大于所述待检修管道的内径。Optionally, the diameter of the water outlet hole of the first prefabricated socket and the diameter of the water outlet hole of the second prefabricated socket are both no larger than the inner diameter of the pipeline to be inspected.

可选的,第一预制承插口和第一压盖法兰之间形成有空腔。Optionally, a cavity is formed between the first prefabricated socket and the first gland flange.

可选的,第二预制承插口和第二压盖法兰之间形成有空腔。Optionally, a cavity is formed between the second prefabricated socket and the second gland flange.

可选的,第一预制承插口和第一压盖法兰之间安装有盘根。Optionally, packing is installed between the first prefabricated socket and the first gland flange.

可选的,第二预制承插口和第二压盖法兰之间安装有盘根。Optionally, packing is installed between the second prefabricated socket and the second gland flange.

本申请的有益技术效果在于:The beneficial technical effects of this application are:

本申请实施例提供的一种检修爆管用管件,包括:第一压盖法兰、第二压盖法兰和预制管道;第一压盖法兰用于套入待检修管道的左侧段,第二压盖法兰用于套入所述待检修管道的右侧段;预制管道的两端分别与第一压盖法兰和第二压盖法兰的两端密封连接。本申请实施例能在供水管道爆管时对其进行检修,且能带水施工作业,完成快速修复。The embodiment of the present application provides a pipe fitting for repairing a burst pipe, comprising: a first gland flange, a second gland flange and a prefabricated pipe; the first gland flange is used to be inserted into the left section of the pipe to be repaired, and the second gland flange is used to be inserted into the right section of the pipe to be repaired; the two ends of the prefabricated pipe are respectively sealed and connected to the first gland flange and the two ends of the second gland flange. The embodiment of the present application can repair a water supply pipe when it bursts, and can carry out construction work with water to complete rapid repair.

附图说明BRIEF DESCRIPTION OF THE DRAWINGS

图1为本申请实施例提供的一种检修爆管用管件的结构示意图;FIG1 is a schematic structural diagram of a pipe fitting for repairing pipe burst provided in an embodiment of the present application;

图2为一种供水管道爆管的示意图;FIG2 is a schematic diagram of a water supply pipe burst;

图3为本申请实施例提供的一种检修爆管用管件的安装示意图。FIG3 is a schematic diagram of the installation of a pipe fitting for repairing a burst pipe provided in an embodiment of the present application.

图中:In the figure:

1-第一压盖法兰;2-第一预制承插口;3-预制管道;4-第二预制承插口;5-第二压盖法兰。1-first gland flange; 2-first prefabricated socket; 3-prefabricated pipe; 4-second prefabricated socket; 5-second gland flange.

具体实施方式DETAILED DESCRIPTION

为了使本领域的技术人员更好地理解本申请,下面将结合本申请实施例中的附图对本申请实施例中的技术方案进行清楚-完整的描述。显而易见的,下面所述的实施例仅仅是本申请实施例中的一部分,而不是全部。基于本申请记载的实施例,本领域技术人员在不付出创造性劳动的情况下得到的其它所有实施例,均在本申请保护的范围内。In order to make those skilled in the art better understand the present application, the technical scheme in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the embodiments described below are only a part of the embodiments of the present application, not all. Based on the embodiments recorded in the present application, all other embodiments obtained by those skilled in the art without paying creative work are within the scope of protection of the present application.

参见图1,该图为本申请实施例提供的一种检修爆管用管件的结构示意图。Refer to Figure 1, which is a schematic diagram of the structure of a pipe fitting for repairing burst pipes provided in an embodiment of the present application.

本申请实施例提供的一种检修爆管用管件,包括:第一压盖法兰1、第二压盖法兰5和预制管道3;A pipe fitting for repairing a burst pipe provided in an embodiment of the present application comprises: a first gland flange 1, a second gland flange 5 and a prefabricated pipe 3;

第一压盖法兰1用于套入待检修管道的左侧段,第二压盖法兰5用于套入所述待检修管道的右侧段;The first gland flange 1 is used to be inserted into the left section of the pipeline to be repaired, and the second gland flange 5 is used to be inserted into the right section of the pipeline to be repaired;

预制管道3的两端分别与第一压盖法兰1和第二压盖法兰5的两端密封连接。Both ends of the prefabricated pipeline 3 are sealedly connected to both ends of the first gland flange 1 and the second gland flange 5 respectively.

在本申请实施例一些可能的实现方式中,所述管件,还可以包括:第一预制承插口2和第二预制承插口4;In some possible implementations of the embodiments of the present application, the pipe fitting may further include: a first prefabricated socket 2 and a second prefabricated socket 4;

第一预制承插口2用于套入所述待检修管道的左侧并通过螺栓与第一压盖法兰1相连;所述待检修管道的左侧段连接第一预制承插口2的出水口;The first prefabricated socket 2 is used to be inserted into the left side of the pipeline to be repaired and connected to the first gland flange 1 through bolts; the left section of the pipeline to be repaired is connected to the water outlet of the first prefabricated socket 2;

第二预制承插口4用于套入所述待检修管道的右侧并通过螺栓与第二压盖法兰5相连;所述待检修管道的右侧段连接第二预制承插口4的出水口;The second prefabricated socket 4 is used to be inserted into the right side of the pipeline to be repaired and connected to the second gland flange 5 through bolts; the right side section of the pipeline to be repaired is connected to the water outlet of the second prefabricated socket 4;

预制管道3的两端通过焊接的方式与第一预制承插口2和第二预制承插口4连接。Both ends of the prefabricated pipe 3 are connected to the first prefabricated socket 2 and the second prefabricated socket 4 by welding.

在一个例子中,第一预制承插口2的出水孔直径和第二预制承插口4的出水孔直径均不大于所述待检修管道的内径。In one example, the diameter of the water outlet hole of the first prefabricated socket 2 and the diameter of the water outlet hole of the second prefabricated socket 4 are both no larger than the inner diameter of the pipeline to be repaired.

在另一个例子中,第一预制承插口2和第一压盖法兰1之间形成有空腔。第二预制承插口4和第二压盖法兰5之间形成有空腔。In another example, a cavity is formed between the first prefabricated socket 2 and the first gland flange 1. A cavity is formed between the second prefabricated socket 4 and the second gland flange 5.

在具体实施时,第一预制承插口2和第一压盖法兰1之间可以安装有盘根,第二预制承插口4和第二压盖法兰5之间可以安装有盘根。In a specific implementation, a packing may be installed between the first prefabricated socket 2 and the first gland flange 1 , and a packing may be installed between the second prefabricated socket 4 and the second gland flange 5 .

可以理解的是,使用该管件检修爆管时,可以将第一压盖法兰1套入待检修管道左侧段,第一预制承插口2套入检修管道左侧并通过螺栓与第一压盖法兰1相连接。将第二压盖法兰5套入待检修管道右侧段,第二预制承插口2套入检修管道右侧并通过螺栓与第二压盖法兰5相连接。将预制管道3通过焊接的方式与第一预制承插口2和第二预制承插口4连接。最后,在各个压盖法兰和预制承插口间加入盘根,紧固所有螺母,完成爆管管道的修复、密封。It is understandable that when using the pipe fitting to repair a burst pipe, the first gland flange 1 can be inserted into the left section of the pipeline to be repaired, and the first prefabricated socket 2 can be inserted into the left side of the repaired pipeline and connected to the first gland flange 1 by bolts. The second gland flange 5 can be inserted into the right section of the pipeline to be repaired, and the second prefabricated socket 2 can be inserted into the right side of the repaired pipeline and connected to the second gland flange 5 by bolts. The prefabricated pipeline 3 can be connected to the first prefabricated socket 2 and the second prefabricated socket 4 by welding. Finally, packing is added between each gland flange and prefabricated socket, and all nuts are tightened to complete the repair and sealing of the burst pipe.

下面结合一个具体的例子详细说明本申请实施例提供的一种检修爆管用管件的具体使用方法。The specific method for using a pipe fitting for repairing a burst pipe provided in an embodiment of the present application is described in detail below with reference to a specific example.

参见图2,假设供水管道A段C段B段如图2所示,当管道A段B段之间的C发生爆管时,会造成该段漏水,当管道上游阀门通道有漏,可能会又微量水漏至A段B段,可采用本申请实施例提供的一种检修爆管用管件对A段B段管道进行检修。Referring to Figure 2, assuming that sections A, C and B of the water supply pipeline are as shown in Figure 2, when a pipe bursts at section C between sections A and B of the pipeline, this section will leak. When there is a leak in the valve channel upstream of the pipeline, a small amount of water may leak to sections A and B. A pipe fitting for repairing a burst pipe provided in an embodiment of the present application can be used to repair sections A and B of the pipeline.

具体可以包括如下步骤:The specific steps may include:

(1)将爆管C段切除,对A段、B段管道创面进行平整处理;(1) Remove the burst pipe section C and smooth the wound surface of sections A and B;

(2)将第一压盖法兰1、第一预制承插口2套入A段管道;(2) Insert the first gland flange 1 and the first prefabricated socket 2 into the pipe section A;

(3)使用螺栓将第一压盖法兰1和第一预制承插口2连接;(3) Use bolts to connect the first gland flange 1 and the first prefabricated socket 2;

(4)将第二压盖法兰4、第二预制承插口5套入B段管道;(4) Insert the second gland flange 4 and the second prefabricated socket 5 into the pipe section B;

(5)使用螺栓将第二压盖法兰4和第二预制承插口5连接;(5) Connect the second gland flange 4 and the second prefabricated socket 5 using bolts;

(6)根据第一预制承插口2与第二预制承插口5间距制作合适长度的预制管道3;(6) manufacturing a prefabricated pipe 3 of appropriate length according to the distance between the first prefabricated socket 2 and the second prefabricated socket 5;

(7)将预制管道3上侧分别与第一预制承插口2、第二预制承插口5进行焊接;(7) Welding the upper side of the prefabricated pipe 3 to the first prefabricated socket 2 and the second prefabricated socket 5 respectively;

(8)将焊接后的预制管道3、第一预制承插口2、第二预制承插口5下侧旋转至上侧进行焊接,用于防止由于漏水造成的下侧无法焊接的情况;(8) Rotate the lower sides of the welded prefabricated pipe 3, the first prefabricated socket 2, and the second prefabricated socket 5 to the upper side for welding to prevent the lower side from being unable to be welded due to water leakage;

(9)分别在第一压盖法兰1和第一预制承插口2、第二压盖法兰4和第二预制承插口5间加入盘根,并对所有螺栓进行紧固,完成A段B段管道爆管检修。(9) Add packing between the first gland flange 1 and the first prefabricated socket 2, and between the second gland flange 4 and the second prefabricated socket 5, and tighten all bolts to complete the pipe burst inspection of section A and section B.

上面结合附图和实施例对本申请作了详细说明,但是本申请并不限于上述实施例,在本领域普通技术人员所具备的知识范围内,还可以在不脱离本申请宗旨的前提下作出各种变化。本申请中未作详细描述的内容均可以采用现有技术。The present application is described in detail above in conjunction with the accompanying drawings and embodiments, but the present application is not limited to the above embodiments, and various changes can be made within the knowledge of ordinary technicians in the field without departing from the purpose of the present application. Any content not described in detail in the present application can adopt the existing technology.

Claims (7)

1.一种检修爆管用管件,其特征在于,所述管件,包括:第一压盖法兰(1)、第二压盖法兰(5)和预制管道(3);1. A pipe fitting for repairing a burst pipe, characterized in that the pipe fitting comprises: a first gland flange (1), a second gland flange (5) and a prefabricated pipe (3); 第一压盖法兰(1)用于套入待检修管道的左侧段,第二压盖法兰(5)用于套入所述待检修管道的右侧段;The first gland flange (1) is used to be inserted into the left section of the pipeline to be repaired, and the second gland flange (5) is used to be inserted into the right section of the pipeline to be repaired; 预制管道(3)的两端分别与第一压盖法兰(1)和第二压盖法兰(5)的两端密封连接。The two ends of the prefabricated pipeline (3) are respectively sealed and connected to the two ends of the first gland flange (1) and the second gland flange (5). 2.根据权利要求1所述的检修爆管用管件,其特征在于,所述管件,还包括:第一预制承插口(2)和第二预制承插口(4);2. The pipe fitting for repairing pipe burst according to claim 1, characterized in that the pipe fitting further comprises: a first prefabricated socket (2) and a second prefabricated socket (4); 第一预制承插口(2)用于套入所述待检修管道的左侧并通过螺栓与第一压盖法兰(1)相连;所述待检修管道的左侧段连接第一预制承插口(2)的出水口;The first prefabricated socket (2) is used to be inserted into the left side of the pipeline to be repaired and connected to the first gland flange (1) through bolts; the left side section of the pipeline to be repaired is connected to the water outlet of the first prefabricated socket (2); 第二预制承插口(4)用于套入所述待检修管道的右侧并通过螺栓与第二压盖法兰(5)相连;所述待检修管道的右侧段连接第二预制承插口(4)的出水口;The second prefabricated socket (4) is used to be inserted into the right side of the pipeline to be repaired and connected to the second gland flange (5) through bolts; the right side section of the pipeline to be repaired is connected to the water outlet of the second prefabricated socket (4); 预制管道(3)的两端通过焊接的方式与第一预制承插口(2)和第二预制承插口(4)连接。Both ends of the prefabricated pipe (3) are connected to the first prefabricated socket (2) and the second prefabricated socket (4) by welding. 3.根据权利要求2所述的检修爆管用管件,其特征在于,第一预制承插口(2)的出水孔直径和第二预制承插口(4)的出水孔直径均不大于所述待检修管道的内径。3. The pipe fitting for repairing burst pipes according to claim 2, characterized in that the diameter of the water outlet hole of the first prefabricated socket (2) and the diameter of the water outlet hole of the second prefabricated socket (4) are not larger than the inner diameter of the pipe to be repaired. 4.根据权利要求2所述的检修爆管用管件,其特征在于,第一预制承插口(2)和第一压盖法兰(1)之间形成有空腔。4. The pipe fitting for repairing pipe burst according to claim 2, characterized in that a cavity is formed between the first prefabricated socket (2) and the first gland flange (1). 5.根据权利要求2所述的检修爆管用管件,其特征在于,第二预制承插口(4)和第二压盖法兰(5)之间形成有空腔。5. The pipe fitting for repairing pipe burst according to claim 2, characterized in that a cavity is formed between the second prefabricated socket (4) and the second gland flange (5). 6.根据权利要求2所述的检修爆管用管件,其特征在于,第一预制承插口(2)和第一压盖法兰(1)之间安装有盘根。6. The pipe fitting for repairing pipe burst according to claim 2, characterized in that a packing is installed between the first prefabricated socket (2) and the first gland flange (1). 7.根据权利要求2所述的检修爆管用管件,其特征在于,第二预制承插口(4)和第二压盖法兰(5)之间安装有盘根。7. The pipe fitting for repairing pipe burst according to claim 2, characterized in that a packing is installed between the second prefabricated socket (4) and the second gland flange (5).
CN202323537639.7U 2023-12-22 2023-12-22 Pipe fitting for overhauling explosion pipe Active CN221683888U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202323537639.7U CN221683888U (en) 2023-12-22 2023-12-22 Pipe fitting for overhauling explosion pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202323537639.7U CN221683888U (en) 2023-12-22 2023-12-22 Pipe fitting for overhauling explosion pipe

Publications (1)

Publication Number Publication Date
CN221683888U true CN221683888U (en) 2024-09-10

Family

ID=92617316

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202323537639.7U Active CN221683888U (en) 2023-12-22 2023-12-22 Pipe fitting for overhauling explosion pipe

Country Status (1)

Country Link
CN (1) CN221683888U (en)

Similar Documents

Publication Publication Date Title
CN207729133U (en) Gas medium pipe flange reveals online processing device
CN202381681U (en) Process hole blocking flange
CN202834568U (en) Pipeline fast pressure plugging device
CN205298949U (en) Disconnect -type grout clamp tip sealing device
CN202065608U (en) High pressure pipe plugging device
CN201281200Y (en) Guarantee and reinforcement structure of gas pipeline
CN221683888U (en) Pipe fitting for overhauling explosion pipe
CN205479957U (en) Novel root leaking stoppage device
CN108980510B (en) A kind of device and method for plugging on-line leakage of gas pipeline network
CN212107457U (en) Leakage stopping structure with pressure for leakage point of gas pipeline
CN107131389A (en) The online quick-speed first-aid repair method of running water metal tube seepage
CN204922377U (en) Device that quick maintenance pipeline was revealed
CN216952102U (en) Double-sealing connection structure for lining pipe
CN108051288A (en) A kind of PE pipelines pressue device and method
CN209543935U (en) Nuclear power plant pipeline defect treatment device
CN221075685U (en) A composite sleeve
CN221797583U (en) A device for sealing damaged cooling water pipes inside blast furnace copper cooling stave
CN106194126A (en) The integral method gone into operation for high sour gas well debugging
CN205226757U (en) A positive left -hand thread ferrule connection structure for interior outer anti -corrosion pipeline
CN219605542U (en) A gas turbine control oil source system
CN205078971U (en) No weld bond ji huiguandao of high pressure
CN221800936U (en) A flange
CN220724228U (en) Grouting and plugging device for box making of blast furnace air supply system pipeline
CN116146802B (en) A connection structure and installation method of prestressed steel cylinder concrete pipe
CN206280659U (en) One kind is without leak source Quick overhaul filling pipe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant